Curriculum VitaeName: Tom Duffy

Address: 320 Parkridge Way , SECalgary, Alberta T2J 4Z6Cell- 403 990 5955

Discipline: Commissioning/Completions Manager Industries: Petrochemical /Hydrocarbon / Offshore and related Industries /Pharmaceutical /Mining

Key Skills: Professional competencies acquired in the commissioning of major Projects worldwide;Good technical, communicational and working skills .Proactive approach to decision making and team works .Proven management ability in a multi-interface and technically demanding Projects.Knowledge in relevant oil and gas practices/compliance principles/ methodologist with proven theoretical and practical experience in managing operations and commissioning activities in oil and gas fields

Well organized Team player, excellent communication skills.PC Skills :

Career SummaryOver 30 years project experience of Instrumentation and Electrical disciplines within the Petrochemical, Chemical, Offshore, Pharmaceutical, and related Industries.Positions held range from Project Manager, Commissioning Manager, Validation Engineer ,Construction coordinator and QA/QC Inspector/Manager .My responsibilities have predominantly been executed during or before Mechanical Completion to a ready to operate status.Duties have included Planning and Scheduling, Progress monitoring and control, Manpower Supervision, Equipment Checkout, and Vendor coordination, subcontractor support, Technical assistance, and documentation control and client handover. Overseas experience includes USA, Canada, Qatar, Bahrain, Kuwait, Russia, Africa, France, Germany, Spain, Belgium, the Netherlands, and the UK.

***

From /ToEmployer Employment History

May ’15 to Feb ‘16Kentz-TSS

Alberta,Canada

Plains Midstream CanadaKerrobert Unit Train Terminal ,Kerrobert ,Saskatchewan ,Canada Contracted to Plains midstream Canada as Project Commissioning Lead to oversee the Handover and Commissioning of new Unit Train Crude loading facility Terminal.Responsibilities included :-

Provide input to project management, engineering, and construction to ensure CSU requirements are incorporated into project activities, including review of project designs and construction to ensure plant operability and operating personnel safety.

Supervise, coordinate, and review the work of assigned specialists, estimate staffing needs and schedules, and assigns work to meet completion dates.

Preparing and agree project budgets, timescales with clients/managers Create detailed Commissioning procedures. Co-coordinating testing and commissioning activities and providing advice on testing and

commissioning procedures and documentation Liaise with Facility Operators, Project Management Team and EPC) as part of job

execution. Monitoring progress, recording all test results, witnessing final testing and acceptance of

equipment and compilation of all documentation for inclusion in the site test dossier Develop and implement Project Mechanical Completion system and train EPS contractor

for use of same. Oversee Process System and Subsystem breakout and progress monitoring. Develop and implement site specific PTW and LOTO procedures

1

MS Access (Advanced) MS Project (Intermediate) WinPCS (Intermediate)MS Excel (Advanced) MS PowerPoint (Intermediate) Orbit

Page 2: Tom Duffy- Resume Feb 2016 wo quals

Dec ‘14 to April ‘15

Kentz-TSSAlberta,Canada

Kearl Fine Tails Treatment, Ft MacMurray, Alberta ,CanadaContracted to Imperial Oil as the E&I Commissioning Specialist to oversee the Mechanical Completion acceptance and the successful Commissioning of the installation Responsibilities included :-

Development of detailed Project Commissioning schedules. Sourcing and interviewing commissioning support personnel. Monitoring and maintenance and of safe work practices. Management of mechanical completion inspections, punch list development and quality

control. Resolution of Engineering queries and issues. Scheduling of Vendor commissioning assistance.

Nov ’13 to Nov ‘14 Kentz-TSS

Alberta,Canada

Mildred Lake Mine Replacement Project , Alberta ,CanadaContracted to Imperial Oil as the Commissioning Lead to oversee the successful turnover and energizing of fourteen HV Substations.Responsibilities included :-

Progress tracking and reporting of equipment function testing and all commissioning activities.

Supervision of functional demonstrations to Syncrude Power Distribution department (PD).

Management of re-lines and final handover documentation. Development of client training program. Tracking and resolving Engineering issues with Engineering Contractor. Review Handover documentation and attending System Walk downs.

