SOFTWARE TESTING

It is the process of checking any software application is meeting all the customer requirements or not

QUALITY

When we have reached validating all the requirements and found application is defect free then we can say project or product is quality.

PROJECT

Any software application is developed based on the single customer requirement then we can say it is a project.Ex: ICICI Application, Stitching Shirt

PRODUCT

Any software application is developing based on the software industry requirement then we can say it is a product.Ex: Windows XP, GMAIL

Durgasoft

Page 3: Manual Testing Material by Durgasoft

QUALITY ASSURANCE

It is the process of verifying all the standards and processes of company for giving right product to the customer.We are going to verify are we building the right product or not.

QUALITY CONTROL

It is the process of validating the application, based on the requirements and verify are we building the product right or not.

VERIFICATION

It is a technique in quality assurance and we will verify the process for delivering the right product to the customer.

VALIDATION

It is a technique under quality control, here we will do the actual testing for delivering quality software to the customer.

Durgasoft

Page 4: Manual Testing Material by Durgasoft

SOFTWARE DEVELOPMENT LIFE CYCLE

SDLC is divided into 6 phases for developing any software , we have to choose one of the process for successfully delivering quality product to the customer. The phases as follows:

RequirementAnalysisDesignCodingTestingDelivery and Maintenance

REQUIREMENT

Participant: Business Analyst, PM, Technical Lead, Development Lead

Process: Based on the appointment date given by the client along with project manager, development lead, technical lead( all are optional ) along with business analyst will go to the client location and gather all the requirements of a customer.

After gathering the requirements from the client, they will come back to the company and they will start documenting the requirements which is easily

Durgasoft

Page 5: Manual Testing Material by Durgasoft

understandable to all the teams. After that business analyst will share documented requirements to the customer, he will verify all his requirements are covered or documented and he will update to the business analyst if at all any requirements need to updating documented requirements.Once business analyst will get the approval from the client then he will give sign off to the requirement document.

Output: SRS - Software requirement specificationBRS - Business requirement specificationFRS - Functional requirement specificationBD - Business documentBDD - Business design document

Durgasoft

Page 6: Manual Testing Material by Durgasoft

ANALYSIS PHASE

1. Feasibility Study2. Selection of Technology and Environment3. Requirement Analysis4. Team Building5. Understanding Document6. PlanningFeasibility Study:

As per the budget and time provided by the bidding teams here we are going to cross verify whether we are able to complete entire project by above budget and time.

If there discussion demands any changes in the budget or time with the help of business analyst they will take it to the customer.

Selection of technology and environment:Project manager will discuss with the architects of development lead for

selecting the which technology is suitable for our project along with the environment based on the type of project.

Requirement Analysis:project manager , development lead, test lead are going to discuss with the

business analyst for understanding of the requirements more clearly, if at all they are having any doubts or queries they are going to ask in this session.

Durgasoft

Page 7: Manual Testing Material by Durgasoft

Team Building:Based on the understanding of the requirements in the above analysis phase,

they are going to find out how many number of resources are required for both development and testing.

Based on the availability of resources they may use from the bench strength or they may recruit from outside.

Understanding Document:For understanding all the requirements business analyst is going to provide a

requirement sessions to the both development and testing teams.(nearly it will be for 7 to 10 days)

Based on the understanding they have to prepare their own understanding document which is going to use for giving reverse knowledge transfer presentation to the client.

Planning:With the help of development lead and testing lead, project manager is going to

prepare plan and he will send it to the client for approval.

Participants: BA, PM, TL, Test Lead, Development Team, Test Team, ArchitectsOutput: Understanding Document and Project Plan

Durgasoft

Page 8: Manual Testing Material by Durgasoft

Note: requirement query document is the document containing questions of both development and testing people and then either development or test lead are going to share this document to business analyst for update.

DESIGN PHASE:

Participants: Architects

Process: Based on the understanding of the requirements architects will prepare the design documents which are going to use for developing the GUI part of the application along with understanding of the application flow.

Output:1. Design document

a) High level design documentb) Low level design document

Note: unified modelling language is used for creating the diagrams, flow charts with the effective manner and easily understanding to the all team members.

Durgasoft

Page 9: Manual Testing Material by Durgasoft

CODING PHASE

Participants: development team

Process: Developing the programming statements

Output: Programming statements (build)

Note: it is a part of software containing some features and deliver to the testing team for verifying the application functionality

SRN – Software/Service Release Note

TESTING PHASE

1. Test Plan2. Test Scenario and test cases3. Test Case execution4. Results analysis5. Bug Tracking6. Reporting

Durgasoft

Page 10: Manual Testing Material by Durgasoft

Testing is the process for ensuring quality of the software and update to the client on periodic basis about status of this software application.

Test Plan:It is a document containing all the project activities under testing.This document will tell us when and what need to do by the testing team.Based on this document we are going to start activities accordingly.

Test Scenarios: Usecases: Usecases are having diagram representation of actors, actions involved as per the requirements(Architechs will prepare these diagrams).

Scenarios: These are high level verification points or high level ways of testing the entire

application.We need to derive test scenarios from requirements document and knowledge

of all the requirements.

Durgasoft

Page 11: Manual Testing Material by Durgasoft

Test Cases:These are low level verification points which we need to derive from test

scenarios.There is no mandatory need to derive few test cases. We can derive any number

of test cases based on the requirements.Test cases having unique id, test steps, description, expected results, actual

results, comment section which will allow us to easily understand what we need to verify in our application.

Test Case Execution:Here we are going to validate all the low level verification points and going to

justify what is the quality of part or entire application.Based on this if at all any test cases not meeting expected result then we have to

update issue to the development team.Once development team fix above raised issues, then they will update to the

testing team so that we need to test again same feature whether it is working according to the requirements or not.

Durgasoft

Page 12: Manual Testing Material by Durgasoft

Status Reports:Based on the above test case execution, we need to update to the client

through daily status reports for the update daily activities and weekly status reports for the update of week activities.

Based on these reports client will understand what is the stability of the part or entire application.

100% Quality Software:Based on the test case execution and if we have done with all the test cases

and there is no more number of defects opened then we can deliver 100% quality software to the client and if we are able to do all these activities as per the test plan then we can say we are giving quality software to the client in on time and on budget.

Delivery and Maintenance Phase:

Delivery:Whenever testing phase is completed, it means all the test cases need to

execute by the testing team and there are no open defects with the development team then we are going to deliver quality software to the client.

Based on the client, with the help of his own team going to deploy it in real time environment so that it can be used by the end users.

Durgasoft

Page 13: Manual Testing Material by Durgasoft

Maintenance:

Whenever end users keep on working on our software, when they get any issues which leads to stop their business then with the help of client or vendors they are going to post those all issues to the specific development team for fixing.

The same process will continue number of years as per mentioned in SOW(Statement of Work).

