Grand AvenueImprovement Concepts
Community Cafe
Agenda• Introductions & Why are we here?
• Overview of Complete Streets
• Group Discussion
Gra
ndA
venu
e
2
10/12/2017
2
Complete StreetsComponents - Multimodal
Gra
ndA
venu
e
3
• Incorporates pedestrians, bicyclists, transit users, people with disability,and motor vehicles.
Complete StreetsComponents – Multimodal
Gra
ndA
venu
e
4
10/12/2017
3
Complete StreetsComponents - Green
Gra
ndA
venu
e
5
• Incorporates street trees, bio-swales, and permeable surfaces, to use plantsand soils to collect rain water to improve water quality and limit itstransport and pollutant conveyance to the collection system.
Complete StreetsComponents - Green
Gra
ndA
venu
e
6
10/12/2017
4
Complete StreetsComponents - Smart
Gra
ndA
venu
e
7
• Incorporates intelligent signals, smart parking meters, electric vehiclecharging stations, car and bicycle-sharing, dynamic way-finding and socialnetworks for greater system efficiencies and user convenience.
Gra
ndA
venu
e
8
Complete Streets Examples“The BLVD” – Lancaster, CA
• 8 blocks in historic downtown
• Project Features Road diet (4 lanes to 2 lanes) Removal of 6 traffic signals Widened sidewalks Center “Rambla”: diagonal
parking, pedestrian amenities,and street trees
• Outcomes Several existing parking lots
were transformed into publicplazas and playgrounds
Weekly farmers market andholiday events
40 new businesses 800 new jobs Made property values increase
by 9%
10/12/2017
5
Gra
ndA
venu
e
9
Complete Streets - Examples“The BLVD”
Gra
ndA
venu
e
10
Complete Streets - ExampleLa Jolla Boulevard in San Diego, CA
• 4 blocks in Business District
• Project Features Road diet (5 lanes to 2 lanes) 5 modern roundabouts Angled parking Bike lanes Bulbouts and raised center
medians LED illuminated ped crossing
signs and in-pavement flashers
• Outcomes Shorter pedestrian crossing
distances Reduced vehicular speeds and
delays at intersections 20% boost in sales New stores built Noise levels reduced
10/12/2017
6
Complete StreetsComponents - Smart
Gra
ndA
venu
e
11
Complete StreetsBenefits - Safety• Reduced vehicular
speeds
• Dedicated facilities
• Increased space forbuffer areas
• Shorter crossingdistances
Gra
ndA
venu
e
12
10/12/2017
7
Complete StreetsBenefits - Health
Gra
ndA
venu
e
13Source: Frank, LD, JF Sallis, TL Conway, JE Chapman, BE Saelens,and W Bachman. 2006. “Many Pathways from Land Use to Health.”Journal of the American Planning Association 72 (1).
• Increased opportunities for physicalactivity
• Physical activity can reduce a numberof health problems, including obesity,heart disease, diabetes, and mentalillness
• Reduced air pollution and carbonemissions
• Reduced greenhouse gases
Gra
ndA
venu
e
14
Complete StreetsBenefits - Economic
Source: Itʹs a Safe Decision: Complete Streets in California, 2012
10/12/2017
8
Gra
ndA
venu
e
15
Grand AvenueExisting Cross-Section
Gra
ndA
venu
e
16
Complete StreetsImprovement Option - Rambla
10/12/2017
9
Gra
ndA
venu
e
17
Complete StreetsImprovement Option - Rambla
Gra
ndA
venu
e
18
Complete StreetsImprovement Option – Alternating Parking
10/12/2017
10
Gra
ndA
venu
e
19
Complete StreetsImprovement Option – Alternating Parking
Group Discussion – Question 1
Gra
ndA
venu
e
20
What do you like best aboutDowntown?
10/12/2017
11
Group Discussion – Question 2
Gra
ndA
venu
e
21
What detracts you fromspending more time in
Downtown? (What would youchange?)
Group Discussion – Question 3
Gra
ndA
venu
e
22
When considering GrandAvenue, what do you want to
see?
10/12/2017
12
Next Steps• Summarize Your Input
• Refine Concepts• Obtain Feedback from Project Development Team• Apply for SANDAG Grant Funding to Construct