Transcript
Page 1: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

speedformtm

Page 2: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

s p e e d f o r m t m

1

With headquarters in Malaysia, serving as the central hub, and being supported by its subsidiaries in Singapore, Philippines and India together with invaluable partners in other markets, we have positioned ourselves as a leading building products player with an established and extensive network throughout Asia and the Middle East.

Long term partnerships with our customers motivate us to continuously extend our product offering to more reinforcement and construction accessories. Our product range is used from small scale residential projects to large development projects in infrastructure, high rise or commercial construction. Our specialized teams are there to provide technical information and to ensure consistent and high quality solutions.

Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The Halfen-Moment Group has access to financial resources, innovative products and technical expertise from around the world in order to support its continuous development.

Being part of a stock quoted company, we are aware of our global, local and social responsibility. Leading our business with integrity is our daily credo!

HALFEN-MOMENT GROUP

MILESTONES

1991

1998 20101999 2003 2005 2008

Incorporation of MOMENT

Expansion of MOMENT to

Singapore

Expansion of

MOMENT to India

Expansion of MOMENT to

Philippines

MOMENT goes Middle

East

First patent of MOMENT BARBREAK

coupler

Sole distributorship

for FORTA reinforcement fibre in Asia

ThE haLfEN-MOMENT GrOup Of cOMpaNIES STarTEd ITS

OpEraTION IN MaLaySIa, SuppLyING MEchaNIcaL cOupLErS TO

cONSTrucTION SITES, aS a cOST EffEcTIvE aLTErNaTIvE fOr

cONvENTIONaL SpLIcING. ONE Of Our fIrST IcONIc prOjEcTS

waS ThE pETrONaS TOwErS. SINcE ThEN, ThE GrOup haS bEEN

ExpaNdING rapIdLy aNd TOday ThE MOMENT® cOupLEr IS a wELL-

ESTabLIShEd braNd IN ThE MarkET.

Page 3: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

H A L F E N M O M E N T

2

QuaLITy OuTSTaNdING SuppOrT

2012 2014 20152013

2016

Acquisition of MOMENT by CRH and restructuring as HALFEN-MOMENT

Group

Widening of product portfolio via

collaboration with CRH subsidiary companies:

HALFEN, ANCON AND PLAKA GROUP

Launching of the complete range of

precast accessories

Participating in the iconic Qatar Basin

project with 2.5 million epoxy couplers

supplied within the year

Providing quality assurance & safe products through excellent service, is one of the top principles of Halfen-Moment Group. Being part of CRH plc., we strive to adhere to the most stringent group quality policies. Our in house team is conceived daily with quality checks to ensure the highest quality is offered. Our quality management system is accorded by the ISO 9001 : 2008 accreditation.

Halfen-Moment Group offers additional services to you from technical support, statistical calculation to product installation performed by our qualified engineers & specially trained staff.

Development of operational

excellence with Lean 6S Safetyimplementation

Page 4: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

L I F T I N G A N C H O R S Y S T E M

LIGhTwEIGhT, MuLTIpLE ShapES,varIETy Of appLIcaTIONS 4

SpEEdfOrMTM bENEfITS 5

TEchNIcaL SpEcIfIcaTION 6

pErfOrMaNcE cOMparISON 7

METhOd Of appLIcaTION- pILE cap & baSES 8

TypIcaL LayOuTS fOr dIffErENT pILE capcONfIGuraTIONS 8

fOuNdaTION baSES 9

bEaM OpTIONS 9

cIrcuLar fOrMwOrk 10

SuppOrT TEchNIQuES 11

ThE SpEEdfOrMTM SErvIcE 12

prOjEcTS 13

cONTENTS

Page 5: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

H A L F E N M O M E N T

4

MOMENT® SPEEdFORMTM

Lightweight, Multiple Shapes, variety Of applicationsThe formwork of the future is here now!

The innovative solution to conventional formwork SpeedformTM is the result of many years of intensive research and development overseas.The basic material consists of a steel wire mesh with a heat-shrunk layer of polyethylene applied to both sides of the mesh.

This combination creates a material that is both light and structurally strong, making it extremely easy to handle.

SpeedformTM not only IMPROVES SITE SAFETY but also SAVES TIME, CONCRETE & LABOUR!