Durgasoft

Page 14: Manual Testing Material by Durgasoft

Testing methodology

The number of methods of testing we used to do for getting quality on entire application to find whether it is working according to the requirements or not.There are 4 different methods we can use for ensuring application quality.

1. Static Testinga. Reviewb. Walk-throughc. Inspection

2. White Box3. Black Box4. Grey Box

1. Static Testing:It is the type of testing done by the people who are having 100% knowledge on

entire project requirements.Here we are going to check entire process and documentation as per the

company standards and process.

Durgasoft

Page 15: Manual Testing Material by Durgasoft

Review:

It is type of verification technique to check something is as per the requirements, whether it is prepared according to the all the standards or not.

It is informal meeting and there is no prior intimation to the team members.Review are divided into 2 types1. Peer Review2. Lead Review

Peer Review: This is the review done by the same designation people, will update us any enhancements on the same document.

Lead review: This is the review done by all the test leads, he will go through the all the team members documents and will update whether we are on right track to deliver the right product to the client.

Walk-through:It is more formal than review, here we are going to discuss about specific

document (requirements, test scenarios, test cases, test case results, defects ) whether these all are according to the client requirements are not, we are going to verify.

Moderator will be sending a clear note to the members who are required with prior intimation.

Durgasoft

Page 16: Manual Testing Material by Durgasoft

Inspection:It is more formal then walk-through, separate quality assurance(QA) team is

going to inspect our standards and processes, whether we are following or not.If at all they found anything not following by the company standards it should

be escalated to the higher management.

Ex: 1) Maintaining documents in configuration management tool2) Using the company standard format for all documentations.3) Sending the daily and weekly status reports to the client ( as per the discussion with the client)

These all process verification will be handled by auditing department (QA Team)

White Box Testing:It is type of testing done by the development team for restricting number of

defects moving from development phase to testing phase.Development team will cross check or do testing through programming

source code and if at all they find any issues they will update or for those all and updated software will be delivered to the testing team.

Durgasoft

Page 17: Manual Testing Material by Durgasoft

Black Box Testing: It is a type of testing done by all the testing team through application GUI

based on the client requirements, they are able to find application is working according to the given requirements.

Before getting the software for testing team will prepare the test scenarios, test cases and perform the execution so that they are able to justify whether it is working according to the requirements or not.

Grey Box Testing:It is type of testing done by the team who are having knowledge on both

programming (developing the source code) and how to test the application (writing test scenarios, test cases and execution).

Earlier days grey box testing will be done by the development team due to budget saving with that process they could not able to deliver the quality projects to the customers hence they are maintaining separate testing team.

Durgasoft

Page 18: Manual Testing Material by Durgasoft

Testing Levels

Software development life cycle(SDLC), once software is developed by the development team is giving to deliver to the testing team then we have to perform below levels of testing for ensuring 100% quality for his project/product.

1. Module Level Testing2. Integration Level Testing3. System Level Testing4. User Acceptance Testing5. Pre-production Testing6. Production or Production validating Testing

Module Level Testing:Based on the features or functionality developed in the number of builds, testing teamhave to test all these features or functionalities individually, they have to ensure eachfeature or functionality or collection of features working according to the clientrequirements.

Module: It contains collection of features and we are able to perform one specificOperation or activity. In this level of testing we are going to get quality on all modulesindividually.

Durgasoft

Page 19: Manual Testing Material by Durgasoft

VENKATA KRISHNA

Integration Level Testing:Once module testing is done, we are going to verify interrelations between

individual modules whether data is passing from one module to another modules or not.Here we will test all the modules integration and ensure entire application is

integrated very well.

System Level Testing:Testing team is going to test entire application end-to-end and they have to

ensure all the requirements are covered and working according to the client expectations.

We are going to test entire system on multiple browsers and multiple operating systems and we have to ensure entire system is working according to the client requirements.

Note: System testing justifies whether we are able to deliver quality product to the client and when we can deliver.

User Acceptance Testing (UAT):It is a type of testing done by the client side testing team to ensure one more

time whether all functionalities are covered and those all are working according to the client requirements.

UAT team will perform End-to-End testing in front of the client at offshore location is called alpha testing. Here they will ensure entire system functionality according to the requirements.

Page 20: Manual Testing Material by Durgasoft

Developed software will be taken to the client location or on-site location and application will be tested in this location with the help of installation engineers (Deployment engineers) and they will continue one more round of testing for ensuring application quality and stability in his location. This type of testing is beta testing.

Pre-production Testing:It is a type of testing done by the client side team to ensure system is working

and stable in the production simulated environment.It will be similar to the production testing but before going to deploy it in

production, we will create duplicate environment to the production and we will ensure application is stable.

Production Testing:It is a type of testing done on real time environment or live environment, along

with the end users, client side testing team will perform End-to-End testing to ensure everything is working according to the client expectations.

Durgasoft

Page 21: Manual Testing Material by Durgasoft

White Box Testing Level

Before application is delivered to the testing team, development team will perform few types of testing's for restricting number of defects moving from development phase to testing phase.

1. Unit Testing2. Integration Level Testing

Unit Testing:It is a type of testing done by the development team by checking every piece

of code and ensure every unit is working according to the requirements.

Technical Integration Level Testing:It is a type of testing done by the development team through source code for

checking inter relations between multiple modules whether those are working or inter relations are happening or not.

Development team will follow few types of integration levels for integrating multiple modules.

Top Down ApproachBottom Up ApproachHybrid Approach Durgasoft

Page 22: Manual Testing Material by Durgasoft

Top Down Approach:Started developing modules or features from high priority to low priority or

from parent to child and integrated accordingly.Here integration will be happened from top to bottom till end of all the parent

and child modules.

Bottom Up Approach:Development team will start developing from low priority or child module to

high priority or parent module and integrated accordingly from bottom to top till end of all the parent and child modules

Parent1

Parent1 Parent1

Child2 Child1 Child3 Child n

Durgasoft

Page 23: Manual Testing Material by Durgasoft

Parent1

Parent1 Parent1

Child2 Child1 Child3

Hybrid Approach:It is a type of approach covers combination of both top down and bottom up

approaches.The way development team is comfortable for developing either parent or child,

they will integrate both the ways till end of all the parent and child modules.

Parent1

Parent1 Parent1

Child2 Child1 Child3 Durgasoft

Page 24: Manual Testing Material by Durgasoft

Stub and Driver:

It is a temporary program developed by the development team for replacing the mandatory module which is required for testing people to test all the integrated modules.

It will work as a normal behavior and based on the SRN document. We have to find what are all the features or functionalities this temporary program is going to provide.

If it is a top down approach integration, then we are calling this temporary program as stub.

If it is a bottom up approach integration, then we are calling this temporary program as driver.

