Page 1: Template Test Plan V10

SAP AG

Version: X.Y

Author: <name>

Test Plan Documentation

Project: <name>

History

Version Date Comments (Author)

X.Y

About this TemplateYou use this template to document how the testing of this project will be organized. The document is organized as a type of questionnaire.This document contains form elements to simplify the data entry but it requires to be in protected mode in order to enable the form entry.

© 2023 SAP AG Project: <name> Version: X.YDate:

Page 1 of 19

Page 2: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

Table of ContentsRoles and Responsibilities for Testing.......................................................................................3Transport Landscape.................................................................................................................................. 4Roles, Responsibilities and Workflow.......................................................................................................5Change request............................................................................................................................................ 6

Current Test Strategy....................................................................................................................7Activities distribution.................................................................................................................................. 7Definition of test scope............................................................................................................................. 11Development of tests................................................................................................................................. 12Customer specific quality targets and criteria........................................................................................12Test Case description................................................................................................................................ 13Test result documentation........................................................................................................................ 14Test KPIs.................................................................................................................................................... 15Test data preparation and management..................................................................................................15

Test execution.............................................................................................................................17Execution.................................................................................................................................................... 17Monitoring.................................................................................................................................................. 17Error Tracking............................................................................................................................................ 18Tools ..................................................................................................................................................... 18

Page 2 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 3: Template Test Plan V10

Test Plan Documentation Project: <name>

Roles and Responsibilities for Testing

Action: Please enter information about Test Management roles and responsibilities and provide the con-tact details of the persons in these roles.

Example:

Role / Area Responsible Company Phone e-Mail

Business Process Owner(s) John SmithKlaus Muster-mann

XYZ GmbHXYZ GmbH

+49(1)777-888+49(1)888-777

john.smith @xyz.com

[email protected]

Roles

Role / Area Responsible Company Phone e-Mail

Executive Sponsor                        Test Project Manager(s) / Test Coordinator(s)

                       

Application implementation / operation

                       

Technical implementation / operation

                       

Business Process Owner(s)                        Key / Power User(s)                        Test Case Development                                                                                  

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 3 of 19

Page 4: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

Transport Landscape

Please describe the transport landscape of the chosen solution in the tables below.

Action: In this table please enter the information regarding productive systems in the landscape.

Example:

SID1 System role Release

PRD R/3 system, Automotive 4.7 SR 2

Productive system

SID System role Release

               

Action: In this table please enter the information about each system in the transport landscape. This in-cludes the SID of the ‘upstream’ 2- and ‘downstream’ 3-systems for each system in the landscape.

As soon as the table is completed, it describes the whole transport landscape and the transport routes in the landscape.

Example: the table below describes the classical 3-systems landscape DEV 4 -> QAS 5 -> PRD 6. Here PRD is a downstream-system for QAS and DEV is upstream-system for QAS:

SID Role in the transport landscape SID of ‘up-stream’ - system

SID of ‘down-

stream’ - system

DEV Development system - QAS

QAS Quality Assurance system DEV PRD

PRD Productive system QAS -

1 SID – System ID. The name for your SAP system which is unique throughout your organization and must consist of exactly three alphanumeric characters

where only uppercase letters are allowed and the first character is a letter (not a digit)

2 ‘Upstream’-system means a system where the transports come from

3 ‘Downstream’-system means a system where the transports go to

4 DEV – development system in a transport landscape

5 QAS – quality assurance system in a transport landscape

6 PRD – productive system in a transport landscape

Page 4 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 5: Template Test Plan V10

Test Plan Documentation Project: <name>

Systems in Transport Landscape

SID Role in the transport landscape SID of ‘up-stream’ - system

SID of ‘down-

stream’ - system

                 

                 

                 

                 

                 

                 

                 

Roles, Responsibilities and Workflow

Action: Please describe in the column ‘Project, Name and Role’ who is responsible for each particular step in the change management and the corresponding role. If they are different for several projects please en-ter the information for each project in one field using a project short name as a prefix.

