Transcript
Page 1: Big Project, Small Staff, Tight Deadlines

P. Jay MasseyDirector, Web Services

University of West Florida

@ JAY MASSEY

Page 2: Big Project, Small Staff, Tight Deadlines

We Have Limited Time TodayNo weeds

Moving fast

This is typically a 4-8 hour consult

High-level review of how we did it

Happy to chat afterwards for more detail…at lunch, dinner, or whenever, find me & AMA

@ JAY MASSEY

Page 3: Big Project, Small Staff, Tight Deadlines

@ JAY MASSEY

@JayMassey - managing web teams since 1999

Director, Web ServicesUniversity of West Florida

Founder / Chief Vision OfficerCoco Interactive, LLC

What are your duties?

Page 4: Big Project, Small Staff, Tight Deadlines

@ JAY MASSEY

Page 5: Big Project, Small Staff, Tight Deadlines

@ JAY MASSEY

Monarch

Nobles

Knights

Merchants

Farmers

Surfs

President

VPs / Provost(s)

AVPs / Deans

Exec Dirs

Directors

Staff

Page 6: Big Project, Small Staff, Tight Deadlines

Disclaimer: Everyone’s situation is different these are what worked for us.

• The job interviewLimited staff

No budget

• Web Services is under Marketing & Communications

• Speed of change issues

• ITS was deep into a 3-yr Banner implementation

• Trigger came from the top

• Be prepared to run with it (with little notice)

@ JAY MASSEY

Page 7: Big Project, Small Staff, Tight Deadlines

Flash homepage

50,000 pages

Static

Dreamweaver maintained

130 DW content providers

ColdFusion web server

Usablenet accessibility

@ JAY MASSEY

Page 8: Big Project, Small Staff, Tight Deadlines

5,600 pages down from 50,000

Fully responsive, CMS-managed public website

Removed roadblocksGlut content

Usability

Accessibility

Mobility

Search-ability

Engaged Stakeholders230 CMS-trained CPs

Web Summit

@ JAY MASSEY

Page 9: Big Project, Small Staff, Tight Deadlines

rēˌsərCHnoun1. the systematic investigation

into and study of materials and sources in order to establish facts and reach new conclusions.

verb2. investigate systematically.

Make your case with research2011 E-Expectations Report: The Online Expectations of Prospective College Students and Their Parents

@ JAY MASSEY

• Other universities and colleges

• Whitepapers, etc.

• UWF survey (782)

• Homepage heatmap

• Wireframe review

Page 10: Big Project, Small Staff, Tight Deadlines

Mind map

Wall art

Pre-screening vendors

Reviewing migration options

@ JAY MASSEY

Page 11: Big Project, Small Staff, Tight Deadlines

Timeline

Current Issues

Personas

Message

Market

Accessibility

Mobility

Search

SEO

@ JAY MASSEY

Discussion Points

Internet Marketing

Other Institutions (peer, aspirant, cool stuff)

Statistics / Analytics

Process

Sample Sites

Content Management

3rd Party Products

Quality Assurance

Page 12: Big Project, Small Staff, Tight Deadlines

We started the process with an interim step…

Rebuilt on the legacy website homepage and styles only

Benefits:

• Remove Flash from homepage

• More time to work on major process

• Subtle transition to new visual styling

• Introduce more audience-centered layout

@ JAY MASSEY

Page 13: Big Project, Small Staff, Tight Deadlines

We did CMS First (not recommended)

Compare Content Management SystemsCMSmatrix.org

CMS Matrix as Part of the RFPSoftware Capabilities

Required / Preferred / Beneficial

Service CapabilitiesRequired / Beneficial

Technical CapabilitiesRequired / Beneficial

@ JAY MASSEY

Page 14: Big Project, Small Staff, Tight Deadlines

Open Source vs. Commercial License CMS

Cost, Value, Contracts, Comparing Apples to Apples

Do Not Underestimate the TimeThis could be the most time consuming part of the process

@ JAY MASSEY

Page 15: Big Project, Small Staff, Tight Deadlines

@ JAY MASSEY

Page 16: Big Project, Small Staff, Tight Deadlines

via xkcd.com

where we were

@ JAY MASSEY

Page 17: Big Project, Small Staff, Tight Deadlines

The reality ofan enterprisemigration…

where we went

@ JAY MASSEY

Page 18: Big Project, Small Staff, Tight Deadlines

• Research / Planning

• Procurement

• Responsive Design (accessible, mobile, searchable)

• CMS Integration

• Pre-training / Train the Trainer

• Content Migration

• Review / Testing

• Training (ongoing)

• QA Audits & Maintenance (ongoing)

• New Development (ongoing)

• Web Governance

@ JAY MASSEY

Page 19: Big Project, Small Staff, Tight Deadlines

Divide and CommunicateTop Down

Bottom Up

User surveys

Focus group

Leadership updates

Content provider input and training

@ JAY MASSEY

Page 20: Big Project, Small Staff, Tight Deadlines

Take Note of Your Assets and Use What You HavePeople, Money or Time

Leadership

Vendors

Money opportunities

Campus staff and students

Content ProvidersCrowd-sourced migration

@ JAY MASSEY

Page 21: Big Project, Small Staff, Tight Deadlines

@ JAY MASSEY

Page 22: Big Project, Small Staff, Tight Deadlines

Pre-migration SessionsGetting ready

CMS Migration TrainingsHow to use the system and move content “easily”

CMS TrainingHow to use the system

Post-migration, Ongoing TrainingHow to use the system better

@ JAY MASSEY

Page 23: Big Project, Small Staff, Tight Deadlines

1. Communication is key to your survival• Communications plan

• Professional communicator (if possible)

• Under promise, over communicate

2. Leverage anything and everything

3. CMS Matrix

4. Migration is your albatross, plan for it

5. Always keep your eye and heart on the user

@ JAY MASSEY

Page 24: Big Project, Small Staff, Tight Deadlines

Happy to chat about your situation

Find me - dinner, breakfast, lunch, coffee, beer, phone, tweet, AMA

@ JAY MASSEY


Recommended