Transcript
Page 1: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Status For Letting

August 14, 2018

AWARDED:

08/17/2018 002 003 005 006

08/24/2018 001 004

WITHDRAWN:

DEFERRED:

NO BIDS RECEIVED:

REJECTED:

UNDER FURTHER REVIEW:

Report Created: 08/24/2018

Page 2: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Concrete PavingType Of Work:

1 ZIGNEGO COMPANY, INC. W226 N2940 Duplainville Road Waukesha, WI 53186Bidder No.

2 JAMES PETERSON SONS, INC. N2251 Gibson Dr. Medford, WI 54451-0120Bidder No.

3 MASHUDA CONTRACTORS, INC. P.O. Box 16 Princeton, WI 54968Bidder No.

4 HOFFMAN CONSTRUCTION COMPANY 123 County Rd A Black River Falls, WI 54615Bidder No.

5 INTEGRITY GRADING AND EXCAVATING, INC. 605 Grossman Drive Schofield, WI 54476-0138Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

203.0200 5,000.00Removing Old Structure (station)01. 114+33.56

LS 5,000.00 5,000.001.000 5,000.00 5,000.00 5,000.00

203.0200 5,000.00Removing Old Structure (station)01. 221+99.98

LS 5,000.00 5,000.001.000 5,000.00 5,000.00 5,000.00

203.0225.S 5,000.00Debris Containment (structure) 01.B-25-0016

LS 5,000.00 5,000.001.000 5,000.00 5,000.00 5,000.00

203.0225.S 10,000.00Debris Containment (structure) 02.B-25-0018

LS 10,000.00 10,000.001.000 10,000.00 10,000.00 10,000.00

203.0225.S 100.00Debris Containment (structure) 03.B-25-0020

LS 100.00 100.001.000 100.00 100.00 100.00

203.0225.S 100.00Debris Containment (structure) 04.B-25-0021

LS 100.00 100.001.000 100.00 100.00 100.00

203.0225.S 100.00Debris Containment (structure) 05.B-25-0022

LS 100.00 100.001.000 100.00 100.00 100.00

203.0225.S 6,500.00Debris Containment (structure) 06.B-25-0023

LS 6,500.00 6,500.001.000 6,500.00 6,500.00 6,500.00

204.0100 211,885.60Removing Pavement SY 211,885.60 62,835.04146,128.000 1.45 1.45 0.43

204.0150 1,900.00Removing Curb & Gutter LF 1,900.00 760.00190.000 10.00 10.00 4.00

204.0165 22,428.00Removing Guardrail LF 22,428.00 22,428.0014,952.000 1.50 1.50 1.50

204.0170 750.00Removing Fence LF 750.00 750.00150.000 5.00 5.00 5.00

204.0180 5,525.00Removing Delineators and Markers EACH 5,525.00 5,525.00221.000 25.00 25.00 25.00

204.0190 1,500.00Removing Surface Drains EACH 1,500.00 750.005.000 300.00 300.00 150.00

All Bids Received

August 14, 2018

Page 1 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 3: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

204.0220 3,200.00Removing Inlets EACH 3,200.00 2,800.008.000 400.00 400.00 350.00

204.0245 3,200.00Removing Storm Sewer (size) 01.18-Inch

LF 3,200.00 2,800.00160.000 20.00 20.00 17.50

204.0245 7,200.00Removing Storm Sewer (size) 02.12-Inch

LF 7,200.00 6,600.00400.000 18.00 18.00 16.50

205.0100 519,271.00Excavation Common CY 519,271.00 746,148.75121,325.000 4.28 4.28 6.15

206.1000 4,500.00Excavation for Structures Bridges(structure) 01. B-25-0017

LS 4,500.00 4,500.001.000 4,500.00 4,500.00 4,500.00

206.1000 4,500.00Excavation for Structures Bridges(structure) 01. B-25-0020

LS 4,500.00 4,500.001.000 4,500.00 4,500.00 4,500.00

210.1500 1,056.00Backfill Structure Type A TON 1,056.00 1,056.0088.000 12.00 12.00 12.00

213.0100 4,200.00Finishing Roadway (project) 01.1204-04-77

EACH 3,000.00 1,814.001.000 4,200.00 3,000.00 1,814.00

305.0110 121,907.50Base Aggregate Dense 3/4-Inch TON 121,907.50 119,195.007,750.000 15.73 15.73 15.38

305.0120 857,050.00Base Aggregate Dense 1 1/4-Inch TON 857,050.00 1,233,590.00140,500.000 6.10 6.10 8.78

312.0110 213,170.50Select Crushed Material TON 213,170.50 231,040.0018,050.000 11.81 11.81 12.80

415.0085 716,718.00Concrete Pavement 8 1/2-Inch SY 643,348.71 643,348.7118,861.000 38.00 34.11 34.11

415.0095 4,574,610.00Concrete Pavement 9 1/2-Inch SY 4,920,247.20 4,920,247.20135,544.000 33.75 36.30 36.30

415.0410 164,430.00Concrete Pavement Approach Slab SY 193,540.20 193,540.201,015.000 162.00 190.68 190.68

415.5110.S 4,000.00Concrete Pavement Joint Layout LS 1,000.00 1,000.001.000 4,000.00 1,000.00 1,000.00

415.6000.S 77,701.20Rout and Seal LF 77,701.20 77,701.20106,440.000 0.73 0.73 0.73

416.0610 150.00Drilled Tie Bars EACH 140.00 140.0010.000 15.00 14.00 14.00

416.0620 2,300.00Drilled Dowel Bars EACH 1,472.00 1,472.0092.000 25.00 16.00 16.00

416.1010 8,750.00Concrete Surface Drains CY 5,638.10 5,638.1010.000 875.00 563.81 563.81

416.1110 15,105.60Concrete Shoulder Rumble Strips LF 15,105.60 14,948.2531,470.000 0.48 0.48 0.48

440.4410 30,626.00Incentive IRI Ride DOL 30,626.00 30,626.0030,626.000 1.00 1.00 1.00

450.4000 14,337.50HMA Cold Weather Paving TON 14,337.50 14,337.505,735.000 2.50 2.50 2.50

All Bids Received

August 14, 2018

Page 2 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 4: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

460.2000 10,620.00Incentive Density HMA Pavement DOL 10,620.00 10,620.0010,620.000 1.00 1.00 1.00

460.5224 824,295.00HMA Pavement 4 LT 58-28 S TON 824,295.00 824,295.0013,425.000 61.40 61.40 61.40

465.0110 1,150.00Asphaltic Surface Patching TON 1,150.00 1,150.005.000 230.00 230.00 230.00

465.0125 144,491.00Asphaltic Surface Temporary TON 144,491.00 144,491.002,449.000 59.00 59.00 59.00

465.0400 5,869.50Asphaltic Shoulder Rumble Strips LF 5,869.50 5,643.7545,150.000 0.13 0.13 0.13

502.0100 30,000.00Concrete Masonry Bridges CY 30,000.00 30,000.0010.000 3,000.00 3,000.00 3,000.00

502.0717.S 314.00Crack Sealing Epoxy LF 314.00 314.003,140.000 0.10 0.10 0.10

502.3100 10,000.00Expansion Device (structure) 01. B-25-0016

LS 10,000.00 10,000.001.000 10,000.00 10,000.00 10,000.00

502.3100 33,000.00Expansion Device (structure) 02. B-25-0018

LS 33,000.00 33,000.001.000 33,000.00 33,000.00 33,000.00

502.3100 15,000.00Expansion Device (structure) 03. B-25-0023

LS 15,000.00 15,000.001.000 15,000.00 15,000.00 15,000.00

502.3200 13,593.25Protective Surface Treatment SY 13,593.25 13,593.254,943.000 2.75 2.75 2.75

502.3210 6,540.00Pigmented Surface Sealer SY 6,540.00 6,540.00436.000 15.00 15.00 15.00

502.4205 10,010.00Adhesive Anchors No. 5 Bar EACH 10,010.00 10,010.00286.000 35.00 35.00 35.00

502.4206 648.00Adhesive Anchors No. 6 Bar EACH 648.00 648.0018.000 36.00 36.00 36.00

502.4207 2,072.00Adhesive Anchors No. 7 Bar EACH 2,072.00 2,072.0056.000 37.00 37.00 37.00

505.0600 39,957.50Bar Steel Reinforcement HS CoatedStructures

LB 39,957.50 39,957.5014,530.000 2.75 2.75 2.75

506.0105 52,220.00Structural Steel Carbon LB 52,220.00 52,220.005,222.000 10.00 10.00 10.00

506.2610 38,500.00Bearing Pads ElastomericLaminated

EACH 38,500.00 38,500.0044.000 875.00 875.00 875.00

506.7050.S 14,000.00Removing Bearings (structure) 01.B-25-0016

EACH 14,000.00 14,000.004.000 3,500.00 3,500.00 3,500.00

506.7050.S 63,000.00Removing Bearings (structure) 02.B-25-0018

EACH 63,000.00 63,000.0018.000 3,500.00 3,500.00 3,500.00

All Bids Received

August 14, 2018

Page 3 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 5: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

506.7050.S 28,000.00Removing Bearings (structure) 03.B-25-0023

EACH 28,000.00 28,000.008.000 3,500.00 3,500.00 3,500.00

506.7050.S 49,000.00Removing Bearings (structure) 04.B-25-0024

EACH 49,000.00 49,000.0014.000 3,500.00 3,500.00 3,500.00

509.0301 75,075.00Preparation Decks Type 1 SY 75,075.00 75,075.00429.000 175.00 175.00 175.00

509.0302 61,050.00Preparation Decks Type 2 SY 61,050.00 61,050.00222.000 275.00 275.00 275.00

509.0310.S 650.00Sawing Pavement Deck PreparationAreas

LF 650.00 650.0065.000 10.00 10.00 10.00

509.0500 81,576.00Cleaning Decks SY 81,576.00 81,576.004,532.000 18.00 18.00 18.00

509.1000 111,600.00Joint Repair SY 111,600.00 111,600.00124.000 900.00 900.00 900.00

509.1500 73,220.00Concrete Surface Repair SF 73,220.00 73,220.00523.000 140.00 140.00 140.00

509.2000 59.00Full-Depth Deck Repair SY 59.00 59.0059.000 1.00 1.00 1.00

509.2500 255,750.00Concrete Masonry Overlay Decks CY 255,750.00 255,750.00330.000 775.00 775.00 775.00

509.5100.S 33,189.48Polymer Overlay SY 33,189.48 33,189.48778.000 42.66 42.66 42.66

509.9010.S 8,840.00Removing Asphaltic Concrete DeckOverlay (structure) 02. B-25-0020

SY 8,840.00 8,840.00680.000 13.00 13.00 13.00

509.9050.S 22,095.00Cleaning Parapets LF 7,856.00 7,856.00982.000 22.50 8.00 8.00

511.1200 5,625.00Temporary Shoring (structure) 01.B-25-0017

SF 5,625.00 5,625.00250.000 22.50 22.50 22.50

511.1200 1.35Temporary Shoring (structure) 02.B-25-0020

SF 1.35 1.35135.000 0.01 0.01 0.01

516.0500 270.00Rubberized MembraneWaterproofing

SY 270.00 270.006.000 45.00 45.00 45.00

517.1800.S 108,000.00Structure Repainting RecycledAbrasive (structure) 01. B-25-0023

LS 108,000.00 108,000.001.000 108,000.00 108,000.00 108,000.00

517.1800.S 14,000.00Structure Repainting RecycledAbrasive (structure) 02. B-25-0024

LS 14,000.00 14,000.001.000 14,000.00 14,000.00 14,000.00

517.4500.S 48,125.00Negative Pressure Containment andCollection of Waste Materials(structure) 01. B-25-0023

LS 48,125.00 48,125.001.000 48,125.00 48,125.00 48,125.00

All Bids Received

August 14, 2018

Page 4 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 6: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

517.4500.S 7,150.00Negative Pressure Containment andCollection of Waste Materials(structure) 02. B-25-0024

LS 7,150.00 7,150.001.000 7,150.00 7,150.00 7,150.00

517.6001.S 4,000.00Portable Decontamination Facility EACH 8,000.00 4,000.002.000 2,000.00 4,000.00 2,000.00

520.3312 2,040.00Culvert Pipe Class III-A 12-Inch LF 2,040.00 2,700.0060.000 34.00 34.00 45.00

520.8700 1,200.00Cleaning Culvert Pipes EACH 1,200.00 1,200.001.000 1,200.00 1,200.00 1,200.00

521.1012 2,480.00Apron Endwalls for Culvert PipeSteel 12-Inch

EACH 2,480.00 1,152.004.000 620.00 620.00 288.00

522.1018 2,715.00Apron Endwalls for Culvert PipeReinforced Concrete 18-Inch

EACH 2,715.00 2,223.003.000 905.00 905.00 741.00

601.0409 27,180.00Concrete Curb & Gutter 30-InchType A

LF 33,763.60 33,763.601,510.000 18.00 22.36 22.36

601.0413 196,380.00Concrete Curb & Gutter 6-InchSloped 30-Inch Type G

LF 192,452.40 192,452.4010,910.000 18.00 17.64 17.64

601.0586 4,400.00Concrete Curb & Gutter 4-InchSloped 30-Inch Type TBTT

LF 22,940.00 22,940.00200.000 22.00 114.70 114.70

602.0405 3,240.00Concrete Sidewalk 4-Inch SF 7,673.40 7,673.40270.000 12.00 28.42 28.42

602.0505 2,880.00Curb Ramp Detectable WarningField Yellow

SF 1,600.00 1,600.0040.000 72.00 40.00 40.00

604.0500 21,141.00Slope Paving Crushed Aggregate SY 20,776.50 20,776.50729.000 29.00 28.50 28.50

604.9010.S 3,600.00Slope Paving Repair CrushedAggregate

CY 720.00 720.0012.000 300.00 60.00 60.00

606.0200 10,206.00Riprap Medium CY 17,010.00 13,365.00243.000 42.00 70.00 55.00

608.0318 9,577.00Storm Sewer Pipe ReinforcedConcrete Class III 18-Inch

LF 9,577.00 11,657.25157.000 61.00 61.00 74.25

611.0630 18,810.00Inlet Covers Type HM-GJ EACH 18,810.00 18,150.0033.000 570.00 570.00 550.00

611.0654 3,420.00Inlet Covers Type V EACH 3,420.00 3,000.006.000 570.00 570.00 500.00

611.3220 6,900.00Inlets 2x2-FT EACH 6,900.00 7,210.005.000 1,380.00 1,380.00 1,442.00

611.3230 4,695.00Inlets 2x3-FT EACH 4,695.00 5,064.003.000 1,565.00 1,565.00 1,688.00

All Bids Received

August 14, 2018

Page 5 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 7: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

612.0212 8,555.00Pipe Underdrain Unperforated 12-Inch

LF 8,555.00 9,882.50295.000 29.00 29.00 33.50

612.0406 60.00Pipe Underdrain Wrapped 6-Inch LF 60.00 500.0020.000 3.00 3.00 25.00

614.0150 875.00Anchor Assemblies for Steel PlateBeam Guard

EACH 875.00 875.007.000 125.00 125.00 125.00

614.0220 15,600.00Steel Thrie Beam Bullnose Terminal EACH 15,600.00 15,600.002.000 7,800.00 7,800.00 7,800.00

614.0230 8,000.00Steel Thrie Beam LF 8,000.00 8,000.00200.000 40.00 40.00 40.00

614.0250 4,200.00Steel Thrie Beam StructureApproach Temporary

LF 4,200.00 4,200.0084.000 50.00 50.00 50.00

614.0360 8,764.00Steel Plate Beam Guard Temporary LF 8,764.00 8,764.00626.000 14.00 14.00 14.00

614.0380 22,500.00Steel Plate Beam Guard EnergyAbsorbing Terminal Temporary

EACH 22,500.00 22,500.009.000 2,500.00 2,500.00 2,500.00

614.2300 303,601.50MGS Guardrail 3 LF 303,601.50 303,601.5014,121.000 21.50 21.50 21.50

614.2500 80,305.50MGS Thrie Beam Transition LF 80,305.50 80,305.501,023.000 78.50 78.50 78.50

614.2610 122,500.00MGS Guardrail Terminal EAT EACH 122,500.00 122,500.0035.000 3,500.00 3,500.00 3,500.00

614.2620 14,400.00MGS Guardrail Terminal Type 2 EACH 14,400.00 14,400.0012.000 1,200.00 1,200.00 1,200.00

616.0100 3,000.00Fence Woven Wire (height) 01. 4.5FEET

LF 3,000.00 3,000.00150.000 20.00 20.00 20.00

618.0100 0.01Maintenance And Repair of HaulRoads (project) 01. 1204-04-77

EACH 1.00 1.001.000 0.01 1.00 1.00

619.1000 761,000.00Mobilization EACH 922,000.00 787,049.001.000 761,000.00 922,000.00 787,049.00

624.0100 24,000.00Water MGAL

24,000.00 20,000.00800.000 30.00 30.00 25.00

625.0500 40,208.50Salvaged Topsoil SY 40,208.50 51,993.7569,325.000 0.58 0.58 0.75

627.0200 7,812.00Mulching SY 7,812.00 7,812.0055,800.000 0.14 0.14 0.14

628.1504 36,950.00Silt Fence LF 36,950.00 36,950.0014,780.000 2.50 2.50 2.50

628.1520 2,956.00Silt Fence Maintenance LF 2,956.00 2,956.0029,560.000 0.10 0.10 0.10

