Transcript

Analisa Harga satuan Material1. Surface Course Data mix design Kadar Aspal Optimum (KAO) = 5,685 % Berat jenis aspal Agregat yang digunakan : Fraksi Fraksi Sand Dust Berat jenis efektif agregat = 10 % = 36 % = 10 % = 44 % = 2,682 = 1,026

Berat jenis campuran (max teoritis) =a r a kti a r as a as a a

== 2,4567

2. Lapis permukaan (laston) per meter panjang jalan Volume total lapisan permukaan = 2,540 m3 Berat total lapisan permukaan = 2,540 x 2,4567 = 6,240 Ton 3. Berat aspal = KAO x Berat total lapisan permukaan = 5,685% x 6,240 = 0,3547 Ton = 354,7 Kg

1. Volume aspal =

== 0, 3457 m3 2. Berat agregat = (100 KAO) x berat total = (100 5,685)% x 6,240 = 5,8857 Ton 3. Berat fraksi agregat = % fraksi campuran x berat agregat a r at = 10 % x 5,8857 = 0,5886 a r at = 36 % x 5,8857 = 2,1189 % sand % dust = 10 % x 5,8857 = 0.5886 = 44 % x 5,8857 = 2,5897

4. Volume fraksi agregat A r at = = = 0,2195 m3 A r at = = = 0,7900 m3 Sand = = = 0,2195 m3 Dust = = = 0,9656 m3

Peralatan1. Alat berat yang digunakan Asphalt Mixing Plant (AMP) Dump Truck Asphalt Finisher Pneumatic Tyre Roller Loader Tandem Roller Asphalt Sprayer

2. Perhitungan kapasitas alat a. Digunakan AMP tipe Batching Plant dengan kapasitas 5500 Kg Tiap batch dengan kapasitas teoritis = 40 ton/jam Efisiensi = 0,75 QAMP = 0,75 x 40 = 30 ton/jam Digunakan : 30 / 30 = 1 unit b. Loader QL = Dimana : QL = Kapasitas Loader, (m3/jam) q E = Kapasitas bucket, (2,3 m3) = Efisiensi (0,75)

Ws = Waktu Siklus Ws = Dimana : D F Z Ws = = (25/50) x 2 + 0,35 = 1,35 menit QL = x 1,7 = Jarak material dengan could bin = 25 m = Kecepatan maju, (50 m/menit) = Waktu Tetap = 0,35 menit

= 76,67 m3/jam x 1,7 = 130,34 ton/jam Digunakan : = = , unit

c. Dump truck Q= Dimana : q E Cwh = Kapasitas Dump truck (10 ton) = Efisiensi = Waktu siklus

Cwh = Dimana : D F F t1 t2

+

+ t1 +

+ t2

= Jarak Amp Sile = Kecepatan berangkat, (50 Km/jam) = Kecepatan pulang, (400 Km/jam) = waktu buang = waktu mengatur posisi

Cwh =

+

+ 10 +

+5

= 72 menit Q = = = 6,25 m3/jam Digunakan :

d. Asphalt Finisher Digunakan Negata NF 38.V.T Lebar Paving = 2,55 3,8 m (dipakai 3,5 m (B)) Kecepatan Rolling (v) = 3 m/menit Tebal pengaspalan = 16,5 cm Efisiensi (E) = 0,70 Q = B . V . t . Bd . E = 3,5 . 180 . 0,165 . 2,55 . 0,7 = 56,2275 ton/jam Digunakan : = = , unit

e. Tandem Roller Q= Dimana : Q V H N = Produksi alat per jam = Kecepatan operasi, (Km/jam) = Tebal pemadatan (16,5 cm) = Jumlah lintasan

W = Lebar pemadatan efektif (1,20 m)

Q= = 8,84 m3 x 2,25 = 19,89 m3 Digunakan : = = , unit

f. Pneumatic Tyre Roller Digunakan untuk intermediate rolling 10 passing = 12 lintasan (N) Lebar efektif = 1,8 m Kecepatan Rolling (v) = 5 Km/jam Tebal pengaspalan = 16,5 cm Efisiensi (E) = 0,80 Q = = 30 m3 x 2,25 = 67,5 ton/jam Digunakan : = = , unit

g. Asphalt Sprayer Q = Dimana : Q V Is E Q = = 320 liter/jam x 2,25 = 720 km/jam Digunakan : = = , unit = Produksi alat per jam = Volume Tangki, (800 liter) = Waktu siklus termasuk pemanasan = 2 jam = Efisiensi = 0,8

Wc = Kebutuhan asphalt 39574 liter

3. Alat yang Digunakan dan Kapasitas Produksi 1 unit AMP 1 unit loader 5 unit Dump truck 1 unit asphalt finisher 2 unit tandem roller 2 unit pneumatic tyre roller 2 unit asphalt sprayer kapasitas 30 ton/jam kapasitas 130,34 ton/jam kapasitas 6,25 x 5 = 31,25 ton/jam kapasitas 56,2275 ton/jam kapasitas 19,89 ton/jam kapasitas 67,5 x 2 = 135 ton/jam kapasitas 72 x 2 = 144 ton/jam

4. Koefisien Alat AMP 1/30 = 0,03333 Loader 1/130,34 = 0,00767 Dump truck 1/31,25 = 0,03200 Asphalt finisher 1/56,2275 = 0,01778 Tandem roller 1/19,89 = 0,05028 Pneumatic tyre roller 1/135 = 0,00741 Asphalt sprayer 1/144 = 0,00695

Tenaga1. Perhitungan Jumlah Tenaga Kerja Mandor : 2 orang (1 orang di AMP dan 1 orang dilapangan) Pekerja : 12 orang (4 orang di AMP dan 8 orang dilapangan) Waktu kerja per hari Produksi per hari Koefisien mandor Koefisien pekerja = 8 jam = 7 x 30 ton = 210 ton/hari = = = 0,11667 = 0,4

2. Koefisien Upah -