Durgasoft

Page 25: Manual Testing Material by Durgasoft

SDLC Models

Waterfall Model:

Requirement

Analysis

Design

Coding

Testing

Delivery & Maintenance

Durgasoft

Page 26: Manual Testing Material by Durgasoft

In waterfall model all the phases will move from top to bottom and should not go bottom to up.Once completion of each phase then only we are moving to the next phase.How the water falls from top to bottom, in the same manner this model going to work from requirements to delivery and maintenance phase.

Advantages:For any project if all the requirements are stable, then this is the suitable model to deliver quality product.Minimal budget is required for the project if requirement are stable.

Drawbacks:It will not allow moving from bottom to up when there is a change in requirement then again we have to start from requirement phase.Verification technique will not be available so that we cannot ensure everything is happening in each phase according to the requirement. Hence all the issues leads to find in testing phaseFor any project which are having unstable requirements, it is not at all suitable, if we continue then it will become a deliver quality product in unexpected time and lot of budget required.

Durgasoft

Page 27: Manual Testing Material by Durgasoft

Spiral Model:This model is going to overcome few of the disadvantages getting in the waterfall model.In this model we will deliver entire project in multiple cycles and we are going to deliver few of the requirements in each cycle so that in ‘n’ number of cycles we will deliver entire project. If at all client asked us to change or update any of the requirements, we should need to incorporate and continue with the next cycle.

Advantages:High visibility will be there for client on his product or project.For every cycle client will be receive some part of the application based on that client may give feedback to the company for updating or changing the any of the features.Risk management will be handled properly for each cycle, it will allow us to deliver in ontime, if at all we did not get any major changes from the client.

Drawbacks:Defect identification will be happen only in the testing phase.More time consuming.More budget is required.

Durgasoft

Page 28: Manual Testing Material by Durgasoft

Prototype Model:Based on the requirements received from the client company is going to start preparing prototype by covering all the requirements. Company will share the same to the client for approval.If at all client reviewed and updated few more changes then we have to update our prototype and share it with the client. This process will continue till either acceptance or rejection of the prototype.

Requirement

Analysis

Designing Coding

Testing

Delivery and maintenance

1

n

Durgasoft

Page 29: Manual Testing Material by Durgasoft

If the client rejected the prototype then we have to stop our work on it.If at all he accepted the prototype then we have to kick start with the actual work on it.

Advantages:Client visibility will be more.Scope of getting the projects from the client will be more based on the client satisfaction on prototype.

Requirement

Analysis

Prototype

Client

Stop Waterfall model

Accept Not Accept

Send

Durgasoft

Page 30: Manual Testing Material by Durgasoft

Drawbacks:The prototype cost will be taken care by the company, if at all client rejects the Prototype, company is going to loose entire cost spent on prototype.Mistake done in requirement, analysis, design, coding are going to find in testing phase, due to this we may deliver in ontime or not.

V – V MODEL

We can also call it as a verification and validation model.By using verification in all the phases we are going to verify all the documents and standards whether we are on right track to deliver right product to the customer.Testing team involvement will be there right from starting of the project.Parallely to all the phases we will involve and we will design various scenarios and test cases.Once we get the build from development team we need to use designed test cases and go ahead with test case execution.

Durgasoft

Page 31: Manual Testing Material by Durgasoft

Verification Validation

Requirement UAT

Analysis

Designing

Coding Unit Testing

Integration Testing

System Testing

Advantages:

With the verification we can cross check in every phase whether we are on right track as per the requirement.Testing team will be involving from start, any deviations to the requirements they can identify in the earlier stage.We can assure quality product or project deliver to the client in ontime and onbudget.

Durgasoft

Page 32: Manual Testing Material by Durgasoft

Disadvantages:

Stable requirements are required to continue this model.More budget is required due to maintaining testing team from beginning of the project.

AGILE MODEL

For any projects/products which are not having stable requirements then they have to approach agile model as it is most suitable and more visibility to the client on daily basis.

Scrum master is the person who is going to manage all the testing and development activities on daily basis, he will monitor and ensure every thing is going on as per the sprint time lines.

Product owner is the person from client side and he will cross check all the activities from both development and testing team are working according to the client requirements.

Durgasoft

Page 33: Manual Testing Material by Durgasoft

All the requirements are splited into stories by the scrum master and he will derive tasks from the stories based on the priority to the client and depends on the time lines given by the team(Estimations) and he will include all those tasks into that sprint and according teams needs to work.Usually sprint duration will be nearly 2-3 weeks.

This process will continue till end of all the stories given by the client.

Project requirements

Stories (scrum masters) Tasks Testing

Sprint

Delivery

Testing

Coding Scrum Meeting

Design

Analysis

Divide High priority Sprint Demo

Enhancements

DefectsDurgasoft

Page 34: Manual Testing Material by Durgasoft

Scrum Meeting/Daily Stand up meetings:

This is the meeting conducted by the scrum masters with development and testing teams for tracking the project/product development activities.If at all anybody struck with any issues they can update those issues and resolutions will be found in this meeting.

Here every body need to update tasks covered on that day and planning of tomorrow and regarding the issues. AdvantagesHigh visibility will be there to the client

On daily basis client will check this product or project features if at all he found to change any thing then immediately he can update to the scrum master so that development teams will try to change those feature instantly in coming sprints.

It wont take more time for the development and testing activities.Disadvantages

Poor documentation will be there

Both development and testing team will be allocated with some tasks. So that teams feels more busy with work.

Durgasoft

Page 35: Manual Testing Material by Durgasoft

TYPES OF ENVIRONMENTS

The place or area where we are going to develop the application or accessing the application is called environment. Four types of environment will be there

1. Standalone environment or 1-tier architecture2. Client-server environment or 2-tier architecture3. Web environment or 3-tier architecture4. Distributed environment or n-tier architecture

1. Standalone Environment:

Any application or software is installing or using in single system for personal usage then that environment is called standalone environment.We cannot access the data from other systems because it will be limited to specific system.

PL

BL

DLDurgasoft

Page 36: Manual Testing Material by Durgasoft

2. Client Server Environment:

The application or software which we are able to access in the specific area or limited environment is called client server environment.We are making one system as a server and installing the application after that it will allow us to access the application from the server

Ex: companies internal sites, siri technologies

DL

BL

PL

3. Web Environment:

Any application or software which we are able to access from world wide web that environment is called web environment.Application will be displayed into the server and it will be linked with the internet by making or giving a URL based on that we can access the application by using the same URL in the internet.