July ’12 to Oct ‘13 Kentz-TSS

Alberta,Canada

Aurora Mine Relocation Project , Alberta ,CanadaContracted to Imperial Oil as the E&I Commissioning Lead.Responsibilities included :-

Population of Project Completions database Control of As built/Redlines Safety Training of all Commissioning Personnel. Lead the FAT inspections of Vendor supplied equipment and modules. Scheduling of Vendor start up assistance. Deputizing for System Completions Manager. Supervise Commissioning personnel and liaise with Syncrude during Start up .

Oct ’10 – July ‘12 Kentz USA. Inc

ExxonMobil NRU Project, Hawkins, Texas.Contracted to ExxonMobil USP as Project Commissioning Lead.Responsibilities included :-

The development and completion of all Project TCP documentation. Definition of Process System boundary definitions and development of Equipment/

Instrument databases for progress tracking and planning. Scheduling/planning of manpower resources and equipment for all disciplines for the

Commissioning and Start up activities. Assisting with initial set up of Mechanical Completion system and development of

associated documentation. Carry out technical review of Contractors handover documentation and ensure quality of

the works according to Clients requirements and specification Scheduling and participation in Tri-party MC inspection walk downs Management of all Testing, trouble shooting activities and turnover of Instrumentation

and Electrical Systems including HV Distribution, DCS,F&G and SIS Systems. Transferred to ExxonMobil Operations to assist with Co-ordination of startup activities.

Jan ’10 to Sept’ 10Kentz USA. Inc

Pearl GTL Utilities, Ras Laffan , Qatar.Contracted to KBR as E&I Completions Lead on the HRSG units .Responsible for driving the E&I contractor to deliver a quality installation on schedule. Duties included scheduling of joint walk downs, verification of punch list clearance and adherence to specifications, ensuring all engineering and materials issues were addressed promptly and reviewing of handover documentation .

June 09 to Dec ‘09Kentz Russia

Sakhalin

Sakhalin Energy BS2, Castella, Sakhalin Island, Russia.Contracted to facility owner SEIC, and seconded to main contractor Eaststroy LLC(Korea) as E&I Commissioning Coordinator for the Rolls Royce Gas Compression packages. Initial duties included the development of reporting systems and equipment databases, planning and scheduling of works with Rolls Royce site representatives, development of test packages and System HO documentation.Later responsible for management of all E&I testing and commissioning activities, vendor co-

2

Page 3: Tom Duffy- Resume Feb 2016 wo quals

ordination ,control of “as-Built” documentation and timely submittal of progress report to senior SEIC Project management. Deputized for facility Commissioning Manager during rotation.

Sept’08 to May ‘09Kentz UK .Ltd

South Hook LNG Terminal, Milford Haven, Wales.Contracted to facility owner as System Completions Supervisor. Responsible for scheduling of balance of works , generation of “works to go” and punch lists for E&I contractor , scheduling and execution of joint walk downs with EPC contractor and overseeing completion of MC handover documentation and updating of WinPCS project tracking system. Implementation of commissioning driven construction program to facilitate sequential process system handover. Preparation of progress reports for construction Manager.Seconded to Commissioning Department to oversee completion of TCP documentation for final handover. Later assisted De Norske Veritas with the validation of SIL targets for ESD system.

Jan ’08 to Sept ‘08Kentz Caspian

Tengiz-Chevroil SGP Project, Kazakhstan.Contracted to Parsons-Flour Daniel as Loop Check /Commissioning Lead to supervise activities and overseeing the preparation of contractor’s handover documentation.Duties also included the training and supervision of local personnel, management of personnel rotation schedules and travel arrangements and other personnel issues.

Jan’07 to Dec ‘07Mercury Int’lKingdom of

Bahrain

World Trade Center, Manama, Bahrain.Contracted by Mercury International on prestigious show piece project as Commissioning Manager for all M&E commissioning and QA/QC activities. Responsibilities include:- production of detailed commissioning method statements for all services ,co-ordination of inspection and commissioning activities and scheduling of specialist subcontractors ,resolving design issues with the main contractor and owner ,control of site variations and as-built documentation and handover documents.

Feb ‘04 to Jan ‘07Gaslines Ltd

Ireland

Gaslines Ltd, IrelandRegional Operations Manager.Responsible for sales and servicing of online and portable gas detection equipment .Project surveys and preparation of Tenders. Co-ordination of project execution and after sales services, including scheduled equipment inspections and calibrations.

Oct ‘03 to Nov ‘03Dumul B.V.

