Page 1: Fm11 ch 10 show

10 - 1Chapter 10:

The Basics of Capital Budgeting: Evaluating Cash Flows

Overview and “vocabulary”Methods

Payback, discounted paybackNPVIRR, MIRRProfitability Index

Unequal livesEconomic life

Page 2: Fm11 ch 10 show

10 - 2

What is capital budgeting?

Analysis of potential projects.Long-term decisions; involve large

expenditures.Very important to firm’s future.

Page 3: Fm11 ch 10 show

10 - 3

Steps in Capital Budgeting

Estimate cash flows (inflows & outflows).

Assess risk of cash flows.Determine r = WACC for project.Evaluate cash flows.

Page 4: Fm11 ch 10 show

10 - 4

What is the difference between independent and mutually exclusive

projects?

Projects are:independent, if the cash flows of one are unaffected by the acceptance of the other.

mutually exclusive, if the cash flows of one can be adversely impacted by the acceptance of the other.

Page 5: Fm11 ch 10 show

10 - 5

What is the payback period?

The number of years required to recover a project’s cost,

or how long does it take to get the business’s money back?

Page 6: Fm11 ch 10 show

10 - 6

Payback for Franchise L(Long: Most CFs in out years)

10 8060

0 1 2 3

-100

=

CFt

Cumulative -100 -90 -30 50

PaybackL 2 + 30/80 = 2.375 years

0100

2.4

Page 7: Fm11 ch 10 show

10 - 7

Franchise S (Short: CFs come quickly)

70 2050

0 1 2 3

-100CFt

Cumulative -100 -30 20 40

PaybackS 1 + 30/50 = 1.6 years

100

0

1.6

=

Page 8: Fm11 ch 10 show

10 - 8

Strengths of Payback:1. Provides an indication of a

project’s risk and liquidity.2. Easy to calculate and understand.

Weaknesses of Payback:

1. Ignores the TVM.2. Ignores CFs occurring after the

payback period.

Page 9: Fm11 ch 10 show

10 - 9

10 8060

0 1 2 3

CFt

Cumulative -100 -90.91 -41.32 18.79Discountedpayback 2 + 41.32/60.11 = 2.7 yrs

Discounted Payback: Uses discountedrather than raw CFs.

PVCFt -100

-100

10%

9.09 49.59 60.11

=

Recover invest. + cap. costs in 2.7 yrs.

Page 10: Fm11 ch 10 show

10 - 10

.

10t

tn

t rCFNPV

NPV: Sum of the PVs of inflows and outflows.

Cost often is CF0 and is negative.

.

1 01

CFr

CFNPV tt

n

t

Page 11: Fm11 ch 10 show

10 - 11

What’s Franchise L’s NPV?

10 8060

0 1 2 310%

Project L:

-100.00

9.0949.5960.1118.79 = NPVL NPVS = $19.98.

Page 12: Fm11 ch 10 show

10 - 12

Calculator Solution

Enter in CFLO for L:

-100

10

60

80

10

CF0

CF1

NPV

CF2

CF3

I = 18.78 = NPVL

Page 13: Fm11 ch 10 show

10 - 13

Rationale for the NPV Method

NPV = PV inflows - Cost= Net gain in wealth.

Accept project if NPV > 0.

Choose between mutually exclusive projects on basis ofhigher NPV. Adds most value.

Page 14: Fm11 ch 10 show

10 - 14

Using NPV method, which franchise(s) should be accepted?

If Franchise S and L are mutually exclusive, accept S because NPVs > NPVL .

If S & L are independent, accept both; NPV > 0.

Page 15: Fm11 ch 10 show

10 - 15

Internal Rate of Return: IRR

0 1 2 3

CF0 CF1 CF2 CF3

Cost Inflows

IRR is the discount rate that forcesPV inflows = cost. This is the sameas forcing NPV = 0.

Page 16: Fm11 ch 10 show

10 - 16

.