SYSTEMSERVER

Durgasoft

Page 37: Manual Testing Material by Durgasoft

PLBLDL

SERVER SERVER CLIENT

4. Distributed Environment:

Any application or software is installing or deploying into the server system in multiple locations using many business logic layers and database layers is called distributed environment.In this environment even though load is getting increased and though one or more servers will be down, then automatically requests will connect to the other business logic layers and database layers and it will give the response.Ex: Gmail application, Google

PLPLPL

BLBLBL

DBLDBLDBL

SERVER SERVER CLIENT

Durgasoft

Page 38: Manual Testing Material by Durgasoft

TYPES OF TESTING

1. Smoke Testing2. Sanity Testing3. Retesting 4. Regression Testing5. Compatibility Testing6. Performance Testing7. Install/Uninstall Testing8. Adhoc Testing9. Usability Testing10. Security Testing11. Functional Testing12. GUI Testing13. End to End Testing14. Recovery Testing

Durgasoft

Page 39: Manual Testing Material by Durgasoft

1. Smoke Testing

It is type of testing conducted by the testing team for checking build stability whether it is meeting the acceptance criteria or not

In this testing we are going to verify all the basic functionalities are working or not based on this we will accept or reject the build.

In smoke testing, atleast 70-80% of the basic functionalities should work, then only we can say that it meets the acceptance criteria, accordingly our test lead will send a mail to development lead saying that we are accepting the build for major testing.

If build is not meeting the acceptance criteria then our test lead will send a mail to development lead saying that rejecting the build by specifying what all the features are not working.

Usually smoke testing will be done in 2-3 hours, but based on the company, it may vary.

Durgasoft

Page 40: Manual Testing Material by Durgasoft

2. Sanity Testing:

It is used for finding the build stability for accepting the build for major testing by executing all the basic functionalities related test cases and next level major test cases.

If it meets acceptance criteria, then we will accept the build for major testing.

3. Retesting:

It is first type of testing after smoke testing, whenever we have started our test case execution, then it there will be a chance for finding deviations in our application, then we have to update, these deviations or issues or bugs or defects to the development team.

Development team will cross check all the deviations and they will fix these all issues and sending back to the testing team for testing again to find whether fixed deviations are working according to the requirements are not. This type of testing is called retesting.

4. Regression Testing:

It is type of testing used for finding the stability of the entire application.

This is used for finding the impacted features due to the fixing of the defects or addition of the new features. Durgasoft

Page 41: Manual Testing Material by Durgasoft

With these above two cases we are having chance of getting impacted, with this existing functionalities will not work even though changed feature or added feature are working.

After retesting we have to do the regression testing

ex: car repair of head lights

5. Compatibility Testing:

This type of testing comes under system level testing.Here we are going to check entire application is supporting multiple software, hardware, browsers.

Compatibility will give us result our application is supporting all the browsers, operating system, environments, based on the client request.

Note: what are all the environments we have to check in the compatibility given by the client.

Durgasoft

Page 42: Manual Testing Material by Durgasoft

6. Performance Testing:

It is used for finding the application response time based on the multiple sets of load putting on the application.

Application is giving response in less time with multiple set of loads then we can say application performance is very high and it will be satisfactory to the customers.

If at all application is taking more time for giving the response then we can say application performance is very poor.

Performance testing is combination of 1. Load testing 2. Stress testing

Load Testing:By giving the multiple set of loads, analyzing the performance time or response time is called load testing.Here in this testing we are going to find application response times for the different level of loads.Stress Testing:By giving different set of loads continuously for some time, we are going to find application stability and where it is getting crashed will be analyzed in the stress testing.

Durgasoft

Page 43: Manual Testing Material by Durgasoft

If at all they find peak level of load for the application is bearing, then they have to follow some other ways to overcome the same.

Note: for the application which are used by the number of customers or end users globally then they have to concentrate more on performance testing for giving high satisfaction to the customers or end users.

7. Install/Uninstall Testing:

Install Testing:Here in this section we are going to find how our product is installing properly or not for multiple hardware, software is called installation testing.This testing will be available only for the products which are used in standalone environments

Uninstall Testing:If at all we install any product then it is going to create supporting data into our machine by using uninstallation testing we have to ensure supported data is getting removed properly or not.

Durgasoft

Page 44: Manual Testing Material by Durgasoft

8. Adhoc Testing:

Due to the lack of time, we could not able to manage the testing activities effectively then adhoc testing will be the testing playing major role.

Here we are not maintaining documentation like test scenario, test cases because due to insufficient time.

Adhoc testing is the testing done by the experienced testers based on experience they are having understanding on the requirements.

Note: adhoc testing will not give 100% quality application but as per the client request we have to do and deliver application to the client.

9. Usability Testing:

It is the type of testing for finding the application graphical user interface (GUI) is user friendly or not.

Here we have to justify the entire application GUI using client or end user perspective whether it is easily understanding to the end user or not.

For doing the usability testing we need to have end user expectation on our application.Durgasoft

Page 45: Manual Testing Material by Durgasoft

Note: UAT team is having high visibility on client or end user expectations then it will be easier for them to do the usability testing.

10. Security Testing:

Security is nothing but how effectively protecting the entire application is called security.

In this testing we are finding or checking how much application or network is getting protected from unauthorised sources.

Majorly we will concentrate on below three types of testings under on security1. Authentication2. Network3. Application URL

Authentication:Here we will check whether the application is successfully protecting from unauthorised people when they do some of the miscellaneous actions on it.

Network:Here we are having bunch of systems connected to the network, we have to protect the information of entire network , For that we have to use the firewalls for restricting unauthorized sources.

Durgasoft

Page 46: Manual Testing Material by Durgasoft

Application URL:Here we are going to check applications security based on the URL, getting the URL from other source and trying to perform other operations . It should restrict for the unauthorized sources, it means should not allow to access the information.

11. Functional Testing:

It is the type of testing for finding application behaviour.

By using this testing we can justify whether entire application functionality is working according to the client requirements or not.

By doing some actions or operations on our application, we have to check application behaviour is according to the client expectations.

It is divided into 2 types:1. Functional Positive Testing2. Functional Negative Testing

Durgasoft

Page 47: Manual Testing Material by Durgasoft

Functional Positive Testing:We are checking functionality of the entire application with positive data or valid Data and we have to justify whether our application is working according to the client

expectations.

Ex: entering valid username, password into gmail login page

Functional Negative Testing:By doing some operations or activities with the negative data or invalid data, we have to find out whether our application is restricting or not.

Ex: entering invalid data into gmail login page

12. GUI Testing:We are checking GUI of the application according to the client specifications given in SRS document.

Here we will do testing on GUI elements, such as all the elements or controls are properly displaying, alignment is fine or not, Tab Order.

Ex: in gmail username, pwd field, login and Cancel buttons are displaying or not.

Durgasoft

Page 48: Manual Testing Material by Durgasoft

13. End to End Testing:It is a type of testing where we can test all the functionalities of entire application to justify every feature is working according to the given client requirement.

Based on this testing we can find stability of the entire system with one environment.

Note: It is come under System Testing. Combination of End to End Testing and Compatibility testing is called System Testing.

14. Recovery Testing:It is a type of testing used for finding the capability of the application, whenever it is getting crashed whether we are able to recover automatically or not.

If at all any application is not getting recovered then we can say it does not have enough quality.