628.1905 1,500.00Mobilizations Erosion Control EACH 1,500.00 1,500.006.000 250.00 250.00 250.00

All Bids Received

August 14, 2018

Page 6 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 8: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

628.1910 1,050.00Mobilizations Emergency ErosionControl

EACH 1,050.00 1,050.003.000 350.00 350.00 350.00

628.2004 20,410.50Erosion Mat Class I Type B SY 20,410.50 20,410.5018,555.000 1.10 1.10 1.10

628.7005 2,750.00Inlet Protection Type A EACH 2,750.00 2,750.0025.000 110.00 110.00 110.00

628.7015 2,160.00Inlet Protection Type C EACH 2,160.00 2,160.0036.000 60.00 60.00 60.00

628.7504 487.50Temporary Ditch Checks LF 487.50 487.5050.000 9.75 9.75 9.75

628.7555 50.00Culvert Pipe Checks EACH 50.00 50.004.000 12.50 12.50 12.50

629.0210 3,024.00Fertilizer Type B CWT 3,024.00 3,024.0056.000 54.00 54.00 54.00

630.0130 8,736.15Seeding Mixture No. 30 LB 8,736.15 8,736.151,257.000 6.95 6.95 6.95

630.0200 1,887.00Seeding Temporary LB 1,887.00 1,887.00629.000 3.00 3.00 3.00

633.0100 4,972.50Delineator Posts Steel EACH 4,972.50 4,972.50221.000 22.50 22.50 22.50

633.0500 1,093.95Delineator Reflectors EACH 1,093.95 1,093.95221.000 4.95 4.95 4.95

633.1000 8,398.00Delineator Brackets EACH 8,398.00 8,398.00221.000 38.00 38.00 38.00

633.1100 3,325.00Delineators Temporary EACH 3,325.00 3,325.00133.000 25.00 25.00 25.00

633.5200 350.00Markers Culvert End EACH 350.00 350.007.000 50.00 50.00 50.00

642.5201 20,000.00Field Office Type C EACH 10,000.00 17,500.001.000 20,000.00 10,000.00 17,500.00

643.0300 21,030.50Traffic Control Drums DAY 21,030.50 21,030.5084,122.000 0.25 0.25 0.25

643.0420 4,135.00Traffic Control Barricades Type III DAY 4,135.00 4,135.008,270.000 0.50 0.50 0.50

643.0500 18,900.00Traffic Control Flexible TubularMarker Posts

EACH 18,900.00 18,900.00900.000 21.00 21.00 21.00

643.0600 4,500.00Traffic Control Flexible TubularMarker Bases

EACH 4,500.00 4,500.00900.000 5.00 5.00 5.00

643.0705 1,951.60Traffic Control Warning Lights TypeA

DAY 1,951.60 1,951.609,758.000 0.20 0.20 0.20

643.0715 1,864.00Traffic Control Warning Lights TypeC

DAY 1,864.00 1,864.009,320.000 0.20 0.20 0.20

643.0800 14,640.00Traffic Control Arrow Boards DAY 14,640.00 14,640.00976.000 15.00 15.00 15.00

All Bids Received

August 14, 2018

Page 7 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 9: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

643.0900 12,381.30Traffic Control Signs DAY 12,381.30 12,381.3041,271.000 0.30 0.30 0.30

643.0910 1,000.00Traffic Control Covering Signs TypeI

EACH 1,000.00 1,000.002.000 500.00 500.00 500.00

643.0920 800.00Traffic Control Covering Signs TypeII

EACH 800.00 800.0040.000 20.00 20.00 20.00

643.1050 5,364.80Traffic Control Signs PCMS DAY 5,364.80 5,364.80112.000 47.90 47.90 47.90

643.5000 31,550.00Traffic Control EACH 31,550.00 31,550.001.000 31,550.00 31,550.00 31,550.00

644.1420.S 5,000.00Temporary Pedestrian SurfacePlywood

SF 7,390.00 7,500.001,000.000 5.00 7.39 7.50

644.1601.S 2,000.00Temporary Curb Ramp EACH 1,400.00 5,000.002.000 1,000.00 700.00 2,500.00

645.0111 350.00Geotextile Type DF Schedule A SY 350.00 500.0010.000 35.00 35.00 50.00

645.0120 405.00Geotextile Type HR SY 405.00 1,134.0027.000 15.00 15.00 42.00

646.1020 69,797.40Marking Line Epoxy 4-Inch LF 69,797.40 69,797.40116,329.000 0.60 0.60 0.60

646.1545 22,736.25Marking Line Grooved Wet RefContrast Epoxy 4-Inch

LF 22,736.25 22,736.2510,575.000 2.15 2.15 2.15

646.3020 300.00Marking Line Epoxy 8-Inch LF 300.00 300.0075.000 4.00 4.00 4.00

646.3545 30,258.50Marking Line Grooved Wet RefContrast Epoxy 8-Inch

LF 30,258.50 30,258.508,290.000 3.65 3.65 3.65

646.6120 180.00Marking Stop Line Epoxy 18-Inch LF 180.00 180.0018.000 10.00 10.00 10.00

646.7220 13,440.00Marking Chevron Epoxy 24-Inch LF 13,440.00 13,440.00960.000 14.00 14.00 14.00

646.8120 320.00Marking Curb Epoxy LF 320.00 320.0080.000 4.00 4.00 4.00

649.0120 35,000.00Temporary Marking Line Epoxy 4-Inch

LF 35,000.00 35,000.0070,000.000 0.50 0.50 0.50

649.0150 94,795.40Temporary Marking Line RemovableTape 4-Inch

LF 94,795.40 94,795.4096,730.000 0.98 0.98 0.98

649.0250 2,400.00Temporary Marking Line RemovableTape 8-Inch

LF 2,400.00 2,400.001,200.000 2.00 2.00 2.00

650.4000 1,725.00Construction Staking Storm Sewer EACH 750.00 750.005.000 345.00 150.00 150.00

All Bids Received

August 14, 2018

Page 8 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 10: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

650.4500 88.40Construction Staking Subgrade LF 442.00 88.408,840.000 0.01 0.05 0.01

650.5000 671.05Construction Staking Base LF 3,355.25 20,131.5067,105.000 0.01 0.05 0.30

650.5500 34.50Construction Staking Curb Gutterand Curb & Gutter

LF 276.00 276.00345.000 0.10 0.80 0.80

650.6000 9.99Construction Staking Pipe Culverts EACH 210.00 210.001.000 9.99 210.00 210.00

650.7000 58,569.70Construction Staking ConcretePavement

LF 47,812.00 47,812.0059,765.000 0.98 0.80 0.80

650.9910 1.00Construction Staking SupplementalControl (project) 01. 1204-04-77

LS 10,000.00 10,000.001.000 1.00 10,000.00 10,000.00

650.9920 32,455.80Construction Staking Slope Stakes LF 18,031.00 18,031.0013,870.000 2.34 1.30 1.30

690.0150 220.10Sawing Asphalt LF 220.10 220.10142.000 1.55 1.55 1.55

690.0250 379.95Sawing Concrete LF 379.95 379.95149.000 2.55 2.55 2.55

715.0415 46,317.00Incentive Strength ConcretePavement

DOL 46,317.00 46,317.0046,317.000 1.00 1.00 1.00

715.0710 122,000.00Optimized Aggregate GradationIncentive

DOL 122,000.00 122,000.00122,000.000 1.00 1.00 1.00

ASP.1T0A 4,375.00On-the-Job Training Apprentice at$5.00/HR

HRS 4,375.00 4,375.00875.000 5.00 5.00 5.00

ASP.1T0G 5,500.00On-the-Job Training Graduate at$5.00/HR

HRS 5,500.00 5,500.001,100.000 5.00 5.00 5.00

SPV.0060 5,850.00Special 01. Cleaning and PaintingBearings

EACH 5,850.00 5,850.0018.000 325.00 325.00 325.00

SPV.0060 39,200.00Special 02. Soil Nail EACH 39,200.00 39,200.0016.000 2,450.00 2,450.00 2,450.00

SPV.0105 62,212.00Special 01. Remove TemporaryCrossover V

LS 62,212.00 39,100.001.000 62,212.00 62,212.00 39,100.00

SPV.0105 62,212.00Special 02. Remove TemporaryCrossover W

LS 62,212.00 39,100.001.000 62,212.00 62,212.00 39,100.00

SPV.0105 62,212.00Special 03. Remove TemporaryCrossover X

LS 62,212.00 39,100.001.000 62,212.00 62,212.00 39,100.00

All Bids Received

August 14, 2018

Page 9 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 11: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

SPV.0105 62,212.00Special 04. Remove TemporaryCrossover Y

LS 62,212.00 39,100.001.000 62,212.00 62,212.00 39,100.00

SPV.0105 62,212.00Special 05. Remove TemporaryCrossover Z

LS 62,212.00 39,100.001.000 62,212.00 62,212.00 39,100.00

SPV.0165 14,400.00Special 01. Shotcrete SF 14,400.00 14,400.00360.000 40.00 40.00 40.00

SPV.0165 20,340.00Special 02. Wall Facing SF 20,340.00 20,340.00360.000 56.50 56.50 56.50

SPV.0180 12,250.00Special 01. Fast Set Deck Patching SY 4,760.00 12,250.007.000 1,750.00 680.00 1,750.00

$13,306,741.24 $13,559,323.98$12,863,221.33Proposal Total:

All Bids Received

August 14, 2018

Page 10 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 12: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

1 ZIGNEGO COMPANY, INC. W226 N2940 Duplainville Road Waukesha, WI 53186Bidder No.

2 JAMES PETERSON SONS, INC. N2251 Gibson Dr. Medford, WI 54451-0120Bidder No.

3 MASHUDA CONTRACTORS, INC. P.O. Box 16 Princeton, WI 54968Bidder No.

4 HOFFMAN CONSTRUCTION COMPANY 123 County Rd A Black River Falls, WI 54615Bidder No.

5 INTEGRITY GRADING AND EXCAVATING, INC. 605 Grossman Drive Schofield, WI 54476-0138Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

203.0200 5,000.00Removing Old Structure (station)01. 114+33.56

LS 5,000.00 0.001.000 5,000.00 5,000.00 0.00

203.0200 5,000.00Removing Old Structure (station)01. 221+99.98

LS 5,000.00 0.001.000 5,000.00 5,000.00 0.00

203.0225.S 5,000.00Debris Containment (structure) 01.B-25-0016

LS 5,000.00 0.001.000 5,000.00 5,000.00 0.00

203.0225.S 10,000.00Debris Containment (structure) 02.B-25-0018

LS 10,000.00 0.001.000 10,000.00 10,000.00 0.00

203.0225.S 100.00Debris Containment (structure) 03.B-25-0020

LS 100.00 0.001.000 100.00 100.00 0.00

203.0225.S 100.00Debris Containment (structure) 04.B-25-0021

LS 100.00 0.001.000 100.00 100.00 0.00

203.0225.S 100.00Debris Containment (structure) 05.B-25-0022

LS 100.00 0.001.000 100.00 100.00 0.00

203.0225.S 6,500.00Debris Containment (structure) 06.B-25-0023

LS 6,500.00 0.001.000 6,500.00 6,500.00 0.00

204.0100 876,768.00Removing Pavement SY 160,740.80 0.00146,128.000 6.00 1.10 0.00

204.0150 1,140.00Removing Curb & Gutter LF 651.70 0.00190.000 6.00 3.43 0.00

204.0165 22,428.00Removing Guardrail LF 59,808.00 0.0014,952.000 1.50 4.00 0.00

204.0170 750.00Removing Fence LF 450.00 0.00150.000 5.00 3.00 0.00

204.0180 5,525.00Removing Delineators and Markers EACH 4,420.00 0.00221.000 25.00 20.00 0.00

204.0190 1,500.00Removing Surface Drains EACH 2,750.00 0.005.000 300.00 550.00 0.00

204.0220 2,400.00Removing Inlets EACH 1,949.04 0.008.000 300.00 243.63 0.00

All Bids Received

August 14, 2018

Page 11 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 13: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

204.0245 1,600.00Removing Storm Sewer (size) 01.18-Inch

LF 2,168.00 0.00160.000 10.00 13.55 0.00

204.0245 4,000.00Removing Storm Sewer (size) 02.12-Inch

LF 5,108.00 0.00400.000 10.00 12.77 0.00

205.0100 606,625.00Excavation Common CY 731,589.75 0.00121,325.000 5.00 6.03 0.00

206.1000 4,500.00Excavation for Structures Bridges(structure) 01. B-25-0017

LS 4,500.00 0.001.000 4,500.00 4,500.00 0.00

206.1000 4,500.00Excavation for Structures Bridges(structure) 01. B-25-0020

LS 4,500.00 0.001.000 4,500.00 4,500.00 0.00

210.1500 1,056.00Backfill Structure Type A TON 1,133.44 0.0088.000 12.00 12.88 0.00

213.0100 1.00Finishing Roadway (project) 01.1204-04-77

EACH 12,439.60 0.001.000 1.00 12,439.60 0.00

305.0110 130,975.00Base Aggregate Dense 3/4-Inch TON 139,500.00 0.007,750.000 16.90 18.00 0.00

305.0120 1,405.00Base Aggregate Dense 1 1/4-Inch TON 1,081,850.00 0.00140,500.000 0.01 7.70 0.00

312.0110 196,745.00Select Crushed Material TON 204,506.50 0.0018,050.000 10.90 11.33 0.00

415.0085 643,348.71Concrete Pavement 8 1/2-Inch SY 643,348.71 0.0018,861.000 34.11 34.11 0.00

415.0095 4,920,247.20Concrete Pavement 9 1/2-Inch SY 4,920,247.20 0.00135,544.000 36.30 36.30 0.00

415.0410 193,540.20Concrete Pavement Approach Slab SY 193,540.20 0.001,015.000 190.68 190.68 0.00

415.5110.S 1,000.00Concrete Pavement Joint Layout LS 1,000.00 0.001.000 1,000.00 1,000.00 0.00

415.6000.S 77,701.20Rout and Seal LF 77,701.20 0.00106,440.000 0.73 0.73 0.00

416.0610 140.00Drilled Tie Bars EACH 140.00 0.0010.000 14.00 14.00 0.00

416.0620 1,472.00Drilled Dowel Bars EACH 1,472.00 0.0092.000 16.00 16.00 0.00

416.1010 5,638.10Concrete Surface Drains CY 5,638.10 0.0010.000 563.81 563.81 0.00

416.1110 14,948.25Concrete Shoulder Rumble Strips LF 15,105.60 0.0031,470.000 0.48 0.48 0.00

440.4410 30,626.00Incentive IRI Ride DOL 30,626.00 0.0030,626.000 1.00 1.00 0.00

450.4000 14,337.50HMA Cold Weather Paving TON 14,337.50 0.005,735.000 2.50 2.50 0.00

460.2000 10,620.00Incentive Density HMA Pavement DOL 10,620.00 0.0010,620.000 1.00 1.00 0.00

All Bids Received

August 14, 2018

Page 12 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 14: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

460.5224 824,295.00HMA Pavement 4 LT 58-28 S TON 824,295.00 0.0013,425.000 61.40 61.40 0.00

465.0110 1,150.00Asphaltic Surface Patching TON 8,305.20 0.005.000 230.00 1,661.04 0.00

465.0125 144,491.00Asphaltic Surface Temporary TON 144,491.00 0.002,449.000 59.00 59.00 0.00

465.0400 5,643.75Asphaltic Shoulder Rumble Strips LF 5,418.00 0.0045,150.000 0.13 0.12 0.00

502.0100 30,000.00Concrete Masonry Bridges CY 30,000.00 0.0010.000 3,000.00 3,000.00 0.00

502.0717.S 314.00Crack Sealing Epoxy LF 314.00 0.003,140.000 0.10 0.10 0.00

502.3100 10,000.00Expansion Device (structure) 01. B-25-0016

LS 10,000.00 0.001.000 10,000.00 10,000.00 0.00

502.3100 33,000.00Expansion Device (structure) 02. B-25-0018

LS 33,000.00 0.001.000 33,000.00 33,000.00 0.00

502.3100 15,000.00Expansion Device (structure) 03. B-25-0023

LS 15,000.00 0.001.000 15,000.00 15,000.00 0.00

502.3200 13,593.25Protective Surface Treatment SY 13,593.25 0.004,943.000 2.75 2.75 0.00

502.3210 6,540.00Pigmented Surface Sealer SY 6,540.00 0.00436.000 15.00 15.00 0.00

502.4205 10,010.00Adhesive Anchors No. 5 Bar EACH 10,010.00 0.00286.000 35.00 35.00 0.00

502.4206 648.00Adhesive Anchors No. 6 Bar EACH 648.00 0.0018.000 36.00 36.00 0.00

502.4207 2,072.00Adhesive Anchors No. 7 Bar EACH 2,072.00 0.0056.000 37.00 37.00 0.00

505.0600 39,957.50Bar Steel Reinforcement HS CoatedStructures

LB 39,957.50 0.0014,530.000 2.75 2.75 0.00

506.0105 52,220.00Structural Steel Carbon LB 52,220.00 0.005,222.000 10.00 10.00 0.00