10

NPVr

CFt

tn

t

t

n tt

CFIRR

0 1

0.

NPV: Enter r, solve for NPV.

IRR: Enter NPV = 0, solve for IRR.

Page 17: Fm11 ch 10 show

10 - 17

What’s Franchise L’s IRR?

10 8060

0 1 2 3IRR = ?

-100.00

PV3

PV2

PV1

0 = NPV

Enter CFs in CFLO, then press IRR:IRRL = 18.13%. IRRS = 23.56%.

Page 18: Fm11 ch 10 show

10 - 18

40 40 40

0 1 2 3IRR = ?

Find IRR if CFs are constant:

-100

Or, with CFLO, enter CFs and press IRR = 9.70%.

3 -100 40 0

9.70%N I/YR PV PMT FV

INPUTS

OUTPUT

Page 19: Fm11 ch 10 show

10 - 19

Rationale for the IRR Method

If IRR > WACC, then the project’s rate of return is greater than its cost-- some return is left over to boost stockholders’ returns.

Example: WACC = 10%, IRR = 15%.Profitable.

Page 20: Fm11 ch 10 show

10 - 20

Decisions on Projects S and L per IRR

If S and L are independent, accept both. IRRs > r = 10%.

If S and L are mutually exclusive, accept S because IRRS > IRRL .

Page 21: Fm11 ch 10 show

10 - 21

Construct NPV Profiles

Enter CFs in CFLO and find NPVL andNPVS at different discount rates:

r 05

101520

NPVL

50 3319

7

NPVS

402920125 (4)

Page 22: Fm11 ch 10 show

10 - 22

-10

0

10

20

30

40

50

60

0 5 10 15 20 23.6

NPV ($)

Discount Rate (%)

IRRL = 18.1%

IRRS = 23.6%

Crossover Point = 8.7%

r 05

101520

NPVL

503319

7(4)

NPVS

402920125

S

L

Page 23: Fm11 ch 10 show

10 - 23NPV and IRR always lead to the same accept/reject decision for independent projects:

r > IRRand NPV < 0.

Reject.

NPV ($)

r (%)IRR

IRR > rand NPV > 0

Accept.

Page 24: Fm11 ch 10 show

10 - 24

Mutually Exclusive Projects

r 8.7 r

NPV

%

IRRS

IRRL

L

S

r < 8.7: NPVL> NPVS , IRRS > IRRL

CONFLICT r > 8.7: NPVS> NPVL , IRRS > IRRL

NO CONFLICT

Page 25: Fm11 ch 10 show

10 - 25

To Find the Crossover Rate

1. Find cash flow differences between the projects. See data at beginning of the case.

2. Enter these differences in CFLO register, then press IRR. Crossover rate = 8.68%, rounded to 8.7%.

3. Can subtract S from L or vice versa, but better to have first CF negative.

4. If profiles don’t cross, one project dominates the other.

Page 26: Fm11 ch 10 show

10 - 26

Two Reasons NPV Profiles Cross

1. Size (scale) differences. Smaller project frees up funds at t = 0 for investment. The higher the opportunity cost, the more valuable these funds, so high r favors small projects.

2. Timing differences. Project with faster payback provides more CF in early years for reinvestment. If r is high, early CF especially good, NPVS > NPVL.

Page 27: Fm11 ch 10 show

10 - 27

Reinvestment Rate Assumptions

NPV assumes reinvest at r (opportunity cost of capital).

IRR assumes reinvest at IRR.Reinvest at opportunity cost, r, is

more realistic, so NPV method is best. NPV should be used to choose between mutually exclusive projects.

Page 28: Fm11 ch 10 show

10 - 28

Managers like rates--prefer IRR to NPV comparisons. Can we give them a

better IRR?

Yes, MIRR is the discount rate whichcauses the PV of a project’s terminalvalue (TV) to equal the PV of costs.TV is found by compounding inflowsat WACC.

