Summer training report on

dieSel locomotive workS varanaSi

submitted by:- Shubham chaurasiya punjab university

Page 2: DLW varanasi summer training report

introduction DLW, was founded by Late Railway Minister Mr. Lal Bahadur Shastri on 23

April 1956. It is spread in 300 acres area at Varanasi.

It is a production unit owned by Indian railways , for which it manufactures diesel–electric locomotives and its spares parts.

To meet the increased transportation needs of the Indian railways it was established in collaboration with ALCO( American Locomotive Company), USA in 1961.

DLW rolled out its first locomotive three years later, on January 3, 1964. It manufactures locomotives.

Page 3: DLW varanasi summer training report

Got its first ISO certification in 1997 and ISO-9001 and ISO-14001 in

December 2002.

At present the latest locomotive produced by DLW; i.e. WDG 5 has capacity upto 5000 HP & trying to make it 5500 HP.

It has supplied locomotives to other countries such as Sri Lanka, Bangladesh, Malaysia, Tanzania and Vietnam etc.

DLW is supplying locos to PSU’s & Industries Like NTPC, COAL, INDOGULF etc.

Page 4: DLW varanasi summer training report

dieSel electric locomotive In a diesel-electric locomotive, the diesel engine drives an electrical generator or

alternator whose output provides power to the traction motors. There is no mechanical connection between the engine and the wheels.

Page 5: DLW varanasi summer training report

claSSification of locomotiveSLocos, except the older steam ones, have classification codes that identify them. This code is of the form WDG5A “ [ gauge ][ power ][load ][ series ][ sub type ]”

the firSt letter (gauge)

W- Indian broad gauge

Y- meter gauge

Z- narrow gauge(2.5 ft)

N- narrow gauge (2 ft) the Second letter (motive power)

D- Diesel

C- DC electric (can run under DC traction only)

A- AC electric (can run under AC traction only)

CA- Both DC and AC (can run under both AC and DC tractions)

B- Battery electric locomotive (rare)

Page 6: DLW varanasi summer training report

the third letter (load type) G-goods P-passenger M-mixed traffic ; both goods and passenger S-Used for shunting U-Electric multiple units (E.M.U.) R-Railcars

the fourth letter (SerieS) The series digit identifies the horsepower range of the locomotive. Example for the series letter ‘3’ means that the locomotive has power

over 3000 hp but less than 4000 hp.

the fifth letter (Subtype) an optional letter or number that indicates some smaller variations in

the basic model. For ex: ‘A’ for 100 hp, ‘B’ for 200 hp and so on……..

Page 7: DLW varanasi summer training report

engine diviSion

1. Engine Erection Shop2. Engine Testing Shop3. Light Machine Shop4. Sub Assembly Shop5. Rotor Shop6. Heat Treatment Shop7. Turbo Section

Page 8: DLW varanasi summer training report

loco diviSion1. Loco Frame Shop2. Pipe Shop3. Truck Machine Shop4. Traction Assembly Shop5. Sheet Metal Shop6. Loco Assembly Shop7. Loco Paint Shop8. Loco Test Shop

Page 9: DLW varanasi summer training report

welding Shop

Welding is a process which produces joining of materials by heating them to suitable temperatures with or without the application of pressure and with or without the use of filler material.

Welding is used for making permanent joints.

It is used in the manufacturing of automobile bodies, aircraft frames, railway wagons, machine frames, structural works, tanks, furniture, boilers, general repair work and ship building.

Page 10: DLW varanasi summer training report

Shielded Metal Arc Welding [SMAW]Submerged Arc Welding [SAW]Gas Shielded Metal Arc Welding [MIG]Flux Cored Arc Welding [FCAW]

Shielded Metal Arc Welding [SMAW]Submerged Arc Welding [SAW]Gas Shielded Metal Arc Welding [MIG]Flux Cored Arc Welding [FCAW]

Types Of Welding Used in dlWTypes Of Welding Used in dlW

Page 11: DLW varanasi summer training report

WhaT is sMaW?WhaT is sMaW?

It is a welding process which joins metals by heating the metals to their melting point with an electric arc set up between the end of a coated metal electrode and the work piece.

Molten metal droplets and the molten weld are shielded from the atmosphere by the gases produced from the decomposition of the flux coating .

Page 12: DLW varanasi summer training report

saW prOcess principles

SAW is a welding process which joins metals by heating the metals to their melting point with an electric arc or arcs set up between a bare metal electrode and the job.

The arc, the end of electrode and molten pool remains completely hidden and are invisible being submerged under a blanket of granular flux.

The continuously fed bare metal electrode melts and acts as filler rod.

Page 13: DLW varanasi summer training report

SAW Features

•High Productivity, high amperages may be used•Easy to de-slag •High Quality•Deep penetration•Excellent mechanical properties•Environment friendly•Very little fume•No radiation•Easy operation

•High Productivity, high amperages may be used•Easy to de-slag •High Quality•Deep penetration•Excellent mechanical properties•Environment friendly•Very little fume•No radiation•Easy operation

Page 14: DLW varanasi summer training report

Gas Metal Arc ( MIG ) Welding

Uses continuous wire 0.6 – 2.0 mm as electrode

Gas shielded, inert or active gas

Manual, automatic or semi-automatic process

High productivity

If the wire feed speed is increased more current is drawn to burn it off .