506.2610 38,500.00Bearing Pads ElastomericLaminated

EACH 38,500.00 0.0044.000 875.00 875.00 0.00

506.7050.S 14,000.00Removing Bearings (structure) 01.B-25-0016

EACH 14,000.00 0.004.000 3,500.00 3,500.00 0.00

506.7050.S 63,000.00Removing Bearings (structure) 02.B-25-0018

EACH 63,000.00 0.0018.000 3,500.00 3,500.00 0.00

506.7050.S 28,000.00Removing Bearings (structure) 03.B-25-0023

EACH 28,000.00 0.008.000 3,500.00 3,500.00 0.00

All Bids Received

August 14, 2018

Page 13 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 15: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

506.7050.S 49,000.00Removing Bearings (structure) 04.B-25-0024

EACH 49,000.00 0.0014.000 3,500.00 3,500.00 0.00

509.0301 75,075.00Preparation Decks Type 1 SY 75,075.00 0.00429.000 175.00 175.00 0.00

509.0302 61,050.00Preparation Decks Type 2 SY 61,050.00 0.00222.000 275.00 275.00 0.00

509.0310.S 650.00Sawing Pavement Deck PreparationAreas

LF 650.00 0.0065.000 10.00 10.00 0.00

509.0500 81,576.00Cleaning Decks SY 81,576.00 0.004,532.000 18.00 18.00 0.00

509.1000 111,600.00Joint Repair SY 111,600.00 0.00124.000 900.00 900.00 0.00

509.1500 73,220.00Concrete Surface Repair SF 73,220.00 0.00523.000 140.00 140.00 0.00

509.2000 59.00Full-Depth Deck Repair SY 59.00 0.0059.000 1.00 1.00 0.00

509.2500 255,750.00Concrete Masonry Overlay Decks CY 255,750.00 0.00330.000 775.00 775.00 0.00

509.5100.S 33,189.48Polymer Overlay SY 33,189.48 0.00778.000 42.66 42.66 0.00

509.9010.S 8,840.00Removing Asphaltic Concrete DeckOverlay (structure) 02. B-25-0020

SY 8,840.00 0.00680.000 13.00 13.00 0.00

509.9050.S 7,856.00Cleaning Parapets LF 7,856.00 0.00982.000 8.00 8.00 0.00

511.1200 5,625.00Temporary Shoring (structure) 01.B-25-0017

SF 5,625.00 0.00250.000 22.50 22.50 0.00

511.1200 1.35Temporary Shoring (structure) 02.B-25-0020

SF 1.35 0.00135.000 0.01 0.01 0.00

516.0500 270.00Rubberized MembraneWaterproofing

SY 270.00 0.006.000 45.00 45.00 0.00

517.1800.S 108,000.00Structure Repainting RecycledAbrasive (structure) 01. B-25-0023

LS 108,000.00 0.001.000 108,000.00 108,000.00 0.00

517.1800.S 14,000.00Structure Repainting RecycledAbrasive (structure) 02. B-25-0024

LS 14,000.00 0.001.000 14,000.00 14,000.00 0.00

517.4500.S 48,125.00Negative Pressure Containment andCollection of Waste Materials(structure) 01. B-25-0023

LS 48,125.00 0.001.000 48,125.00 48,125.00 0.00

All Bids Received

August 14, 2018

Page 14 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 16: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

517.4500.S 7,150.00Negative Pressure Containment andCollection of Waste Materials(structure) 02. B-25-0024

LS 7,150.00 0.001.000 7,150.00 7,150.00 0.00

517.6001.S 4,000.00Portable Decontamination Facility EACH 4,000.00 0.002.000 2,000.00 2,000.00 0.00

520.3312 2,400.00Culvert Pipe Class III-A 12-Inch LF 2,882.40 0.0060.000 40.00 48.04 0.00

520.8700 1,200.00Cleaning Culvert Pipes EACH 2,500.00 0.001.000 1,200.00 2,500.00 0.00

521.1012 1,200.00Apron Endwalls for Culvert PipeSteel 12-Inch

EACH 1,475.32 0.004.000 300.00 368.83 0.00

522.1018 3,600.00Apron Endwalls for Culvert PipeReinforced Concrete 18-Inch

EACH 2,094.48 0.003.000 1,200.00 698.16 0.00

601.0409 33,763.60Concrete Curb & Gutter 30-InchType A

LF 33,763.60 0.001,510.000 22.36 22.36 0.00

601.0413 192,452.40Concrete Curb & Gutter 6-InchSloped 30-Inch Type G

LF 192,452.40 0.0010,910.000 17.64 17.64 0.00

601.0586 22,940.00Concrete Curb & Gutter 4-InchSloped 30-Inch Type TBTT

LF 22,940.00 0.00200.000 114.70 114.70 0.00

602.0405 7,673.40Concrete Sidewalk 4-Inch SF 7,673.40 0.00270.000 28.42 28.42 0.00

602.0505 1,600.00Curb Ramp Detectable WarningField Yellow

SF 1,600.00 0.0040.000 40.00 40.00 0.00

604.0500 20,776.50Slope Paving Crushed Aggregate SY 21,141.00 0.00729.000 28.50 29.00 0.00

604.9010.S 720.00Slope Paving Repair CrushedAggregate

CY 3,600.00 0.0012.000 60.00 300.00 0.00

606.0200 14,580.00Riprap Medium CY 15,848.46 0.00243.000 60.00 65.22 0.00

608.0318 10,990.00Storm Sewer Pipe ReinforcedConcrete Class III 18-Inch

LF 12,123.54 0.00157.000 70.00 77.22 0.00

611.0630 21,450.00Inlet Covers Type HM-GJ EACH 20,621.70 0.0033.000 650.00 624.90 0.00

611.0654 2,700.00Inlet Covers Type V EACH 5,144.76 0.006.000 450.00 857.46 0.00

611.3220 7,500.00Inlets 2x2-FT EACH 10,222.05 0.005.000 1,500.00 2,044.41 0.00

611.3230 4,500.00Inlets 2x3-FT EACH 6,065.31 0.003.000 1,500.00 2,021.77 0.00

All Bids Received

August 14, 2018

Page 15 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 17: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

612.0212 10,325.00Pipe Underdrain Unperforated 12-Inch

LF 16,688.15 0.00295.000 35.00 56.57 0.00

612.0406 500.00Pipe Underdrain Wrapped 6-Inch LF 380.60 0.0020.000 25.00 19.03 0.00

614.0150 875.00Anchor Assemblies for Steel PlateBeam Guard

EACH 875.00 0.007.000 125.00 125.00 0.00

614.0220 15,600.00Steel Thrie Beam Bullnose Terminal EACH 15,000.00 0.002.000 7,800.00 7,500.00 0.00

614.0230 8,000.00Steel Thrie Beam LF 5,000.00 0.00200.000 40.00 25.00 0.00

614.0250 4,200.00Steel Thrie Beam StructureApproach Temporary

LF 5,040.00 0.0084.000 50.00 60.00 0.00

614.0360 8,764.00Steel Plate Beam Guard Temporary LF 9,390.00 0.00626.000 14.00 15.00 0.00

614.0380 22,500.00Steel Plate Beam Guard EnergyAbsorbing Terminal Temporary

EACH 22,500.00 0.009.000 2,500.00 2,500.00 0.00

614.2300 303,601.50MGS Guardrail 3 LF 268,299.00 0.0014,121.000 21.50 19.00 0.00

614.2500 80,305.50MGS Thrie Beam Transition LF 69,564.00 0.001,023.000 78.50 68.00 0.00

614.2610 122,500.00MGS Guardrail Terminal EAT EACH 105,000.00 0.0035.000 3,500.00 3,000.00 0.00

614.2620 14,400.00MGS Guardrail Terminal Type 2 EACH 11,400.00 0.0012.000 1,200.00 950.00 0.00

616.0100 3,000.00Fence Woven Wire (height) 01. 4.5FEET

LF 4,500.00 0.00150.000 20.00 30.00 0.00

618.0100 100.00Maintenance And Repair of HaulRoads (project) 01. 1204-04-77

EACH 1,500.00 0.001.000 100.00 1,500.00 0.00

619.1000 1,569,747.00Mobilization EACH 958,000.00 0.001.000 1,569,747.00 958,000.00 0.00

624.0100 28,000.00Water MGAL

20,000.00 0.00800.000 35.00 25.00 0.00

625.0500 124,785.00Salvaged Topsoil SY 56,846.50 0.0069,325.000 1.80 0.82 0.00

627.0200 7,812.00Mulching SY 11,160.00 0.0055,800.000 0.14 0.20 0.00

628.1504 36,950.00Silt Fence LF 33,255.00 0.0014,780.000 2.50 2.25 0.00

628.1520 2,956.00Silt Fence Maintenance LF 295.60 0.0029,560.000 0.10 0.01 0.00

628.1905 1,500.00Mobilizations Erosion Control EACH 3,000.00 0.006.000 250.00 500.00 0.00

All Bids Received

August 14, 2018

Page 16 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 18: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

628.1910 1,050.00Mobilizations Emergency ErosionControl

EACH 1,500.00 0.003.000 350.00 500.00 0.00

628.2004 20,410.50Erosion Mat Class I Type B SY 20,410.50 0.0018,555.000 1.10 1.10 0.00

628.7005 2,750.00Inlet Protection Type A EACH 3,500.00 0.0025.000 110.00 140.00 0.00

628.7015 2,160.00Inlet Protection Type C EACH 2,700.00 0.0036.000 60.00 75.00 0.00

628.7504 487.50Temporary Ditch Checks LF 475.00 0.0050.000 9.75 9.50 0.00

628.7555 50.00Culvert Pipe Checks EACH 100.00 0.004.000 12.50 25.00 0.00

629.0210 3,024.00Fertilizer Type B CWT 4,200.00 0.0056.000 54.00 75.00 0.00

630.0130 8,736.15Seeding Mixture No. 30 LB 9,113.25 0.001,257.000 6.95 7.25 0.00

630.0200 1,887.00Seeding Temporary LB 1,887.00 0.00629.000 3.00 3.00 0.00

633.0100 4,972.50Delineator Posts Steel EACH 7,072.00 0.00221.000 22.50 32.00 0.00

633.0500 1,093.95Delineator Reflectors EACH 884.00 0.00221.000 4.95 4.00 0.00

633.1000 8,398.00Delineator Brackets EACH 9,945.00 0.00221.000 38.00 45.00 0.00

633.1100 3,325.00Delineators Temporary EACH 3,325.00 0.00133.000 25.00 25.00 0.00

633.5200 350.00Markers Culvert End EACH 315.00 0.007.000 50.00 45.00 0.00

642.5201 15,000.00Field Office Type C EACH 15,000.00 0.001.000 15,000.00 15,000.00 0.00

643.0300 21,030.50Traffic Control Drums DAY 21,030.50 0.0084,122.000 0.25 0.25 0.00

643.0420 4,135.00Traffic Control Barricades Type III DAY 4,135.00 0.008,270.000 0.50 0.50 0.00

643.0500 18,900.00Traffic Control Flexible TubularMarker Posts

EACH 18,900.00 0.00900.000 21.00 21.00 0.00

643.0600 4,500.00Traffic Control Flexible TubularMarker Bases

EACH 4,500.00 0.00900.000 5.00 5.00 0.00

643.0705 1,951.60Traffic Control Warning Lights TypeA

DAY 1,951.60 0.009,758.000 0.20 0.20 0.00

643.0715 1,864.00Traffic Control Warning Lights TypeC

DAY 1,864.00 0.009,320.000 0.20 0.20 0.00

643.0800 14,640.00Traffic Control Arrow Boards DAY 14,640.00 0.00976.000 15.00 15.00 0.00

All Bids Received

August 14, 2018

Page 17 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 19: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

643.0900 12,381.30Traffic Control Signs DAY 12,381.30 0.0041,271.000 0.30 0.30 0.00

643.0910 1,000.00Traffic Control Covering Signs TypeI

EACH 1,000.00 0.002.000 500.00 500.00 0.00

643.0920 800.00Traffic Control Covering Signs TypeII

EACH 800.00 0.0040.000 20.00 20.00 0.00

643.1050 5,364.80Traffic Control Signs PCMS DAY 5,364.80 0.00112.000 47.90 47.90 0.00

643.5000 31,550.00Traffic Control EACH 31,550.00 0.001.000 31,550.00 31,550.00 0.00

644.1420.S 10,000.00Temporary Pedestrian SurfacePlywood

SF 4,000.00 0.001,000.000 10.00 4.00 0.00

644.1601.S 1,000.00Temporary Curb Ramp EACH 3,000.00 0.002.000 500.00 1,500.00 0.00

645.0111 200.00Geotextile Type DF Schedule A SY 409.60 0.0010.000 20.00 40.96 0.00

645.0120 540.00Geotextile Type HR SY 791.91 0.0027.000 20.00 29.33 0.00

646.1020 69,797.40Marking Line Epoxy 4-Inch LF 69,797.40 0.00116,329.000 0.60 0.60 0.00

646.1545 22,736.25Marking Line Grooved Wet RefContrast Epoxy 4-Inch

LF 22,736.25 0.0010,575.000 2.15 2.15 0.00

646.3020 300.00Marking Line Epoxy 8-Inch LF 300.00 0.0075.000 4.00 4.00 0.00

646.3545 30,258.50Marking Line Grooved Wet RefContrast Epoxy 8-Inch

LF 30,258.50 0.008,290.000 3.65 3.65 0.00

646.6120 180.00Marking Stop Line Epoxy 18-Inch LF 180.00 0.0018.000 10.00 10.00 0.00

646.7220 13,440.00Marking Chevron Epoxy 24-Inch LF 13,440.00 0.00960.000 14.00 14.00 0.00

646.8120 320.00Marking Curb Epoxy LF 320.00 0.0080.000 4.00 4.00 0.00

649.0120 35,000.00Temporary Marking Line Epoxy 4-Inch

LF 35,000.00 0.0070,000.000 0.50 0.50 0.00

649.0150 94,795.40Temporary Marking Line RemovableTape 4-Inch

LF 94,795.40 0.0096,730.000 0.98 0.98 0.00

649.0250 2,400.00Temporary Marking Line RemovableTape 8-Inch

LF 2,400.00 0.001,200.000 2.00 2.00 0.00

650.4000 750.00Construction Staking Storm Sewer EACH 750.00 0.005.000 150.00 150.00 0.00

All Bids Received

August 14, 2018

Page 18 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 20: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

650.4500 17,680.00Construction Staking Subgrade LF 88.40 0.008,840.000 2.00 0.01 0.00

650.5000 671.05Construction Staking Base LF 20,131.50 0.0067,105.000 0.01 0.30 0.00

650.5500 276.00Construction Staking Curb Gutterand Curb & Gutter

LF 690.00 0.00345.000 0.80 2.00 0.00

650.6000 210.00Construction Staking Pipe Culverts EACH 200.00 0.001.000 210.00 200.00 0.00

650.7000 47,812.00Construction Staking ConcretePavement

LF 107,577.00 0.0059,765.000 0.80 1.80 0.00

650.9910 10,000.00Construction Staking SupplementalControl (project) 01. 1204-04-77

LS 5,000.00 0.001.000 10,000.00 5,000.00 0.00

650.9920 18,031.00Construction Staking Slope Stakes LF 13,870.00 0.0013,870.000 1.30 1.00 0.00

690.0150 220.10Sawing Asphalt LF 220.10 0.00142.000 1.55 1.55 0.00

690.0250 379.95Sawing Concrete LF 379.95 0.00149.000 2.55 2.55 0.00

715.0415 46,317.00Incentive Strength ConcretePavement

DOL 46,317.00 0.0046,317.000 1.00 1.00 0.00

715.0710 122,000.00Optimized Aggregate GradationIncentive

DOL 122,000.00 0.00122,000.000 1.00 1.00 0.00

ASP.1T0A 4,375.00On-the-Job Training Apprentice at$5.00/HR

HRS 4,375.00 0.00875.000 5.00 5.00 0.00

ASP.1T0G 5,500.00On-the-Job Training Graduate at$5.00/HR

HRS 5,500.00 0.001,100.000 5.00 5.00 0.00

SPV.0060 5,850.00Special 01. Cleaning and PaintingBearings

EACH 5,850.00 0.0018.000 325.00 325.00 0.00

SPV.0060 39,200.00Special 02. Soil Nail EACH 39,200.00 0.0016.000 2,450.00 2,450.00 0.00

SPV.0105 7,000.00Special 01. Remove TemporaryCrossover V

LS 24,741.77 0.001.000 7,000.00 24,741.77 0.00

SPV.0105 7,000.00Special 02. Remove TemporaryCrossover W

LS 23,185.01 0.001.000 7,000.00 23,185.01 0.00

SPV.0105 7,000.00Special 03. Remove TemporaryCrossover X

LS 23,138.58 0.001.000 7,000.00 23,138.58 0.00

All Bids Received

August 14, 2018

Page 19 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 21: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814001Proposal ID:001

State Project(s):

Platteville - Madison; Sth 23 To Ush 18//B-25-16 Thru -24

Platteville - Madison

Iowa

USH 151, Iowa County

Location:1204-04-77

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

SPV.0105 7,000.00Special 04. Remove TemporaryCrossover Y

LS 42,781.69 0.001.000 7,000.00 42,781.69 0.00

SPV.0105 7,000.00Special 05. Remove TemporaryCrossover Z

LS 42,407.07 0.001.000 7,000.00 42,407.07 0.00

SPV.0165 14,400.00Special 01. Shotcrete SF 14,400.00 0.00360.000 40.00 40.00 0.00

SPV.0165 20,340.00Special 02. Wall Facing SF 20,340.00 0.00360.000 56.50 56.50 0.00