Thus, MIRR assumes cash inflows are reinvested at WACC.

Page 29: Fm11 ch 10 show

10 - 29

MIRR = 16.5%

10.0 80.060.0

0 1 2 310%

66.0 12.1158.1

MIRR for Franchise L (r = 10%)

-100.010%

10%

TV inflows-100.0PV outflows

MIRRL = 16.5%

$100 = $158.1(1+MIRRL)3

Page 30: Fm11 ch 10 show

10 - 30

To find TV with 10B, enter in CFLO:

I = 10NPV = 118.78 = PV of inflows.Enter PV = -118.78, N = 3, I = 10, PMT = 0.Press FV = 158.10 = FV of inflows.Enter FV = 158.10, PV = -100, PMT = 0, N = 3.Press I = 16.50% = MIRR.

CF0 = 0, CF1 = 10, CF2 = 60, CF3 = 80

Page 31: Fm11 ch 10 show

10 - 31

Why use MIRR versus IRR?

MIRR correctly assumes reinvestment at opportunity cost = WACC. MIRR also avoids the problem of multiple IRRs.Managers like rate of return comparisons, and MIRR is better for this than IRR.

Page 32: Fm11 ch 10 show

10 - 32

Normal Cash Flow Project:Cost (negative CF) followed by aseries of positive cash inflows. One change of signs.

Nonnormal Cash Flow Project:Two or more changes of signs.Most common: Cost (negativeCF), then string of positive CFs,then cost to close project.Nuclear power plant, strip mine.

Page 33: Fm11 ch 10 show

10 - 33

Inflow (+) or Outflow (-) in Year

0 1 2 3 4 5 N NN

- + + + + + N

- + + + + - NN

- - - + + + N

+ + + - - - N

- + + - + - NN

Page 34: Fm11 ch 10 show

10 - 34

Pavilion Project: NPV and IRR?

5,000 -5,000

0 1 2r = 10%

-800

Enter CFs in CFLO, enter I = 10.NPV = -386.78IRR = ERROR. Why?

Page 35: Fm11 ch 10 show

10 - 35We got IRR = ERROR because there are 2 IRRs. Nonnormal CFs--two signchanges. Here’s a picture:

NPV Profile

450

-800

0400100

IRR2 = 400%

IRR1 = 25%

r

NPV

Page 36: Fm11 ch 10 show

10 - 36

Logic of Multiple IRRs

1. At very low discount rates, the PV of CF2 is large & negative, so NPV < 0.

2. At very high discount rates, the PV of both CF1 and CF2 are low, so CF0 dominates and again NPV < 0.

3. In between, the discount rate hits CF2 harder than CF1, so NPV > 0.

4. Result: 2 IRRs.

Page 37: Fm11 ch 10 show

10 - 37Could find IRR with calculator:

1. Enter CFs as before.2. Enter a “guess” as to IRR by

storing the guess. Try 10%:10 STO

IRR = 25% = lower IRRNow guess large IRR, say, 200:200 STO

IRR = 400% = upper IRR

Page 38: Fm11 ch 10 show

10 - 38

When there are nonnormal CFs and more than one IRR, use MIRR:

0 1 2

-800,000 5,000,000 -5,000,000

PV outflows @ 10% = -4,932,231.40.TV inflows @ 10% = 5,500,000.00.MIRR = 5.6%

Page 39: Fm11 ch 10 show

10 - 39

Accept Project P?

NO. Reject because MIRR = 5.6% < r = 10%.

Also, if MIRR < r, NPV will be negative: NPV = -$386,777.

Page 40: Fm11 ch 10 show

10 - 40

S and L are mutually exclusive and will be repeated. r = 10%. Which is

better? (000s)

0 1 2 3 4

Project S:(100)Project L:(100)

60

33.5

60

33.5 33.5 33.5

Page 41: Fm11 ch 10 show

10 - 41

S LCF0 -100,000 -100,000CF1 60,000 33,500Nj 2 4I 10 10

NPV 4,132 6,190

NPVL > NPVS. But is L better?Can’t say yet. Need to perform common life analysis.

