    Mariner Topside EPC ProjectEngineering Execution Plan

    EM Team

    January 8 th , 2013

  • 8/10/2019 Dsme Introductory Presentation

    2/21

    The House of Wisdom & Innovation 2

    DSME IntroductionSME Introduction

    Name PositionChung-Tae Choi PULQ Engineering ManagerMu-Chul Park Drilling Engineering ManagerJun-Hong Kim Proposal EngineerHyun-Suk Yoon Naval Architecture EngineerHung-Rae Rim Process Lead Engineer

    Ye-Ho Lee Process Lead EngineerJong-Kun Choi Electrical Lead EngineerUi-Hong Whang Instrument Lead EngineerKwang-Hyo Lee Piping Lead EngineerChan-Soon Park Piping EngineerMi-Jeong Kim Piping EngineerJin-Woong Lee Piping Material Engineer

    Jae-Seok Yoo Mechanical Lead EngineerDae-Won Yang Mechanical EngineerJae-Beom Sim Mechanical EngineerYong-Woong Choi Structural Lead EngineerHyeok Jeon Steel Outfitting Lead EngineerSoo-Hyung Kim Architecture Lead Engineer

    DSME Mobilized Engineer

  • 8/10/2019 Dsme Introductory Presentation

    3/21

    The House of Wisdom & Innovation 3

    Contentsontents

    Project Summary1

    2 Engineering Interface Formation

    6

    3

    4

    5

    7 Engineering Mobilization Plan

    Engineering Organization

    Scope of Work

    Engineering Staged Milestone

    Project Schedule

    8

    9

    Engineering Execut. Strategy

    Engineering Start-up Schedule

  • 8/10/2019 Dsme Introductory Presentation

    4/21

    The House of Wisdom & Innovation

    Project Summary(1/3)

    4

    Statoil Mariner PDQ Platform Project: Statoil (UK) Ltd.

    PDQ (Process, Drilling & Quarter) Platform Topsides: Topside Modules(Process & Utility) + Drilling Module + Living Quarter

    Location : North-sea, UK Continental Shelf (Block 9/11)Dimension : Abt. 126.5 (L) x 52 (B) x 80 (H)Production Capa. : 80,000bbls (Oil), 14 MMSCFD (Gas), 314,465 bbls (Water)Water Depth : 110 MClass : N/A Key Schedule

    C/A S/C S/A 2012.12.21 2014.5.15 C/A+36

    - FEED Familiarization- UK + Norwegian Regulation

    - UK Contents

    Topside (Net Dry, mT): 30,500

  • 8/10/2019 Dsme Introductory Presentation

    5/21

    The House of Wisdom & Innovation

    1

    5

    OILFromWell

    Crude Booster Pumps (3*50%)

    Crude/ Water Heat exchanger

    (2*50%)

    Crude/ CrudeHeat Exchanger A/B

    (2*50%)

    Crude Heater (2*50%)

    Fuel gasCompressor

    1 st StageRecompressio

    n

    2nd StageRecompressio

    n

    Produced water heater

    Water injectionBooster pumps A/B

    (2*50%)

    1st stageseparator

    2nd stageseparator

    Oil export pumpsA/B/C (3*50%)

    Rejectvesse

    l

    Sand cyclone

    ProductionManifold

    Hydrocyclone3*50%

    CFUVessel(3*33%)

    Produced water Surge drum

    Water injectionpumps A/B (2*50%)

    Diluent/CrudeHeat Exchanger

    Crude Cooler

    Diluent FromFSU

    3 rd StageRecompressor

    aftercooler

    Fuel GasScrubber

    SuctionScrubber

    Maureen andHeimdal

    Heavy oil reservoirs

    11.5 barg / 58

    1.5 barg / 105

    2 barg / 105

    1.2barg / 30

    3.8barg / 95

    3.3barg / 20

    BS&W < 0.5%

    10.5barg / 20

    40barg / 75

    Total Oil incl diluent :12,840 Sm3/sdGas : ~0.4MMSm3/d

    Produced water : 46,240 Sm3/sdTotal liquid : 52,100 Sm3/sd

    Max diluent in export oil :3,140 Sm3/sdWater injection :50,665 Sm3/sdMake-up water (for injection) :