SPV.0180 4,760.00Special 01. Fast Set Deck Patching SY 4,760.00 0.007.000 680.00 680.00 0.00

$13,671,760.47 $0.00$13,667,826.84Proposal Total:

All Bids Received

August 14, 2018

Page 20 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 22: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

StructuresType Of Work:

1 ZENITH TECH., INC. - WAUKESHA N6 W23633 Bluemound Rd Waukesha, WI 53187Bidder No.

2 LUNDA CONSTRUCTION COMPANY 620 Gebhardt Road Black River Falls, WI 54615Bidder No.

3 KRAEMER NORTH AMERICA, LLC One Plainview Road Plain, WI 53577Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

201.0120 1,200.00Clearing ID 1,200.00 1,200.0030.000 40.00 40.00 40.00

201.0220 920.00Grubbing ID 920.00 920.0046.000 20.00 20.00 20.00

204.0100 3,500.00Removing Pavement SY 3,500.00 3,500.00700.000 5.00 5.00 5.00

204.0150 2,780.00Removing Curb & Gutter LF 2,780.00 2,780.00695.000 4.00 4.00 4.00

204.0155 7,200.00Removing Concrete Sidewalk SY 7,200.00 7,200.00900.000 8.00 8.00 8.00

204.0195 825.00Removing Concrete Bases EACH 825.00 833.3611.000 75.00 75.00 75.76

204.0210 1,000.00Removing Manholes EACH 1,000.00 1,000.002.000 500.00 500.00 500.00

204.0220 3,150.00Removing Inlets EACH 3,150.00 3,150.009.000 350.00 350.00 350.00

204.0245 4,020.00Removing Storm Sewer (size) 01.15-Inch or Less

LF 4,020.00 4,020.00268.000 15.00 15.00 15.00

204.0245 2,400.00Removing Storm Sewer (size) 02.24-Inch

LF 2,400.00 2,400.00120.000 20.00 20.00 20.00

204.0245 2,950.00Removing Storm Sewer (size) 03.36-Inch

LF 2,950.00 2,950.00118.000 25.00 25.00 25.00

204.0245 1,400.00Removing Storm Sewer (size) 04.42x60-Inch

LF 1,400.00 1,400.0035.000 40.00 40.00 40.00

204.0280 350.00Sealing Pipes EACH 350.00 350.001.000 350.00 350.00 350.00

204.0291.S 468.75Abandoning Sewer CY 468.75 468.753.750 125.00 125.00 125.00

204.9060.S 200.00Removing (item description) 01.Flashing Beacon Assembly

EACH 200.00 202.022.000 100.00 100.00 101.01

204.9090.S 410.00Removing (item description) 01.Concrete Planter Curb

LF 410.00 410.0082.000 5.00 5.00 5.00

All Bids Received

August 14, 2018

Page 21 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 23: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

204.9105.S 1,500.00Removing (item description) 01.Concrete Steps, Supports, andRailings

LS 1,500.00 1,500.001.000 1,500.00 1,500.00 1,500.00

205.0100 18,578.00Excavation Common CY 18,578.00 18,578.001,327.000 14.00 14.00 14.00

206.1000 180,000.00Excavation for Structures Bridges(structure) 01. B-53-294

LS 46,300.00 150,000.001.000 180,000.00 46,300.00 150,000.00

206.5000 285,000.00Cofferdams (structure) 01. B-53-294 LS 600,000.00 600,000.001.000 285,000.00 600,000.00 600,000.00

210.1500 20,295.00Backfill Structure Type A TON 20,295.00 20,295.001,230.000 16.50 16.50 16.50

213.0100 500.00Finishing Roadway (project) 01.5990-00-34

EACH 500.00 500.001.000 500.00 500.00 500.00

305.0120 16,617.00Base Aggregate Dense 1 1/4-Inch TON 16,617.00 16,617.001,146.000 14.50 14.50 14.50

312.0110 3,204.50Select Crushed Material TON 3,204.50 3,204.50221.000 14.50 14.50 14.50

415.0080 81,072.00Concrete Pavement 8-Inch SY 81,072.00 81,072.001,126.000 72.00 72.00 72.00

415.0410 22,550.00Concrete Pavement Approach Slab SY 22,550.00 22,550.00110.000 205.00 205.00 205.00

415.4100 9,758.50Concrete Pavement Joint Filling SY 9,758.50 9,758.501,346.000 7.25 7.25 7.25

455.0605 540.00Tack Coat GAL 540.00 540.0018.000 30.00 30.00 30.00

465.0105 15,810.00Asphaltic Surface TON 15,810.00 15,810.00102.000 155.00 155.00 155.00

465.0125 600.00Asphaltic Surface Temporary TON 600.00 600.001.000 600.00 600.00 600.00

502.0100 1,113,270.00Concrete Masonry Bridges CY 1,078,750.00 1,035,600.001,726.000 645.00 625.00 600.00

502.1100 87,000.00Concrete Masonry Seal CY 108,750.00 83,520.00435.000 200.00 250.00 192.00

502.2000 1,800.00Compression Joint SealerPreformed Elastomeric (width) 01. 21/4-Inch

LF 720.00 3,600.0024.000 75.00 30.00 150.00

502.3200 3,625.00Protective Surface Treatment SY 3,625.00 1,812.501,450.000 2.50 2.50 1.25

502.3210 3,825.00Pigmented Surface Sealer SY 1,350.00 1,350.00450.000 8.50 3.00 3.00

505.0400 32,387.40Bar Steel Reinforcement HSStructures

LB 28,410.00 31,251.0028,410.000 1.14 1.00 1.10

All Bids Received

August 14, 2018

Page 22 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 24: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

505.0600 227,403.60Bar Steel Reinforcement HS CoatedStructures

LB 192,559.50 220,068.00183,390.000 1.24 1.05 1.20

506.2605 2,100.00Bearing Pads Elastomeric Non-Laminated

EACH 900.00 1,830.006.000 350.00 150.00 305.00

511.1200 13,500.00Temporary Shoring (structure) 01.B-53-294

SF 4,500.00 15,000.00300.000 45.00 15.00 50.00

516.0500 2,000.00Rubberized MembraneWaterproofing

SY 1,000.00 360.0040.000 50.00 25.00 9.00

522.1060 4,000.00Apron Endwalls for Culvert PipeReinforced Concrete 60-Inch

EACH 4,000.00 4,000.001.000 4,000.00 4,000.00 4,000.00

550.0010 51,200.00Pre-Boring UnconsolidatedMaterials

LF 22,400.00 33,280.00320.000 160.00 70.00 104.00

550.0500 12,925.00Pile Points EACH 22,000.00 13,750.0055.000 235.00 400.00 250.00

550.2146 382,160.00Piling CIP Concrete 14 X 0.375-Inch LF 348,440.00 314,720.005,620.000 68.00 62.00 56.00

601.0417 16,380.00Concrete Curb & Gutter 30-InchType K

LF 16,380.00 16,380.00585.000 28.00 28.00 28.00

601.0419 3,500.00Concrete Curb & Gutter 30-InchType L

LF 3,500.00 3,500.00125.000 28.00 28.00 28.00

601.0600 2,050.00Concrete Curb Pedestrian LF 2,050.00 2,050.0025.000 82.00 82.00 82.00

602.0410 40,917.50Concrete Sidewalk 5-Inch SF 40,917.50 40,917.506,295.000 6.50 6.50 6.50

602.0415 5,610.00Concrete Sidewalk 6-Inch SF 5,610.00 5,610.00680.000 8.25 8.25 8.25

602.0515 6,240.00Curb Ramp Detectable WarningField Natural Patina

SF 6,240.00 6,240.0096.000 65.00 65.00 65.00

602.0615 940.80Curb Ramp Detectable WarningField Radial Natural Patina

SF 940.80 940.8019.600 48.00 48.00 48.00

606.0300 13,122.30Riprap Heavy CY 10,075.00 10,850.00155.000 84.66 65.00 70.00

606.0700 6,750.00Grouted Riprap Heavy CY 2,250.00 3,750.0030.000 225.00 75.00 125.00

608.0312 11,520.00Storm Sewer Pipe ReinforcedConcrete Class III 12-Inch

LF 11,520.00 11,520.00192.000 60.00 60.00 60.00

All Bids Received

August 14, 2018

Page 23 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 25: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

608.0324 19,800.00Storm Sewer Pipe ReinforcedConcrete Class III 24-Inch

LF 19,800.00 19,800.00180.000 110.00 110.00 110.00

608.0336 6,375.00Storm Sewer Pipe ReinforcedConcrete Class III 36-Inch

LF 6,375.00 6,375.0051.000 125.00 125.00 125.00

608.0342 4,185.00Storm Sewer Pipe ReinforcedConcrete Class III 42-Inch

LF 4,185.00 4,185.0027.000 155.00 155.00 155.00

608.0360 8,820.00Storm Sewer Pipe ReinforcedConcrete Class III 60-Inch

LF 8,820.00 8,820.0042.000 210.00 210.00 210.00

608.3018 2,400.00Storm Sewer Pipe Class III-A 18-Inch

LF 2,400.00 2,400.0040.000 60.00 60.00 60.00

611.2004 1,450.00Manholes 4-FT Diameter EACH 1,450.00 1,450.001.000 1,450.00 1,450.00 1,450.00

611.2005 3,400.00Manholes 5-FT Diameter EACH 3,400.00 3,400.001.000 3,400.00 3,400.00 3,400.00

611.2006 5,500.00Manholes 6-FT Diameter EACH 5,500.00 5,500.001.000 5,500.00 5,500.00 5,500.00

611.3230 12,600.00Inlets 2x3-FT EACH 12,600.00 12,600.009.000 1,400.00 1,400.00 1,400.00

611.8110 300.00Adjusting Manhole Covers EACH 300.00 300.001.000 300.00 300.00 300.00

611.8120.S 75.00Cover Plates Temporary EACH 75.00 75.001.000 75.00 75.00 75.00

612.0406 1,215.00Pipe Underdrain Wrapped 6-Inch LF 1,215.00 1,215.00135.000 9.00 9.00 9.00

612.0902.S 280.00Insulation Board Polystyrene (inch)01. 2-Inch

SY 240.00 144.008.000 35.00 30.00 18.00

616.0700.S 4,800.00Fence Safety LF 3,600.00 3,600.001,200.000 4.00 3.00 3.00

618.0100 2,579.84Maintenance And Repair of HaulRoads (project) 01. 5990-00-34

EACH 1.00 500.001.000 2,579.84 1.00 500.00

619.1000 550,000.00Mobilization EACH 419,250.00 500,000.001.000 550,000.00 419,250.00 500,000.00

624.0100 12.00Water MGAL

12.00 12.0012.000 1.00 1.00 1.00

625.0100 930.00Topsoil SY 930.00 930.0062.000 15.00 15.00 15.00

628.1104 1,250.00Erosion Bales EACH 600.00 600.0050.000 25.00 12.00 12.00

628.1504 1,000.00Silt Fence LF 350.00 350.00100.000 10.00 3.50 3.50

All Bids Received

August 14, 2018

Page 24 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 26: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

628.1520 100.00Silt Fence Maintenance LF 100.00 100.00100.000 1.00 1.00 1.00

628.1905 5,400.00Mobilizations Erosion Control EACH 2,250.00 2,250.009.000 600.00 250.00 250.00

628.1910 3,600.00Mobilizations Emergency ErosionControl

EACH 2,100.00 2,100.006.000 600.00 350.00 350.00

628.2008 150.00Erosion Mat Urban Class I Type B SY 180.00 180.0060.000 2.50 3.00 3.00

628.6005 5,000.00Turbidity Barriers SY 4,000.00 4,000.00100.000 50.00 40.00 40.00

628.7020 2,375.00Inlet Protection Type D EACH 2,375.00 2,375.0019.000 125.00 125.00 125.00

628.7560 3,750.00Tracking Pads EACH 4,500.00 4,500.003.000 1,250.00 1,500.00 1,500.00

629.0210 25.00Fertilizer Type B CWT 50.00 50.000.050 500.00 1,000.00 1,000.00

630.0140 100.00Seeding Mixture No. 40 LB 100.00 100.001.000 100.00 100.00 100.00

632.0101 2,400.00Trees (species) (size) (root) 01.Japanese Tree Lilac, 'Ivory Silk',2.5" Cal., B&B

EACH 2,100.00 2,100.003.000 800.00 700.00 700.00

632.0101 800.00Trees (species) (size) (root) 02.Honeylocust, 'Skyline', 2.5" Cal.,B&B

EACH 700.00 700.001.000 800.00 700.00 700.00

632.9101 10,000.00Landscape Planting Surveillanceand Care Cycles

EACH 10,000.00 10,000.0010.000 1,000.00 1,000.00 1,000.00

637.2210 481.25Signs Type II Reflective H SF 226.88 226.8813.750 35.00 16.50 16.50

637.2230 990.00Signs Type II Reflective F SF 660.00 660.0033.000 30.00 20.00 20.00

638.2602 585.00Removing Signs Type II EACH 225.00 225.009.000 65.00 25.00 25.00

638.3000 120.00Removing Small Sign Supports EACH 75.00 75.003.000 40.00 25.00 25.00

642.5001 10,000.00Field Office Type B EACH 5,000.00 15,000.001.000 10,000.00 5,000.00 15,000.00

643.0300 3,140.00Traffic Control Drums DAY 471.00 3,140.003,140.000 1.00 0.15 1.00

643.0410 696.00Traffic Control Barricades Type II DAY 626.40 696.001,392.000 0.50 0.45 0.50

643.0420 9,293.00Traffic Control Barricades Type III DAY 3,252.55 9,293.009,293.000 1.00 0.35 1.00

643.0705 1,693.05Traffic Control Warning Lights TypeA

DAY 902.96 1,693.0511,287.000 0.15 0.08 0.15

All Bids Received

August 14, 2018

Page 25 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 27: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

643.0715 628.00Traffic Control Warning Lights TypeC

DAY 251.20 628.003,140.000 0.20 0.08 0.20

643.0900 8,693.55Traffic Control Signs DAY 5,216.13 8,693.5519,319.000 0.45 0.27 0.45

643.1000 4,010.00Traffic Control Signs Fixed Message SF 3,408.50 4,010.00200.500 20.00 17.00 20.00

643.1050 3,500.00Traffic Control Signs PCMS DAY 840.00 3,500.0014.000 250.00 60.00 250.00

643.5000 7,950.00Traffic Control EACH 8,100.00 7,950.001.000 7,950.00 8,100.00 7,950.00

644.1410.S 3,375.00Temporary Pedestrian SurfaceAsphalt

SF 3,375.00 3,375.0075.000 45.00 45.00 45.00

644.1420.S 500.00Temporary Pedestrian SurfacePlywood

SF 1,500.00 1,250.0050.000 10.00 30.00 25.00

644.1430.S 1,000.00Temporary Pedestrian Surface Plate SF 1,500.00 1,250.0050.000 20.00 30.00 25.00

644.1601.S 4,000.00Temporary Curb Ramp EACH 4,800.00 4,800.004.000 1,000.00 1,200.00 1,200.00

644.1616.S 5,600.00Temporary Pedestrian Safety Fence LF 9,800.00 9,800.00700.000 8.00 14.00 14.00

645.0111 720.00Geotextile Type DF Schedule A SY 720.00 720.00120.000 6.00 6.00 6.00

645.0120 2,960.00Geotextile Type HR SY 1,110.00 370.00370.000 8.00 3.00 1.00

646.1020 1,822.50Marking Line Epoxy 4-Inch LF 1,822.50 1,822.501,215.000 1.50 1.50 1.50

646.3020 195.00Marking Line Epoxy 8-Inch LF 195.00 195.00100.000 1.95 1.95 1.95

646.5020 550.00Marking Arrow Epoxy EACH 550.00 550.002.000 275.00 275.00 275.00

646.6120 437.50Marking Stop Line Epoxy 18-Inch LF 437.50 437.5035.000 12.50 12.50 12.50

646.7420 3,060.00Marking Crosswalk EpoxyTransverse Line 6-Inch

LF 3,060.00 3,060.00360.000 8.50 8.50 8.50

646.7520 1,652.00Marking Crosswalk Epoxy LadderPattern 24-Inch

LF 1,652.00 1,652.00112.000 14.75 14.75 14.75

646.8320 225.00Marking Parking Stall Epoxy LF 225.00 225.0036.000 6.25 6.25 6.25

649.0250 450.00Temporary Marking Line RemovableTape 8-Inch

LF 450.00 450.0090.000 5.00 5.00 5.00

649.0850 200.00Temporary Marking Stop LineRemovable Tape 18-Inch

LF 200.00 200.0020.000 10.00 10.00 10.00

All Bids Received

August 14, 2018

Page 26 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 28: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

650.4000 1,350.00Construction Staking Storm Sewer EACH 1,350.00 1,350.0015.000 90.00 90.00 90.00

650.4500 3.22Construction Staking Subgrade LF 3.22 3.22322.000 0.01 0.01 0.01

650.5500 2.00Construction Staking Curb Gutterand Curb & Gutter

LF 2.00 2.00200.000 0.01 0.01 0.01

650.6500 3,500.00Construction Staking StructureLayout (structure) 01. B-53-294

LS 3,500.00 3,500.001.000 3,500.00 3,500.00 3,500.00

650.7000 322.00Construction Staking ConcretePavement

LF 322.00 322.00322.000 1.00 1.00 1.00

650.8500 1,200.00Construction Staking ElectricalInstallations (project) 01. 5990-00-34