The Netherlands

Kuwait Petroleum, Europort, Rotterdam. Commissioning Manager , responsible for Instrument and Electrical check out ,punch list management ,progress reporting ,vendor co-ordination ,”as built” and documentation and final handover.

Feb ‘03 to Sept ‘03Dumul B.V.

The Netherlands

Lyondell Chemicals, Europort, Rotterdam. PO-11 ProjectQA/QC Manager , overall responsibility for Electrical ,Instrumentation and Mechanical inspection ,testing ,and document handover ,overall management of manpower and activities the generation daily and weekly progress reports.

Feb ‘02 to Dec ‘02Dumul B.V.

The Netherlands

v.d Geest & de Noord , Swijndrect ,The NetherlandsProject Manager, responsible for construction, inspection and testing of Ships Control, Utility and Safety systems .Duties also included vendor co-ordination, document control and demonstration of safety systems for Ship certification.

July ‘01 to Dec 2001

Dumul B.V. The Netherlands

Novorossiysk, Caspian Pipeline, Black Sea Oil Terminal, Russia.Commissioning Manager, responsible for Instrument and Electrical installation inspection ,testing ,punch list management and plant commissioning .Other duties included vendor co-ordination ,document handover , and training of in house personnel.

Sept ‘00 to July ‘01D.P.SIreland

Schering Plough (Avondale) Ltd, Rathdrum, IrelandElectrical/Instrument commissioning engineer responsible for installation inspection and validation, commissioning activities, vendor co-ordination and control of “as-built” documentation.

Mar ‘00 to July ‘00Dumul B.V.

The Netherlands

United Nations War Crime Tribunal, The Hague.Contracted to the UN as Project Manager for an extension to and upgrading of existing electrical systems, computer network and HVAC installation .Responsibilities included contractor co-ordination, progress measurement and document control.

Jan `99 to Jan ‘00Dumul B.V.

The Netherlands

Eastman Chemicals, San Roque, Spain.Project Manager , responsible of all Electrical, Instrumentation and Mechanical inspection ans commissioning activities .Also responsible for generation of project progress reports and co-ordination of Engineering contractor and sub contractors.

3

Page 4: Tom Duffy- Resume Feb 2016 wo quals

Duties also included scheduling of specialized vendor assistance and training of on site personnel during loop check out and commissioning activities.

March `97 – Nov `98

Dumul B.V. The Netherlands

Eastman Chemicals, Europort, Holland.Supervision of Electrical and Instrumentation inspection activities. Responsible for the generation daily and weekly mechanical completion reports. After mechanical completion assisted with loop check out and commissioning activities

Jan `97 –March `97Dumul B.V.

The Netherlands

Maersk Dan FF,Zwindrecht Holland (Grootint)Commissioning Team Manager. Delegation of specific work packs. Technical support for the commissioning Technicians. Development & implementation of commissioning driven construction program to facilitate sequential process system handover. Preparation of progress reports for construction Manager. I had specific responsibility for the ESD, Fire & Gas and associated Vendor coordination.

July `96 – Dec `96Dumul B.V.

The Netherlands

Clyde P6 Alpha, Dutch Offshore Sector Supervisor responsible for commissioning of all process and shutdown instrumentation on a Gas Compression module as part of a major refurbishment program. My duties included the preparation of work packs to facilitate the Loop by Loop change over of the existing process control equipment into the upgraded Bailey control system. All activities were carried out within a permit to work environment.

Jan `95 – May `96Dumul B.V.

The Netherlands

Shell Per + Europoort, Holland.Initially responsible for the Mechanical completion and Loop checking activities reporting to the Project Manager. My duties included the supervision and control of the inspection and checkout teams to ensure that the project handover schedule was met in a timely and professional manner. Equipment commissioned included a Honeywell DCS (Approx. 3000 I/O ) and associated field installations.

Mar `93 – Dec `94Dumul B.V.

The Netherlands

Maersk (Harold West ) , Zwindrecht (Grootint) Progress monitoring and reporting. Identification of problem areas and de-bottlenecking the checkout process. Development of a 14-day look-ahead schedule to ensure minimum lost time on attempted checkout and handover activities. Vendor and client liaison were also part of my responsibilities.

May `92 – Feb `93Dumul B.V.