Note: For Security Applications, testing team need to concentrate by making forcible application crashes and we have to check whether it is getting automatically recovered or not.

Durgasoft

Page 49: Manual Testing Material by Durgasoft

SOFTWARE TESTING LIFE CYCLE (STLC)

In STLC software testing is playing major role for delivering the quality product to the client.We should plan our testing activities accordingly based on the client request.Testing phase is divided into 6 phases:

1. Test Planning2. Test Development3. Test Execution4. Result Analysis5. Defect Tracking6. Reporting

Test Planning:We are going to plan our testing activities for entire project along with scope, staffing,schedule.By including all above test lead is going to prepare test plan document and he will share it to the client for approval.Once we get the approval from the client we are going to start our actual testing activities.

Note: test plan is the first deliverable to the client from testing team.

Durgasoft

Page 50: Manual Testing Material by Durgasoft

Test Development:

Based on the test plan we are going to start writing test scenarios, test cases.

We have to complete preparing scenarios and test cases as per the schedule mentioned in our plan.

Test Execution:

By using test cases, once we get the build from the development team then we have to start performing all these validations to find what are all working and what are all not working.

Result Analysis:

Based on the test case execution, here we are going to verify the test case results and analyzing the results for finding genuine issues.

Defect Tracking:

If at all any failed test cases we are going to update all those issues to the development team by using any of the tools like bugzilla, jira, QC, testopia, tfs(Team foundation server) ,……….. Durgasoft

Page 51: Manual Testing Material by Durgasoft

Reporting:

Based on the above phase and test cases results, defect reports, we have to update to the client on stability of the application.

We have to report on daily basis, weekly basis, monthly basis based on the client request.

Durgasoft

Page 52: Manual Testing Material by Durgasoft

TEST PLAN

Test Plan Contents:

1. Introduction2. Purpose3. Scope and Goals4. Features that are not to be tested5. Definitions and Abbreviations6. References7. Product/Project Architecture8. Test Environment

a) Required Hardwareb) Required Software

9. Assumptions10. Constraints11. Test Coverage

a) Functional Testingb) User Interface Testingc) Performance Testingd) Security Testinge) Recovery Testingf) Compatibility Testing Durgasoft

Page 53: Manual Testing Material by Durgasoft

12. Test Strategy / Approach13. Test Deliverables14. Human Resource Requirement

a) Staff Requirement for Testingb) Roles and Responsibilities

15. Test Schedule16. Readiness Criteria17. Acceptance Criteria18. Defect Classification19. Defect Management20. Testing Resumption Criteria21. Tools and Techniques22. Risk Identification and Contingency Planning23. Test Case List24. Test data25. Traceability Matrix

Durgasoft

Page 54: Manual Testing Material by Durgasoft

1. Introduction:Here we are going to update overview of the test plan document. It will describe

basic thing of this document.

2. Purpose:Here in this section we are going to update use of this document more clearly

which is understandable to everybody in our project.

3. Scope and Goals:This section having all the features in our scope for testing and what are all goals

we have to achieve in time manner.

4. Features that are not to be tested:Here in this section we are having features list which are out of scope.

Note: Mainly in security application, the client will give non-security features to the companies and he will take care testing of the security features.

5. Definitions and Abbreviations:Here we are having all the short names and their abbreviations

Ex: SIT = System Integration Testing UAT = User Acceptance Testing PVT = Production Validation Testing NA = Not Applicable Durgasoft

Page 55: Manual Testing Material by Durgasoft

6. References:For preparing this document , All required documents list will be given in this section.Ex: SRS, FRD, BRS

7. Product Architecture:Here in this section, we are having entire project or product functionality flow in the single diagram. It will represent overview of entire application.

8. Test Environment:Here we are having environment related data and based on the environment, required hardware and software details will be mentioned in this section.

Required Hardware:

Category

• RAM• MONITOR• INTEL

Description

• 1GB• 17/19 INCHES

Durgasoft

Page 56: Manual Testing Material by Durgasoft

Category

• Operating system• Ms - Office• Bugzilla • QC• QTP

Description

• Windows XP• 2007• 1.6• 10.0• 11.0

Required Software:

9. Assumptions and Dependences:Here in this section for releasing or delivering the quality product to the customer in ontime, what are all the solutions for the problems and their dependencies will be analyzed and those assumptions will be mentioned. Here assumption means assuming something and hoping deliver the product in ontime.Ex: 1) getting build from the development team in ontime2) We are going to complete test case execution in ontime.3) Having all the requirements in SRS and test plan will be accepted by the client.

Durgasoft

Page 57: Manual Testing Material by Durgasoft

10. Constraints:Here in this section we are having all the conditions for delivering quality product to the customer.Ex: 1) Some hardware is meeting or not available.2) Lack of the resources.

11. Test Coverage:Here we will mention what are all the testing types we are going to use in our project will be mentioned here.

Functionality TestingUser Interface TestingSecurity TestingRecovery Testing

12. Test Strategy or Approach:Here in this section we will keep how we are going to test the entire application, what are all the testing levels we are following for the project mentioned here.

Unit testing Module testingIntegration testingSystem testingUser acceptance testing , preproduction testing, production testingDurgasoft

Page 58: Manual Testing Material by Durgasoft

13. Tests Deliverables:Here we will mention what are all the documents or information need to pass to the client in periodic fashion will be mentioned here.Test planTest scenarioTest caseTest case execution resultsBug reportBuild stability reportApplication functionality report

14. Human Resource Requirement:Here in this section, we are having testing team resource names and their responsibilities will be mentioned clearly in this section.

Skill Level Specific Areas for Testing

Effort Training Required

SI No Resource Name Designation Responsibilites

Durgasoft

Page 59: Manual Testing Material by Durgasoft

15. Test Schedule:Here we will mention clear dates for entire project testing activities more clearly along with who are all responsible for completing the tasks in deadlines will be mentioned here. Based on this schedule testing team will follow and they will start and end their activities accordingly.

16. Readiness Criteria:Here in this section what are all the requirements needed for continuing with testing after we get the build from the development team will be mentioned here.Ex: SRS document should be signoff from the client. Test plan should be approved from the client Test cases and scenarios should be prepared ontime. Environment should be ready for testing.

Levels of testing

Person responsible

Documents and records

Approval authority

To be completed on

Testing strategy

Durgasoft

Page 60: Manual Testing Material by Durgasoft

17. Acceptance Criteria:Here in this section we will update customers acceptance condition of entire project, when delivering the project to the customer.Based on the test cases results and defect status. Client will conclude whether we may accept or will give few more enhancements.

18. Defect Classifications:Here we will mention different defect types which we are going to rise in our project.Ex: Critical, high, medium, low

19. Defect Management:Here in this section we are having all the process how we are going to manage our issues or defects in our project.ex: 1) To whom we need to assign the defect either to development lead or development member will be mentioned here.

