Download pdf - Dragan Milosevic

Transcript
Page 1: Dragan Milosevic

Current exploration

6th International Conference on Mineral Resources in the Republic of Serbia

A DRIVING FORCE FOR ECONOMIC DEVELOPMENT

www.serbiamining.rs

Current explorationin Serbia

exploration activities

International Conference on Mineral Resources in the Republic of Serbia

A DRIVING FORCE FOR ECONOMIC DEVELOPMENT

exploration activitiesSerbia

Page 2: Dragan Milosevic

OCCURRENCES

(INDUSTRIAL MINERALS) AND MINERAL OCCURRENCES

www.serbiamining.rs

� 2000 METALLIC MINERAL DEPOSITS AND MINERAL OCCURRENCES

� 2500 NON-METALLIC MINERAL DEPOSITS (INDUSTRIAL MINERALS) AND MINERAL OCCURRENCES

� 46 COAL BASINS

�13 bituminous coal (2 in exploitation)

GEOLOGICAL INFORMATION SYSTEM OF SERBIA

�33 brown coal (11 in exploitation)

� 250 OIL AND GAS DEPOSITS, 90 OIL AND GAS FIELDS,

� 4 OIL SHALE BASINS - 14 OIL SHALE DEPOSITS

http://geoliss.mre.gov.rs/

Page 3: Dragan Milosevic

www.serbiamining.rs

CRM map

Page 4: Dragan Milosevic

www.serbiamining.rs

CRM in SerbiaSerbia

Page 5: Dragan Milosevic

Criticalraw material

Major suppliers (>20%) Criticalraw material

Antimony China, 87% Magnesite

Beryllium USA, 90% Magnesium

BoratesTurkey, 38%

USA, 30%Natural Graphite

ChromiumSouth Africa, 43%

Kazakhstan, 20%Niobium

Cobalt DRC, 56% PGM’s

www.serbiamining.rs

Coking Coal China, 94% Phosphate Rock

Fluorspar China, 56% REE (Heavy)

Gallium China, 69% REE (Light)

Germanium China, 59% Silicon Metal

Indium China, 58% Tungsten

CRM has identified several critical minerals needed for sustainable development.

EU

Critical

raw materialMajor suppliers (>20%)

China, 69%

China, 86%

GraphiteChina, 69%

Brazil, 92%

South Africa, 61%

Russia, 27%

Critical

raw

materials

Phosphate RockChina, 38%

China, 99%

China, 87%

China, 56%

China, 85%

CRM has identified several critical minerals needed for sustainable development.

Page 6: Dragan Milosevic

Exploration activities in last 1

50

44

35

Exploration activities

www.serbiamining.rs

16

97

4

35

26

73

AU (+CU) CU (+AU) LI + B PB-ZN MO

2003-2009 2010-2015

Exploration activities in last 13 years

Commodity 2003-2009 2010-2015

Au (+Cu) 50 44

Cu (+Au) 16 35

Li + B 9 26Li + B 9 26

Pb-Zn 7 7

Mo 4 3

Sb 6 3

63

SB

Page 7: Dragan Milosevic

Current exploration activities

• Cu – 43

• Au - 47

www.serbiamining.rs

• Pb Zn – 22

http://gis.mre.gov.rs/Srbija/

Current exploration activities – active licensees

• Fe – 4

• Sb – 3

http://gis.mre.gov.rs/Srbija/

Page 8: Dragan Milosevic

SIGNIFICANT MINERAL POTENTIAL

� Porphyry copper and massive sulphide (Exploration)

� Sediment-hosted gold deposit (PotajResources)

www.serbiamining.rs

Resources)

� Lithium-Boron deposit (Jadar basin /

� Pb Zn deposits (Suva Ruda, West Serbia

POTENTIAL OF SERBIA

Porphyry copper and massive sulphide (Čukaru Peki / Rakita

Potaj Čuka – Tisnica / Avala

Boron deposit (Jadar basin / Rio Tinto)

Serbia…)