    13,000Sm3/sd

    Total Oil incl diluent :12,840 Sm3/sdGas : ~0.4MMSm3/d

    Produced water : 46,240 Sm3/sdTotal liquid : 52,100 Sm3/sd

    Max diluent in export oil :3,140 Sm3/sdWater injection :50,665 Sm3/sdMake-up water (for injection) :

    13,000Sm3/sd

    GAS

    WATER

    26barg / 45

    11.5barg / 125

    Waterproduction

    well Make-up water

    GAS

    OIL

    WATER

    VesterledPipelineImport gas

    170barg

    ElectrostaticCoalescer A/B

    Mariner Platform Schematic Diagram

    Project Summary(2/3)

  • 8/10/2019 Dsme Introductory Presentation

    6/21

    The House of Wisdom & Innovation

    1

    6

    System Category System and CapacityProduction Oil 80,000 BOPD

    Gas 14 MMscfd

    Production Water 46,240 Sm3/SD

    Water Injection 318,673 BWPD

    Oil System Separation 1-Trains : 1st

    Stage Separator-> 2nd

    Stage Separator ->Electrostatic Coalescer A/B

    Gas System Compression 1-Trains :1 st Stage Compression -> 2 nd StageCompression -> Fuel gas Compression

    Gas All produced solution gas will be used for fuel.Supplemental gas for fuel will be imported from Veterledpipeline.

    Water System MEG Regenerationsystem N/A

    Water Treatment System HydrocycloneCFU VesselProduced water Surge drum

    Water Injection Produced water re-injection& Well make-up water

    Major Process Summary

    Project Summary(3/3)

  • 8/10/2019 Dsme Introductory Presentation

    7/21

    The House of Wisdom & Innovation

    Process & Safety Mechanical Electrical & Instrument Structure Piping HVAC Accommodation

    ENGINEERINGCENTER

    IN CB&I OFFICE Procure. Engineering Detailed Engg Coord. Interface Engineering

    Statoil Supply FEED Offshore Commissioning Start-up & Operation

    COMPANY SUPPLIERS

    Vendor Data

    CB&I for TOPSIDE

    SNC Lavalin for JacketDesign

    ENGINEERINGCENTER IN Okpo

    Production Engineering

    Sinhan L/Q Sub-con

    L/Q Fabrication

    Jacket Fabricator

    NMA Sub-con

    Sub-sea, Riser & Pipeline

    Engineering Interface Formation

    Transportation

    Amec(UK) Sub-con Hook-up

    Process & Safety Mechanical Electrical & Instrument Structure Piping HVAC

    RDS for Drilling Pkg

    Sapem SUB-CON Installation

    2

    7

    Suppliers Sub-con Vendor data

  • 8/10/2019 Dsme Introductory Presentation

    8/21

    The House of Wisdom & Innovation

    Project Schedule

    8

    Level 1 Schedule

    05.15 12.31

  • 8/10/2019 Dsme Introductory Presentation

    9/21

    The House of Wisdom & Innovation 9

    3 Project Schedule Modue Schedule Level 1

  • 8/10/2019 Dsme Introductory Presentation

    10/21

    The House of Wisdom & Innovation

    Mar

    1

    4 MONTHS4 MONTHS

    7 MONTHS7 MONTHS

    STAGE 1

    STAGE 2

    STAGE 3

    STAGE 4

    -15-16 -13-14 -11-12 -10 -7-8 -5-6 -3-4 -1-2

    Deliver to DSME

    Top S/C(May 15, 14)

    -17-18

    Planning & FEED Verification

    Design

    Design Completion & Deliverable Production

    Detailed & Construction Engineering

    -9

    E n g g

    T r a n s i t

    .