20. Testing Resumption Criteria:Here in this section we will mention when we are going to resume our testing activities after suspending the build, it will be clearly mentioned in this section.

Durgasoft

Page 61: Manual Testing Material by Durgasoft

21. Tools and Techniques:Here in this section we will update required tools information and required techniques for continuing with testing comfortably.

22. Risk Identification and Contingency Planning:Here in this section we will mention all the possible risks and their solutions clearly mentioned here.Note: Contingency planning means identifying the solution.

23. Test Case List:Here we will mention test case document name, once we have done with test case preparation, test case document name and location should need to update in our test plan document for all the testing team members reference.

S No Risk Nature of Impact Contingency Planning

1 2 resources are not available Work is getting effected

Recreate another 2 resources

2 Build not delivered on time Test plan gets effected

Test plan should need to be updated

Durgasoft

Page 62: Manual Testing Material by Durgasoft

24. Test Data:Here we will mention the data required for testing clearly.

25. Traceability Matrix:Will be discussed in coming classes.

Durgasoft

Page 63: Manual Testing Material by Durgasoft

Test Development:Here in this phase we are developing the test cases by deriving from scenarios which are derived from requirements.Note: Deliverable(Output) from test development phase is test case document.

1. Test Bed: It is type of environment where we are going to work on application is called test bed.

2. Test Scenario:It is high level verification point for testing the application. We can derive scenarios from the client requirement document.

S No Scenario Id Scenario description

Requirement document ID

Expected TC Count

Time Required for TC’s

Durgasoft

Page 64: Manual Testing Material by Durgasoft

3. Test Case:It is a low level verification point which we can derive from test scenarios. For testing the application we have to come up with as many number of cases from the requirements for delivering the quality product to the customer.

TC Id

Scenario Id

Test Description

Pre-requisite

Test steps

Expected results

Actual results

Pass/ fail

Comments

Positive/ negative

Durgasoft

Page 65: Manual Testing Material by Durgasoft

Durgasoft

Page 66: Manual Testing Material by Durgasoft

Durgasoft

Requirements:

1. Siri Technologies Functionality1.1 By entering valid username, password it should allow us to login1.2 Valid username should contain 5-20 characters and combination is upper

case, lower case1. 3 Valid password should contain 5-10 chars with combination is upper and

special chars

2. Graphical user interface of the app2.1 Siri title should be available along with siri technologies header, username, password, text labels, text fields.2.2 Ok, cancel buttons

3. Error Messages should be displayed when entered invalid data

Page 67: Manual Testing Material by Durgasoft

Scenario Types:Scenarios are divided into 4 types

GUI ScenarioFunctional Positive scenarioFunctional Negative scenarioNon-functional ScenarioField level validation scenarios.

Note: 1) Non-functional testing covers security testing, recovery testing, performance testing.2) Based on the project requirement we are going to cover scenarios for the same.

Test Case Types:

Test cases are divided into 4 types and we are deriving these cases from the designed scenarios.GUI test cases are derived from GUI scenariosFunctional positive test cases are derived from functional positive scenariosFunctional negative test cases are derived from functional negative scenariosNon-functional test cases are derived from non-functional scenariosField level validation test cases derived from Field level validation scenarios.

Durgasoft

Page 68: Manual Testing Material by Durgasoft

Test Case Technique:For deciding on the length of the input data we need to use below techniques for finalizing the positive and negative length. If once length is finalized then we can play with type of data with number of combinations with that length.Positive data will be the positive length and having the any type of data as per our requirement.Negative type of data will be the negative length with positive and negative type of data.

Boundary Value Analysis:By using this technique we can decide length of the text fields by using 6 combinations

min – 1 5-20 charsmin 4min + 1 5max – 1 6max 19max + 1 20

21

Durgasoft

Page 69: Manual Testing Material by Durgasoft

Equivalence class partitioning:By using this technique we can finalize the length of the data for the text field by using 3 values.

< min< min & max >max >

Error Guessing Technique:By using testing people experience and knowledge, if somebody will work on similar type of projects continuously for long time then there will be a chance for guessing the frequent errors or hidden errors in our application.For all these errors they will prepare corresponding test cases and they will add it into original test case document.Usually test lead or senior test engineer will involve in this technique because they are having sufficient knowledge for guessing the errors.

Decision Table:It is a technique used for deriving the regression and integration related test cases.It is a table containing all the functionality names in left and top sections.Whenever any relation between any of the functionalities, for those all functionalities we need to put a mark for identifying those all are interrelated.For regression and integration we can derive the test cases very easily by using this table. Durgasoft

Page 70: Manual Testing Material by Durgasoft

Durgasoft

Usually it will be prepared by the persons who are having entire project knowledge, obviously test lead will prepare or in some cases senior test engineers also involve while preparing.

Test Case Execution:Based on the test plan schedule, we will get the build from the development team then we have to start validating test cases as per the test steps mentioned and based on expected results.

Function 1 Function 2 Function 3 -------- Function N

Function 1

Function 2

Function 3

||

Function N

Page 71: Manual Testing Material by Durgasoft

Durgasoft

This process continues till end of all the test cases related to features developed in that build.This process will continues till end of all the features or covered of all the requirements in many numbers of builds, testing people will receive and validate the same.If at all they have validated all the test cases by covering all the requirements, it means test case execution phase is completed.

Result Analysis:Based on the execution phase and depend upon the test cases status, here we are going to analyze or cross check test case results.Based on the analysis we will come to know what are all the features are not working.Features which are not working based on the analysis we need to update to the development team.

Bug Tracking:Based on the result analysis phase we will finalize or confirm list of issues or bugs or defects.For all those confirmed issues we need to track somewhere by using any of the bug tracking tool.

Page 72: Manual Testing Material by Durgasoft

Durgasoft

Mandatory fields or data required for rising the Bugs:

1. Summary:It is a single line description about the specific defect which is required for understanding the defect in simple manner.

2.Description:It is having some more detailed description about the bug which we can use for understanding the defect more clearly.

3. Steps to Reproduce:Here we are updating all the sequential steps which we required for reproducing the issues by the development team.

4. Project:It is a drop-down field containing all the project names, here we have to select, specific project of us.

5. Module:It is a drop-down list containing all the modules name, here we have to select specific modules related to the defect or issue.

Page 73: Manual Testing Material by Durgasoft

Durgasoft

6. Build No:It is a drop down list containing all the build numbers from starting to latest one we have to select latest build number which we are working on currently. It can be found from BRN document.

7. Severity:It will notifies seriousness of the issue based on the issue seriousness or issue complexity. We have to update severity any of the below:

Intermediate (Show Stopper or Critical)HighMediumLow

Based on the severity ,development people will analyze the issue seriousness and based on that they may update the priority on top of tester priority value.

8. Priority:It will notify how much urgently to fix the issue by the development team.Based on the severity given by testing team, they will update their priority. Based on that they will work on fixing the issues in the following order.

