9
CONSTRUCTION OF THE TAILINGS STORAGE FACILITY 10 Dec 12 DSCN0369 Two days after 60 mm rain. 10 Dec 12 DSCN0368 KP Weekly Report No 81, 15 December 2012 1

WR81 Constr Photos

Embed Size (px)

Citation preview

Page 1: WR81 Constr Photos

CONSTRUCTION OF THE TAILINGS STORAGE FACILITY

10 Dec 12 DSCN0369Two days after 60 mm rain.

10 Dec 12 DSCN0368High water level on sand stockpile after 60 mm rain event.

KP Weekly Report No 81, 15 December 2012 1

Page 2: WR81 Constr Photos

CONSTRUCTION OF THE TAILINGS STORAGE FACILITY

11 Dec 12 DSCN0371Still draining area three days after 60 mm rain.

11 Dec 12 DSCN0372Dewatering and cleaning out trench for LCRS outfall pipe for 3rd time.

KP Weekly Report No 81, 15 December 2012 2

Page 3: WR81 Constr Photos

CONSTRUCTION OF THE TAILINGS STORAGE FACILITY

12 Dec 12 DSCN0375Section of LCRS pipe installation completed 11th Dec.

13 Dec 12 DSC01405Basin works eastern side.

KP Weekly Report No 81, 15 December 2012 3

Page 4: WR81 Constr Photos

CONSTRUCTION OF THE TAILINGS STORAGE FACILITY

13 Dec 12 DSC01406Installing LCRS outfall pipes through Divider Embankment.

13 Dec 12 DSC01410Temporary decant and causeway construction.

KP Weekly Report No 81, 15 December 2012 4

Page 5: WR81 Constr Photos

CONSTRUCTION OF THE TAILINGS STORAGE FACILITY

14 Dec 12 DSCN0385Placing fill over LCRS outfall pipes.

14 Dec 12 DSCN0387LCRS construction.

KP Weekly Report No 81, 15 December 2012 5

Page 6: WR81 Constr Photos

CONSTRUCTION OF THE TAILINGS STORAGE FACILITY

14 Dec 12 DSC01427Branch drain construction.

CONSTRUCTION OF WSD PIEZOMETER ACCESS

14 Dec 12 DSC01429Constructing access stairs and handrails to WSD embankmentpiezometers.

KP Weekly Report No 81, 15 December 2012 6