    C/A(Dec.21, 12)

    Follow-up EnggFollow-up Engg

    Cutg PlanCutg Plan

    2012

    MarFeb MayApr JulJun Aug NovOct JanDec Feb MayAprJanDec Sep

    +1Jun

    Okpo Stage-4 in parallelOkpo Stage-4 in parallelReview

    4 MONTHS4 MONTHS

    Nov

    4 Engg Staged Milestone PULQ

    +2

    10

    Long Lead Item (TG, Gas Comp. SW P/P, FWP/P):PO(-16.5M), 1 st VD(-13.5M), As-noted(-11.5M)

    Critical Items: RFQ(-16.5M), PO(-13.5M),1st VD(-11.5M), As-noted(-9.5M)

    Minor Equip.: PO(-9M), 1 st VD(-8M), As-noted(-7M)

    Certified V/D (-6M)

    POR: Primary(-5M), Secondary(-4M)

    Long Lead O/F (Valves): RFQ(-10M), POR(-7M), V/D(-5M)

    O/F Hole Plan: Major(-6M), Final(-2M)

    Design Review: STG1(-10M), STG2(-8M), STG3(-5M), STG4(-3M)

    Notes1) Green: Detailed Design

    2) Dark Blue: DSME production design3) Pink: Procurement Engineering

    P&ID: IFR(-12M), HAZOP(-10.5M), IFA(-9M), AFC(-4.5M)

    SLD: IFR(-12M), IFA(-9M), AFC(-7M)

    Basic Layout, MA: IFR(-13M), IFA1(-11M), IFA2-9M), AFC(-6M)

    Structure: IFA(-7M), Primary AFC(-6M), Secondary AFC(-5M)

  • 8/10/2019 Dsme Introductory Presentation

    11/21

    The House of Wisdom & Innovation

    Mar

    1

    4 MONTHS4 MONTHS

    5 MONTHS5 MONTHS

    STAGE 1

    STAGE 2

    STAGE 3

    STAGE 4

    -16-17 -14-15 -12-13 -11 -8-9 -6-7 -4-5 -2-3

    Deliver to DSM

    Top S/C(June1, 14)

    -18-19

    Planning & FEED Verification

    Design

    Design Completion & Deliverable Production

    Detailed & Construction Engineering

    -10

    E n g g

    T r a n s i t

    .

    C/A(Dec.21, 12)

    Follow-up Eng,gFollow-up Eng,g

    Cutg PlanCutg Plan

    2012

    MarFeb MayApr JulJun Aug NovOct JanDec Feb MayAprJanDec Sep

    -1Jun

    Okpo Stage-4 in parallelOkpo Stage-4 in parallelReview

    4 MONTHS4 MONTHS

    Nov

    4 Engg Staged Milestone Drilling

    +1

    11

    Long Lead Item (Drilling, BOP pkg,ICU,Cemnt eq.):RFQ(-16M),PO(-15M),1 st VD(-12M), As-noted(-10M)

    Critical Items: RFQ(-16M), PO(-14M),1 st VD(-12M), As-noted(-10M)

    Minor item.: PO(-9M), 1 st VD(-8M), As-noted(-7M)

    Certified V/D (-6M)

    POR: Primary(-5M), Secondary(-4M)

    Long Lead O/F (Valves): RFQ(-10M), POR(-7M), V/D(-5M)

    O/F Hole Plan: Major(-6M), Final(-2M)

    Design Review: STG1(-10M), STG2(-8M), STG3(-5M), STG4(-3M)

    Notes1) Green: Detailed Design

    2) Dark Blue: DSME production design3) Pink: Procurement Engineering

    Structure: IFA(-7M), Primary AFC(-6M), Secondary AFC(-5M)

    P&ID: IFR(-12M), HAZOP(-10.5M), IFA(-9M), AFC(-4.5M)

    SLD: IFR(-12M), IFA(-9M), AFC(-7M)

    Basic Layout, MA: IFR(-13M), IFA1(-11M), IFA2-9M), AFC(-6M)

  • 8/10/2019 Dsme Introductory Presentation

    12/21

    The House of Wisdom & Innovation 12

    Scope of WorkActivity Process & Utility LQ Drilling

    Project Management DSME DSME DSME

    Detailed Eng. (up to Stage 3) CB&I CB&I RDS

    Construction Engineering DSME DSME DSME

    Procurement DSME DSME DSME (L/S + R/I)