LS 1,200.00 1,200.001.000 1,200.00 1,200.00 1,200.00

650.9000 1,800.00Construction Staking Curb Ramps EACH 1,800.00 1,800.009.000 200.00 200.00 200.00

650.9910 800.00Construction Staking SupplementalControl (project) 01. 5990-00-34

LS 800.00 800.001.000 800.00 800.00 800.00

650.9920 2.27Construction Staking Slope Stakes LF 2.27 2.27227.000 0.01 0.01 0.01

652.0105 80.00Conduit Rigid Metallic 3/4-Inch LF 80.00 80.8016.000 5.00 5.00 5.05

652.0125 400.00Conduit Rigid Metallic 2-Inch LF 400.00 404.0020.000 20.00 20.00 20.20

652.0205 3,549.00Conduit Rigid Nonmetallic Schedule40 3/4-Inch

LF 3,549.00 3,584.491,183.000 3.00 3.00 3.03

652.0225 6,654.75Conduit Rigid Nonmetallic Schedule40 2-Inch

LF 6,654.75 6,724.801,401.000 4.75 4.75 4.80

652.0235 120.75Conduit Rigid Nonmetallic Schedule40 3-Inch

LF 120.75 122.0121.000 5.75 5.75 5.81

652.0305 257.30Conduit Rigid Nonmetallic Schedule80 3/4-Inch

LF 257.30 259.7983.000 3.10 3.10 3.13

652.0325 918.75Conduit Rigid Nonmetallic Schedule80 2-Inch

LF 918.75 927.50175.000 5.25 5.25 5.30

652.0700.S 375.00Install Conduit into Existing Item EACH 375.00 378.805.000 75.00 75.00 75.76

652.0800 448.00Conduit Loop Detector LF 448.00 452.48112.000 4.00 4.00 4.04

653.0115 2,600.00Pull Boxes Steel 12x36-Inch EACH 2,600.00 2,626.284.000 650.00 650.00 656.57

All Bids Received

August 14, 2018

Page 27 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 29: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

653.0140 2,700.00Pull Boxes Steel 24x42-Inch EACH 2,700.00 2,727.284.000 675.00 675.00 681.82

653.0222 7,875.00Junction Boxes 18x12x6-Inch EACH 7,875.00 7,954.527.000 1,125.00 1,125.00 1,136.36

653.0900 225.00Adjusting Pull Boxes EACH 225.00 227.283.000 75.00 75.00 75.76

653.0905 225.00Removing Pull Boxes EACH 225.00 227.283.000 75.00 75.00 75.76

654.0101 585.00Concrete Bases Type 1 EACH 585.00 590.911.000 585.00 585.00 590.91

655.0210 30.60Cable Traffic Signal 3-14 AWG LF 30.60 30.9636.000 0.85 0.85 0.86

655.0230 34.00Cable Traffic Signal 5-14 AWG LF 34.00 34.4040.000 0.85 0.85 0.86

655.0260 43.50Cable Traffic Signal 12-14 AWG LF 43.50 43.8030.000 1.45 1.45 1.46

655.0610 4,114.50Electrical Wire Lighting 12 AWG LF 4,114.50 4,177.806,330.000 0.65 0.65 0.66

655.0615 2,814.00Electrical Wire Lighting 10 AWG LF 2,814.00 2,854.204,020.000 0.70 0.70 0.71

655.0625 2,651.25Electrical Wire Lighting 6 AWG LF 2,651.25 2,676.502,525.000 1.05 1.05 1.06

655.0630 4,166.40Electrical Wire Lighting 4 AWG LF 4,166.40 4,201.123,472.000 1.20 1.20 1.21

655.0635 1,913.60Electrical Wire Lighting 2 AWG LF 1,913.60 1,937.521,196.000 1.60 1.60 1.62

655.0700 171.60Loop Detector Lead In Cable LF 171.60 173.03143.000 1.20 1.20 1.21

655.0800 244.40Loop Detector Wire LF 244.40 248.16376.000 0.65 0.65 0.66

657.0100 145.00Pedestal Bases EACH 145.00 146.461.000 145.00 145.00 146.46

657.0420 375.00Traffic Signal Standards Aluminum13-FT

EACH 375.00 378.791.000 375.00 375.00 378.79

657.6005 3,500.00Anchor Assemblies Light Poles onStructures

EACH 3,500.00 3,535.357.000 500.00 500.00 505.05

658.5069 465.00Signal Mounting Hardware (location)01. Milwaukee Street & River Street

LS 465.00 469.701.000 465.00 465.00 469.70

658.5069 250.00Signal Mounting Hardware (location)02. Milwaukee Street & Main Street

LS 250.00 252.531.000 250.00 250.00 252.53

690.0150 426.25Sawing Asphalt LF 426.25 426.25275.000 1.55 1.55 1.55

690.0250 1,823.25Sawing Concrete LF 1,823.25 1,823.25715.000 2.55 2.55 2.55

All Bids Received

August 14, 2018

Page 28 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 30: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

715.0415 500.00Incentive Strength ConcretePavement

DOL 500.00 500.00500.000 1.00 1.00 1.00

715.0502 10,356.00Incentive Strength ConcreteStructures

DOL 10,356.00 10,356.0010,356.000 1.00 1.00 1.00

999.1000.S 12,850.00Seismograph LS 5,000.00 17,000.001.000 12,850.00 5,000.00 17,000.00

999.1500.S 8,750.00Crack and Damage Survey LS 5,000.00 10,000.001.000 8,750.00 5,000.00 10,000.00

SPV.0060 19,000.00Special 01. Manholes 8x8-FTSpecial

EACH 19,000.00 19,000.001.000 19,000.00 19,000.00 19,000.00

SPV.0060 2,300.00Special 02. Manhole Cover TypeSpecial Logo

EACH 2,300.00 2,300.004.000 575.00 575.00 575.00

SPV.0060 2,500.00Special 03. Inlet Cover Type HSpecial Logo

EACH 2,500.00 2,500.004.000 625.00 625.00 625.00

SPV.0060 3,125.00Special 04. Inlet Cover Type HSpecial Logo LP

EACH 3,125.00 3,125.005.000 625.00 625.00 625.00

SPV.0060 500.00Special 05. Utility Line Opening(ULO)

EACH 500.00 500.001.000 500.00 500.00 500.00

SPV.0060 2,025.00Special 06. Concrete Base Type 3Special

EACH 2,025.00 2,045.463.000 675.00 675.00 681.82

SPV.0060 5,850.00Special 07. Concrete Base Type 5Special

EACH 5,850.00 5,909.139.000 650.00 650.00 656.57

SPV.0060 1,575.00Special 08. Remove and SalvageLight Pole Assembly

EACH 1,575.00 1,590.939.000 175.00 175.00 176.77

SPV.0060 25,500.00Special 09. Decorative Mast ArmLighting Unit

EACH 25,500.00 25,757.583.000 8,500.00 8,500.00 8,585.86

SPV.0060 54,640.00Special 10. Decorative Pole TopLighting Unit

EACH 54,640.00 55,192.0016.000 3,415.00 3,415.00 3,449.50

SPV.0060 15,000.00Special 11. Tree Grate EACH 5,000.00 20,000.005.000 3,000.00 1,000.00 4,000.00

SPV.0060 1,000.00Special 12. Root Pruning ExistingTerrace Trees

EACH 2,000.00 2,000.002.000 500.00 1,000.00 1,000.00

SPV.0060 1,200.00Special 13. Remove, Salvage andReinstall Trash Receptacle

EACH 2,250.00 2,250.003.000 400.00 750.00 750.00

All Bids Received

August 14, 2018

Page 29 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 31: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

SPV.0060 1,000.00Special 14. Remove, Salvage andReinstall Bench, 6-Foot, Backed

EACH 1,500.00 1,500.002.000 500.00 750.00 750.00

SPV.0060 1,800.00Special 15. Bicycle Rack EACH 2,500.00 2,500.002.000 900.00 1,250.00 1,250.00

SPV.0060 2,000.00Special 16. Trash Receptacle EACH 2,100.00 2,100.001.000 2,000.00 2,100.00 2,100.00

SPV.0060 6,000.00Special 17. Bench, 6-Foot, Backless EACH 7,425.00 7,425.003.000 2,000.00 2,475.00 2,475.00

SPV.0060 275.00Special 18. Perennials, Daylily,Happy Returns, CG, #1

EACH 275.00 275.0011.000 25.00 25.00 25.00

SPV.0060 200.00Special 19. Perennials, Aster, PurpleDome, CG, #1

EACH 200.00 200.008.000 25.00 25.00 25.00

SPV.0060 250.00Special 20. Perennials, Lilyturf, CG,#SP04

EACH 250.00 250.0010.000 25.00 25.00 25.00

SPV.0060 300.00Special 21. Bulbs, Daffodil, Mixed EACH 420.00 420.0030.000 10.00 14.00 14.00

SPV.0060 7,500.00Special 22. Sidewalk Cover Plate EACH 7,000.00 5,500.001.000 7,500.00 7,000.00 5,500.00

SPV.0090 4,050.00Special 01. Concrete Planter CurbSpecial

LF 4,050.00 4,050.0030.000 135.00 135.00 135.00

SPV.0090 1,200.00Special 02. Concrete Curb & Gutter30-Inch Type K Special

LF 1,200.00 1,200.0040.000 30.00 30.00 30.00

SPV.0090 600.00Special 03. Concrete Curb & Gutter24-Inch Type L Special

LF 600.00 600.0020.000 30.00 30.00 30.00

SPV.0090 2,475.00Special 04. Concrete Gutter 36-InchSpecial

LF 2,475.00 2,475.0055.000 45.00 45.00 45.00

SPV.0090 5,670.00Special 05. Metal DecorativeHandrail

LF 6,300.00 3,360.0042.000 135.00 150.00 80.00

SPV.0090 22,750.00Special 06. Metal DecorativeGuardrail

LF 20,300.00 20,650.0070.000 325.00 290.00 295.00

SPV.0090 1,000.00Special 07. Remove, Salvage andReinstall Concrete Barrier

LF 500.00 250.0050.000 20.00 10.00 5.00

SPV.0090 900.00Special 08. Remove and SalvageConcrete Barrier

LF 200.00 100.0020.000 45.00 10.00 5.00

SPV.0090 99,715.00Special 09. Parapet Concrete Type'TX'

LF 81,400.00 81,400.00407.000 245.00 200.00 200.00

All Bids Received

August 14, 2018

Page 30 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 32: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

SPV.0090 90.00Special 10. Shovel Cut Edging LF 150.00 1,500.0015.000 6.00 10.00 100.00

SPV.0105 2,000.00Special 01. Remove, Salvage, &Reinstall Traffic Signal Eqpt(Milwaukee St & River St)

LS 2,000.00 2,020.201.000 2,000.00 2,000.00 2,020.20

SPV.0105 2,000.00Special 02. Remove, Salvage, &Reinstall Traffic Signal Eqpt(Milwaukee St & Main St)

LS 2,000.00 2,020.201.000 2,000.00 2,000.00 2,020.20

SPV.0105 38,000.00Special 03. Concrete Steps andSupports

LS 15,000.00 25,000.001.000 38,000.00 15,000.00 25,000.00

SPV.0105 100,000.00Special 04. Construction Access LS 400,000.00 506,000.001.000 100,000.00 400,000.00 506,000.00

SPV.0105 635,000.00Special 05. Removing Old StructureOver Waterway with Minimal DebrisStation 14+54

LS 750,000.00 500,000.001.000 635,000.00 750,000.00 500,000.00

SPV.0105 500.00Special 06. Locate and ReferenceProperty Corners

LS 500.00 500.001.000 500.00 500.00 500.00

SPV.0105 500.00Special 07. Reset Property Corners LS 500.00 500.001.000 500.00 500.00 500.00

SPV.0105 2,000.00Special 08. Remove and ReattachExisting Railing

LS 5,000.00 1,700.001.000 2,000.00 5,000.00 1,700.00

SPV.0105 5,000.00Special 09. Remove, Salvage,Modify, and Reattach ExistingRailing

LS 8,000.00 7,000.001.000 5,000.00 8,000.00 7,000.00

SPV.0105 12,000.00Special 10. Reconstruct CantileverSidewalk

LS 30,000.00 7,000.001.000 12,000.00 30,000.00 7,000.00

SPV.0105 500.00Special 11. Remove, Salvage andReinstall Awning Side Panels

LS 3,000.00 800.001.000 500.00 3,000.00 800.00

SPV.0165 31,155.75Special 01. Concrete Sidewalk, 5-Inch, Colored

SF 31,155.75 31,155.753,405.000 9.15 9.15 9.15

SPV.0165 2,500.00Special 02. Vault Wall SF 7,500.00 2,500.0050.000 50.00 150.00 50.00

SPV.0165 1,500.00Special 03. Abandoned VaultRemoval Masonry, Depth to 5'

SF 1,500.00 1,500.0050.000 30.00 30.00 30.00

SPV.0165 3,000.00Special 04. Abandoned VaultRemoval Masonry, Depth Over 5'

SF 3,000.00 3,000.0050.000 60.00 60.00 60.00

All Bids Received

August 14, 2018

Page 31 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 33: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814002Proposal ID:002

State Project(s):

C Janesville, W Milwaukee Street; Rock River Bridge B-53-0294

C Janesville, W Milwaukee Street

Rock

LOC STR, Rock County

Location:5990-00-34

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

SPV.0165 1,750.00Special 05. Abandoned VaultRemoval Reinforced Concrete 0"-10", Depth to 5'

SF 1,750.00 1,750.0050.000 35.00 35.00 35.00

SPV.0165 3,500.00Special 06. Abandoned VaultRemoval Reinforced Concrete 0"-10", Depth Over 5'

SF 3,500.00 3,500.0050.000 70.00 70.00 70.00

SPV.0165 2,000.00Special 07. Abandoned VaultRemoval Reinforced Concrete 10"+,Depth to 5'

SF 2,000.00 2,000.0050.000 40.00 40.00 40.00

SPV.0165 4,000.00Special 08. Abandoned VaultRemoval Reinforced Concrete 10"+,Depth Over 5'

SF 4,000.00 4,000.0050.000 80.00 80.00 80.00

SPV.0165 14,700.00Special 09. Structural SidewalkSpecial

SF 26,250.00 16,800.00210.000 70.00 125.00 80.00

SPV.0165 150.00Special 10. Construction StakingSidewalk

SF 150.00 150.00150.000 1.00 1.00 1.00

SPV.0180 840.00Special 01. Shredded HardwoodBark Mulch

SY 280.00 280.0028.000 30.00 10.00 10.00

SPV.0195 22,000.00Special 01. Excavation, Hauling,and Disposal of PAH ContaminatedSoil

TON 22,000.00 22,000.00400.000 55.00 55.00 55.00

$5,031,410.31 $5,039,002.19$4,740,427.18Proposal Total:

All Bids Received

August 14, 2018

Page 32 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 34: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814003Proposal ID:003

State Project(s):

C Sparta, Milwaukee Avenue; Farmers Valley Crk Bridge B-41-0299

C Sparta, Milwaukee Avenue

Monroe

LOC STR, Monroe County

Location:7016-00-05

StructuresType Of Work:

1 LARSON CONSTRUCTION CO., INC. 19681 55th Avenue Chippewa Falls, WI 54729Bidder No.

2 RADTKE CONTRACTORS INC. Po Box 6000 Winneconne, WI 54986Bidder No.

3 CONCRETE STRUCTURES, INC. 3006 Bond Place Janesville, WI 53548-3218Bidder No.

4 PHEIFER BROTHERS CONSTRUCTION CO., INC. 599 Bondow Drive Neenah, WI 54956Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

201.0105 40.00Clearing STA 40.00 40.002.000 20.00 20.00 20.00

201.0205 140.00Grubbing STA 140.00 140.002.000 70.00 70.00 70.00

203.0600.S 19,000.00Removing Old Structure OverWaterway With Minimal Debris(station) 01. 10+00

LS 13,842.69 15,000.001.000 19,000.00 13,842.69 15,000.00

205.0100 3,942.00Excavation Common CY 3,942.00 3,942.00438.000 9.00 9.00 9.00

206.1000 15,000.00Excavation for Structures Bridges(structure) 01. B-41-299

LS 7,817.39 10,000.001.000 15,000.00 7,817.39 10,000.00

208.0100 4,104.00Borrow CY 4,104.00 4,104.00342.000 12.00 12.00 12.00

210.1500 7,200.00Backfill Structure Type A TON 6,744.00 7,200.00300.000 24.00 22.48 24.00

213.0100 500.00Finishing Roadway (project) 01.7016-00-05

EACH 500.00 500.001.000 500.00 500.00 500.00

305.0110 435.00Base Aggregate Dense 3/4-Inch TON 435.00 435.0015.000 29.00 29.00 29.00

305.0120 7,952.00Base Aggregate Dense 1 1/4-Inch TON 7,952.00 7,952.00568.000 14.00 14.00 14.00

455.0605 330.00Tack Coat GAL 330.00 330.0055.000 6.00 6.00 6.00

465.0105 21,903.00Asphaltic Surface TON 21,903.00 21,903.00210.000 104.30 104.30 104.30

465.0315 910.00Asphaltic Flumes SY 910.00 910.0014.000 65.00 65.00 65.00

502.0100 79,785.00Concrete Masonry Bridges CY 102,713.83 128,050.00197.000 405.00 521.39 650.00

502.3200 544.00Protective Surface Treatment SY 354.96 408.00136.000 4.00 2.61 3.00

