Transcript

SPECO TECH ROOFING & CEILING SYSTEMS PVT. LTD.

Division

PRE ENGINEERED STEEL

BUILDINGS

A renowned namein the field of

PRE ENGINEERED STEEL BUILDINGS (PEB)utilizing the most Hi-Tech solutions

AGENDA

About SPECO Comparison between

PEB & Conventional Steel Our Vision & Mission Introduction to PEB

Buildings Project Gallery SPECO PEB Buildings Framing Systems Types of PEB Buildings Products & Services SPECO Plant &

Machinery SPECO Winnings Our Clients

ABOUT US

• M/s Speco-Tech Roofing & Ceiling Systems Private Limited is an ISO Certified organization. Our pre-engineered building system is unmatched in its speed and value. Buildings, to suit specific needs, are designed, engineered, manufactured and shipped in less than 8 weeks and at a cost that is as low as 30 percent of the cost of conventional steel buildings (when compared to speed of occupancy and space usability).

• Clear spans up to 93 meters wide and eave heights as high as 30 meters are possible.

Largest manufacturer of corrugated Roof and Wall Cladding profiling machines in India.

Associated manufacturer of Indian Oil, Bharat Petroleum and Hindustan Petroleum and Pan India

supply of Petrol Pump Canopies

Introduced Speco Pre Engineered Steel Buildings with State of the Art manufacturing Facilities in Faridabad

(HR).Plasma Arc Automated Plate Cutting Machine

Continuous H Beam Welding machine with PLC

COMPARISONPre –engineered buildings (PEB) Conventional Steel Buildings

Structure Weight PEB Buildings is on an average 30% lighter

because of the efficient use of Steel.

Primary & Secondary members are from

standard hot rolled which are heavier than

what is actually required by design

Design Quick & efficient as basic design is based on

international design codes.

Conventional Steel Structure Are designed

from scratch with limited design aids provided

to engineer.

Delivery Average delivery period 6 to 12 weeks

according to the given area. The Erection

process is faster and much easier with very

less requirement for equipment.

Average 20-26 Weeks

Foundations Simple design, easy to construct and light

weight.

Extensive heavy foundations required for

heavy sections

Overall Price Price per square meter may be as much as

20% lower than conventional steel.

Higher Price per square meter.

Future Expansion Depending on the size of structure installation

takes an average 7-10 day. Delivery after

order takes about 6-12 weeks.

Steel Building are permanent and cannot be

relocated.

Erection & Delivery Depending on the size of the structure

installation takes an average 4-6 weeks.

Delivery after order takes about 6-12 weeks.

Installation time is approx. Double than PEB.

Delivery of material averages from 20-26

weeks.

Performance All components have been specified and

designed specifically to act together as a

system for maximum efficiency precise fit, and

peak performance in the field.

Components are custom designed for a

specific application on a specific job. Design

and detailing errors are possible when

assembling the diverse components into

unique buildings.

VISSION & MISSION

VISION“To Create Opportunities Discover Latent Potential and Develop Existing Opportunities in the Pre Engineered Buildings (PEB) Market.”

MISSION“To facilitate the most beneficial, durable and smooth market presence for our clients.”

INTRODUCTION TO PEB BUILDINGS

Pre engineered buildings are metal buildings that consists of light gauge metal standing seam roof panels. These panels are fitted on steel purling spanning between rigid frames with light gauge metal wall cladding.

It is a relatively flexible and a lighter structure vs. a conventional steel framed building.

PEB systems are extensively used in industrial as well as several non industrial constructions all over the world.

PROJECT GALLERY

Kota, Rajasthan60000 Sq ft.

Kota, Rajasthan24654 Sqft.

Bokaro45673 Sqft.

Faridabad55000 Sqft.

PROJECT GALLERYFaridabad Bangalore

Jodhpur (RJ) Bokaro,Jharkhand

SPECO PEB BUILDINGSSpecoTech PEB systems are custom made as per clientrequirements without compromising on the utility andfunctionality of a building. Pre engineered buildings by Specoare light in weight and more economical than otherconventional constructions.

Material specifics:

•High quality Galvalume, PPGI, GI, CR, high tensile steel•Tensile strength of GI steel and Galvalume: 240Mpa-550Mpa•Pre cut solid built up sections•SAW type welding of web to flange alternating with stitch weld•All columns/portals are in ready to erect condition and supplied in a fully finished for field assembly condition

FRAMING SYSTEMS

SPECO Pre-Engineered Steel Buildings are custom designed to provide maximum space utilization, excellent strength and highest safety standards.

Our basic architectural measures include:

Building Width:Building LengthEnd Bay LengthInterior Bay Length

TYPES OF PEB BUILDINGS

Ideal for manufacturing And factories that require cranes for material handling, these specialized building systems by Speco are designed to support crane systems of varying weights and measurements.

BUILDINGS WITH MEZZANINES

BUILDINGS WITH CRANES

Mezzanine floor systems by Speco are a very smart design. Made of superior galvanized steel, the decking’s of this system are supported by joints that are connected to mezzanine beams.

PRODUCTS & SERVICES

SPECO Pre-Engineered steel Buildings

Hi-Rib Roofing & Cladding Systems

CEE and Z Purlin SPECO Steel Deck

SPECO Crimp Curve Turbo & Air Ventilator

SPECO Klippon SPECO Standing Seam

SPECO Plant & Machinery

SPECO WINNINGS

Our Clients