Page 6: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

s p e e d f o r m t m

5

Flexible

SpeedformTM is a versatile formworking material perfect for those radius specifications. The strength and versatility of SpeedformTM make it the natural choice for the following applications:

• Groundbeams

• Footingsandbases

• Pilecaps

• Constructionjoints(stopends)

• Specialshapesorcurves

• Voidformation

• Ribbedandwaffleslabs

• Penetrations

• Recesses

• Temporaryfencing

• Safetyscreens

• Othervarietyofapplications

SPEEDFORMTM (VR6) STANDARD SHEET SIzES

600 X 2250 mm 900 X 2250 mm 1200 X 2250 mm 1500 X 2250 mm 1800 X 2250 mm 1875 X 2250 mm

PreformedSpeedformTM is pre-formed and delivered to site ready for assembly or it can be simply folded on site using a manual folder.

High Speed FormworkSpeedformTM is designed for fast assembly. No hammer, nails or saws, just tie-wire.

Easy Installation ProcedureBecause is it pre-formed, it is easily assembled using on site labour.

SITE SAFETYSpeedformTM can provide enhanced site safety by:

• Back-filling excavations earlier than with conventionalformwork

• Minimisingneedforworkerstobeinexcavations• Reducing the heavy labour needed for conventional

formwork• Eliminatingtheneedtostripformwork

SpEEdfOrMTM bENEfITS

Page 7: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

H A L F E N M O M E N T

6

How strong is SpeedformTM ?

To demonstrate the strength of SpeedformTM as a formwork system, a sheet of SpeedformTM was bent into a 450 mm square x 1200 mm high form to replicate a form that would be used for a footing. The base was restrained by wood blocks, and three straps were used to hold the form body together.Two reinforcing bars were inserted through opposite sides.The inside of the form was then filled with ready mixed concrete.

As can be seen in this photograph, a minor amount of bulging is evident on the sides, but no other distress to the SpeedformTM is indicated. No leakage is visible, and there is no evidence of leakage at the locations where the reinforcement bars penetrated the sides.

As SpeedformTM is primarily intended as a sub-grade formwork system that is backfilled on the outside of the form before the concrete is poured, bulging of the sides will be negligible, as the sides will be restrained by the backfill.

ItemStandard

Other SpeedformTM types(AVAILABLE UPON REQUEST)

VR6 Standard VR4 VR8 VR10

MAINWIRESIZE(NOMINAL) 5.5 mm diameter 4 mm diameter 7.5 mm diameter 9.8 mm diameter

MAIN WIRE SPACING 150 mm c/c 100 mm c/c 150 mm c/c 150 mm c/c

CROSSWIRESIZE(NOMINAL) 4 mm diameter 4 mm diameter 4 mm diameter 4 mm diameter

CROSS WIRE SPACING 75 mm c/c 100 mm c/c 75 mm c/c 75 mm c/c

WIRE SPECIFICATION High tensile steelof tensile

strength 485 N/mm2 -Non Galvanised

High tensile steel of tensile

strength 485 N/mm2 -Non Galvanised

High tensile steel of tensile

strength 485 N/mm2 -Non Galvanised

High tensile steel of tensile

strength 485 N/mm2 -Non Galvanised

GALVANISEDCODE VR6G-Galvanisedwire VR4G-Galvanised VR8G-Galvanised VR1OG-Galvanised

POLYETHYLENE FILM 0.12 mm thick -One layer each side

0.12 mm thick -One layer each side

0.12 mm thick -One layer each side

0.12 mm thick -One layer each side

POLYETHYLENECOLOUR(*) Red Red Red Red

WEIGHT 2.64 kg/m2 2.62 kg/m2 3.78 kg/m2 5.69 kg/m2

STANDARDSIZEa)Widthb)Height

2250 mmCan be varied

according to order requirements

2250 mmCan be varied

according to order requirements

2250 mmCan be varied

according to order requirements

2250 mmCan be varied

according to order requirements

VR6 also available with two layers of 0.12 mm thick polyethylene on each side of wire mesh.Available as VR60. (*) -Other colours are also available subject to quantity of order.

