Everglades Agricultural AreaStorage Reservoir Feasibility Study

December 13, 2017

Page 2: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Meeting Agenda Welcome and Introductions Project Schedule Array of Alternatives Modeling Results Habitat Unit Analysis Next Steps Public Comment

2

Page 3: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

WELCOME AND INTRODUCTIONSEAA Storage Reservoir Feasibility Study

3

Page 4: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

PROJECT SCHEDULEEAA Storage Reservoir Feasibility Study

4

Page 5: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

5

Project Schedule

Page 6: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

ARRAY OF ALTERNATIVESEAA Storage Reservoir Feasibility Study

6

Page 7: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Laws of Florida Ch. 2017 – 10CEPP Post Authorization Change Report The District is committed to planning, designing and constructing a

project that meets the storage goals and water quality criteria set forth in state law and the Comprehensive Everglades Restoration Plan (CERP)

The Central Everglades Planning Project (CEPP) included the first increment of CERP storage, treatment and conveyance south of Lake Okeechobee

The CEPP Post Authorization Change Report (PACR) builds upon the first increment of CEPP and is consistent with the CERP by providing additional water storage, treatment and conveyance south of the lake to reduce the volume of regulatory discharges from the lake to the northern estuaries

This increment of CEPP emphasizes the components that maximize reductions of harmful discharges to the estuaries

7

Page 8: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

8

Laws of Florida Ch. 2017 – 10CEPP Post Authorization Change Report The Legislature directs the District, in the implementation of the

reservoir project, to abide by applicable state and federal law in order to do that which is required to obtain federal credit under CERP

Comprehensive Review Study (Yellow Book April 1999)Everglades Agricultural Storage Reservoir (Component G) – The purpose of this feature is to improve the timing of environmental deliveries to the Water Conservation Areas, including reducing damaging flood releases from the Everglades Agricultural Area to the Water Conservation Areas, reducing Lake Okeechobee regulatory releases to the estuaries, meeting Everglades Agricultural Area irrigation and Everglades water demands, and increasing flood protection in the Everglades Agricultural Area.

Page 9: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Laws of Florida Ch. 2017 – 10CEPP Post Authorization Change Report

The District is directed to jointly develop a Post Authorization Change Report with the USACE for the CEPP

Post Authorization Change Report modifies CEPP New Water Component

9

Page 10: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

CEPP Recommended Plan ALT 4R2 PPA New Water

• A-1 & A-2 Flow Equalization Basin• Seepage Barrier, L-31N Levee

PPA North• L-6 Canal Flow Diversion• L-5 Canal Conveyance Improvements• S-8 Pump Station Complex

Modifications• L-4 Levee Degrade and Pump Station• Miami Canal Backfill

PPA South• S-333 Spillway Modification• L-29 Canal Gated Spillway• L-67A Conveyance Structures• L-67C Levee Gap • L-67C Levee Degrade • Blue Shanty Levee, WCA 3B• L-29 Levee Degrade• L-67 Extension Levee Degrade and

Canal Backfill• Old Tamiami Trail Removal• S-356 Pump Station Modifications• System-wide Operations Refinements

10

Page 11: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

CEPP Post-Authorization Change Report

Engage landowners on a ‘willing seller’ basis

240,000 acre-feet of storage and necessary treatment on A-2 Parcel plus conveyance improvements

360,000 acre-feet of storage and necessary treatment on A-1 and A-2 Parcels plus conveyance improvements

Report to State Legislature by January 9, 2018

Submit Post-Authorization Change Report to Congress for approval by October 1, 2018

Laws of Florida Ch. 2017 – 10

11

Page 12: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

12

WRDA 2000 Sec. 601 • Elimination or transfer of existing legal sources • Maintain existing level of flood protection• Requires protection of water for the natural system

Section 373, Florida Statutes• Elimination or transfer of existing legal sources • Maintain existing level of flood protection• Requires protection of water for the natural system• Compliance Report - requires FDEP to ensure that the project:

• considered all water resource issues • is technologically feasible and cost effective• is consistent with all state and federal laws

Water Quality Standards• Will not cause or contribute to a violation of state water quality standards, permit

discharge limits or specific permit conditions• Reasonable assurances exist that adverse impacts on flora and fauna will not

occur

Other Applicable Laws

Page 13: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

13

What We’ve HeardPublic Involvement Overview

Seven Public Meetings held to-date• 2 evening meetings in Clewiston, 5 evening/daytime meetings in West

Palm Beach

• Discussion/Q&A opportunities have been provided at each meeting

• Several comment cards have been received

Additional coordination meetings have been conducted• Governmental Agency, Tribal and Non-Governmental Organizations

(NGOs)