    Construction DSME Shinhan DSME

    Mechanical Completion DSME Shinhan DSME

    Onshore Comm. Assist DSME Shinhan DSME

    Transportation DSME DSME

    Installation Statoil Statoil

    Offshore Hook-up DSME w/ AMEC DSME w/ AMEC

    Offshore Comm. Assist DSME w/ AMEC DSME w/AMEC

    Note1. Drilling Reimbursable , Schedule Requirement (EU, UK, NORSOK, LCI )2. : Reimbursable, : Lump-sum

  • 8/10/2019 Dsme Introductory Presentation

    13/21

    The House of Wisdom & Innovation

    1

    Engineering Organization(1/3)

    DSMEEngineering Director

    CB&I, PMPLUQ

    Eng Sub-con.

    Process

    HSE

    Structural

    Piping

    Electrical

    Inst. / Control

    Loss Control

    Piping

    Mechanical

    Weight Control

    Safety

    PEC

    DSME-Site, London

    Mechanical

    Piping

    Steel Outfitg

    HVAC

    Architecture

    Structure

    Weight Control

    Process

    Electrical

    Instrument

    Safety

    Information

    Quality

    DSME-Okpo

    Saipem or Amec(UK),

    PMTransp & Install

    Sub-con.

    Mechanical

    Piping

    Structure

    Weight

    Electrical

    Instrument

    Safety

    Doc. Control

    Information

    Quality

    Mechanical

    Piping

    Steel Outfitg

    HVAC

    Architecture

    Structure

    Weight Control

    Process

    Electrical

    Instrument

    Safety

    Mechanical

    Piping

    Steel Outfitg

    HVAC

    Architecture

    Structure

    Weight Control

    Process

    Electrical

    Instrument

    Safety

    RDS, PMDrilling

    Eng Sub-con.

    Process

    HSE

    Structural

    Piping

    Electrical

    Inst. / Control

    Loss Control

    Piping

    Mechanical

    Weight Control

    Safety

    Information

    Quality

    6

    13

    PULG, CB&IEngg Mgr

    Drilling, RDSEngg Mgr

    Overall Project Engineering Organization

  • 8/10/2019 Dsme Introductory Presentation

    14/21

    The House of Wisdom & Innovation

    Yong-Woong Choi* Hyun-suk Yoon * Young-Jin Heo Jong-kun Choihyunsuk@ ywchoi@ huh2001@ jkchoi4@

    PULQ Engg Manager

    Jae-Seok Yoo jaeseokyoo@

    InstrumentUi-Hong Whang

    Hung-Rae Rimdawnhorse@

    huhong@

    Doc. Control

    ctchoi@

    Construction designJong-Ho Jeong

    jongho@

    Ext. Interface Proj. Eng. Coord.

    Layout* Jeong-Ho Song

    jhsong81@

    StructureNaval Outfitting ElectricProcessMechanical

    * Legend *Discipline

    Key Person

    E-mail (@dsme.co.kr)

    @

    TBD TBD

    Detail design Outfitting DetailMechanical ProcessNaval

    Chung-Tae Choi

    Production Tech.

    @

    Coating* Youl-Duck Ahn

    ray010@

    Noise & Vib.

    @

    Architect* Hun-Woo Kim

    hwkim4@

    HVACKeon Lee

    klee@

    Kwang-Hyo Leekhlee5@

    Piping analysis* Jang-Seop Sim

    jssim @

    Piping Material* Hyeok-jun Tae

    hjtae@

    Piping

    Piping

    * Hyun-hong KimOASISINET@

    In-line Instr.

    1

    Kyu-Sung Leelkyus@

    Safety

    TBD

    Engineering Organization(2/3) PULQ Engineering Organization in CB&I

    * : The person working in CB&I and RDS

  • 8/10/2019 Dsme Introductory Presentation

    15/21

    The House of Wisdom & Innovation 1

    Jae-keun Lee* Hyun-suk Yoon * Young-Jin Heo Sun-Youn Leehyunsuk@ jklee0404@ huh2001@ hoop1973@

    Drilling Engg Manager

    Yang-Hyo Kimhaeyoun@

    InstrumentSun-Youn Lee

    Ye-Ho Lee jhkim8040@

    hoop1973@

    Doc. Control

    mcpark7@

    Construction DesignHo-Joo Kimshipco@

    Ext. Interface Proj. Eng. Coord.

