1 BACKGROUND....................................................................................................................................................... 1 1.1 PARTNER SITES.................................................................................................................................................... 1 1.2 GEOGRAPHICAL AREAS ....................................................................................................................................... 2

1.2.1 Centre of Kafanchan (<2 km) ..................................................................................................................... 2 1.2.2 Kagoro Hills ............................................................................................................................................... 3 1.2.3 Radio Simulation from Kagoro Hills .......................................................................................................... 5

1.3 NETWORK REQUIREMENTS.................................................................................................................................. 5 2 NETWORK TOPOLOGY....................................................................................................................................... 6

2.1 ROUTABILITY NET13.......................................................................................................................................... 7 2.2 ROUTABILITY NET18.......................................................................................................................................... 7

3 NETWORK DESCRIPTION .................................................................................................................................. 8 3.1 NETWORK OPERATION CENTRE (NOC)............................................................................................................... 8 3.2 TOWER AND SERVICE AREA ................................................................................................................................ 9

3.2.1 City of Kafanchan (SECT1) ........................................................................................................................ 9 3.2.2 North Sites (SECT2)................................................................................................................................... 9 3.2.3 OMNI .......................................................................................................................................................... 9

3.3 KAGORO SITES (CS-KP PTP LINK) .................................................................................................................... 11 4 NETWORK MAP.................................................................................................................................................. 12 5 NETWORK BACKHAUL EXTENSION............................................................................................................. 13

5.1 SOUTH AND FAR WEST SITES (NET18-1) .......................................................................................................... 13 5.2 FAR NORTH SITES (NET18-2) ........................................................................................................................... 13

6 EQUIPMENT.......................................................................................................................................................... 14 7 NETWORK GROWTH ......................................................................................................................................... 14 8 SITE SUMMARY TABLE .................................................................................................................................... 16

Page 3: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

1

1 Background

1.1 Partner Sites For clarity in this proposal, each partner site has been assigned a 2-4 letters unique reference code. The area/zone section of the table gives and indication of the physical presence of the partners. Eight out of 18 sites are marked in column PRI as a priority for Fantsuam Foundation. An estimation of the number of users, the distance in km and the coordinates are also included. The following table digests the information gathered related to the partners sites. Code Area Zone PRI Short Description Type Users km Lat Long FF Fantsuam Foundation Fantsuam 0,00 9,584 8,306 OR City W Okosun Residence Residence 1,37 9,593 8,298

BSS City W Baptist Secondary School School 50 2,03 9,595 8,292

CoN City W College of Nursing Academic 50 1,14 9,59 8,298 SdS City W Shida da Shida Kiosk 1,38 9,589 8,295 JSC City W Jagindi Street Clinic Health 10 1,74 9,581 8,291 CoE Road E NE College of Education Academic 2,34 9,598 8,321 HSS Road E N Head Start School Academic 60 2,13 9,602 8,311 MH Train N N Madcity Hotel Hotel 9,13 9,663 8,319 CS

Train N N

Catholic Seminary Madakiya Academic 100 4,90 9,627 8,305

NWM Road X N New World Motel Hotel 1,16 9,594 8,304 GGSS C SW GGSS Takau Academic 1,45 9,575 8,297 KP Road E Kagoro Palace Palace 10 10,24 9,606 8,393 ECWA Road E ECWA Seminary Academic 50 9,49 9,607 8,386 DSS SW+ Daddu Secondary School Academic 22,30 9,552 8,113

GCoE S Gidanwaya College of Education Academic 15,68 9,48 8,396

KCP SW+ Kwoi Chiefs Palace Palace 10 36,97 9,456 8,008 ATP NE Agwa Tyap Palace Palace 29,25 9,819 8,409 YD NE YOTASSID Office 22,88 9,784 8,296

Table 1. Summary Partners

In summary, from the 18 potential partners studied:

• 9 partners are in the range of <2 km from the Fantsuam premises. • 1 partner is in the 5 km range. • 3 partners are in the 10 km range • and 5 partners are in the range >10 km

A full network topology and deployment plan is proposed in this document. The full topology (NET18) will enable the interconnection of all 18 sites to a central gateway and the Internet. In order to connect all 18 sites, two solar-powered repeaters need to be placed at the top of two identified hills. The inclusion of the repeaters requires a detailed field study. As a result, we have left those sites out of the scope of this initial proposal. This proposal focuses on the partner sites that do not require the use of auxiliary (standalone) repeaters. The network (NET13) is conformed by 13 sites located in the range of 2-10 km.