Over 830 emails and several written correspondence received

The project website has received more than 3,400 views

Comments received from governmental agencies, non-governmental organizations and the general public

All comments received will be summarized in the Feasibility Report

Page 14: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Project Opportunities and Objectives Reduce the high-volume freshwater discharges from

Lake Okeechobee to the Northern Estuaries Identify storage, treatment and conveyance south of Lake

Okeechobee to improve flows to the Everglades system Reduce ongoing ecological damage to the Northern

Estuaries and Everglades system

St. Lucie Inlet14

Page 15: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

15

Project ModelingStep 1 - Screening Analysis

Identified the CERP goals for sending water south to the Everglades and reduce damaging discharges to the Northern Estuaries

Used the DMSTA model to approximate STA size requirements needed to meet CERP target flow

Step 2 – Detailed Modeling Included refinements from

screening analysis Integrated system-wide

performance Incorporated detailed feature

operating protocols Optimized operations

Page 16: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

16

240A: A-2 East Reservoir and A-2 West STA(no modifications to A-1 FEB)

Page 17: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

17

240B: A-2 West Reservoir and A-2 East STA(no modifications to A-1 FEB)

Page 18: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

18

360C: A-2 East Reservoir, A-1 Reservoirand A-2 West STA

Page 19: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

19

360D: A-2 Reservoir, A-1 North Reservoirand A-1 South STA

Page 20: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

MODELING RESULTSEAA Storage Reservoir Feasibility Study

20

Page 21: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Third Phase:Detailed Modeling of a Variety

of Options Provides Information for System

Evaluation (e.g. Habitat Units)

How Modeling Fits into Project Planning

21

Along this path, there are many opportunities for refinement. Intermediate products serve the immediate need and then are enhanced,

incorporating feedback and information as the process progresses.

Second Phase:Detailed Modeling of a Variety of Options to Determine how to

Route Water to Achieve Desired Project Benefits

First Phase:Screening Modeling to Assist in Selection and

Sizing of Features that will be Evaluated in More Detail

Final Phase:Incorporating Feedback and Information Gained in Earlier

Steps, Refine Detailed Modeling of a Highly Performing Option

Page 22: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Modeling Scenarios R240 = 240 kac-ft reservoir + A1 FEB (configuration A or B)

• Reservoir is ~ 10,100 acres effective area and ~ 23 ft depth (levee side-slopes accounted for in storage calculation)

• 6,500 acre STA

R360 = 360 kac-ft reservoir (no A1 FEB) (configuration C or D)• Reservoir is ~ 19,700 acres effective area and ~ 18 ft depth

(levee side-slopes accounted for in storage calculation)• 11,500 acre STA

C360 = 360 kac-ft reservoir (no A1 FEB)• Same as R360, but reservoir can also serve multiple purposes as

identified in CERP Component G

22

Page 23: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Modeled Canal Conveyance CERP envisioned 7500 cfs increase in canal

capacity split between the Miami and North New River Canals

Evaluation of CEPP’s performance showed that remaining damaging discharges (with CEPP in place) did not exceed 4500 cfs average monthly

Model sensitivity was run to evaluate if other canal capacity assumptions (lower than 4500 cfs) achieve similar estuary performance

Evaluation identified that 1200 cfs canal capacity improvements performs similar to 4500 cfs

Page 24: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

S308_QFC+

S77_QFC

0.0

500.0

1000.0

1500.0

2000.0

2500.0

3000.0

3500.0

4000.0

4500.0

5000.0

Jan-

66

Jan-

66

Mar

-66

Apr-

66

May

-66

Jun-

66

Jul-6

6

Aug-

66

Sep-

66

Oct

-66

Nov

-66

Dec-

66

Jan-

67

Feb-

67

Mar

-67

Lake

Oke

echo

bee

Floo

d Co

ntro

l Rel

ease

s to

the

Nor

ther

n Es

tuar

ies

(cfs

)

R360_1200

R360_4500

Significant time spent below damaging

release thresholds

High discharge events still occur

but performance is not constrained by

canal capacity.