Example:

Step / Function Project, Name and Role

Perform functional test in DEV PSAP_R3 - J.Smith, Test Manager; SCM_SAP - S.John, Test Manager

Roles in Change Management

Step / Function Project, Name and Role

Decision about software projects <Please type in your answer here>

Create and assign transport requests to developers

<Please type in your answer here>

Plan functional test in DEV <Please enter your answer here>Perform functional test in DEV <Please enter your answer here>Transport into QAS <Please enter your answer here>Monitor result of import in QAS <Please enter your answer here>Plan test in QAS <Please enter your answer here>Perform test in QAS <Please enter your answer here>Approval of test <Please enter your answer here>Import into PRD <Please enter your answer here>Monitor result of import in PRD <Please enter your answer here>

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 5 of 19

Page 6: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

An exception to the standard transport workflow could be necessary to allow fast reaction to urgent problems in the productive system.

Action: Please answer the question:

ExeptionsQuestions Answers

Is an exception to this workflow al-lowed (e.g. for emergency trans-ports)?

Yes No

Who can request those emergency transports?

End User

Key User

Business Process Owner

System Owner (Administrator)

Development

<Other>DD.MM.YYDD.MM.YY

Who is responsible for approval of emergency transports?

Key User

Business Process Owner

System Owner (Administrator)

Development Manager

<Other>DD.MM.YYDD.MM.YY

DD.MM.YYDD.MM.YY

Change request

Action: Please mark the appropriate field if there is any standard change request form in use in the com-pany and if there is a change request database storing the requests, which are already processed.

Change Request Form and DatabaseQuestions Answers

Change request form available? Yes No

Change request database available? Yes No

Page 6 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 7: Template Test Plan V10

Test Plan Documentation Project: <name>

Current Test Strategy

Activities distribution

Action: Please use the tables below to describe how the test activities are assigned to organizational units in the company. We are interested in the following test types: Unit Test 7, User Acceptance Test 8, Cus-tomer Development Test 9, Integration Test 10, Regression Test 11 and Technical System Test 12. For each activ-ity in each table, please mark the appropriate organizational units (one or more) which are responsible for this particular activity.

If there are any comments or additions regarding activities distribution please use the field under the table.

In each table for each activity mark at least one responsible organizational unit.

Unit Test Who performs an activity?

Activities

Every Busi-ness Depart-ment on their own

Central Test organization in each branch

Central Test organization corporate wide

Central IT department

Project team <Other>

to decide what needs to be tested

to create test case descriptions

to organize testing

to execute test

to monitor test

to evaluate test results

Comment to the table above: <Please enter your comment here>

7 Unit Test – the lowest level of testing where the program or transaction is tested and evaluated for errors

8 User Acceptance Test – represents end-to-end testing from the business perspective. The purpose of that is to prove that initial business requirements were

implemented exactly and in accordance to specifications made before

9 Customer Development Test – mixture of Unit Test and Integration Test with scope limited to the customer’s own development

10 Integration Test – is accomplished through the execution of predefined business flows, or scenarios, that emulate how the system will run your business. In-

tegration Test starts with the testing of the cross-functional integration points and ends with the end-to-end testing of critical business processes

11 Regression Test – test of critical business processes after a change to ensure that a) any problem has been fixed and that no other previously working

functionality has been harmed as a result of the changes and/or b) that newly added features working as designed and have not created any unexpected side effects

12 Technical System Test – test aimed to verify the production system environment from a technical standpoint, e.g. to test if the system can be started /

stopped properly, if the basis technical infrastructure is working fine and the whole system in conjunction with database and operating system performs well from technical point of view. Among this the following technical tests are usually part of Technical System Test: backup and recovery, system administration, printing and faxing, failure scenarios, disaster recovery

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 7 of 19

Page 8: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

User Acceptance Test Who performs an activity?