TEchNIcaL SpEcIfIcaTION

Dimension and Availability

Page 8: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

s p e e d f o r m t m

7

PERFORMANCEDIMENSIONS

SPEEDFORMTM

CONVENTIONAL(TIMBER/

PLYWOOD)

ALUMINIUM/STEEL

FORMWORK

ADVANTAGES OFSPEEDFORMTM

SPEED Faster Slower Medium • Earlycompletion• Savinginpreliminariescost• Clientincentives• Lessdependentonweather

INVESTMENTCOST Low Low High • Lowinvestmentcost

LABOURREQUIREMENT

Lower Higher Medium • Lessrelianceonskilledlabour• Lowerlabourcost

SKILLS General Workers Skilled Carpenters & General Workers

Skilled Workers • Savinginlabourcost• Availability>speed

INSTALLATION Light & easy Tedious & Time Consuming

Simple but skilled labour

required

• Savetime• Savinginlabourcost

DEBRISREMOVAL Not required Required Not required • Savingindebrisremovalcost• Savetheenvironment/forest

LIFTINGDEVICE/CRANAGE

Man handled Cranage required Cranage required

• Smallerstoragespace• Moreworkingspace

STORAGE REQUIREMENT

Minimum High High • Savinginmachinery/cranagecost• Savinginoperatorcost

FORMWORK REMOVAL

Not required Required Required • Savetime

ENVIRONMENTALACCEPTANCE

Environmental friendly

High rate of timber consumption

& burning

Environmental friendly

• Enhancecorporateimage• Complieswithlegislation• Savetheforest

SITE CLEANLINESS Neat and clean Untidy, dangerousand hazardous

Neat & clean • Enhancesitesafety• Enhancecorporateimage• Improveproductivity

CORPORATE IMAGE

Excellent Poor Good • Enhancecorporateimage

pErfOrMaNcE cOMparISON

Page 9: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

H A L F E N M O M E N T

8

METhOd Of appLIcaTION- pILE cap & baSES

TypIcaL LayOuTS fOr dIffErENT pILE cap cONfIGuraTIONS

Single Pile DoublePile Triple Pile Multiple Pile

1. Apply lean concrete blinding after pile cap excavation.

2. Fix reinforcement cage and provide the necessary spacing from the blinding to allow for the concrete cover.

3. Place SpeedformTM around perimeter of pile cap after strategically securing strips of long spacers or equivalent.

4. Backfill excavation up to 150 mm from the top of the SpeedformTM to avoid contamination.

5. Pour and vibrate the concrete in accordance with good concreting practice.

6. The SpeedformTM remains in the ground.

1. 2.

4.

5.

3.

Page 10: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

s p e e d f o r m t m

9

ChangetheaboveYellowColouroutlinetoOrange.

Foundation - Bases

Bases can be constructed from either L-shapes or flat strips of Pecaform'"' similar to either beam or pile cap construction. Lean concrete blinding is applied in the traditional manner, and the reinforcement cage complete with spacer blocks at the bottom is lowered onto the blinding.

Pecaform"" is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers, bar chairs or equivalent.

Backfill excavation up to 1 50 mm from the top of the Pecaform"' to prevent contamination.

Beam options

Ground beams can be divided into two categories:

D Suspended Beams (on piled foundation)

The ground on which the beam is constructed should be capable of safely supporting the weight of the wet concrete during construction. Only nominal surface compaction is required and a thin layer of sand blinding to level the formation and bed-in the beam soffit may be necessary.

II Ground Bearing Beams

These are founded in the bearing strata. Therefore, a thin layer of sand may be used as blinding to bed-in the Pecaform"'. Unless supported independently, Pecaform ... relies on backfill to counteract the pressure exerted by the concrete pour. Suitable spacers attached to the reinforcement cage ensure the beam profile is maintained.

f,so PecaformTM • U-Shapes

Spacers

. .

Backfill

Sand

L-Shapes below blinding

L-Shapes above blinding

bEaM OpTIONS

fOuNdaTION baSES

Bases can be constructed from either L-shapes or flat strips of SpeedformTM similar to either beam or pile cap construction. Lean concrete blinding is applied in the traditional manner, and the reinforcement cage complete with spacer blocks at the bottom is lowered onto the blinding.

SpeedformTM is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers, bar chairs or equivalent.

Backfill excavation up to 150 mm from the top of the SpeedformTM to prevent contamination.

Ground beams can be divided into two categories:

Suspended Beams (onpiledfoundation)

The ground on which the beam is constructed should be capable of safely supporting the weight of the wet concrete during construction. Only nominal surface compaction is required and a thin layer of sand blinding to level the formation and bed-in the beam soffit may be necessary.