Page 4: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

2

1.2 Geographical Areas In order to better understand the proposed network topology, we start by giving the necessary information of the different areas where the partners are located

1.2.1 Centre of Kafanchan (<2 km) The centre of the city of Kafanchan is situated 1.5 km west of Fantsuam Foundation premises (where the VSAT gateway is situated).

Fig 1. Centre of Kafanchan and Fantsuam Foundation

The central area of Kafanchan is approximately 4 km2 (2x2 km) located between the river in the West (SW-NE) and the railway at the East (purple line). Two land communication infrastructures exist: (1) the road (SW Abuja - NE Jos) that crosses the city from West to East (2) the railway

Page 5: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

3

The railway crosses the city from South (Makurdi) to North (Kaduna) and also branches to the East towards Jos.

Fig 2. Kafanchan Area

1.2.2 Kagoro Hills Following the road 10 km to the East (direction Jos), we find the Kagoro Hills. The hills are situated 1100-1200 meters over the sea level and 350-550 meters higher than the central area of Kafanchan. An initial radio simulation analysis revealed that a repeater located at the top of the Kagaro Hill(s) can enable long distance backhaul links in the order of 30-40 km to the East. If the repeater is facing South, it can enable even longer links up to 40-50 km. An optimal position of a repeater is in the South West part of the Kagoro Hills. Such a repeater could provide service area to both (Far) South and East sites.

Page 6: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

4

Fig 3. Line of Sight from Kagoro Hills to DSS, KCP (East) and GCoE (South) For example, a repeater placed at the top of the Kagoro Hills will enable the connection of two of the remote East sites (DSS and KCP) and the southern site of GCoE (lower South Valley). In Figure 3, the yellow circles indicated the three sites GCoE, KCP and DSS (from left-to-right) that will be reachable by such a repeater (Rep1) in place. Unfortunately a repeater in the Kagoro Hills will require a separate viability study. A repeater in the hills needs to be powered by solar energy and physical security must be guaranteed.

Page 7: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

5

1.2.3 Radio Simulation from Kagoro Hills Figure 4 shows the results of a radio link simulation from the Kagoro Hills. The simulation shows a link between the repeater (Rep1) and the Kwoi Chief Palace (43 km distance).

Fig 4: Link Rep1 and Kwoi Chief Palace (KCP) (43 km)

1.3 Network Requirements

The following aspects have been taken into consideration in the proposal of the network topology/design.

• Minimize the number of hops to the central gateway to minimize delay and jitter for real time services. If possible, all nodes of the network should be in less than 2 hops-range from the gateway.

• Minimize the radio interference. Optimizing the radio channel allocation. If possible, use a maximum of three non-overlapping channels in every site.

• Minimize the number of nodes that are part of the routing infrastructure. Reduce the sites that need remote network management and power backup.

• Provide a stable and dedicated bandwidth to the backhaul nodes.

• Provide a stable backbone design that allows scalable growth. The investment should focus on long term planning and expec growth of the network.

• Careful radio planning and simulation of all links, especially those longer than 5 km. The topography of many areas do not guarantee easy line of sight. There is big difference in elevation data between sites.

The use of (dynamic) mesh topology in Kafanchan has been discarded. In this concrete scenario, a dynamic mesh topology does not provide extra benefits but

Page 8: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

6

adds extra complexity to the radio planning. The backbone/haul of the wireless network will be composed by a set of initial nodes with stable routes and guaranteed bandwidth.

2 Network Topology The simulation diagram below (Fig. 5) shows how all the 18 notes will be interconnected. Starting by a first phase that connects the 13 initial sites (NET13) and expanding the backhaul network to 5 more sites (NET18) that are connected with the help of two solar-powered repeaters (Rep1 and Rep2) . NET18 is the result of adding Rep1 (orange) in Kagoro Hills (NET18-1 , south-east extension) and Rep2 (white) 10 km North of Kagoro Hills (NET18-2, north extension) to NET13.

Fig 5: Network Topology (NET13 and NET18)

Page 9: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

7

2.1 Routability NET13 11 out of 13 partners sites will be one-hop away from the gateway.

1 hop to the gateway: CoN, OR, JSC, SdS, BSS, CoE, HSS, NWM, GGSS, MH, CS (11 partners)

2 hops to the gateway: KP (KP is connected via CS – 10 km)

3 hops to the gateway: ECWA (EWCA is connected via KP – 1 Km)

2.2 Routability NET18 All extended partners sites in NET18 will be two hops away from the gateway.

NET18 is the result of adding NET18a and NET18b networks to NET13 by means of two repeaters.