Example Performance:

Page 25: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

25

ENV WSFlood controlWS+FCCUP WSFC+ENVBasin with DMD and/or ROCanal for traffic control

Reservoir/STA where stages will be simulatedSpecial code structure

miami700

ssdd702

cd01

umia

mi

706

C4A7021

C4Abp7020

miaBasin2mc7000

mc2miaBasin7001

G3737062

A610

rote

nber

ger

708

lmia

mi

705

eswcd732

closter731

STA34740

NnrHillsBasin730

NnrHills733

L5E707

LOK100

3.7 %

96.3%

seep_E142

4EK41

STA2N738

STA2737

STA2S739

umia

mi_

S69

6

miacdiv7019

G372HL7064

ERSTA800

1

1 umiami_S_to_A2RES

2

2 NnrHills_S_to_A2RES

33 A2RES_to_ERSTA

4

4 ERSTA _to_ lmiami

55 sta34scW_to_ ERSTA

A2RES90

A1FEB760

a2res2a1feb

6

6

Example RSM model setup and flow routing diagram for a potential EAA Storage Reservoir concept

Detailed view in the vicinity of the A1 & A2 parcels displayed; does not show entire model domain or study area

Miami – Assumed to add 1000 cfs

capacityNNR – Assumed to add 200 cfs

capacity

All scenarios close to achieving desired increase of 300 kac-ft

average annual flow south

Page 26: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

26

Example Reservoir Utilization in Scenarios

0.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

18.000

20.000

Jan-

65

Jan-

67

Jan-

69

Jan-

71

Jan-

73

Jan-

75

Jan-

77

Jan-

79

Jan-

81

Jan-

83

Jan-

85

Jan-

87

Jan-

89

Jan-

91

Jan-

93

Jan-

95

Jan-

97

Jan-

99

Jan-

01

Jan-

03

Jan-

05

R360

Res

ervo

ir De

pth

(ft)

Page 27: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

As previously discussed, as storage is added and system infrastructure capability is increased, it makes sense to develop optimized Lake Okeechobee schedule rules that work with storage, treatment and conveyance improvements

Modeling for these scenarios was informed by operational optimization efforts that evaluated approximately 30 parameters affecting the Lake Okeechobee decision outcomes (e.g. “up-to” limits, classification of tributary conditions, etc…) and when flow is sent south to storage and treatment.

Constrained Latin Hypercube sampling techniques were used to explore 2500 unique operational strategies per scenario.

Selected operations were identified using Pareto analysis and desired performance criteria (e.g. Flow south, Lake O, water supply) with an emphasis placed on estuary performance.

Operational Considerations for EAASR

Page 28: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Duration of the Lake-Caused High Discharge EventsReduced from

10 to 5 monthsReduced from 8 to 4 months

Reduced from 6 to 2 months

Reduced from 4 to 3 years

Reduced from 5 to 2 years

Reduced from 2 to 2 years

Current System Example Future System with IRL, CEPP, EAASR

and other Projects

Page 29: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Duration of the Lake-Caused High Discharge Events

Reduced from11 to 7 months

Reduced from14 to 4 months

Reduced from8 to 4 months

Reduced from5 to 3 years

Reduced from4 to 3 years

Reduced from3 to 3 years

Current System Example Future System with IRL, CEPP, EAASR

and other Projects

Page 30: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Geographic Area: Lake Okeechobee, Northern

Estuaries (NE) and Lake Okeechobee Service Area (LOSA)

Key System Outcomes: Addition of EAA Storage

Reservoir, STAs and LakeO. operational changes

All alternatives generally maintain Lake O. performance relative to EARFWO

All alternatives reduces the number of high discharge events to NEs relative to EARFWO

All alternatives provide approximately 300 kac-ftadditional flow to Everglades compared to EARFWO

No alternatives adversely impact LOSA water supply; C360 alternative improves performance

Page 31: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

31

Using “Standard Score” weighting from CEPP, Lake Okeechobee

performance is similar between FWO and Alternatives

Page 32: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

32

All alternatives show reduced

number of high discharge events caused by Lake

Okeechobee

Page 33: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

EARFWO stages generally higher than EARECB (except at extremes)

Events from Caloos Basin

Runoff

Events from Lake

Okeechobee

All alternatives show reduced

number of high discharge events caused by Lake

Okeechobee

Page 34: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

34

No alternatives increase cutbacks during drought conditions and C360

significantly improves performance

Page 35: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

EAA Storage Reservoir Modeling Data

Modeling data is available via ftp at:ftp://ftp.sfwmd.gov/pub/EAASR/

35

Link can also be found onwww.sfwmd.gov/EAAreservoir

Page 36: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

PROJECT BENEFIT (HABITAT UNIT) ANALYSISEAA Storage Reservoir Feasibility Study

36

Page 37: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Ecological Benefits Reduce Lake Okeechobee damaging discharges to

the northern estuaries• Caloosahatchee and St. Lucie Estuary Flow Targets

Increase flow to water conservation areas and Everglades National Park• Sheetflow in the Ridge and Slough landscape

Improve wetland hydroperiod• Inundation duration in the Ridge and Slough landscape

Habitat Units are a Measure of Ecological Benefits

37

Page 38: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Ecological Benefits = Habitat Units (HU) USACE process Applied nation-wide for National Ecosystem

Restoration Calculates environmental quality over an area,

in acres, to describe environmental lift and to provide a standardized measure to compare alternatives

Utilizes USACE Ecosystem Planning Center of Expertise approved and certified CEPP Planning Model

38

Page 39: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Step 1: Raw performance measure sub-metrics are

linearly re-scaled between 0 and 100.