Ground Bearing Beams

These are founded in the bearing strata. Therefore, a thin layer of sand may be used as blinding to bed-in the SpeedformTM. Unless supported independently, SpeedformTM relies on backfill to counteract the pressure exerted by the concrete pour. Suitable spacers attached to the reinforcement cage ensure the beam profile is maintained.

ChangetheaboveYellowColouroutlinetoOrange.

Foundation - Bases

Bases can be constructed from either L-shapes or flat strips of Pecaform'"' similar to either beam or pile cap construction. Lean concrete blinding is applied in the traditional manner, and the reinforcement cage complete with spacer blocks at the bottom is lowered onto the blinding.

Pecaform"" is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers, bar chairs or equivalent.

Backfill excavation up to 1 50 mm from the top of the Pecaform"' to prevent contamination.

Beam options

Ground beams can be divided into two categories:

D Suspended Beams (on piled foundation)

The ground on which the beam is constructed should be capable of safely supporting the weight of the wet concrete during construction. Only nominal surface compaction is required and a thin layer of sand blinding to level the formation and bed-in the beam soffit may be necessary.

II Ground Bearing Beams

These are founded in the bearing strata. Therefore, a thin layer of sand may be used as blinding to bed-in the Pecaform"'. Unless supported independently, Pecaform ... relies on backfill to counteract the pressure exerted by the concrete pour. Suitable spacers attached to the reinforcement cage ensure the beam profile is maintained.

f,so PecaformTM • U-Shapes

Spacers

. .

Backfill

Sand

L-Shapes below blinding

L-Shapes above blinding ChangetheaboveYellowColouroutlinetoOrange.

Foundation - Bases

Bases can be constructed from either L-shapes or flat strips of Pecaform'"' similar to either beam or pile cap construction. Lean concrete blinding is applied in the traditional manner, and the reinforcement cage complete with spacer blocks at the bottom is lowered onto the blinding.

Pecaform"" is then placed against the side of the cage and spaced off the reinforcement with strips of long spacers, bar chairs or equivalent.

Backfill excavation up to 1 50 mm from the top of the Pecaform"' to prevent contamination.

Beam options

Ground beams can be divided into two categories:

D Suspended Beams (on piled foundation)

The ground on which the beam is constructed should be capable of safely supporting the weight of the wet concrete during construction. Only nominal surface compaction is required and a thin layer of sand blinding to level the formation and bed-in the beam soffit may be necessary.

II Ground Bearing Beams

These are founded in the bearing strata. Therefore, a thin layer of sand may be used as blinding to bed-in the Pecaform"'. Unless supported independently, Pecaform ... relies on backfill to counteract the pressure exerted by the concrete pour. Suitable spacers attached to the reinforcement cage ensure the beam profile is maintained.

f,so PecaformTM • U-Shapes

Spacers

. .

Backfill

Sand

L-Shapes below blinding

L-Shapes above blinding

U-Shapes

SpeedformTM

Backfill

U-Shapes

Spacers

Sand

L-Shapes below blinding

L-Shapes above blinding

SpeedformTM

L-Shapes

Backfill

Fixing Pin

Fixing Pin

Blinding

Blinding

150

SpeedformTM

L-Shaped

150

Excavated Profile

150 Backfill

Page 11: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

H A L F E N M O M E N T

10

cIrcuLar fOrMwOrk

Speedform™ can be used to surround large diameter bored pile cages in poor ground conditions. Any radius can be easily formed using either standard or cut-to-size units, and can be pre-formed to fit the pile cage.

Speedform™ is also suitable for manhole casing formwork or circular bases can be produced using composite units to suit varying diameters and depths, for instant site assembly against the reinforcement cage.

It also can also be used for construction above the ground of large diameter r.c. bases using tensioned straps for support during the concrete pour. This enables the units to be struck and re-used for other bases.

‘FASTER, EASIER AND

CHEAPER! ExTRA BENEFITS AT

NO ExTRA COST!’

Page 12: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

s p e e d f o r m t m

11

SuppOrT TEchNIQuES

Girders

For beams and footings up to and including 1.5 m in depth, where the SpeedformTM formwork is required to be re-used several times, the fastest and easiest technique is the girder system.This consists of a system of tie rods and girders strategically placed to give rigidity to the system during concreting. A simple locking mechanism at each end of the tie rod is designed to lock or unlock the girder and SpeedformTM

with great ease and speed.The SpeedformTM girder system for foundation formworking consists of:

• SpeedformTMVR6• Tierodsandlockingnails

The SpeedformTM foundation formworking system represents the most economical alternative to conventional formwork.