502.3210 355.00Pigmented Surface Sealer SY 587.88 568.0071.000 5.00 8.28 8.00

505.0400 4,224.00Bar Steel Reinforcement HSStructures

LB 3,696.00 3,872.003,520.000 1.20 1.05 1.10

All Bids Received

August 14, 2018

Page 33 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 35: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814003Proposal ID:003

State Project(s):

C Sparta, Milwaukee Avenue; Farmers Valley Crk Bridge B-41-0299

C Sparta, Milwaukee Avenue

Monroe

LOC STR, Monroe County

Location:7016-00-05

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

505.0600 29,940.00Bar Steel Reinforcement HS CoatedStructures

LB 24,201.50 29,940.0024,950.000 1.20 0.97 1.20

516.0500 860.00Rubberized MembraneWaterproofing

SY 784.00 640.0020.000 43.00 39.20 32.00

550.1100 34,562.50Piling Steel HP 10-Inch X 42 Lb LF 32,821.25 39,375.00875.000 39.50 37.51 45.00

601.0411 5,580.00Concrete Curb & Gutter 30-InchType D

LF 5,580.00 5,580.00186.000 30.00 30.00 30.00

606.0300 9,690.00Riprap Heavy CY 7,765.30 8,550.00190.000 51.00 40.87 45.00

612.0406 1,520.00Pipe Underdrain Wrapped 6-Inch LF 737.20 1,520.00190.000 8.00 3.88 8.00

614.0150 400.00Anchor Assemblies for Steel PlateBeam Guard

EACH 754.52 1,200.004.000 100.00 188.63 300.00

618.0100 500.00Maintenance And Repair of HaulRoads (project) 01. 7016-00-05

EACH 83.07 100.001.000 500.00 83.07 100.00

619.1000 45,800.00Mobilization EACH 61,873.15 38,256.001.000 45,800.00 61,873.15 38,256.00

624.0100 525.00Water MGAL

525.00 525.0035.000 15.00 15.00 15.00

625.0500 1,365.00Salvaged Topsoil SY 1,365.00 1,365.00525.000 2.60 2.60 2.60

627.0200 315.00Mulching SY 315.00 525.00525.000 0.60 0.60 1.00

628.1504 1,716.00Silt Fence LF 1,716.00 1,560.00780.000 2.20 2.20 2.00

628.1520 7.80Silt Fence Maintenance LF 7.80 39.00780.000 0.01 0.01 0.05

628.1905 600.00Mobilizations Erosion Control EACH 600.00 750.002.000 300.00 300.00 375.00

628.1910 60.00Mobilizations Emergency ErosionControl

EACH 100.00 750.002.000 30.00 50.00 375.00

628.6005 4,960.00Turbidity Barriers SY 5,897.75 5,425.00155.000 32.00 38.05 35.00

629.0210 55.00Fertilizer Type B CWT 55.00 165.000.550 100.00 100.00 300.00

630.0120 400.00Seeding Mixture No. 20 LB 400.00 300.0020.000 20.00 20.00 15.00

630.0200 120.00Seeding Temporary LB 120.00 100.0010.000 12.00 12.00 10.00

634.0612 320.00Posts Wood 4x6-Inch X 12-FT EACH 320.00 300.004.000 80.00 80.00 75.00

All Bids Received

August 14, 2018

Page 34 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 36: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814003Proposal ID:003

State Project(s):

C Sparta, Milwaukee Avenue; Farmers Valley Crk Bridge B-41-0299

C Sparta, Milwaukee Avenue

Monroe

LOC STR, Monroe County

Location:7016-00-05

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

637.2230 360.00Signs Type II Reflective F SF 360.00 240.0012.000 30.00 30.00 20.00

638.2602 180.00Removing Signs Type II EACH 180.00 100.004.000 45.00 45.00 25.00

638.3000 180.00Removing Small Sign Supports EACH 180.00 40.004.000 45.00 45.00 10.00

642.5001 1,400.00Field Office Type B EACH 2,308.50 1,000.001.000 1,400.00 2,308.50 1,000.00

643.0420 324.00Traffic Control Barricades Type III DAY 1,198.80 324.001,620.000 0.20 0.74 0.20

643.0705 243.00Traffic Control Warning Lights TypeA

DAY 267.30 243.002,430.000 0.10 0.11 0.10

643.0900 182.25Traffic Control Signs DAY 607.50 182.251,215.000 0.15 0.50 0.15

643.5000 1,600.00Traffic Control EACH 893.04 1,600.001.000 1,600.00 893.04 1,600.00

645.0111 240.00Geotextile Type DF Schedule A SY 243.60 240.0060.000 4.00 4.06 4.00

645.0120 1,095.00Geotextile Type HR SY 1,281.15 1,095.00365.000 3.00 3.51 3.00

650.4500 200.00Construction Staking Subgrade LF 4.00 4.00400.000 0.50 0.01 0.01

650.5000 400.00Construction Staking Base LF 400.00 400.00400.000 1.00 1.00 1.00

650.6500 2,000.00Construction Staking StructureLayout (structure) 01. B-41-299

LS 2,000.00 2,000.001.000 2,000.00 2,000.00 2,000.00

650.9910 300.00Construction Staking SupplementalControl (project) 01. 7016-00-05

LS 300.00 300.001.000 300.00 300.00 300.00

650.9920 400.00Construction Staking Slope Stakes LF 400.00 400.00400.000 1.00 1.00 1.00

690.0150 320.00Sawing Asphalt LF 118.00 718.0040.000 8.00 2.95 17.95

715.0502 1,182.00Incentive Strength ConcreteStructures

DOL 1,182.00 1,182.001,182.000 1.00 1.00 1.00

801.0117 24,000.00Railroad Flagging Reimbursment DOL 24,000.00 24,000.0024,000.000 1.00 1.00 1.00

$357,958.18 $376,387.25$340,266.55Proposal Total:

All Bids Received

August 14, 2018

Page 35 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 37: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814003Proposal ID:003

State Project(s):

C Sparta, Milwaukee Avenue; Farmers Valley Crk Bridge B-41-0299

C Sparta, Milwaukee Avenue

Monroe

LOC STR, Monroe County

Location:7016-00-05

1 LARSON CONSTRUCTION CO., INC. 19681 55th Avenue Chippewa Falls, WI 54729Bidder No.

2 RADTKE CONTRACTORS INC. Po Box 6000 Winneconne, WI 54986Bidder No.

3 CONCRETE STRUCTURES, INC. 3006 Bond Place Janesville, WI 53548-3218Bidder No.

4 PHEIFER BROTHERS CONSTRUCTION CO., INC. 599 Bondow Drive Neenah, WI 54956Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

201.0105 2,771.52Clearing STA 0.00 0.002.000 1,385.76 0.00 0.00

201.0205 2,771.52Grubbing STA 0.00 0.002.000 1,385.76 0.00 0.00

203.0600.S 37,342.89Removing Old Structure OverWaterway With Minimal Debris(station) 01. 10+00

LS 0.00 0.001.000 37,342.89 0.00 0.00

205.0100 3,705.48Excavation Common CY 0.00 0.00438.000 8.46 0.00 0.00

206.1000 43,900.00Excavation for Structures Bridges(structure) 01. B-41-299

LS 0.00 0.001.000 43,900.00 0.00 0.00

208.0100 3,652.56Borrow CY 0.00 0.00342.000 10.68 0.00 0.00

210.1500 5,088.00Backfill Structure Type A TON 0.00 0.00300.000 16.96 0.00 0.00

213.0100 888.21Finishing Roadway (project) 01.7016-00-05

EACH 0.00 0.001.000 888.21 0.00 0.00

305.0110 491.25Base Aggregate Dense 3/4-Inch TON 0.00 0.0015.000 32.75 0.00 0.00

305.0120 8,224.64Base Aggregate Dense 1 1/4-Inch TON 0.00 0.00568.000 14.48 0.00 0.00

455.0605 330.00Tack Coat GAL 0.00 0.0055.000 6.00 0.00 0.00

465.0105 21,903.00Asphaltic Surface TON 0.00 0.00210.000 104.30 0.00 0.00

465.0315 910.00Asphaltic Flumes SY 0.00 0.0014.000 65.00 0.00 0.00

502.0100 102,440.00Concrete Masonry Bridges CY 0.00 0.00197.000 520.00 0.00 0.00

502.3200 530.40Protective Surface Treatment SY 0.00 0.00136.000 3.90 0.00 0.00

502.3210 710.00Pigmented Surface Sealer SY 0.00 0.0071.000 10.00 0.00 0.00

505.0400 3,872.00Bar Steel Reinforcement HSStructures

LB 0.00 0.003,520.000 1.10 0.00 0.00

All Bids Received

August 14, 2018

Page 36 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 38: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814003Proposal ID:003

State Project(s):

C Sparta, Milwaukee Avenue; Farmers Valley Crk Bridge B-41-0299

C Sparta, Milwaukee Avenue

Monroe

LOC STR, Monroe County

Location:7016-00-05

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

505.0600 27,445.00Bar Steel Reinforcement HS CoatedStructures

LB 0.00 0.0024,950.000 1.10 0.00 0.00

516.0500 1,020.00Rubberized MembraneWaterproofing

SY 0.00 0.0020.000 51.00 0.00 0.00

550.1100 38,500.00Piling Steel HP 10-Inch X 42 Lb LF 0.00 0.00875.000 44.00 0.00 0.00

601.0411 5,580.00Concrete Curb & Gutter 30-InchType D

LF 0.00 0.00186.000 30.00 0.00 0.00

606.0300 11,590.00Riprap Heavy CY 0.00 0.00190.000 61.00 0.00 0.00

612.0406 1,312.90Pipe Underdrain Wrapped 6-Inch LF 0.00 0.00190.000 6.91 0.00 0.00

614.0150 1,200.00Anchor Assemblies for Steel PlateBeam Guard

EACH 0.00 0.004.000 300.00 0.00 0.00

618.0100 1.00Maintenance And Repair of HaulRoads (project) 01. 7016-00-05

EACH 0.00 0.001.000 1.00 0.00 0.00

619.1000 51,808.69Mobilization EACH 0.00 0.001.000 51,808.69 0.00 0.00

624.0100 974.40Water MGAL

0.00 0.0035.000 27.84 0.00 0.00

625.0500 3,360.00Salvaged Topsoil SY 0.00 0.00525.000 6.40 0.00 0.00

627.0200 525.00Mulching SY 0.00 0.00525.000 1.00 0.00 0.00

628.1504 1,560.00Silt Fence LF 0.00 0.00780.000 2.00 0.00 0.00

628.1520 39.00Silt Fence Maintenance LF 0.00 0.00780.000 0.05 0.00 0.00

628.1905 750.00Mobilizations Erosion Control EACH 0.00 0.002.000 375.00 0.00 0.00

628.1910 750.00Mobilizations Emergency ErosionControl

EACH 0.00 0.002.000 375.00 0.00 0.00

628.6005 5,425.00Turbidity Barriers SY 0.00 0.00155.000 35.00 0.00 0.00

629.0210 165.00Fertilizer Type B CWT 0.00 0.000.550 300.00 0.00 0.00

630.0120 300.00Seeding Mixture No. 20 LB 0.00 0.0020.000 15.00 0.00 0.00

630.0200 100.00Seeding Temporary LB 0.00 0.0010.000 10.00 0.00 0.00

634.0612 300.00Posts Wood 4x6-Inch X 12-FT EACH 0.00 0.004.000 75.00 0.00 0.00

All Bids Received

August 14, 2018

Page 37 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 39: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814003Proposal ID:003

State Project(s):

C Sparta, Milwaukee Avenue; Farmers Valley Crk Bridge B-41-0299

C Sparta, Milwaukee Avenue

Monroe

LOC STR, Monroe County

Location:7016-00-05

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

637.2230 240.00Signs Type II Reflective F SF 0.00 0.0012.000 20.00 0.00 0.00

638.2602 100.00Removing Signs Type II EACH 0.00 0.004.000 25.00 0.00 0.00

638.3000 40.00Removing Small Sign Supports EACH 0.00 0.004.000 10.00 0.00 0.00

642.5001 3,700.00Field Office Type B EACH 0.00 0.001.000 3,700.00 0.00 0.00

643.0420 324.00Traffic Control Barricades Type III DAY 0.00 0.001,620.000 0.20 0.00 0.00

643.0705 243.00Traffic Control Warning Lights TypeA

DAY 0.00 0.002,430.000 0.10 0.00 0.00

643.0900 182.25Traffic Control Signs DAY 0.00 0.001,215.000 0.15 0.00 0.00

643.5000 1,600.00Traffic Control EACH 0.00 0.001.000 1,600.00 0.00 0.00

645.0111 391.80Geotextile Type DF Schedule A SY 0.00 0.0060.000 6.53 0.00 0.00

645.0120 1,679.00Geotextile Type HR SY 0.00 0.00365.000 4.60 0.00 0.00

650.4500 40.00Construction Staking Subgrade LF 0.00 0.00400.000 0.10 0.00 0.00

650.5000 400.00Construction Staking Base LF 0.00 0.00400.000 1.00 0.00 0.00

650.6500 2,000.00Construction Staking StructureLayout (structure) 01. B-41-299

LS 0.00 0.001.000 2,000.00 0.00 0.00

650.9910 300.00Construction Staking SupplementalControl (project) 01. 7016-00-05

LS 0.00 0.001.000 300.00 0.00 0.00

650.9920 400.00Construction Staking Slope Stakes LF 0.00 0.00400.000 1.00 0.00 0.00

690.0150 362.80Sawing Asphalt LF 0.00 0.0040.000 9.07 0.00 0.00

715.0502 1,182.00Incentive Strength ConcreteStructures

DOL 0.00 0.001,182.000 1.00 0.00 0.00

801.0117 24,000.00Railroad Flagging Reimbursment DOL 0.00 0.0024,000.000 1.00 0.00 0.00

$0.00 $0.00$429,422.31Proposal Total:

All Bids Received

August 14, 2018

Page 38 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 40: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814004Proposal ID:004

State Project(s):

Wisconn Valley Way; Box Culvert

Wisconn Valley Way

Racine

Local Street, Racine County

Location:2704-00-78

3763-00-75

StructuresType Of Work:

1 HOFFMAN CONSTRUCTION COMPANY 123 County Rd A Black River Falls, WI 54615Bidder No.

2 CONCRETE STRUCTURES, INC. 3006 Bond Place Janesville, WI 53548-3218Bidder No.

3 ZENITH TECH., INC. - WAUKESHA N6 W23633 Bluemound Rd Waukesha, WI 53187Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

108.4400 100.00CPM Progress Schedule EACH 5,500.00 3,500.001.000 100.00 5,500.00 3,500.00

201.0105 945.90Clearing STA 945.90 950.002.000 472.95 472.95 475.00

201.0115 420.40Clearing ACRE 420.40 420.000.100 4,204.00 4,204.00 4,200.00

201.0120 283.80Clearing ID 283.80 285.0015.000 18.92 18.92 19.00

201.0205 367.86Grubbing STA 367.86 370.002.000 183.93 183.93 185.00

201.0215 52.55Grubbing ACRE 52.55 52.550.100 525.50 525.50 525.50

201.0220 78.90Grubbing ID 78.90 78.7515.000 5.26 5.26 5.25

203.0100 1,000.00Removing Small Pipe Culverts EACH 1,000.00 6,750.001.000 1,000.00 1,000.00 6,750.00

203.0200 10,000.00Removing Old Structure (station)002. Sta 378+36

LS 20,000.00 107,000.001.000 10,000.00 20,000.00 107,000.00

204.0165 667.50Removing Guardrail **P** LF 667.50 667.50267.000 2.50 2.50 2.50

204.0280 2,400.00Sealing Pipes EACH 1,400.00 1,400.004.000 600.00 350.00 350.00

204.9090.S 1,000.00Removing (item description) 001.Drain Tile

LF 1,400.00 1,400.00200.000 5.00 7.00 7.00

205.0100 18,600.00Excavation Common CY 55,800.00 55,800.003,100.000 6.00 18.00 18.00

206.2000 10,000.00Excavation for Structures Culverts(structure) 001. C-51-85

LS 10,000.00 107,000.001.000 10,000.00 10,000.00 107,000.00

206.2000 10,000.00Excavation for Structures Culverts(structure) 002. B-30-142

LS 40,000.00 146,000.001.000 10,000.00 40,000.00 146,000.00

208.0100 40,625.00Borrow CY 125,000.00 125,000.006,250.000 6.50 20.00 20.00

210.2500 190,050.00Backfill Structure Type B TON 228,060.00 240,730.0012,670.000 15.00 18.00 19.00

305.0120 22,850.00Base Aggregate Dense 1 1/4-Inch TON 22,850.00 22,850.00914.000 25.00 25.00 25.00

All Bids Received

August 14, 2018

Page 39 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 41: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814004Proposal ID:004

State Project(s):

Wisconn Valley Way; Box Culvert

Wisconn Valley Way

Racine

Local Street, Racine County

Location:2704-00-78

3763-00-75

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

311.0110 65,124.00Breaker Run TON 84,420.00 60,300.002,412.000 27.00 35.00 25.00

450.4000 3,530.00HMA Cold Weather Paving TON 3,530.00 3,530.00353.000 10.00 10.00 10.00

455.0605 185.00Tack Coat GAL 185.00 185.0074.000 2.50 2.50 2.50

465.0105 42,713.00Asphaltic Surface TON 42,713.00 42,713.00353.000 121.00 121.00 121.00

