18
A PRESENTATION ON “DELAY IN FORMULATION OF TOWN PLANNING SCHEMES Guide Dr.J.E.M.Macwan Seminar Coordinator Shri. Chetan R Patel P.G. URBAN PLANNING CIVIL ENGINEERING DEPARTMENT, M.TECH. (PLANNING), SEMESTER-3 Prepared by: Malvika Jaishal (P12UP004)

Delay informulation of TP Schemes

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Delay informulation of TP Schemes

APRESENTATION ON

“DELAY IN FORMULATION OF TOWN PLANNING SCHEMES

Guide

Dr.J.E.M.Macwan

Seminar Coordinator

Shri. Chetan R Patel

P.G. URBAN PLANNING

CIVIL ENGINEERING DEPARTMENT, M.TECH. (PLANNING), SEMESTER-3

Prepared by:Malvika Jaishal

(P12UP004)

Page 2: Delay informulation of TP Schemes

CONTENTS

Introduction Issues Town Planning Acts

GTPUDA Town Planning Schemes Causes of Delay Experts’ View Suggestions Summary References

Page 3: Delay informulation of TP Schemes

INTRODUCTION

This presentation is an attempt to give a brief view about Town planning Schemes and will address the loopholes in practices of preparing TP Schemes.

It include few suggestion that can be introduce in to speed up the process of preparing TPS.

Page 4: Delay informulation of TP Schemes

ISSUES

In Gujarat State out of 800 TP, 350 TPS are pending before to state government for final approval.

In Surat, only out of 128 TP Schemes 60 TPS is in Draft Preliminary State and 28 are in Sanction Preliminary State.

The prime issue is the delay in the process of Formulation of Town Planning Schemes and its sanction from State Government.

Page 5: Delay informulation of TP Schemes

HISTORY OF TOWN PLANNING ACT

TPS is well coordinated & powerful tool for Planning

Town Planning Acts: Bombay Town Planning Act, 1915 & 1954 MRTP Act 1966 Gujarat Town Planning and Urban Development

Act, 1976

Page 6: Delay informulation of TP Schemes

GUJARAT TOWN PLANNING AND URBAN DEVELOPMENT ACT

Enacted in 1976

GTPUDA –mandates the creation of Area Development Authorities.

Urban Planning in Gujarat is 2 Step Process. Development Plan Town Planning Schemes

Page 7: Delay informulation of TP Schemes

TOWN PLANNING SCHEME

It based on Land Pooling Techniques and Re-distribution.

TPS is conceptualize as joint venture between the local Authorities and owner of land.

Area- 100-120 Ha

Time Frame- 50 -60 months

Page 8: Delay informulation of TP Schemes

TIME FRAME OF FORMATION PROCESS

Hearing

Page 9: Delay informulation of TP Schemes

REASON OF SUCCESS

Manageable scheme size Self-financing Land owner satisfaction Fair Process Early provision of infrastructure

Page 10: Delay informulation of TP Schemes

CAUSES OF DELAY

LONG-ACTING PERIOD

3 stage process 49 months for sanctioning of TPs No force on the State Government to sanction TP

in definite time period.

Page 11: Delay informulation of TP Schemes

LIMITED DATA

Cadastre Data are not updated at regular basis. It takes more than 6 month to collect data. Need Certification from Revenue Department

USING ARCHAIC MAPS

Archaic Maps are so old and not updated. Distortion of data to match with Revenue Data,

in order to get certified. It does not match with current Scenario of land.

Page 12: Delay informulation of TP Schemes

MANNER OF REVIEWS OF TPS IS INADEQUATE.

Too Much Centralized Process. State government review both procedural and

planning procedure. State Govt. is reviewing TPS in two stages, each

in Preliminary Stage and at Final Stage.

Page 13: Delay informulation of TP Schemes

INADEQUATE PLANNING CAPACITY OF GOVT. AUTHORITIES

Lack of Technical capacity of local government.

Less Staff in Town Planning Department.

1 TPO is handling more than 10 TP scheme

Page 14: Delay informulation of TP Schemes

EXPERTS’ VIEW 3 Stage of Preparing TP Scheme is Unnecessary

Main delay occurs between preliminary and Final Town Planning Scheme.

A thought to Review Process, should remain with local authorities, but it will be hard to maintain the system transparent.

Lack of Staff

Private sector capacities have not significantly developed.

Quick implementation will lead to faster growth.

Page 15: Delay informulation of TP Schemes

SUGGESTIONS

Enforcement on State Govt.

Limiting the role of the State Government.

Streamlining the land records at State level

Utilizing Private Sector Capacities

Page 16: Delay informulation of TP Schemes

SUMMARY

TPS has tremendous potential

Quick Implementation is need of Time.

Modification of Town Planning Act and Policy.

Enhancing & Utilizing Private Sector Capacities .

Page 17: Delay informulation of TP Schemes

REFERENCES

Department Of Town Planning Of Maharashtra, “Maharashtra Town And Regional Planning Act, 1966” Maharashtra.

  Department Of Town Planning Of Gujarat, “Gujarat Town Planning And Urban Development

Act, 1976”, Last Embedded In 2000.  Government Of India Ministry Of Home Affairs National Disaster Management Division

(Sept 2004), “Town And Country Planning Act-1960.  Maharashtra Regional And Town Planning Act, 1966, Urban Development Plans Formulation

And Implementation Guide, Ministry Of Urban Affairs & Employment , Government Of India August1996.

  Shirley Ballaney (2008), “The Town Planning Mechanism In Gujarat, India”, World Bank

Institute. Washington, D.C.

Shirley Ballaney (2010),“Land Pooling and Reconstitution: A Self-Financing Mechanism for Urban Development. IDFC group Policy Group Quarterly No.7, India

Sri Ramakrishna Nallathiga Centre Of Good Governance (2010)“managing Urban Growth Using The Town Planning Schemes In Andhra Pradesh”.

  The Gujarat Town Planning Act And Urban Development Act 1976, Urban Development

Plans Formulation And Implementation Guide August 1996

Page 18: Delay informulation of TP Schemes