IntermediateHighMediumLow

Page 74: Manual Testing Material by Durgasoft

Durgasoft

9. Founded By:Here we need to update the test engineer name who found this issue. It is a drop down list containing all the team members, in those we have to select one.

10. Assigned To:Here we need to update the developer name from the drop down list.Test lead will update the entire team regarding developer names for respective features.

11. Comments:Here we will update any other information required for this issue.

12. Status:It is a drop down list containing different status for the bug or defect and statuses are:

->New->Open->Fixed->Closed->Reopen->Reject

Page 75: Manual Testing Material by Durgasoft

Durgasoft

Bug Life Cycle or Defect Life Cycle:

In our test case execution, test cases are validating based on the expected results and actual results from the application, we are analyzing and confirming the test cases passed or failed.

Whenever any test case is failed we need to update this deviation to the development team

In the form of bug or defect we will update to the development team.

By updating all the mandatory fields required (based on the tool mandatory fields will change) for rising the bug or defect need to update and saving the issue as it will create unique bug-id along with the status new.

Development team will work on all the new issues and if at all they confirm the same issue is getting reproduced in their environment then they will accept the issue for fixing by changing the status to open.

If at all they could not able to reproduce then they may reject the bug by changing the status to reject by updating with proper comments.

Page 76: Manual Testing Material by Durgasoft

Durgasoft

Whenever development team will work on all the open issues and if at all they fix any issues then they will change the status to be fixed.

Testing team have to verify all the fixed issues and if at all issued is resolved then we are going to close the defect by changing the status to closed.

If at all any issue is fails in retesting then again we need to update it to the development team by making the status reopen.

Based on the comments entered for rejecting the bugs we need to cross check one more time in the functionality and confirms everything is working then we have to close the defect by making the status to closed.

Even though some of the closed issues may get reopened while doing regression testing whenever any new features are added or any defects are fixed.

Page 77: Manual Testing Material by Durgasoft

Durgasoft

New

Dev verify

Open/Reopen

Fixed

Testing team verify

Closed

Reject

Test verify

Not accept

Accept

Fixed

Not working

Work

Work

Bug Life Cycle

Page 78: Manual Testing Material by Durgasoft

Durgasoft

Reporting:We will send multiple status of application in many builds to the client in periodic manner for updating the status of the application.These reports include daily status, weekly status, monthly status and project status report.

1. Daily Status Report:This is the report we are sending everyday to the client for updating on the activities covered on the same day. It will be prepared and send by the team lead.

2. Weekly Status Report:It is a report containing all the activities done in that week. Here we will update tasks like test cases and scenarios writing, test case execution, test results are mentioned clearly and update to the client.

3. Monthly Status:It is a report containing activities done in that month will be mentioned clearly along with clear explanation on tasks covered.It will notifies to the client that activities covered by the testing team in that month.

Page 79: Manual Testing Material by Durgasoft

Durgasoft

4. Project Closure report:It is a report containing stability of the entire application. We will mention clearly number of test cases executed , number of bugs found, based on that client will analyze stability of the application at that time.Based on the analysis he may update or talk with the project manager regarding the application status.If client satisfied, we will deliver project or product to client and he will continue next level of testing.

Build 110

Build 210 + 10

Build 320 + 10

Build n100

Testing regressionFT

Testingregression

FT

Testing

Bugs

resolveBuild 1&2 bugs

Page 80: Manual Testing Material by Durgasoft

Durgasoft

Requirement Traceability Matrix:

This document is used for tracking the requirements for checking the scenarios and test cases coverage.

Defaultly, this matrix is having columns requirement id, scenario id and test case id.

Requirement id will be updated by the test lead and he will share this document to the entire testing team for updating the scenario ids and test case ids.

Once entire team is updated with their scenario ids and test case ids, test lead is going to verify every requirement is covered for writing the test case or not.

If at all he finds any of the requirements is not covered which means scenario ids and test case ids will be empty for corresponding requirements, then he will assign those requirements to somebody in our team for writing scenarios and test cases.

Requirement Id Scenario Id Test Case Id

Page 81: Manual Testing Material by Durgasoft

Durgasoft

Test Metrics:The purpose of the metrics is to find the efficiency of the test team & Quality of the application.1. Test Coverage:-This metrics will be used to deside when to stop the testing of a certain feature. If the Test coverage is 100% & If most of the Test cases is pass, Then we can stop the testing.To estimate the testers efficiency by lead or P.M

Test Coverage = Total No.of Test cases executed / Total No.of Test cases*100.

2. Remark V/s Defect Ratio:- (Defect V/s Remark Ratio)

The result of metrics should be in B/W 80% - 95%. If it is less than 80% we can derive that Test team is not clear with the requirements & If it is more than 95% we can derive that the tester might be interacted with the developer before logging a defect to confirm, Whether the issue is really defect or not.

This metrics will be use to find out the efficiency of a tester by Lead or PMRemark to defect ratio = Total No.of Valid defects/ Total No.of Remarks *100

Page 82: Manual Testing Material by Durgasoft

Durgasoft

3. Defects per KLOC (or) Defect Dencity:-This metrics is use to estimate the developer efficiencyDefects per KLOC = Total No.of Valid defects / KLOC ORDefects per KLOC = Total No.of Valid defects / LOC * 1000LCL & UCL for this metrics are 5 &7.

4. Defect Severity Index:-The purpose of this metrics is to find how stable the application or module.D.S.I = 10*I + 5*H + 3*M + 2*L / I + H + M + L Defect Severity Index on Open defects = <7Defect Severity Index must be = <5

5. Bad fix Ratio :-To define the developer efficiency, & it will calculation at the end of the project for each developer.Bad fix Ratio = Total No.of reopened defects / Total No.of Fixed defects * 100It should not be more than 10%

Page 83: Manual Testing Material by Durgasoft

Durgasoft

6. Effort Variance :- For hours Schedule Variance:- For DaysThis metrics purpose is to define the stability of a PM

EX:Given time to complete the project is 1000 hrs , Then the acceptable time should be B/W 950 to 1050 hrs Effort variance950 to 1050 days Schedule variance

Effort Variance :- Actual Time / Estimated Time * 100Schedule Variance :- Actual Days / Estimated Days * 100

Page 84: Manual Testing Material by Durgasoft

Durgasoft

Software process:A Sequence of steps followed for getting quality on documentation and on Project/project.

A set of predefined activities should follow by every project team for ensuring quality and deliver the project in on time with quality. If at all we are not following process: a) Not able to reach project deadlines b) May not able to maintain Quality e) More rework is required f) Client may not able to satisfy with the quality g) More resources are requiredh) More gaps will identify in end of the project in testing phase due to the gaps in documentation.