504.0100 485,550.00Concrete Masonry Culverts **P** CY 640,926.00 857,805.001,079.000 450.00 594.00 795.00

505.0400 129,010.00Bar Steel Reinforcement HSStructures

LB 135,460.50 174,163.50129,010.000 1.00 1.05 1.35

505.0600 11,220.00Bar Steel Reinforcement HS CoatedStructures

LB 11,220.00 18,360.0010,200.000 1.10 1.10 1.80

516.0500 5,950.00Rubberized MembraneWaterproofing **P**

SY 3,570.00 5,355.00119.000 50.00 30.00 45.00

522.1024 2,000.00Apron Endwalls for Culvert PipeReinforced Concrete 24-Inch

EACH 1,700.00 1,700.002.000 1,000.00 850.00 850.00

522.1030 1,050.00Apron Endwalls for Culvert PipeReinforced Concrete 30-Inch

EACH 900.00 900.001.000 1,050.00 900.00 900.00

522.1036 1,400.00Apron Endwalls for Culvert PipeReinforced Concrete 36-Inch

EACH 1,300.00 1,300.001.000 1,400.00 1,300.00 1,300.00

606.0200 17,622.00Riprap Medium CY 17,622.00 13,662.00198.000 89.00 89.00 69.00

608.0324 8,758.00Storm Sewer Pipe ReinforcedConcrete Class III 24-Inch

LF 10,570.00 10,570.00151.000 58.00 70.00 70.00

608.0330 6,000.00Storm Sewer Pipe ReinforcedConcrete Class III 30-Inch

LF 6,400.00 6,400.0080.000 75.00 80.00 80.00

608.0436 14,924.00Storm Sewer Pipe ReinforcedConcrete Class IV 36-Inch

LF 15,580.00 15,580.00164.000 91.00 95.00 95.00

608.0512 8,000.00Storm Sewer Pipe ReinforcedConcrete Class V 12-Inch

LF 12,000.00 12,000.00200.000 40.00 60.00 60.00

611.2005 3,200.00Manholes 5-FT Diameter EACH 3,500.00 3,500.001.000 3,200.00 3,500.00 3,500.00

611.2006 4,000.00Manholes 6-FT Diameter EACH 4,500.00 4,500.001.000 4,000.00 4,500.00 4,500.00

612.0700 1,000.00Drain Tile Exploration LF 600.00 600.00200.000 5.00 3.00 3.00

All Bids Received

August 14, 2018

Page 40 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 42: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814004Proposal ID:004

State Project(s):

Wisconn Valley Way; Box Culvert

Wisconn Valley Way

Racine

Local Street, Racine County

Location:2704-00-78

3763-00-75

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

616.0700.S 2,340.00Fence Safety LF 2,340.00 2,340.00600.000 3.90 3.90 3.90

619.1000 329,500.00Mobilization EACH 86,000.00 405,000.001.000 329,500.00 86,000.00 405,000.00

623.0200 2,100.00Dust Control Surface Treatment SY 350.00 350.003,500.000 0.60 0.10 0.10

624.0100 2,500.00Water MGAL

50.00 50.0050.000 50.00 1.00 1.00

625.0500 11,548.00Salvaged Topsoil **P** SY 17,322.00 17,322.0011,548.000 1.00 1.50 1.50

628.1104 2,420.00Erosion Bales EACH 2,420.00 2,420.00200.000 12.10 12.10 12.10

628.1504 3,735.73Silt Fence LF 3,735.73 3,735.732,087.000 1.79 1.79 1.79

628.1520 104.35Silt Fence Maintenance LF 104.35 104.352,087.000 0.05 0.05 0.05

628.1905 1,200.00Mobilizations Erosion Control EACH 1,200.00 1,200.006.000 200.00 200.00 200.00

628.1910 200.00Mobilizations Emergency ErosionControl

EACH 200.00 200.004.000 50.00 50.00 50.00

628.2004 13,748.00Erosion Mat Class I Type B SY 13,748.00 13,748.0013,748.000 1.00 1.00 1.00

628.6510 1,446.50Soil Stabilizer Type B ACRE 1,446.50 1,446.502.630 550.00 550.00 550.00

628.7005 80.00Inlet Protection Type A EACH 80.00 80.001.000 80.00 80.00 80.00

628.7560 3,000.00Tracking Pads EACH 2,500.00 2,500.002.000 1,500.00 1,250.00 1,250.00

628.7570 1,100.00Rock Bags EACH 1,100.00 1,100.00100.000 11.00 11.00 11.00

630.0200 1,029.00Seeding Temporary LB 1,029.00 1,029.00343.000 3.00 3.00 3.00

633.5200 160.00Markers Culvert End EACH 160.00 160.004.000 40.00 40.00 40.00

643.0420 1,350.00Traffic Control Barricades Type III DAY 1,350.00 1,350.003,000.000 0.45 0.45 0.45

643.0705 540.00Traffic Control Warning Lights TypeA

DAY 540.00 540.006,000.000 0.09 0.09 0.09

643.0900 6,930.00Traffic Control Signs DAY 6,930.00 6,930.0023,100.000 0.30 0.30 0.30

643.0920 200.00Traffic Control Covering Signs TypeII

EACH 200.00 200.005.000 40.00 40.00 40.00

643.1050 840.00Traffic Control Signs PCMS DAY 840.00 840.0014.000 60.00 60.00 60.00

643.5000 6,650.00Traffic Control EACH 6,650.00 6,650.001.000 6,650.00 6,650.00 6,650.00

All Bids Received

August 14, 2018

Page 41 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 43: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814004Proposal ID:004

State Project(s):

Wisconn Valley Way; Box Culvert

Wisconn Valley Way

Racine

Local Street, Racine County

Location:2704-00-78

3763-00-75

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

645.0105 5,577.00Geotextile Type C SY 7,436.00 4,368.651,859.000 3.00 4.00 2.35

645.0120 2,973.00Geotextile Type HR SY 2,973.00 3,577.51991.000 3.00 3.00 3.61

646.1020 8,268.00Marking Line Epoxy 4-Inch **P** LF 8,268.00 8,268.001,060.000 7.80 7.80 7.80

690.0150 141.60Sawing Asphalt LF 240.00 141.6048.000 2.95 5.00 2.95

715.0502 6,474.00Incentive Strength ConcreteStructures

DOL 6,474.00 6,474.006,474.000 1.00 1.00 1.00

SPV.0035 26,040.00Special 001. Natural BackfillMaterial

CY 10,850.00 23,505.44434.000 60.00 25.00 54.16

SPV.0060 57,600.00Special 001. Crash CushionTemporary Left In Place

EACH 57,600.00 57,600.004.000 14,400.00 14,400.00 14,400.00

SPV.0060 1,300.00Special 002. Cover Plates Left InPlace

EACH 350.00 350.002.000 650.00 175.00 175.00

SPV.0060 500.00Special 003. Sand Bags EACH 1,050.00 500.00100.000 5.00 10.50 5.00

SPV.0060 1,000.00Special 013. Connect Drain Tile EACH 700.00 700.002.000 500.00 350.00 350.00

SPV.0090 16,000.00Special 001. Concrete BarrierTemporary Precast DeliveredSpecial

LF 20,000.00 14,000.00400.000 40.00 50.00 35.00

SPV.0105 5,500.00Special 001. Survey Project 2704-00-78

LS 5,500.00 5,500.001.000 5,500.00 5,500.00 5,500.00

SPV.0105 6,700.00Special 002. Survey Project 3763-00-75

LS 6,700.00 6,700.001.000 6,700.00 6,700.00 6,700.00

SPV.0105 50,000.00Special 003. Temporary AccessRoad Culvert C-51-85

LS 72,767.00 72,767.001.000 50,000.00 72,767.00 72,767.00

SPV.0105 15,000.00Special 004. Temporary StreamDiversion Culvert C-51-85

LS 40,000.00 114,000.001.000 15,000.00 40,000.00 114,000.00

SPV.0105 15,000.00Special 005. Temporary StreamDiversion Culvert B-30-142

LS 84,700.00 125,000.001.000 15,000.00 84,700.00 125,000.00

SPV.0170 2,400.00Special 001. Removal and Disposalof Invasive Plant Species

STA 2,100.00 2,100.002.000 1,200.00 1,050.00 1,050.00

$1,988,526.99 $2,968,225.08$1,733,873.09Proposal Total:

All Bids Received

August 14, 2018

Page 42 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 44: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814004Proposal ID:004

State Project(s):

Wisconn Valley Way; Box Culvert

Wisconn Valley Way

Racine

Local Street, Racine County

Location:2704-00-78

3763-00-75

All Bids Received

August 14, 2018

Page 43 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 45: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

StructuresType Of Work:

1 RADTKE CONTRACTORS INC. Po Box 6000 Winneconne, WI 54986Bidder No.

2 CONCRETE STRUCTURES, INC. 3006 Bond Place Janesville, WI 53548-3218Bidder No.

3 PHEIFER BROTHERS CONSTRUCTION CO., INC. 599 Bondow Drive Neenah, WI 54956Bidder No.

4 ZENITH TECH., INC. - WAUKESHA N6 W23633 Bluemound Rd Waukesha, WI 53187Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

201.0105 55.00Clearing STA 55.00 55.0011.000 5.00 5.00 5.00

201.0205 55.00Grubbing STA 55.00 55.0011.000 5.00 5.00 5.00

203.0600.S 96,437.52Removing Old Structure OverWaterway With Minimal Debris(station) 01. 305+22

LS 60,000.00 125,000.001.000 96,437.52 60,000.00 125,000.00

204.0165 552.50Removing Guardrail LF 552.50 552.50221.000 2.50 2.50 2.50

204.0185 200.00Removing Masonry CY 200.00 200.004.000 50.00 50.00 50.00

205.0100 12,285.00Excavation Common CY 12,285.00 12,285.00945.000 13.00 13.00 13.00

205.0400 1,650.00Excavation Marsh CY 1,650.00 1,650.00110.000 15.00 15.00 15.00

206.1000 8,085.89Excavation for Structures Bridges(structure) 01. B-64-180

LS 10,000.00 85,700.001.000 8,085.89 10,000.00 85,700.00

206.5000 24,832.36Cofferdams (structure) 01. B-64-180 LS 60,000.00 40,500.001.000 24,832.36 60,000.00 40,500.00

208.0100 7,521.00Borrow CY 7,521.00 7,521.002,507.000 3.00 3.00 3.00

210.1500 10,961.60Backfill Structure Type A TON 7,280.00 7,280.00520.000 21.08 14.00 14.00

213.0100 500.00Finishing Roadway (project) 01.3840-01-72

EACH 500.00 500.001.000 500.00 500.00 500.00

305.0110 4,780.00Base Aggregate Dense 3/4-Inch TON 4,780.00 4,780.00239.000 20.00 20.00 20.00

305.0120 26,720.00Base Aggregate Dense 1 1/4-Inch TON 26,720.00 26,720.001,670.000 16.00 16.00 16.00

311.0110 9,100.00Breaker Run TON 9,100.00 9,100.00520.000 17.50 17.50 17.50

455.0605 790.60Tack Coat GAL 790.60 2.36236.000 3.35 3.35 0.01

460.2000 320.00Incentive Density HMA Pavement DOL 320.00 320.00320.000 1.00 1.00 1.00

All Bids Received

August 14, 2018

Page 44 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 46: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

460.5223 25,365.00HMA Pavement 3 LT 58-28 S TON 25,365.00 38,925.00300.000 84.55 84.55 129.75

460.5224 17,650.00HMA Pavement 4 LT 58-28 S TON 17,650.00 32,380.00200.000 88.25 88.25 161.90

502.0100 138,847.50Concrete Masonry Bridges CY 196,875.00 117,000.00225.000 617.10 875.00 520.00

502.3200 1,434.20Protective Surface Treatment SY 1,515.00 1,969.50505.000 2.84 3.00 3.90

503.0146 108,504.72Prestressed Girder Type I 45W-Inch LF 113,220.00 139,860.00666.000 162.92 170.00 210.00

505.0400 6,373.20Bar Steel Reinforcement HSStructures

LB 5,640.00 6,204.005,640.000 1.13 1.00 1.10

505.0600 29,059.40Bar Steel Reinforcement HS CoatedStructures

LB 29,326.00 29,326.0026,660.000 1.09 1.10 1.10

506.2605 1,334.76Bearing Pads Elastomeric Non-Laminated

EACH 2,100.00 1,800.0012.000 111.23 175.00 150.00

506.4000 6,204.30Steel Diaphragms (structure) 01. B-64-180

EACH 7,000.00 6,300.0010.000 620.43 700.00 630.00

513.4061 49,353.40Railing Tubular Type M 01. B-64-180

LF 52,210.00 62,100.00230.000 214.58 227.00 270.00

516.0500 1,105.00Rubberized MembraneWaterproofing

SY 832.00 1,326.0026.000 42.50 32.00 51.00

550.0500 2,321.00Pile Points EACH 2,750.00 2,860.0022.000 105.50 125.00 130.00

550.1100 37,783.35Piling Steel HP 10-Inch X 42 Lb LF 42,075.00 40,205.00935.000 40.41 45.00 43.00

606.0300 8,150.05Riprap Heavy CY 5,750.00 13,800.00115.000 70.87 50.00 120.00

612.0406 779.00Pipe Underdrain Wrapped 6-Inch LF 1,520.00 1,520.00190.000 4.10 8.00 8.00

614.2330 36,375.00MGS Guardrail 3 K LF 36,375.00 36,375.001,212.500 30.00 30.00 30.00

614.2500 12,292.80MGS Thrie Beam Transition LF 12,292.80 12,292.80157.600 78.00 78.00 78.00

614.2610 14,000.00MGS Guardrail Terminal EAT EACH 14,000.00 14,000.004.000 3,500.00 3,500.00 3,500.00

618.0100 97.27Maintenance And Repair of HaulRoads (project) 01. 3840-01-72

EACH 100.00 1.001.000 97.27 100.00 1.00

619.1000 130,960.88Mobilization EACH 103,000.00 76,250.181.000 130,960.88 103,000.00 76,250.18

625.0100 26,724.00Topsoil SY 26,724.00 26,724.006,681.000 4.00 4.00 4.00

All Bids Received

August 14, 2018

Page 45 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 47: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

627.0200 500.00Mulching SY 500.00 500.001,000.000 0.50 0.50 0.50

628.1104 600.00Erosion Bales EACH 600.00 600.0050.000 12.00 12.00 12.00

628.1504 3,125.00Silt Fence LF 3,125.00 3,125.001,250.000 2.50 2.50 2.50

628.1520 312.50Silt Fence Maintenance LF 312.50 312.501,250.000 0.25 0.25 0.25

628.1905 750.00Mobilizations Erosion Control EACH 750.00 750.003.000 250.00 250.00 250.00

628.1910 1,050.00Mobilizations Emergency ErosionControl

EACH 1,050.00 1,050.003.000 350.00 350.00 350.00

628.2027 28,935.00Erosion Mat Class II Type C SY 28,935.00 28,935.006,430.000 4.50 4.50 4.50

628.6005 8,360.00Turbidity Barriers SY 8,360.00 8,360.00220.000 38.00 38.00 38.00

628.7504 2,394.00Temporary Ditch Checks LF 2,394.00 2,394.00266.000 9.00 9.00 9.00

628.7570 1,187.50Rock Bags EACH 1,187.50 1,187.5095.000 12.50 12.50 12.50

629.0210 275.60Fertilizer Type B CWT 275.60 275.604.240 65.00 65.00 65.00

630.0120 390.00Seeding Mixture No. 20 LB 390.00 390.0052.000 7.50 7.50 7.50

630.0130 727.50Seeding Mixture No. 30 LB 727.50 727.5097.000 7.50 7.50 7.50

630.0200 644.00Seeding Temporary LB 644.00 644.00184.000 3.50 3.50 3.50

634.0616 150.00Posts Wood 4x6-Inch X 16-FT EACH 150.00 150.002.000 75.00 75.00 75.00

634.0812 460.00Posts Tubular Steel 2x2-Inch X 12-FT

EACH 460.00 460.004.000 115.00 115.00 115.00

634.0814 375.00Posts Tubular Steel 2x2-Inch X 14-FT

EACH 375.00 375.003.000 125.00 125.00 125.00

637.2210 319.00Signs Type II Reflective H SF 319.00 319.0020.000 15.95 15.95 15.95

637.2230 397.95Signs Type II Reflective F SF 397.95 397.9521.000 18.95 18.95 18.95

638.2102 75.00Moving Signs Type II EACH 75.00 75.001.000 75.00 75.00 75.00

638.2602 300.00Removing Signs Type II EACH 300.00 300.0012.000 25.00 25.00 25.00

638.3000 275.00Removing Small Sign Supports EACH 275.00 275.0011.000 25.00 25.00 25.00

642.5001 3,022.20Field Office Type B EACH 1,000.00 3,700.001.000 3,022.20 1,000.00 3,700.00

All Bids Received

August 14, 2018

Page 46 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 48: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

643.0300 596.70Traffic Control Drums DAY 596.70 306.001,530.000 0.39 0.39 0.20

643.0420 2,383.74Traffic Control Barricades Type III DAY 2,383.74 1,511.642,907.000 0.82 0.82 0.52

643.0705 504.90Traffic Control Warning Lights TypeA

DAY 504.90 367.204,590.000 0.11 0.11 0.08

643.0900 7,631.64Traffic Control Signs DAY 7,631.64 8,421.1226,316.000 0.29 0.29 0.32