    Layout* Jeong-Ho Song

    jhsong81@

    StructureNaval Outfitting ElectricProcessDrilling

    * Legend *Discipline

    Key Person

    E-mail (@dsme.co.kr)TBD@

    TBD TBD

    Detail Design Outfitting Detail DesignMechaniery ProcessNaval

    Mu-Chul Park

    Production Tech.

    @

    Coating* Duck-Youl Ahn

    ray010@

    Noise & Vib.

    @

    Architect.* Hun-Woo Kimhwkim4@

    HVACHyeok Jeon

    jeonh@

    Chan-soon Parkcomingsoon@

    Piping Analysis* Jang-Seop Sim jssim @@

    Piping material

    Piping

    Pipiing

    * Hyun-hong Kimoasisinet@

    In-line Instr.

    Hae-seok Leehscj78@

    Safety* Hyeok-jun Tae

    hjtae@

    Engineering Organization(3/3) Drilling Engineering Organization in RDS

    15

    * : The person working in CB&I and RDS

  • 8/10/2019 Dsme Introductory Presentation

    16/21

    The House of Wisdom & Innovation 1

    Engineering Mobilization Plan(1/2) Engineering Mob. Plan in CB&I

    16

    1M 2M 3M 4M 5M 6M 7M 8M 9M 10M 11M 12M 13M 14M 15M 16M 17MFrom To Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

    20 27 32 34 36 40 41 42 41 42 42 41 43 41 38 39 39 0

    Mariner Project, Engineer Mob Plan to CB&I off ice (PULQ)EM Choi, Chung Tae 2013-01-12 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Eng Management

    EC Kim, Jun Hong 2013-01-12 2013-02-28 1 1 Eng Coordinator

    Process Rim, Hung Rae 2013-01-12 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    KP, P&ID

    Lee, Ye Ho 2013-01-12 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 P$ID, Analysis

    I n- li ne I ns t K im, Hyunhon g 2013-03 -0 1 2014-02 -2 8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Control v/a PSA,SDV,BDV POS

    Safety Lee, Kyu Sung 2013-02-16 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    Machinery Yoo, Jae Se ok 2013-01-12 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, All Mech equipment

    Yang Dae Won 2013-01-12 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Rotating, LLI

    Shin, Jaebeom 2013-01-12 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Utility

    Ho ng, Ga he e 20 13 -02 -0 5 20 14 -02 -2 8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Packaged Equipment

    L ee , Jong Hyuk 201 3- 03 -0 5 201 4- 02 -2 8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Vessels

    Baek Jong Hoon 2013-05-07 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1

    H/Exchangers,Utility2013-01-14 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Others

    Electrical Choi Jong Kun 2013-01-14 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    KP, Power system

    2013-01-14 2014-03-31 1 1 1

    2013-05-01 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 POS&TE, Package

    Instrume nt Whang, Ui Hong 2013-01-14 2014-02-28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    KP, Instrument & Control

    2013-06-01 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 Instrument & Control system2013-01-14 2013-04-30 1 1 1 1 Instrument & Control system

    Telecomm Lee Sang Hee 1 1 1 Telecom & Pada & System

    E&I Layout Song, Je ong Ho 2013-04-01 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, E&I Layout, Design review

    Noi & Vib Park Jun Ho 1 1

    Piping Lee, Kwang Hyo 2013-01-14 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Piping layout, PDMS set-up

    K im, M ije ong 20 13 -01 -1 4 20 14 -04 -3 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Layout & Material handling

    2013-03-01 2014-10-31 1 1 1 1 1 1 1 Layout & Routing, Design review

    2013-05-01 2014-01-31 1 1 1 1 1 1 1 Layout & Routing, Design review

    Naval Yoon, Hyunsuk 1 KP, Weight control, GA

    Structure Choi, Yong Woong 2013-01-14 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Structural Analysis

    B yun, Ji n H yug 201 3- 01 -1 4 201 4- 04 -3 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Structure arrag't