The Netherlands

Statoil Refinery Denmark (Kalunburg) Working as part of the project management team with responsibility to ensure that the Instrumentation and Electrical installations were inspected, documented and handed over to the client per the project specifications and contractual requirements. My subordinates included 5 Inspectors and 15 commissioning Technicians. The project consisted of a Honeywell DSC (3500 I/O ) and associated field equipment.

Nov '91 - April '92K.T.S

The Netherlands

North Sea Petrochemicals, Antwerp, Belgium. Instrument Engineer, responsible for factory acceptance of vendor supplied equipment, pre/calibrations and installation inspection. Subsequently took responsibility for checkout and start-up activities.

Mar '91 - Sept '91K.T.S

The Netherlands

Hoogovens H07, Holland.Instrument Engineer/Supervisor, responsible for the quality control of all instrument installation. Responsible also for the generation of instrument indexes. Verification and as-building of loop diagrams. Later took sole responsibility for control system check out on all systems associated with a Steel Production Plant.

July '90 - Sept '90K.T.S

The Netherlands

North Sea Petrochemicals, Antwerp, Belgium Commissioning Engineer, responsible for quality inspection of E & I contractor’s installation. Duties later included coordinating check list and start-up activities

Jan '90 - June '90K.T.S

The Netherlands

Scott Paper, . Orleans, France.Instrument Supervisor, duties included verifying inspection of installation of E & I contractor, monitoring their reported progress and prioritizing activities. Later accepted sole responsibility for instrument and electrical testing and commissioning activities, production of as-built drawings and the training of in-house maintenance personnel - Honeywell TDC 3000 and Gould Modicon.

Jan '89 - Oct '89K.T.S

Kuwait Oil Co., Europoort, HollandProject Supervisor, overseeing quality control, Electrical & Instrumentation installation and loop-

4

Page 5: Tom Duffy- Resume Feb 2016 wo quals

The Netherlands checking activities on a refinery upgrade project.

Sept '88 - Dec '88K.T.S

The Netherlands

General Electric Plastics, Bergen-op-Zoom, Holland Instrument Engineer contracted to G.E.P. Responsible for accepting the installation from E & I contractor and resolving engineering queries. Also responsible for coordinating commissioning and start-up activities.

April '88 - Aug '88K.T.S

The Netherlands

Scott Paper, Duffel, Belgium.Contracted to assist Scott Eng. Department with commissioning and trouble shouting on a prototype tissue machine. Duties also included training of in-house maintenance staff on the associated control systems and as-built instrument drawings.

Sept '87 - Mar '88K.T.S

The Netherlands

Oilofina, Zelzate, Belgium.Project Manager, responsible for electrical installation, qualitycontrol, loop-checking and commissioning of Fatty Alcohol Plant.

June ‘87 - Sept’ 87K.T.S

The Netherlands

Placid Oil Co., Holland ( K12B )Team Supervisor involved with coordinating commissioning of process instrumentation and fire & gas detection systems on a new Natural Gas Platform.

April `87-June `87K.T.S

The Netherlands

Conoco, Schiedam, Holland.Instrument Supervisor co-ordination, pre-calibrations, installation quality control and loop check out.

Aug`86 - Mar `87M.F.Kent,B.V

Esso, Europort, Rotterdam.Contracted to ESSO maintenance department to train in house personnel and to assist the development of a preventive maintenance program.

Sept '85 - July '86MF Kent Intl.

ESSO, Europort, Rotterdam-Flexi Coker ProjectInstrument Construction Supervisor responsible for the quality control of instrumentation installation, updating of QA documentation and as-built drawings. Duties also included supervision and expediting of all problems associated with loop-checking of a distributed control system.

June '85 - Aug '85MF Kent Intl.

H.C.G. Eng. Schiedam, Holland Commissioning Superintendent, coordinating loop-checking and commissioning activities of all control and safety systems associated with offshore production platforms.

May '83 - May '85MF Kent Intl.

Kuwait Oil Co., KuwaitContracted to Kuwait Oil Co to supervise the installation andCommissioning of new on-line analysis stations. Upon completion of this project I took up position as Maintenance Supervisor on an L.P.G. production complex overseeing twenty instrument technicians. Duties also included planning and scheduling of plant shutdowns.

Feb '83 - April '83MF Kent Intl.

South African BreweriesContracted by M.F.Kent International to installation inspect, loop check and commissioning activities for a new CO2 Plant

***