Repeater 1 Name: Rep1 Network: NET18-1 Place: Kagoro Hills (SW) Sites: GCoE (7 km), KCP (43 km), DSS (30 km) Repeater 2 Name: Rep 2 Network: NET18-2 Place: 10 km North of Kagoro Hills Sites: YD (16 km), ATP (18 km)

Page 10: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

8

3 Network Description The following section describes in detail the proposed backhaul network for the 13 partners’ sites in the 10 km vicinity (NET13).

3.1 Network Operation Centre (NOC) We propose starting by an initial star-topology from Fantsuam Foundation VSAT gateway. For that purpose, the central site needs to host a 150 ft (45 meter) central tower. The Network Operation Center of the Wireless ISP will also be responsible of running four common services:

1. Data: Mail and Web caching Local mail server able to work after long offline periods. Web Caching of frequent web requests

2. Voice: VoIP PBX Local Voice over IP exchange and Voice Mail.

3. Traffic: Bandwidth management Internal and External Bandwidth Management

4. Security: AAA (Authorisation, Authentication and Accounting) Access Control and Billing System

Fig 6: NOC Services

Page 11: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

9

3.2 Tower and Service Area The central tower will host a total of three wireless rugged outdoor units named:

1. SECT1 (Channel 1) 2. SECT2 (Channel 5) 3. OMNI (Channel 10)

Both SECT1 and SECT2 provide an horizontal area service of 70° using a vertically polarized panel antenna of 14 dBi gain. Placed carefully both antennas can jointly serve 180°. The third non-overlapping radio channel available in 2.4 Ghz is assigned to OMNI. The OMNI hosts an 6 dBi omnidirectional antenna with a service area of 360°.

3.2.1 City of Kafanchan (SECT1) SECT1 provides coverage to the city of Kafanchan (west). Five sites will be connected to SECT1 serving as the Kafanchan wireless backhaul infrastructure. Each of the sites will be a client of the network and a point of presence (POP) for the network expansion. Each of the sites will receive a guaranteed 1/3 T1 (8 channels of 64 Kbps) over the wireless media (Intranet). The suggested sites are: CoN, OR, JSC, SdS and BSS.

3.2.2 North Sites (SECT2) SECT2 provides coverage to the North and North East backhaul sites. Five sites will be connected to SECT2 serving as backhaul infrastructure to the North Area. Each of the sites will be a client of the network and a point of presence for the network expansion to the North. Each of the sites will receive a guaranteed 1/3 T1 (8 channels of 64 Kbps) over the wireless media (Intranet). The suggested sites are: CoE, HSS, NWM, MH and CS. One of the sites in this sub network will serve as a intermediary (routing) node for the East sites in Kagoro.

3.2.3 OMNI OMNI provides coverage to the sites that can not connect via any Point of Presence (POP) in SECT 1 and SECT2. Initially one site is expected in this service area: GGSS

Page 12: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

10

Fig 7: Central tower service sectors (< 2 km)

Fig 8: Central Tower Equipment (FF)

Page 13: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

11

3.3 Kagoro Sites (CS-KP PtP link) The radio simulations show that a connection from the central tower to the 10 km east sites (EWCA and KP) in the Kagoro area, might not be possible due to the presence of a a set of hills and slopes.

An alternative connection via the CS site has been simulated. The KP site will connect to CS via a point-to-point dedicated link (10 km). Two 21dBi parabolic antennas horizontally polarised will be used for that purpose.

By connecting KP via CS, the KP site will become a new POP of the wireless network. Partners in the proximity, as ECWA (1 Km), can be connected to KP using conventional equipment.

Fig 9. NET13 (orange=PtP, CS-KP)

Page 14: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

12

4 Network Map

The layout of NET13 looks like following:

Fig 10: Network Topology (NET13)

NET13 is composed of 13 radio links using a total of 17 radios.

Page 15: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

13

5 Network Backhaul Extension NET18 is a backhaul extension of the proposed NET13 Network Topology. The network extension will require two solar-power repeaters to connect the “South and Far East Sites” and the “Far North Sites”. Due to the need of a viability study, this proposal has not budgeted for this extension but details about the proposed network topology is included here for future reference.

5.1 South and Far West sites (NET18-1) The simulation (Fig. 11) shows that three of the proposed sites DSS and KCP in the West and GcoE in the South will require a repeater at the top of Kagoro Hills (Rep1).

5.2 Far North Sites (NET18-2) Similarly, a second repeater (Rep2) needs to be placed in the north hills of Kagoro to connect the YD and ATP sites. Both repeaters require dedicated field studies.