Increasing the current increases the arc energy and therefore the heat input. This in turn increases fusion and penetration, wire deposition rate and travel speed.

Page 15: DLW varanasi summer training report
Page 16: DLW varanasi summer training report

16

laser cUTTing-UpTO 4MM

Page 17: DLW varanasi summer training report

17

Under WaTer plasMa cUTTing UpTO 16 MM

Page 18: DLW varanasi summer training report
Page 19: DLW varanasi summer training report

bogie assembly shop

A bogie is a wheeled wagon or trolley. In mechanics terms, a bogie is a chassis or framework carrying wheels, attached to a vehicle.

Usually the train floor is at a level above the bogies, but the floor of the car may be lower between bogies.

Page 20: DLW varanasi summer training report

bogie assembly (emD)

Wheel and Axle assembly. Brake rigging assembly. Traction motor & gear case assembly. Bearing adopter assembly. Final assembly.

Page 21: DLW varanasi summer training report

TracTion moTor• Electric motor providing the primary rotational torque of a machine, usually for conversion into linear motion.

•DC series-wound motors, running on approximately 600 volts.

•The availability of high-powered semiconductors such as thyristors has now made practical the use of much simpler, higher-reliability AC induction motors.

Page 22: DLW varanasi summer training report

assembly process:PRESS BULL GEAR ON AXLE.

SHIFT ABOVE ASSEMBLY AT BEARING HOUSING FITTING STAND.

FIT THE BEARING HOUSING AND BOLTING .

ASSEMBLE SEAL , CAP AND TAPER ROLLER BEARING

BOLTING .

NOW, SHIFT THIS ASSEMBLY ON WHEEL & AXLE PRESS MACHINE.

Page 23: DLW varanasi summer training report

machine shop

1. Heavy Machine Shop2. Light Machine Shop

Page 24: DLW varanasi summer training report

1. Conventional machine2. NC machine3. CNC machine

1. convenTional machine: It is a simple machine which is now an old technique.

2. numerical conTrol machine: Numerical control is defined as a system in which the actions of the machines

are controlled by the insertion of the numerical data. In other words number controls the action.

Types of machines

Page 25: DLW varanasi summer training report

compuTerizeD numerically conTrolleD machine In CNC the control system further energized with a mini computer or a post

processor.

The control unit stores the programmed information of the work piece, the travel limits, collisions zones and the diagnostic information etc. it also gives a feedback to the operator about the current position and distance to be travelled etc.

CNC machines have the ability to edit or alter the existing program in no time.

Page 26: DLW varanasi summer training report

machines in area b

flame cuTTing cnc laser cuTTing

Steel plates are ultrasonically tested before being precision cut by numerically controlled flame cutting machines or by CNC LASER machine.

The laser beam is typically 0.2 mm (0.008 in) diameter at the cutting surface with a power of 1000 to 2000 watts.

Lasers work best on materials such as carbon steel or stainless steels because these are difficult to cut due to their ability to reflect the light as well as absorb and conduct heat. This requires lasers that are more powerful.

Page 27: DLW varanasi summer training report

angular boring machine

Page 28: DLW varanasi summer training report

CNC milliNg maChiNes

CNC mills can perform the functions of drilling and often turning.

CNC Mills are classified according to the number of axes that they possess.

A standard manual light-duty mill is typically assumed to have four axes:

Table x.

Table y.

Table z.

Milling Head z.

Page 29: DLW varanasi summer training report
Page 30: DLW varanasi summer training report

lubriCatiNg oil testiNg

Lubrication is done for better performance of the engine parts. testing is done by checking the circulation of lubricant oil. For rotating parts checking is done by seeing the returning path of the oil

i.e. checking not only the forward path but also the returning path. RR40 is used as lubricating oil.

types of testiNg

Page 31: DLW varanasi summer training report

water testiNg

Water acts as a coolant for moving part of the engine because constant movement or rotation causes various parts to heat up and water working as coolant cooled down the concerned part.

load testiNg For load testing electrical load is provided to the engine. If there is any

abnormal sound then the engine is again tested for lubrication so that any flaw which is there can be removed.

Page 32: DLW varanasi summer training report

eNgiNe test operatioN sequeNCe

Base inspection under screen and fitting over screen.Water circulation.Lube oil filling and check deflection crank shaft.Lube oil circulation.Pre run on no load 3 to 5 times of duration 10 to 30

min each 400 rpm.Intermediate runs 12 runs of 30 min duration each

from 400 to 1000 rpm.

Page 33: DLW varanasi summer training report

Check over speed trip of recheck 3 times.Check bake in nozzles and set tapped clearance.Inspection before fist hour performance.First hour performance on full load.Base inspection.Second hour performance on full load. Attend defects of first hour performance.Final base inspection.Check engine deficiencies.Engine clearance.

Page 34: DLW varanasi summer training report