Page 42: Fm11 ch 10 show

10 - 42

Note that Project S could be repeated after 2 years to generate additional profits.

Can use either replacement chain or equivalent annual annuity analysis to make decision.

Page 43: Fm11 ch 10 show

10 - 43

Franchise S with Replication:

NPV = $7,547.

Replacement Chain Approach (000s)

0 1 2 3 4

Franchise S:(100) (100)

60 60

60(100) (40)

6060

6060

Page 44: Fm11 ch 10 show

10 - 44

Compare to Franchise L NPV = $6,190.

Or, use NPVs:

0 1 2 3 4

4,1323,4157,547

4,13210%

Page 45: Fm11 ch 10 show

10 - 45

If the cost to repeat S in two years rises to $105,000, which is best? (000s)

NPVS = $3,415 < NPVL = $6,190.Now choose L.

0 1 2 3 4

Franchise S:(100)

60 60(105) (45)

60 60

Page 46: Fm11 ch 10 show

10 - 46

Year0123

CF ($5,000) 2,100 2,000 1,750

Salvage Value $5,000 3,100 2,000 0

Consider another project with a 3-year life. If terminated prior to Year 3, the machinery will have positive salvage

value.

Page 47: Fm11 ch 10 show

10 - 47

1.751. No termination

2. Terminate 2 years

3. Terminate 1 year

(5)

(5)

(5)

2.1

2.1

5.2

2

4

0 1 2 3

CFs Under Each Alternative (000s)

Page 48: Fm11 ch 10 show

10 - 48

NPV(no) = -$123.NPV(2) = $215.NPV(1) = -$273.

Assuming a 10% cost of capital, what is the project’s optimal, or economic life?

Page 49: Fm11 ch 10 show

10 - 49

The project is acceptable only if operated for 2 years.

A project’s engineering life does not always equal its economic life.

Conclusions

Page 50: Fm11 ch 10 show

10 - 50

Choosing the Optimal Capital Budget

Finance theory says to accept all positive NPV projects.

Two problems can occur when there is not enough internally generated cash to fund all positive NPV projects:An increasing marginal cost of

capital.Capital rationing

Page 51: Fm11 ch 10 show

10 - 51

Increasing Marginal Cost of Capital

Externally raised capital can have large flotation costs, which increase the cost of capital.

Investors often perceive large capital budgets as being risky, which drives up the cost of capital.

(More...)

Page 52: Fm11 ch 10 show

10 - 52

If external funds will be raised, then the NPV of all projects should be estimated using this higher marginal cost of capital.

Page 53: Fm11 ch 10 show

10 - 53

Capital Rationing

Capital rationing occurs when a company chooses not to fund all positive NPV projects.

The company typically sets an upper limit on the total amount of capital expenditures that it will make in the upcoming year.

(More...)

Page 54: Fm11 ch 10 show

10 - 54

Reason: Companies want to avoid the direct costs (i.e., flotation costs) and the indirect costs of issuing new capital.Solution: Increase the cost of capital by enough to reflect all of these costs, and then accept all projects that still have a positive NPV with the higher cost of capital.

(More...)

Page 55: Fm11 ch 10 show

10 - 55

Reason: Companies don’t have enough managerial, marketing, or engineering staff to implement all positive NPV projects.

Solution: Use linear programming to maximize NPV subject to not exceeding the constraints on staffing.

(More...)

Page 56: Fm11 ch 10 show

10 - 56

Reason: Companies believe that the project’s managers forecast unreasonably high cash flow estimates, so companies “filter” out the worst projects by limiting the total amount of projects that can be accepted.Solution: Implement a post-audit process and tie the managers’ compensation to the subsequent performance of the project.