Activities

Every Busi-ness Depart-ment on their own

Central Test organization in each branch

Central Test organization corporate wide

Central IT department

Project team <Other>

to decide what needs to be tested

to create test case descriptions

to organize testing

to execute test

to monitor test

to evaluate test results

Comment to the table above: <Please enter your comment here>

Customer Development Test

Who performs an activity?

Activities

Every Busi-ness Depart-ment on their own

Central Test organization in each branch

Central Test organization corporate wide

Central IT department

Project team <Other>

to decide what needs to be tested

to create test case descriptions

to organize testing

to execute test

to monitor test

to evaluate test results

Comment to the table above: <Please enter your comment here>

Page 8 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 9: Template Test Plan V10

Test Plan Documentation Project: <name>

Integration Test Who performs an activity?

Activities

Every Busi-ness Depart-ment on their own

Central Test organization in each branch

Central Test organization corporate wide

Central IT department

Project team <Other>

to decide what needs to be tested

to create test case descriptions

to organize testing

to execute test

to monitor test

to evaluate test results

Comment to the table above: <Please enter your comment here>

Regression Test Who performs an activity?

Activities

Every Busi-ness Depart-ment on their own

Central Test organization in each branch

Central Test organization corporate wide

Central IT department

Project team <Other>

to decide what needs to be tested

to create test case descriptions

to organize testing

to execute test

to monitor test

to evaluate test results

Comment to the table above: <Please enter your comment here>

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 9 of 19

Page 10: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

Technical System Test Who performs an activity?

Activities

Every Busi-ness Depart-ment on their own

Central Test organization in each branch

Central Test organization corporate wide

Central IT department

Project team <Other>

to decide what needs to be tested

to create test case descriptions

to organize testing

to execute test

to monitor test

to evaluate test results

Comment to the table above: <Please enter your comment here>

Page 10 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 11: Template Test Plan V10

Test Plan Documentation Project: <name>

Definition of test scope

Action: Please use the table below to document how you evaluate which test cases are needed for specific software changes and software maintenance. In other words, which methods and strategies are in use to help in decision of which test cases should be executed after a change of a specific type?

Test Scope

Possible methods

Change type

projects regular main-tenance

hot fix process

General regression testing of all core business processes

Analysis of changed / new objects and affected application area

Evaluation of customizing settings to identfy which processes are configured and therefore most likely used and potentially affected by changes

Evaluation of load profile (e.g. EWA 13, ST14, RBE 14, etc.) to find the business processes with a high load (meaning that such processes could also be most critical for everyday work)

Only new functionality will be tested, usually no Regression Testing

Others: <Please enter an additional method here if there is any>

13 EWA – Early Watch Alert

14 RBE - Reverse Business Engineer - a tool used for process-oriented analysis and continual optimization of SAP production systems. Using data from pro-

duction systems it is possible to analyze how functions in the SAP System are used and identify potential for improvement

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 11 of 19

Page 12: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

Development of tests

Action: Please use the table below to specify who is responsible for developing test cases. Please also specify what kind of testing is meant (manual or automated).

Development responsibility

Options Manual Automated Remarks

Every Business Department on its own <Please enter your comment here>

Specific project team (implementation / up-grade / etc.)

<Please enter your comment here>

Central Test Organization in each branch <Please enter your comment here>

Central Test Organization corporate wide <Please enter your comment here>

Central IT department <Please enter your comment here>

<Please put in an additional option here if there is any>

<Please enter your comment here>

<Please put in an additional option here if there is any>

<Please enter your comment here>

Customer specific quality targets and criteria

Completeness of any test plays an important role in the total success of the test. A complete test of a complex business scenario very often cannot be created without participation of the people who deal with the scenario in their day-to-day work.

As the major goal of any test activity is to get reliable results, a controlling of correctness, completeness and grade of detail is very important.

Action: Please answer the questions below.

Quality targets and criteria

Questions Yes No Remark

Is the ‘2-person policy’ in use, i.e. test cases need to be tested twice by 2 different persons?