Page 9: Dragan Milosevic

Potential for new world class projects

• SUVA RUDA – Pb Zn polymetallic

• WEST SERBIA – Pb Zn polymetallic

• EAST SERBIA – Cu Au…

www.serbiamining.rs

EAST SERBIA – Cu Au…

• Borates

• Lithium

Potential for new world class projects

polymetallic

polymetallic

Page 10: Dragan Milosevic

2015/16 new moments

• RIO TINTO LENOVAC

• ELDORADO GOLD KMC PROJECT

• JOGMEC TIMOK NORTH PROJECTS

www.serbiamining.rs

• JOGMEC TIMOK NORTH PROJECTS

• TETHYAN RESOURCES SUVA RUDA

moments in exploration

Au

KMC PROJECT Cu Au

TIMOK NORTH PROJECTS Cu AuTIMOK NORTH PROJECTS Cu Au

SUVA RUDA Pb Zn

Page 11: Dragan Milosevic

Rio Tinto - Lenovac• expenditure of $1 million by December

• expenditures of $2 million by December

• expenditures of $5 million by December

www.serbiamining.rs

• expenditures of $32 million prior to December

December 31, 2016

December 31, 2017

December 31, 2019

December 31, 2023

Page 12: Dragan Milosevic

ELDORADO GOLD - KMC • Drill plan for 2016 – 7500 m * 100 € = 750.000

• Laboratory

• Other geological works…

www.serbiamining.rs

KMC PROJECT= 750.000 €

Page 13: Dragan Milosevic

JOGMEC - TIMOK NORTH PROJECTS• Expenditure of US$1 million within one

• Expenditure of US$2 million within the

• Funding the completion of a Feasibilityanniversary of the Agreement (March

www.serbiamining.rs

anniversary of the Agreement (March

NORTH PROJECTSone year (March 7, 2017)

the second year (March, 2018)

Feasibility Study by the eighthMarch 7, 2024)March 7, 2024)

Page 14: Dragan Milosevic

TETHYAN RESOURCES -• completing at least 2,000 metres of drilling on the licence before

December 28, 2016

• drilling at least a further 5,000 metres before December 28,

• completing a preliminary economic assessment within six years of

www.serbiamining.rs

• completing a preliminary economic assessment within six years of the agreement being signed, 2022

• completing an economic feasibility study within seven years of the agreement being signed, 2023

SUVA RUDAcompleting at least 2,000 metres of drilling on the licence before

drilling at least a further 5,000 metres before December 28, 2018

completing a preliminary economic assessment within six years of completing a preliminary economic assessment within six years of

completing an economic feasibility study within seven years of the

Page 15: Dragan Milosevic

Financial projection

2016 2017 2018 2019

Rio Tinto 1,000,000 2,000,000 5,000,000

Eldorado gold 1,000,000

JOGMEC 1,000,000 2,000,000

www.serbiamining.rs

JOGMEC 1,000,000 2,000,000

Tethyan

Resources 500,000 1,000,000

TOTAL 3,500,000 5,000,000

2019 2020 2021 2022 2023

32,000,000

Page 16: Dragan Milosevic

What this means for local economic growth?• Consulting companies

• Geological companies

• Drilling companies

www.serbiamining.rs

• Laboratory

• Earthworks companies

• Survey service…

What this means for local economic growth?

Page 17: Dragan Milosevic

NEW MINING LAW

• LAW ON GEOLOGICAL EXPLORATION AND MINING HAS 2015

� Exploration timeframe is 8 years (3+3+2 years + 2 for significant find in last

exploration year)

www.serbiamining.rs

� Reservation of exploration area for next phase up to 2 years

� Expropriation of the land for private investors is enabled

� SECURITY OF TENURE

� Fastest permitting procedures

HAS ADOPTED AT THE END OF

Exploration timeframe is 8 years (3+3+2 years + 2 for significant find in last

Reservation of exploration area for next phase up to 2 years

Expropriation of the land for private investors is enabled

Page 18: Dragan Milosevic

www.serbiamining.rs

Fokus ne treba da bude na tome kako rudarstvo može da bude održivo, već na tome

kako rudarstvo i eksploatacija mineralnih sirovina može doprineti održivom razvoju!

Fokus ne treba da bude na tome kako rudarstvo može da bude održivo, već na tome

kako rudarstvo i eksploatacija mineralnih sirovina može doprineti održivom razvoju!

Page 19: Dragan Milosevic

www.serbiamining.rs

Thank you for your attention• Dragan Milosevic, mining engineer

• Terragold&co doo Belgrade

[email protected]