    WhyLNG?PresentproductionofnaturalgasinPakistanis4billioncubicfeet/day

    Naturalgascurrentlycomprises48%ofPakistansenergymix

    Sectorsheavilyreliantofnaturalgasarepowergeneration,fertilizerandtransportation(CNG)

    PakistanisnowthelargestCNGuserintheworldPakistanfacesadeficitof2billioncubicfeetofgasperdayduetosurgeindemandinthewinterseason

    (C)MISL2011 2

  • 7/27/2019 LNG Projects in Pakistan

    3/10

    BackgroundofLNGinPakistanThefirstLNGimportprojectinPakistanwasknownastheMashalLNGproject.

    Mashalwasproposedtobeanonshoreprojectandwasawardedtoacompanycalled4Gas

    UndertheMashalproject,500millioncubicfeetperday(mmcfd)ofLNGwastobeimported

    (C)MISL2011 3

  • 7/27/2019 LNG Projects in Pakistan

    4/10

    BackgroundofLNGinPakistanMashalfacedlegalchallengesandwasstruckdownbythePakistanSupremeCourt

    inMarch2011Subsequently,SuiSouthernGasCo(SSGC)boardofdirectorsauthorizedsolicitationof

    bidsforoffshoreLNGprojects.OGRAapprovedthebidsof3companiesforimportofLNG

    (C)MISL2011 4

  • 7/27/2019 LNG Projects in Pakistan

    5/10

    OffshoreLNGLicensees

    PakGasport

    Ltd

    GlobalEnergy

    InfrastructurePakistan

    EngroVopakTerminalLtd

    (C)MISL2011 5

  • 7/27/2019 LNG Projects in Pakistan

    6/10

    OffshoreLNGProjectImportofLNGwouldprimarilybeusedforpowergenerationowingtoitshighimport

    cost.GaswouldbesuppliedtoKESC,IndependentPowerProducers(IPPs),and

    possiblyEngrosnewfertilizerplantLNGcapacityof500mmcfdwouldbecapableofproducing2,500MWelectricity

    (C)MISL2011 6

  • 7/27/2019 LNG Projects in Pakistan

    7/10

    OffshoreLNGProjectGEIhasbeenallocatedcapacityof500mmcfd,PakistanGasporthasbeenallocatedcapacityof400mmcfdand

    Engrohasbeenallowedcapacityof500mmcfd.SSGC&SNGPLwouldmakethenecessaryupgradestotheirinfrastructureinordertoaccommodateLNGfromthethreeterminals.

    (C)MISL2011 7

  • 7/27/2019 LNG Projects in Pakistan

    8/10

    TerminalInfrastructurePGLterminalissituated5.5kminsidethecreekwheretheLNGFloatingStorage&

    RegasificationUnit(FSRU)willbepresent.FromthereasubseapipewillbringthegastothelandterminalwhereanESDvalvewillbepresent.AftertheESDvalve,therewillbe4meteringruns.Itisexpectedthateachmeteringrunwillbe12"class600.