<Please enter your comment here>

Are there any customer-specific quality targets or criteria?

Which?<Please enter your comment here>

Are there special requirements regarding docu-mentation of test cases (paper or electronic)

Which?<Please enter your comment here>

Are there some legal requirements affecting the test process?

Which?<Please enter your comment here>

Page 12 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 13: Template Test Plan V10

Test Plan Documentation Project: <name>

Questions Yes No Remark

Is there a person controlling the completeness of the tests?

Who is this person?<Please enter your comment here>

Is there a person controlling the correctness of the tests?

Who is this person?<Please enter your comment here>

Is there a person controlling the grade of detail of the tests?

Who is this person?<Please enter your comment here>

Do you use templates for test case creation? Example?<Please enter your comment here>

Test Case description

Action: Please use the table below to specify what information is included in the standard test case de-scription adopted to use in the company.

Information in Test Case description

Information Available Remarks

Test Case ID(unique identfier)

<Please enter your comment here>

Name of Project <Please enter your comment here>

Name of Business Process <Please enter your comment here>

Owner of Test Case <Please enter your comment here>

Test Type (e.g. Unit, Integration, Regression) <Please enter your comment here>

Test System <Please enter your comment here>

Client <Please enter your comment here>

Detailed description of preparation activities <Please enter your comment here>

Detailed description of test procedure <Please enter your comment here>

Check / Expected Test Results <Please enter your comment here>

Only for Integration Testing: dependencies on other test cases (predecessor and successor)

<Please enter your comment here>

<Please enter an additional option here if there is any>

<Please enter your comment here>

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 13 of 19

Page 14: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

Test result documentation

Action: Please answer the questions below.

Handling of Test Results

Question Yes No Remark

Do you document the results of the manual testing? How?<Please enter your comment here>

Do the currently used tools allow the tester to document the test results (results such as what has been tested by whom, when and with which results)

<Please enter your comment here>

Action: Please use the table below to specify what information is included in the standard test result doc-umentation adopted to use in the company.

Information in Test Result Documentation

Information Available Remarks

Name of Tester <Please enter your comment here>

Master Data <Please enter your comment here>

Transactional Data <Please enter your comment here>

Actual Test results <Please enter your comment here>

Status information <Please enter your comment here>

Remarks <Please enter your comment here>

Signature <Please enter your comment here>

Date of Test <Please enter your comment here>

<Please put in an additional option here if there is any>

<Please enter your comment here>

Page 14 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 15: Template Test Plan V10

Test Plan Documentation Project: <name>

Test KPIs

Action: Please mark in the table below what kind of measurements via predefined KPIs 15 you have re-garding reliability of the tests.

Test KPIs

Possible measurement Yes No Remark

General Stability <Please enter your comment here>

Availability / unplanned downtime <Please enter your comment here>

Performance <Please enter your comment here>

No. of short dumps <Please enter your comment here>

No. of update-errors <Please enter your comment here>

No. of trouble tickets (per component) <Please enter your comment here>

Interface throughput <Please enter your comment here>

<Please enter additional measurements if there are any> <Please enter your comment here>

Test data preparation and management

Action: Please describe what methods you use to prepare the data in QA system database before test-ing.

Test Data Preparation

Possible method Yes No Remarks

Refresh via system copy of PRD <Please enter your comment here>

Refresh via client copy from PRD <Please enter your comment here>

Refresh via client copy from a standard client in QAS <Please enter your comment here>

15 KPI - key performance indicator - a measurement or metric for evaluating a company's business strategy, performance, or technology. KPI express abstract

company objectives in financial or physical units for comparative purposes

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 15 of 19

Page 16: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

Possible method Yes No Remarks

Manual creation of master data <Please enter your comment here>

Automated creation of master data <Please enter your comment here>

Manual creation of transaction data <Please enter your comment here>

Automated creation of transaction data <Please enter your comment here>

<Please enter an additional method if there is any> <Please enter your comment here>

Action: Please describe what methods you use to manage the test data (to create it, to store it, to update it, etc.) for testing.