Fig 11: Network Topology (NET18-1 and NET18-2 backhaul extension)

Page 16: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

14

6 Equipment SECT1 and SECT2 are served by two Proxim Tsunami MP11 24111 outdoor units (BSU). The units support a proprietary polling technique known as Advanced Wireless Outdoor Routing Protocol (WORP) that uses all the features existing in IEEE 802.11 plus a set of add ons to enable link level QoS. Although the technology does not interoperate with other vendors, it is the most cost-effective way to build a wireless backhaul infrastructure for a wireless ISP (WISP) if Quality of Service is required in the radio channel. Each of the clients connected to SECT1 and SECT2 uses an indoor Tsunami MP11 residential subscriber unit (RSU). A cabinet in each of the clients sites needs to be procured to protect the indoor equipment. The dedicated point-to-point link equipment between CS and KP in the East (Kagoro) does not require support for “dynamic polling”. This link can be implemented by means of conventional outdoor wireless equipment as the Complex Outdoor Unit WPP54G or similar.

7 Network Growth Three basic mechanisms are planned to expand this network:

1. Adding a new backhaul client to any of the two sectors SECT1 and SECT2 (with QoS).

2. Adding new clients to OMNI by means of standard IEEE 802.11 outdoor clients (no QoS)

3. Connect any new client to any of the existing POP's using wired infrastructure or conventional IEEE 802.11 gear. The later requires an extra access point in each of the POP. In this scenario, the POP acts as:

• A backhaul client of the common wireless infrastructure • A server (access point) for other IEEE 802.11-equipped nodes.

With the current design, we expect to be able to support:

• A maximum of 10 (polling) wireless clients per sector (ref: 128 kbps/site).

• A maximum of four (conventional) wireless clients per POP connected via conventional outdoor access points (ref: 32 Kbps/site).

1 Tsumani MP11 Technical Spec. http://www.proxim.com/products/bwa/multipoint/mp11/mp11a/MP11_techspec_TS2-1005.pdf

Page 17: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

15

Fig 12. Potential future service areas

Page 18: APPENDIX I PROPOSAL: WIRELESS TOPOLOGY and NETWORK

16

8 Site Summary Table This table summarizes all partner sites data and the proposed wireless network topology.

Table 2. Site Summary

P O P

C O D E

A R E A

Z O N E

R A D I O

N O T E S

P R I

Short Description

T Y P E

U S E R S

D I S T

[km]

L A T

L O N G

A N G L E

FF Fantsuam Foundation Fantsuam 0,00 9,584 8,306

1 OR City W SECT1 Okosun Residence. Residence 1,37 9,593 8,298 132

2 BSS City W SECT1

Baptist Secondary School School 50 2,03 9,595 8,292 142

3 CoN

City W SECT1 College of Nursing Academic 50 1,14 9,59 8,298 143

4 SdS City W SECT1 Shida da Shida Kiosk 1,38 9,589 8,295 156

5 JSC

City W SECT1 Jagindi Street Clinic. Health 10 1,74 9,581 8,291 191

6 CoE Road E NE SECT2 College of Education. Academic 2,34 9,598 8,321 43

7 HSS

Road E N

SECT2 Head Start School Academic 60 2,13 9,602 8,311 74

8 MH Train N N SECT2 Madcity Hotel Hotel 9,13 9,663 8,319 81

9

CS

Train N

N

SECT2 Kagoro PtP1

Catholic Seminary, Madakiya Academic

100 4,90 9,627 8,305 91

10 NWM Road X N SECT2 New World Motel Hotel 1,16 9,594 8,304 101

11 GGSS C SW OMNI GGSS Takau. Academic 1,45 9,575 8,297 225

12 KP Road E PtP1 OMNI2 Kagoro Palace. Palace 10 10,24 9,606 8,393 14

13 ECWA Road E PtP2 ECWA Seminary Academic 50 9,49 9,607 8,386 16

14 DSS SW+ REP1 NET18-1

Daddu Secondary School. Academic 22,30 9,552 8,113 189

15 GCoE S REP1 NET18-1

Gidanwaya College of Education. Academic 15,68 9,48 8,396 49

16 KCP SW+ REP1 NET18-1 Kwoi Chiefs Palace. Palace 10 36,97 9,456 8,008 203

17 ATP NE REP2 NET18-2 Agwa Tyap Palace. Palace 29,25 9,819 8,409 66

18 YD NE REP2 NET18-2 YOTASSID Office 22,88 9,784 8,296 93


Recommended