HABITAT UNITS – USACE methodologyMethodology for quantifying ecological benefits on the array of alternatives

STEP 3Calculate Zone HUs for Greater

Everglades, Caloosahatchee and St. Lucie Estuaries

STEP 4Compare Alternatives

STEP 2

Combine Performance Measures and Calculate Zone Scores

STEP 1

Normalize Performance Measures to Common Scale

Step 2: Within each zone, performance measure metrics

are combined for each project alternative to produce a net zone benefits score between 0 and 1.

Step 3: The 0 to 1 benefits score for each zone is then

multiplied by the acreage of the zone to generate a HU value for the zone. Northern Estuaries (Two Zones) Greater Everglades (Nine Zones)

Step 4: HU Lift = Alternative – FWO Project Condition

39

Page 40: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

40

Planning Region Performance Measure Description

Northern Estuaries

Salinity envelope St. Lucie Suitability for oyster and sea grass habitat based on frequency of flows from S-80

Salinity envelope Caloosahatchee

Suitability for oyster and sea grass habitat based on frequency of flows from S-79

Greater Everglades

Hydrologic surrogate for soil oxidation

Cumulative drought intensity to reduce exposure of peat to oxidation

Inundation pattern in Greater Everglades Wetlands

Number and duration of inundation events used to calculate the percent period of record of inundation

Number and duration of dry events in Shark River Slough

Number of times and mean duration in weeks that water drops below ground

Sheet flow in the Everglades Ridge and Slough Landscape

Timing, distribution and continuity of sheet flow across the landscape

Slough vegetation suitabilityHydrologic suitability for slough vegetation (hydroperiod, dry-down, dry and wet season depths)

Performance Measures (RECOVER approved)

Page 41: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Habitat Units are a Measure of Ecological Benefits

HABITAT UNITS - USACE MethodologyMethodology for quantifying ecological benefits on the array of alternatives

St. Lucie Estuary

14,994 acres

Salinity envelope target based on habitat suitability for oysters and submerged aquatic vegetation

41

Page 42: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Habitat Units are a Measure of Ecological BenefitsHABITAT UNITS - USACE methodologyMethodology for quantifying ecological benefits on the array of alternatives

Caloosahatchee Estuary

70,979 acres

Salinity envelope target based on habitat suitability for oysters and submerged aquatic vegetation

42

Page 43: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Estuary Performance Measures

43

Page 44: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

44

Northern Estuaries Habitat UnitsNE Habitat Units Modeling Scenarios

Project Region (Zone) Existing Condition FWO R240 R360 C360

Caloosahatchee Estuary (CE-1) 2,839 39,038 40,458 41,168 41,878

St Lucie Estuary (SE-1) 1,349 8,247 8,996 9,446 9,446

Total Northern Estuaries 4,188 47,285 49,454 50,614 51,324

Page 45: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

45

Northern Estuaries Habitat Unit Lift

NE Habitat Units Modeling Scenarios

HU Lift Project Region (Zone) R240 R360 C360

Caloosahatchee Estuary (CE-1) +1,420 +2,130 +2,840

St Lucie Estuary (SE-1) +749 +1,199 +1,199

Total Northern Estuaries +2,169 +3,329 +4,039

Page 46: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

NEXT STEPSEAA Storage Reservoir Feasibility Study

46

Page 47: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

47

Conduct cost benefits analysis on each alternative

Submit report to Legislature on or before January 9, 2018

Prepare Post Authorization Change Report/Feasibility Report

Submit Post Authorization Change Report to ASA – March 30, 2018

Next Steps - Compare Alternative Plans

Page 48: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Public Meetings December 14th – Governing Board Meeting -

West Palm Beach December 18th- WRAC Recreation Meeting –

West Palm Beach

48

December 21st– Public Workshop – West Palm Beach

Project Meetings

Page 49: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

Public Comment Opportunities Public Comment Cards Email Address [email protected] Mailing address:

Mike Albert, Project ManagerSouth Florida Water Management District3301 Gun Club Road, MSC 8312West Palm Beach, FL 33406

Additional information available at www.sfwmd.gov/EAAreservoir

49

Page 50: Everglades Agricultural Area Storage Reservoir Feasibility ... · EAA Storage Reservoir Feasibility Study 3. PROJECT SCHEDULE EAA Storage Reservoir Feasibility Study 4. 5 Project

DISCUSSIONwww.sfwmd.gov/EAAreservoir

50


Recommended