Benefits Of Process: a) 100% Quality b) Defect Prevention c) Reduce the project cost d) Reduce the no of resources e) Assurance on project quality to Client f) Client satisfaction will be very high

Page 85: Manual Testing Material by Durgasoft

Durgasoft

What is Process model:A model is contains collection of processes used for getting quality in all areas of the project such as documentation and functionalities of project.

SEI (Software Engineering Institute) was developed Capability Maturity Models(CMM) model and This will certifies the companies in various levels based on processes follow and implementing in the Organization.

CMMI(Capability Maturity Model integration)replaces CMM in now a days and it is developed by the same SEI. It is a model of 5 levels of process and SEI will determine the companies based on standards followed in the Organizations.

Page 86: Manual Testing Material by Durgasoft

VENKATA KRISHNA

Capability Maturity Models:-1)Performed 2)Managed 3)Defined 4)Quantitatively Managed 5)Optimizing

Process Areas by Maturity Levels: 1) Performed – Overview: Introduction Structure of the model Maturity Levels, Common Features Understanding the Model Using the Model

Page 87: Manual Testing Material by Durgasoft

Durgasoft

2) Managed - Basic Project Management Key Process Areas: Requirement Management Project Planning Project Monitoring and Control Supplier Agreement Management Measurement and Analysis Process and product quality Assurance Configuration Management

3. Defined – Process Standardization:- Key Process Areas: Requirement Development Technical Solution Product Integration Verification Validation Organizational process Focus Organizational Process Definition Integrated project management Organizational Training Risk Management

Page 88: Manual Testing Material by Durgasoft

Durgasoft

4) Quantitatively Managed: Key Process Areas: Organizational process performance Quantitative project management Metrics are used to track productivity processes and products projects is predictable and quality is consistently high. 5) Optimizing – Continuous process improvements : Key process Areas: Organizational Innovation and Development Innovating the new standards and updating the same to CMMI

Page 89: Manual Testing Material by Durgasoft

Durgasoft

QUALITY CENTER

Quality center is divided into 2 sections those are:1. Site Administration2. Quality Center

Site Administration:By using this component we can manage the administration part for quality center.We can manage activities like Creating domain Creating projects Creating users Assigning user to the projects

Creating domain:Based on the client requirements they may mention ‘n’ number of domains in the singletool then we need to create those domains by using the option under siteadministration login

Site project create domainSite project delete domain

Page 90: Manual Testing Material by Durgasoft

Durgasoft

Creating projects:Based on the client requirements we can create ‘n’ number of projects under each domain. We have to provide unique project name while creating

Site administration login

Site projects create projectSite projects delete projectSite projects rename project

Creating User:Based on the requirements we need to create ‘n’ number of users under each project under specific domain.

Site Administration

Site User New UserSite User Delete UserSite User password

Page 91: Manual Testing Material by Durgasoft

Durgasoft

Assigning the user to the project:By using create users we can assign it to the existing projects.One user can be assigned to ‘n’ number of projects.While logging into the quality center it should need to display all the assigned domains in the assigned drop down list and all the assigned projects under project drop down list.

Site projects project users

add user from the users list

Quality Center:It is a test management tool provided by the Hp. By using this tool we can manage our testing activities effectively from starting to ending. By using this we can store all the project related documents related to testing will be maintained as a central repository and it will allow us to access the data parallely by team members.We can store requirements, test cases, test case results, defects or bugs.It will allow us to generate user friendly reports for our test case execution or defect details.

Page 92: Manual Testing Material by Durgasoft

Durgasoft

Quality center is divided into majorly 4 modules related to testing those are:1. Requirement2. Test Plan3. Test Lab4. Defects

1. Requirements:It is used for storing all the requirements documents in the necessary hierarchy.It will allow us to create ‘n’ number of parent and child requirements and we can associate or attach requirements documents for the same. The options in this phase areNew Requirement:

used for creating new parent requirementsNew Child Requirements:

used for creating child requirementsDelete:

used for deleting either existing parent or child requirement.

Whenever we have created any requirement, then quality center will generate requirement id automatically.Ex: RQ0001 and RQ0002

Page 93: Manual Testing Material by Durgasoft

Durgasoft

Test Plan:It is used for maintaining all our test cases documents in the necessary hierarchy by creating number of folders and sub folders.We can classify test cases into different sections and we can create test cases under that.For creating test cases mandatory fields are

Test Case DescriptionStep NumbersExpected ResultsDescriptionAuthorCreated of Date and TimeWe can update the test case with ‘n’ number of steps.

New Folder:used for creating the folder.

New Test Case:used for creating the test case under folder structure.

Delete:used for deleting the either test case or folder.

Page 94: Manual Testing Material by Durgasoft

Durgasoft

3. Test Lab:

It is used for maintaining test case results by linking defects as well for the failed test cases.

By using select test option we are able to see all the available test cases in test plan tab then it will allow us to drag test cases from test plan to test lab tab.

By using test set option we can maintain similar type of test cases under single name.

By using run option we can run the test cases one by one.

By using run test set option we can run all the test cases under that test set. It will take care to show the test case step one by one for updating the results.

Delete option is used for deleting the folders and test sets.

4. Defects:

It is used for maintaining all the issues or bugs found in the test case execution phase.

Page 95: Manual Testing Material by Durgasoft

Durgasoft

By using new defect option we can update all the defect details such as

SummaryDetected bySeverityDetected in versionProjectStatusDetected on dateAssigned toPriorityReproducableSubjectDescription

If at all we want to associate any screen shots for giving better understanding to the developer it will allow us to attach attachments by using attach option.

Page 96: Manual Testing Material by Durgasoft

Durgasoft

Visual Safe Source:

It is a configuration management tool. Configuration management is the process for maintaining all our projects documentation with the version control feature. ( version control means, it will maintain ‘n’ number of copies for each document whenever we did only modifications or updation.

It is having authentication as it required unique username and password for each member for logging into the VSS. With this version control we can track what are all the changes done by the individual team members.

The features included in VSS are: Set Working FolderCreate ProjectCheck OutCheck InGet Latest VersionAdd File

Page 97: Manual Testing Material by Durgasoft

Durgasoft

Set Working Folder:Once we logged into the VSS by using this option, it will allow us to create working folder which will allow us to upload or download data from the VSS.

Create Project:It is used for creating the projects for classifying the data of multiple projects.

Check Out:By using this we can download files from the VSS specifically to the working folder.Note: Anybody did check out for any file it is not going to allow to do the check out by anybody else.

Check In:This option is used for upload the files from working folder to VSS. It will be enabled for any file after we do the check out.

Get Latest Version:It is used for fetching the latest file from the VSS. At a time ‘n’ number of persons can get the latest version from VSS.

Page 98: Manual Testing Material by Durgasoft

Durgasoft

Add File:It is used for adding or uploading the new document or file into the VSS.

History:It is used for checking all the modifications and respective persons for any document, it will be used for checking the multiple versions status.