Page 1: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Construction of Pervious Concrete Pavements

From the Pervious Concrete Certification Program

Page 2: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

SITE PREPARATION

Duraport Parking Lot, Bayonne, NJPlaced October 2007

Page 3: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Site Preparation – Cut and Fill

Site can be graded flat to maximize storage of stormwater

Page 4: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Recharge Bed Preparation

Place and compact stone to desired depth

Keep stone cleanRemove all dirt and debris that may clog recharge bed

Page 5: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Site Preparation - Compaction

Compact subgrade to 92% of modified proctorCompact aggregate base to 95% of modified proctor

Don’t over compact, subgrade must remain permeable

Page 6: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Filter Fabric

Non-woven geotextile fabric is specified toprevent migration of fines into recharge bed

Page 7: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Setting Forms

Use string lines to set form elevation

Wood or steel forms can be used

Page 8: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Crew Duties – 8 Man Crew + 1

1 handles chute & hose

3 rake and level

2 strike-off/compact (run screed)

2 finish (side roller), joint, edge and cure (plastic)

1 to oversee all

Page 9: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Finishing: The Typical Process

SpreadingStrike-offCompactingJointing/EdgingCuring

1

2

3

4

5

Page 10: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Spreading 1

Page 11: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Moistened Base 1

Page 12: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Proper Water Content

When concrete arrives on site, check for quality

“Squeeze test”grab a handful, squeeze for 5 seconds, releaseHalf of your hand should be coated with paste

1

Page 13: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

How Do You Know Its Right? 1

Look for ‘wet metallic sheen’

Page 14: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Recharge Bed Preparation

Rake out tire tracks

Page 15: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Mixer Discharge 1

Hang no chutes

Use only one chute section

Page 16: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Pervious Concrete Placement 1

Page 17: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Edges

Tamp the edges (approx 3’-6”) for durability

1

Page 18: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Edges

Place the edges first, then work toward the middle

1

Page 19: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Edges

Place the edges in lifts, tamp, and continue to top of form

1

Page 20: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Strike-off 2

Page 21: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Pervious Concrete Finishing

Smooth and compactpervious concrete ½”+/- to desired final grade

Hydraulic roller steelscreed recommended –10 psi down pressure recommended

2

Page 22: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Pervious Concrete Finishing 2

Page 23: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Small Jobs - Sidewalks 2

Page 24: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Compacting 3

Page 25: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Delaying compaction may cause raveling on a pervious concrete pavementCompaction takes place in top ½ inch of surfaceCompaction sets aggregate and smoothes the surface

3Compaction

Page 26: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Compacting the Edges 3

Page 27: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Cross Rolling 3

Page 28: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Edges

Use an edging tool to round-off edgesTamp tool – do not slide tool

3

Page 29: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Surface Texture

Important to keep the voids openDo NOT use trowelsDo NOT seal the surfaceNo roller marks

3

Page 30: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Jointing 4

Page 31: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Joints 4

Page 32: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Joints

Cut joints with a special “jointing” tool with a radiusmachined at the flange

Joints should be cut at least ¼ the thicknessof the slab

4

Page 33: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Jointing Technique 4

Page 34: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Curing 5

Page 35: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Curing

• Cure with 6 mil plastic for at least 7 days

• Cover within 20 minutes

5

Page 36: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Properly Secured Curing 5

Hold plastic down by nailing to forms or placing wood or rebar over plastic – do not use dirt

Page 37: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,
Page 38: Construction of Pervious Concrete Pavements · Construction of Pervious Concrete Pavements From the Pervious Concrete Certification Program. SITE PREPARATION Duraport Parking Lot,

Thank You