    2013-05-01 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 Structure arrag'tJ eong , J ong Ho 2 013-09 -01 2 014-04 -30 1 1 1 1 1 1 1 1 Structure arrag't

    Stee l o ut fi tt in g Heo, Young J in 201 3- 03 -1 0 201 4- 04 -3 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Outfitting Layout, SID,POS

    HVAC Jeon, Hyeok 2013-01-12 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Layout, System, POS

    Architect. Kim, Hun Woo 2013-04-01 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Room Layout, Furnishig

    Kim, Soo Hyung 2013-01-12 2013-06-301 1 1 1 1 1

    Tae , Hyeok ju n 2013-05 -01 2014-04 -3 0 1 1 1 1 1 1 1 1 1 1 1 1 Piping Spec. POS, TE

    L ee , Ji n Woong 2 013-01 -12 2 013-12 -31 1 1 1 1 1 1 1 1 1 1 1 1 Piping Spec. POS, TE

    Pip ing s tr es s S im, Jang Seop 1 1 1 1 Piping Stress analysis

    20 21 24 26 29 30 30 30 30 30 29 31 29 26 27 27 0

    Stage-3 & Hand-Over

    Total(Person)

    Name(E)DiscDuration

    Major Responsibility AreaStage-1 Stage-2

    Piping material

    20 P in current, 31 P in peak

  • 8/10/2019 Dsme Introductory Presentation

    17/21

    The House of Wisdom & Innovation 1

    Engineering Mobilization Plan(2/2) Engineering Mob. Plan in RDS

    17

    1M 2M 3M 4M 5M 6M 7M 8M 9M 10M 11M 12M 13M 14M 15M 16M 17MFrom To Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

    Mariner Project, Engineer Mob Plan to RDS off ice (Drilling)EM Park, Mu Chul 2013-01-12 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Eng Management

    Nav al Yoon, Hyunsuk KP, Weight control, GA

    Structure Lee, Jae Keun 2013-01-15 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Structural Analysis

    Kim, Hojoo 2013-09-01 2014-04-30 1 1 1 1 1 1 1 1 Structure arrag't

    M ech. Kim, Yang Hyo 2013-01-15 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Drilling Engineering

    M i n - W K im 2013-01-15 2013-03-01 1 1 Drilling Engineering

    2013-02-24 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 To be confirmed2013-02-24 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 To be confirmed

    2013-01-14 2013-02-151 1

    Safety Lee, Haeseok 2013-02-16 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Safety Study

    Process Lee, Ye Ho 2013-01-12 2014-03-301 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, P&ID (Acting)

    Choi, Hye Jin 2013-02-16 2014-03-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 P&ID, Analysis,Piping Interface

    Piping Park, Chan Soon 2013-01-12 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Piping layout, PDMS set-up

    Instrument Lee Soon Young 2013-05-01 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 Electric & Control system

    Telecomm Lee Sang Hee Telecom & Pada & System

    P. Stress Sim, Jang Seop 1 Pipe stress analysisTae, Hyeokjun 2013-05-01 2014-04-30 Piping Spec. POS, TE

    Lee, Jin Woong 2013-01-12 2013-12-31 Piping Spec. POS, TE

    HVAC Le e, Ke un 2013-04-01 2014-04-30 1 1 1 1 1 1 1 1 1 1 1 1 1 KP, Layout, System, POS

    Architect. Kim, Hun Woo 2013-04-01 2014-04-30 KP, Room Layout, Furnishig

    S. Outfit Heo, Young Jin 2013-03-10 2014-04-30 KP, Outfitting Layout, SID,POS

    Electrical Choi, Jong Kun 2013-01-14 2014-04-30 KP,Power system

    E&I Layout Song, Jeong Ho 2013-06-01 2014-04-30 KP, E&I Layout, Design review

    20 7 11 10 10 11 11 12 11 12 12 12 12 12 12 12 12 0

    Stage-3 & Hand-Over Name(E)Disc

    DurationMajor Re sponsibility Area

    Stage-1 Stage-2

    Piping material

    7 P currently, 12 P in peak

  • 8/10/2019 Dsme Introductory Presentation

    18/21

    The House of Wisdom & Innovation

    Familiarization each other

    FEED evaluation and verification within 3 monthsTimely delivery of vendor data through early P.O

