NEW ADMIN/ARCHIVE & DISPLAY BLDG 2004-2014

Newbldg2004 2014

Embed Size (px)

DESCRIPTION

New Building 2004-2014

Citation preview

Page 1: Newbldg2004 2014

NEW ADMIN/ARCHIVE & DISPLAY BLDG

2004-2014

Page 2: Newbldg2004 2014

2007

The pad was poured in July 2004 and in 2007 the lower section was raised by the local high school carpentry crew.

Page 3: Newbldg2004 2014

2008

In 2008 museum visitors and local wildlife enjoyed the new structure at the rear of the site.

Page 4: Newbldg2004 2014

2008

The roof was installed in the fall of 2008.

Page 5: Newbldg2004 2014

2009

In 2009 we learned that the roof would need snow stops

Page 6: Newbldg2004 2014

2010

By 2010 the windows and snow stops were installed

Page 7: Newbldg2004 2014

2011

2011 saw much activity in behind the cedars. The new porch was added….

Page 8: Newbldg2004 2014

2011

and water/electricity were roughed in.

Page 9: Newbldg2004 2014

2012

The Services Upgrade (water, sewer, power, communications) was completed in May/June.

Page 10: Newbldg2004 2014

2012

The Exterior siding was donated and installed in the summer of 2012

Page 11: Newbldg2004 2014

2012

Landscaping work was completed and the site was extended to its legal survey line in the NE corner.

Page 12: Newbldg2004 2014

2012

The site was graded and gravel was spread and the equipment was placed

Page 13: Newbldg2004 2014

2013

The porch deck was laid and the work on the interior began over the winter

Page 14: Newbldg2004 2014

2013

The insulation was completed over the winter.

Page 15: Newbldg2004 2014

2013

The interior was dry-walled after the HVAC system was installed.

Page 16: Newbldg2004 2014

2013

The exterior doors were painted and installed.

Page 17: Newbldg2004 2014

2013

Painting, trim and carpet installation is underway and the fire system components.

Page 18: Newbldg2004 2014

2013

The interior finishing upper level includes an Office, Processing Rm, and Archive Rm

Page 19: Newbldg2004 2014

2013

The lower level includes a Display space, Washroom, and Utility closet

Page 20: Newbldg2004 2014

2013

By the end of April – the building was ready to move into…after a little construction clean-up.

Page 21: Newbldg2004 2014

2013

Robert Valcourt got us all set up with our new computer system and Fred Provost built a new desk for the office.

Page 22: Newbldg2004 2014

2013

Michel Henry got the lights on and Fenner hooked up the lift station pump system.

Page 23: Newbldg2004 2014

2014

All Moved in

Page 24: Newbldg2004 2014

2014

All Moved in

Page 25: Newbldg2004 2014

2014

This project was made possible with funding from Heritage Canada. Seed money was provided by local government and local businesses and members. Thanks to all who have supported this project since 2004.