643.1050 700.00Traffic Control Signs PCMS DAY 700.00 840.0014.000 50.00 50.00 60.00

643.5000 2,937.04Traffic Control EACH 2,937.04 6,500.001.000 2,937.04 2,937.04 6,500.00

645.0111 541.20Geotextile Type DF Schedule A SY 480.00 720.00120.000 4.51 4.00 6.00

645.0120 1,262.70Geotextile Type HR SY 1,035.00 1,621.50345.000 3.66 3.00 4.70

645.0140 2,250.00Geotextile Type SAS SY 2,250.00 2,250.00450.000 5.00 5.00 5.00

645.0220 1,610.00Geogrid Type SR SY 1,610.00 1,610.00230.000 7.00 7.00 7.00

646.1020 4,523.76Marking Line Epoxy 4-Inch LF 3,090.00 3,090.002,472.000 1.83 1.25 1.25

646.9000 1,334.25Marking Removal Line 4-Inch LF 1,867.95 1,867.951,779.000 0.75 1.05 1.05

650.4500 206.80Construction Staking Subgrade LF 206.80 206.801,034.000 0.20 0.20 0.20

650.5000 1,034.00Construction Staking Base LF 1,034.00 1,034.001,034.000 1.00 1.00 1.00

650.6500 1,600.00Construction Staking StructureLayout (structure) 01. B-64-180

LS 1,600.00 1,600.001.000 1,600.00 1,600.00 1,600.00

650.9910 300.00Construction Staking SupplementalControl (project) 01. 3840-01-72

LS 300.00 300.001.000 300.00 300.00 300.00

650.9920 775.50Construction Staking Slope Stakes LF 775.50 775.501,034.000 0.75 0.75 0.75

690.0150 1,840.00Sawing Asphalt LF 1,840.00 1,840.001,600.000 1.15 1.15 1.15

715.0502 1,350.00Incentive Strength ConcreteStructures

DOL 1,350.00 1,350.001,350.000 1.00 1.00 1.00

SPV.0060 1,400.00Special 01. Utility Line Opening EACH 1,400.00 1,400.004.000 350.00 350.00 350.00

SPV.0105 850.00Special 01. Relocate and Adjust DryHydrant

LS 850.00 850.001.000 850.00 850.00 850.00

$985,175.22 $1,077,204.10$949,818.78Proposal Total:

All Bids Received

August 14, 2018

Page 47 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 49: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

All Bids Received

August 14, 2018

Page 48 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 50: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

1 RADTKE CONTRACTORS INC. Po Box 6000 Winneconne, WI 54986Bidder No.

2 CONCRETE STRUCTURES, INC. 3006 Bond Place Janesville, WI 53548-3218Bidder No.

3 PHEIFER BROTHERS CONSTRUCTION CO., INC. 599 Bondow Drive Neenah, WI 54956Bidder No.

4 ZENITH TECH., INC. - WAUKESHA N6 W23633 Bluemound Rd Waukesha, WI 53187Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

201.0105 4,642.00Clearing STA 0.00 0.0011.000 422.00 0.00 0.00

201.0205 3,481.50Grubbing STA 0.00 0.0011.000 316.50 0.00 0.00

203.0600.S 167,000.00Removing Old Structure OverWaterway With Minimal Debris(station) 01. 305+22

LS 0.00 0.001.000 167,000.00 0.00 0.00

204.0165 552.50Removing Guardrail LF 0.00 0.00221.000 2.50 0.00 0.00

204.0185 200.00Removing Masonry CY 0.00 0.004.000 50.00 0.00 0.00

205.0100 12,285.00Excavation Common CY 0.00 0.00945.000 13.00 0.00 0.00

205.0400 1,650.00Excavation Marsh CY 0.00 0.00110.000 15.00 0.00 0.00

206.1000 40,000.00Excavation for Structures Bridges(structure) 01. B-64-180

LS 0.00 0.001.000 40,000.00 0.00 0.00

206.5000 1.00Cofferdams (structure) 01. B-64-180 LS 0.00 0.001.000 1.00 0.00 0.00

208.0100 7,521.00Borrow CY 0.00 0.002,507.000 3.00 0.00 0.00

210.1500 7,280.00Backfill Structure Type A TON 0.00 0.00520.000 14.00 0.00 0.00

213.0100 500.00Finishing Roadway (project) 01.3840-01-72

EACH 0.00 0.001.000 500.00 0.00 0.00

305.0110 4,780.00Base Aggregate Dense 3/4-Inch TON 0.00 0.00239.000 20.00 0.00 0.00

305.0120 26,720.00Base Aggregate Dense 1 1/4-Inch TON 0.00 0.001,670.000 16.00 0.00 0.00

311.0110 9,100.00Breaker Run TON 0.00 0.00520.000 17.50 0.00 0.00

455.0605 2.36Tack Coat GAL 0.00 0.00236.000 0.01 0.00 0.00

460.2000 320.00Incentive Density HMA Pavement DOL 0.00 0.00320.000 1.00 0.00 0.00

460.5223 38,925.00HMA Pavement 3 LT 58-28 S TON 0.00 0.00300.000 129.75 0.00 0.00

All Bids Received

August 14, 2018

Page 49 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 51: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

460.5224 32,380.00HMA Pavement 4 LT 58-28 S TON 0.00 0.00200.000 161.90 0.00 0.00

502.0100 168,750.00Concrete Masonry Bridges CY 0.00 0.00225.000 750.00 0.00 0.00

502.3200 1,262.50Protective Surface Treatment SY 0.00 0.00505.000 2.50 0.00 0.00

503.0146 116,550.00Prestressed Girder Type I 45W-Inch LF 0.00 0.00666.000 175.00 0.00 0.00

505.0400 6,204.00Bar Steel Reinforcement HSStructures

LB 0.00 0.005,640.000 1.10 0.00 0.00

505.0600 33,325.00Bar Steel Reinforcement HS CoatedStructures

LB 0.00 0.0026,660.000 1.25 0.00 0.00

506.2605 1,680.00Bearing Pads Elastomeric Non-Laminated

EACH 0.00 0.0012.000 140.00 0.00 0.00

506.4000 5,500.00Steel Diaphragms (structure) 01. B-64-180

EACH 0.00 0.0010.000 550.00 0.00 0.00

513.4061 46,000.00Railing Tubular Type M 01. B-64-180

LF 0.00 0.00230.000 200.00 0.00 0.00

516.0500 1,300.00Rubberized MembraneWaterproofing

SY 0.00 0.0026.000 50.00 0.00 0.00

550.0500 2,750.00Pile Points EACH 0.00 0.0022.000 125.00 0.00 0.00

550.1100 46,750.00Piling Steel HP 10-Inch X 42 Lb LF 0.00 0.00935.000 50.00 0.00 0.00

606.0300 11,500.00Riprap Heavy CY 0.00 0.00115.000 100.00 0.00 0.00

612.0406 1,520.00Pipe Underdrain Wrapped 6-Inch LF 0.00 0.00190.000 8.00 0.00 0.00

614.2330 36,375.00MGS Guardrail 3 K LF 0.00 0.001,212.500 30.00 0.00 0.00

614.2500 12,292.80MGS Thrie Beam Transition LF 0.00 0.00157.600 78.00 0.00 0.00

614.2610 14,000.00MGS Guardrail Terminal EAT EACH 0.00 0.004.000 3,500.00 0.00 0.00

618.0100 2,500.00Maintenance And Repair of HaulRoads (project) 01. 3840-01-72

EACH 0.00 0.001.000 2,500.00 0.00 0.00

619.1000 100,000.00Mobilization EACH 0.00 0.001.000 100,000.00 0.00 0.00

625.0100 26,724.00Topsoil SY 0.00 0.006,681.000 4.00 0.00 0.00

627.0200 500.00Mulching SY 0.00 0.001,000.000 0.50 0.00 0.00

All Bids Received

August 14, 2018

Page 50 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 52: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

628.1104 600.00Erosion Bales EACH 0.00 0.0050.000 12.00 0.00 0.00

628.1504 3,125.00Silt Fence LF 0.00 0.001,250.000 2.50 0.00 0.00

628.1520 312.50Silt Fence Maintenance LF 0.00 0.001,250.000 0.25 0.00 0.00

628.1905 750.00Mobilizations Erosion Control EACH 0.00 0.003.000 250.00 0.00 0.00

628.1910 1,050.00Mobilizations Emergency ErosionControl

EACH 0.00 0.003.000 350.00 0.00 0.00

628.2027 28,935.00Erosion Mat Class II Type C SY 0.00 0.006,430.000 4.50 0.00 0.00

628.6005 8,360.00Turbidity Barriers SY 0.00 0.00220.000 38.00 0.00 0.00

628.7504 2,394.00Temporary Ditch Checks LF 0.00 0.00266.000 9.00 0.00 0.00

628.7570 1,187.50Rock Bags EACH 0.00 0.0095.000 12.50 0.00 0.00

629.0210 275.60Fertilizer Type B CWT 0.00 0.004.240 65.00 0.00 0.00

630.0120 390.00Seeding Mixture No. 20 LB 0.00 0.0052.000 7.50 0.00 0.00

630.0130 727.50Seeding Mixture No. 30 LB 0.00 0.0097.000 7.50 0.00 0.00

630.0200 644.00Seeding Temporary LB 0.00 0.00184.000 3.50 0.00 0.00

634.0616 150.00Posts Wood 4x6-Inch X 16-FT EACH 0.00 0.002.000 75.00 0.00 0.00

634.0812 460.00Posts Tubular Steel 2x2-Inch X 12-FT

EACH 0.00 0.004.000 115.00 0.00 0.00

634.0814 375.00Posts Tubular Steel 2x2-Inch X 14-FT

EACH 0.00 0.003.000 125.00 0.00 0.00

637.2210 319.00Signs Type II Reflective H SF 0.00 0.0020.000 15.95 0.00 0.00

637.2230 397.95Signs Type II Reflective F SF 0.00 0.0021.000 18.95 0.00 0.00

638.2102 75.00Moving Signs Type II EACH 0.00 0.001.000 75.00 0.00 0.00

638.2602 300.00Removing Signs Type II EACH 0.00 0.0012.000 25.00 0.00 0.00

638.3000 275.00Removing Small Sign Supports EACH 0.00 0.0011.000 25.00 0.00 0.00

642.5001 7,500.00Field Office Type B EACH 0.00 0.001.000 7,500.00 0.00 0.00

643.0300 596.70Traffic Control Drums DAY 0.00 0.001,530.000 0.39 0.00 0.00

All Bids Received

August 14, 2018

Page 51 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 53: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 6Bidder No. 4 Bidder No. 5

Bid Price Bid Price Bid PriceAmount Amount Amount

643.0420 2,383.74Traffic Control Barricades Type III DAY 0.00 0.002,907.000 0.82 0.00 0.00

643.0705 504.90Traffic Control Warning Lights TypeA

DAY 0.00 0.004,590.000 0.11 0.00 0.00

643.0900 7,631.64Traffic Control Signs DAY 0.00 0.0026,316.000 0.29 0.00 0.00

643.1050 700.00Traffic Control Signs PCMS DAY 0.00 0.0014.000 50.00 0.00 0.00

643.5000 2,937.04Traffic Control EACH 0.00 0.001.000 2,937.04 0.00 0.00

645.0111 720.00Geotextile Type DF Schedule A SY 0.00 0.00120.000 6.00 0.00 0.00

645.0120 2,587.50Geotextile Type HR SY 0.00 0.00345.000 7.50 0.00 0.00

645.0140 2,250.00Geotextile Type SAS SY 0.00 0.00450.000 5.00 0.00 0.00

645.0220 1,610.00Geogrid Type SR SY 0.00 0.00230.000 7.00 0.00 0.00

646.1020 4,523.76Marking Line Epoxy 4-Inch LF 0.00 0.002,472.000 1.83 0.00 0.00

646.9000 1,334.25Marking Removal Line 4-Inch LF 0.00 0.001,779.000 0.75 0.00 0.00

650.4500 206.80Construction Staking Subgrade LF 0.00 0.001,034.000 0.20 0.00 0.00

650.5000 1,034.00Construction Staking Base LF 0.00 0.001,034.000 1.00 0.00 0.00

650.6500 1,600.00Construction Staking StructureLayout (structure) 01. B-64-180

LS 0.00 0.001.000 1,600.00 0.00 0.00

650.9910 300.00Construction Staking SupplementalControl (project) 01. 3840-01-72

LS 0.00 0.001.000 300.00 0.00 0.00

650.9920 775.50Construction Staking Slope Stakes LF 0.00 0.001,034.000 0.75 0.00 0.00

690.0150 1,840.00Sawing Asphalt LF 0.00 0.001,600.000 1.15 0.00 0.00

715.0502 1,350.00Incentive Strength ConcreteStructures

DOL 0.00 0.001,350.000 1.00 0.00 0.00

SPV.0060 1,400.00Special 01. Utility Line Opening EACH 0.00 0.004.000 350.00 0.00 0.00

SPV.0105 850.00Special 01. Relocate and Adjust DryHydrant

LS 0.00 0.001.000 850.00 0.00 0.00

$0.00 $0.00$1,088,562.54Proposal Total:

All Bids Received

August 14, 2018

Page 52 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 54: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814005Proposal ID:005

State Project(s):

Cth Dd; Bridge Over Sugar Creek (B-64-180)

CTH DD

Walworth

CTH DD, Walworth

Location:3840-01-72

All Bids Received

August 14, 2018

Page 53 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 55: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814006Proposal ID:006

State Project(s):

Sauk City - Ih 39; Eagle View Court To Weynand Road

Sauk City - IH 39

Sauk

STH 78, Sauk County

Location:5630-06-62

Asphalt PavingType Of Work:

1 D L GASSER CONSTRUCTION 1000 Terrytown Road Baraboo, WI 53913Bidder No.

2 PAYNE AND DOLAN, INC N3 W23650 Badinger Rd. Waukesha, WI 53187-0781Bidder No.

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

204.0120 63,015.75Removing Asphaltic Surface Milling SY 225,056.25 0.00180,045.000 0.35 1.25 0.00

213.0100 500.00Finishing Roadway (project) 01.5630-06-62

EACH 1,500.00 0.001.000 500.00 1,500.00 0.00

305.0110 50,785.15Base Aggregate Dense 3/4-Inch TON 30,889.00 0.001,817.000 27.95 17.00 0.00

305.0500 12,360.00Shaping Shoulders STA 41,200.00 0.00824.000 15.00 50.00 0.00

450.4000 6,049.20HMA Cold Weather Paving TON 5,041.00 0.005,041.000 1.20 1.00 0.00

455.0605 32,542.23Tack Coat GAL 27,006.00 0.0013,503.000 2.41 2.00 0.00

465.0105 926,839.32Asphaltic Surface TON 1,358,588.00 0.0017,644.000 52.53 77.00 0.00

618.0100 100.00Maintenance And Repair of HaulRoads (project) 01. 5630-06-62

EACH 500.00 0.001.000 100.00 500.00 0.00

619.1000 21,000.00Mobilization EACH 10,000.00 0.001.000 21,000.00 10,000.00 0.00

624.0100 600.00Water MGAL

1,200.00 0.0012.000 50.00 100.00 0.00

642.5201 7,500.00Field Office Type C EACH 2,500.00 0.001.000 7,500.00 2,500.00 0.00

643.0300 900.00Traffic Control Drums DAY 141.00 0.00300.000 3.00 0.47 0.00

643.0900 1,260.00Traffic Control Signs DAY 1,108.80 0.002,520.000 0.50 0.44 0.00

643.1050 1,400.00Traffic Control Signs PCMS DAY 700.00 0.0014.000 100.00 50.00 0.00

643.5000 5,000.00Traffic Control EACH 2,000.00 0.001.000 5,000.00 2,000.00 0.00

646.1020 43,497.00Marking Line Epoxy 4-Inch LF 43,497.00 0.0086,994.000 0.50 0.50 0.00

646.3020 3,880.00Marking Line Epoxy 8-Inch LF 3,880.00 0.003,880.000 1.00 1.00 0.00

646.4520 65,971.80Marking Line Same Day Epoxy 4-Inch

LF 65,971.80 0.0069,444.000 0.95 0.95 0.00

649.0105 43,015.70Temporary Marking Line Paint 4-Inch

LF 5,294.24 0.0066,178.000 0.65 0.08 0.00

All Bids Received

August 14, 2018

Page 54 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation

Page 56: August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 … · 2018. 8. 14. · Proposal Status For Letting August 14, 2018 AWARDED: 08/17/2018 002 003 005 006 08/24/2018 001 004 WITHDRAWN:

Proposal Call: 20180814006Proposal ID:006

State Project(s):

Sauk City - Ih 39; Eagle View Court To Weynand Road

Sauk City - IH 39

Sauk

STH 78, Sauk County

Location:5630-06-62

Item DescriptionItem

Number UnitEstimatedQuantity

Bidder No. 3Bidder No. 1 Bidder No. 2

Bid Price Bid Price Bid PriceAmount Amount Amount

650.8000 7,216.00Construction Staking ResurfacingReference

LF 10,373.00 0.0045,100.000 0.16 0.23 0.00

690.0150 200.60Sawing Asphalt LF 680.00 0.0068.000 2.95 10.00 0.00

$1,837,126.09 $0.00$1,293,632.75Proposal Total:

All Bids Received

August 14, 2018

Page 55 of 55

08/24/2018 16:36:06Wisconsin Department of Transportation