Progressive Backfill Method

SpeedformTM is supplied in U-Shapes for beams and pre-formed strips for footings to form the required profiles. These are assembled on the blinding, wired together, and lined up. Placing approximately 200 mm of backfill against the SpeedformTM stabilises the material prior to the concrete pour.

Backfilling should continue together with the concrete pour to counteract the increasing pressure on the SpeedformTM as the level of the concrete pour rises. Backfilling is required up to within 150 mm from the top of the beams and footings to avoid contamination.

Spacing timbers are recommended to maintain the beam width, but once the pour reaches the top of the SpeedformTM these should be removed to allow vibrating and surface finishing of the concrete.

Construction Joints

SpeedformTM is a suitable material for construction joints. Dependingon thedepthofconcrete tobe retained,supportmethods may vary.

Massive foundations such as those used for high rise buildings have many construction joints.

SpeedformTM provides a tearproof formworking membrane which allows starter bars to be fixed in position without drilling. The timber joist bracing for the SpeedformTM will also act as a support for the reinforcement.

Page 13: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

H A L F E N M O M E N T

12

ThE SpEEdfOrMTM SErvIcE

Our Service

Using SpeedformTM is simple and easy. We conduct briefing and seminars at our premises or yours, where users learn to calculate configurations and costs of using SpeedformTM. 1. a)Generalfoundationlayoutofproject b)Beamsscheduleshowingsizesandlevels c)Columnsizesatfoundationlevel d)Pilecapsizesandlevels 2. a)Soiltype b)Watertablelevel 3. Construction method and program for earthworks, piling, pile caps, ground beams, ground slabs, basement walls, etc.

Halfen-Moment Group offers an unrivalled service. Form the initial enquiry to on-site support we are at hand to assist in the installation of SpeedformTM, as well as offer advice on the techniques and procedures required to achieve the best results. SpeedformTM formwork be delivered to site pre-formed and/cut to size. The standard of 2.25 m can be cut in multiples of 150 mm while the widths are cut in multiples of 75 mm. Larger sizes can be made on request.

Page 14: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

s p e e d f o r m t m

13

PROjECTS

Jimah East Power Plant, Selangor, MalaysiaDEMC Women’s & Children’s Hospital, Shah Alam, Malaysia

Contractor: Johawaki Construction Sdn Bhd

Contractor: Bauer (Malaysia) Sdn Bhd

Menara Tradewinds Square, Kuala Lumpur, Malaysia

Contractor: Bauer (Malaysia) Sdn Bhd

Pusat Latihan Polis Kuala Lumpur, Malaysia

Contractor: Johawaki Construction Sdn Bhd

Menara TA One, Kuala Lumpur, Malaysia

Contractor: Bauer (Malaysia) Sdn Bhd

Page 15: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

H A L F E N M O M E N T

14

NOTES

Page 16: speedformtm · Since 2012, the Halfen-Moment Group has been part of CRH plc, a Global Fortune 500 company, with an annual turnover in excess of €27 billion. Thanks to CRH plc, The

DISCLAIMER: The construction applications and details provided in this literature are indicative only. In every case, project working details should be entrusted to appropriately qualified and experienced persons.

Whilst every care has been exercised in the preparation of this document to ensure that any advice, recommendations or information is accurate, no liability or responsibility of any kind is accepted in respect of Halfen-Moment Group.

With a policy of continuous product development Halfen-Moment Group reserves the right to modify product design and specification without due notice.

www.halfen-moment.com

HALFEN MOMENT SDN. BHD.28 Jalan Anggerik Mokara 31/59, Kota Kemuning,40460 Shah Alam, Selangor, MalaysiaT : +603 5122 4182 F : +603 5122 4184E : [email protected]

HALFEN-MOMENT PTE. LTD.9 Tractor Road, Singapore 627970T : +65 6266 6802 F : +65 6266 6980E : [email protected]

HALFEN MOMENT INDIA PVT. LTD.6, Girikunj, Devdarshan Society, Dongripada, GB Road, Thane 400607, IndiaT : +9122 2500 7092 F : +9122 2500 7093E : [email protected]

HALFEN-MOMENT INC.Unit 1810 Hanston Square, San Miguel Avenue,Ortigas City Pasig City, PhilippinesTelefax : +63 2321 5663E : [email protected]

malaysia

singapore

india

philippines


Recommended