Test Data Management

Possible method Yes No Remarks

Microsoft Office Excel spreadsheets <Please enter your comment here>

Local or central test data databases What kind of databases?

<Please enter your comment here>

Paper <Please enter your comment here>

Automated Test Tools <Please enter your comment here>

Test data is not managed centrally and is up to a tester <Please enter your comment here>

<Please enter an additional method if there is any> <Please enter your comment here>

Page 16 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 17: Template Test Plan V10

Test Plan Documentation Project: <name>

Test execution

Execution

Action: Please answer the questions below.

Execution: Manual or Automated?

Question Yes No Remark

Do you use manual testing in your current test approach? <Please enter your comment here>

Do you use automated testing in your current test approach? How?<Please enter your comment here>

What part (percentage) of the total testing do you perform manually?

<Please enter your comment here>

Monitoring

Action: Please answer the questions below.

Monitoring

Question Yes No Remark

Does the current test approach allow you to have a clear picture of the testing progress at every point of time?

<Please enter your comment here>

Does the current test approach allow you to estimate whether the time schedule is going to be kept?

<Please enter your comment here>

Does the current test approach allow you to have an overview of the actual test results?

<Please enter your comment here>

Does the current test approach allow you to react as re-quired in case of error?

<Please enter your comment here>

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 17 of 19

Page 18: Template Test Plan V10

Project: <name> Test Plan Docu-mentation

Error Tracking

Action: Please describe the workflow for error tracking established in the company.

Error TrackingQuestions Answers

Who is involved in case of an error during tests in QAS? <Please enter your answer here>

Do you have a defined process in case of test errors (feedback loop / issue tracking) ?

Yes No

How does the workflow look like to correct these errors? <Please enter your answer here>

Tools

Action: Please answer the questions below.

Tools

Question Yes No Remark

Do you use CATT 16 / eCATT 17 for testing? <Please enter your comment here>

Are there any 3rd party tools involved in your current test approach?

<Please enter your comment here>

Are there any tools used for assignment of testers? <Please enter your comment here>

Are there any tools used for execution of tests and docu-mentation of results?

<Please enter your comment here>

Are there any tools used to follow-up in case of error? <Please enter your comment here>

Are there any tools used to manage test data? <Please enter your comment here>

16 CATT - Computer Aided Test Tool - an SAP tool enabling you to combine and automate business processes as repeatable test procedures

17 eCATT - extended CATT - a successor of SAP CATT which provides more flexibility and functionality. Delivered starting with the basis release 6.20 of the

SAP Web AS

Page 18 of 19 Project: <name>Version: X.YDate:

© 2023 SAP AG

Page 19: Template Test Plan V10

Test Plan Documentation Project: <name>

Copyright 2009 SAP AG. All Rights Reserved

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other soft-ware vendors.

SAP, R/3, xApps, xApp, SAP NetWeaver, Duet, SAP Business ByDesign, ByDesign, PartnerEdge and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in

Germany and in several other countries all over the world. All other product and service names mentioned and associated logos displayed are the trademarks of their respective companies. Data contained in this document serves informational

purposes only. National product specifications may vary.

The information in this document is proprietary to SAP. This document is a preliminary version and not subject to your li-cense agreement or any other agreement with SAP. This document contains only intended strategies, developments, and functionalities of the SAP® product and is not intended to be binding upon SAP to any particular course of business, prod-uct strategy, and/or development. SAP assumes no responsibility for errors or omissions in this document. SAP does not

warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied

warranties of merchantability, fitness for a particular purpose, or non-infringement.

SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negli-

gence.

The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party

Web pages nor provide any warranty whatsoever relating to third-party Web pages.

© 2023 SAP AG Project: <name>Version: X.YDate:

Page 19 of 19