    Rule & regulation familiarization and application

    Timely implementation of material handling & operation

    -

    Engineering Execution StrategyKey-points in Topside Detailed Design(1/2)

    Timely PO issue( Designated LLI equipment )As noted V/D implementation instead of certified V/DVendor data receiving campaign in early stageAlign procurement sequence with CB&I

    Learning counter parts system and culture amongStatoil, CB&I, RDS and DSME

    8

    18

    Norsok application

    Compliance with EU DirectivesCompliance with UK Legislation(By Statoil)Safety case development

    Poor material handling concept implementation in FEEDand further development requested .(Maintenance space of TG)

  • 8/10/2019 Dsme Introductory Presentation

    19/21

    The House of Wisdom & Innovation

    Design for weight reduction or shedding

    Timely input of topside weight and CoG, and align of jacketconfiguration

    Early Life Cycle Information(LCI) applicationStaged design review through COMS*SMPDC* concurrent engineeringGood organization for interface engineeringImplementation of constructability

    - 19-

    Engineering Execution Strategy

    19

    Key-points in Topside Detailed Design(2/2)

    Early set-up block division & FSD* within 1 month

    Design to maximize pre-outfittingMaximize onshore comming and minimize offshore commingImplementation of lessons learned

    Notes;1. COMS: Constructability, Operability, Maintainability and Safety.2. SMPDC: Structure, Machinery, Piping, Duct and Cable2. FSD: Fabrication Sequence Diagram.

    FEED weight underestimated in piping(valve quantity) andmachinery

  • 8/10/2019 Dsme Introductory Presentation

    20/21

    The House of Wisdom & Innovation 20

    Activities Due Date In Charge

    KP Nomination: Engineering Coordinator, Document Controller etc.) Jan.31,2013 EM & Disc. KPs

    Spec & Regulation Study-. Layout & arrangement-. Technical requirement-. Scope of work-. Specific requirement disciplinewisely (Equipment package

    requirement, E&I requirement etc.)

    Dec.26,2012~

    Jan.31,2013

    Disc. KPs

    DSME Engineering Execution Plan-. Engineering milestone-. Engineering responsibility matrix- Engineering interface management-. Engineering organization, engineer mob. plan-. Engineering strategy

    Jan.24,2013 EM, Disc. KPs

    DSME Engineering Office Open in CB&I and RDS - Office Set-up-. Wire & wireless LAN, Printer, Monitor, Office Facilities-. 3-D modeling station

    ~ Jan.16,2013 EM

    Procurement Engineering Plan-. Procurement engineering control sheet(PECS: RFQ, TE, POS,Vendor data receiving plan)

    ~ Jan.31,2013 EM, KP

    Engineering Start-up Schedule(1/2)

  • 8/10/2019 Dsme Introductory Presentation

    21/21

    The House of Wisdom & Innovation 21

    Activities Due Date In ChargeProject Kick-Off Workshop-. DSME, CB&I, RDS engineering execution plan

    ~ Jan.24,2013 Statoil, DSME,CB&I, RDS

    DSME Lessons Learned & Constructability Requirement Workshop-. DSME lessons learned presentation-. DSME constructability presentation(Block division, Fabricationsequence, Load-out plan, Installation aids etc.)

    ~ Jan.31,2013 ProductionTechnology

    Eng Subcontract with CB&I and RDS-. Scope of work, Responsible matrix-. Engineering schedule align and set-up(Level 3 schedule)

    ~ Jan.31,2013 EM, Disc. KP

    Correspondence with Statoil, DSME, CB&I and RDS-. Communication Procedure-. Document control procedure

    - DSME information management system(DIMS) set-up

    ~ Jan.25,2013 Statoil, DSME,CB&I, RDS

    Weight Control Philosophy-. Weight control plan and procedure

    Feb.14,2013 Statoil, DSME,CB&I, RDS

    FEED Verification Mar.21,2013 DSME, CB&I,RDS

    Project Engineering Risk Assessment Continued DSME, CB&I,RDS

    Engineering Start-up Schedule(2/2)