9
EIE EffCoBuild WP6 Implementation of WP6 Implementation of pilot/demonstration pilot/demonstration projects projects Introduction Introduction WP leader BCEI ZRMK Marjana Šijanec Zavrl Building and Civil Engineering Institute ZRMK Meeting in Sala, February 22-23, 2007

WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

Embed Size (px)

Citation preview

Page 1: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EIE EffCoBuild

WP6 Implementation of WP6 Implementation of pilot/demonstration projectspilot/demonstration projects

IntroductionIntroduction

WP leader BCEI ZRMK

Marjana Šijanec ZavrlBuilding and Civil Engineering Institute ZRMK

Meeting in Sala, February 22-23, 2007

Page 2: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EffCoBuild

WP6 Implementation of pilot/demonstration projects

WP 2: Analyses of framework in the pilot community

WP 3: Energy saving potentials in building sector and virtual “power saving plant”

WP 1: projec

t manageme

nt

WP 4: Development of a concept for measures towards enhancing the energy saving in buildings

WP 5: Compilation of “10 best of” examples for a brochure

WP 6: Implementation of pilot/demonstration projects

Brochure with 10 examples for each country

Initiated pilotproject in each pilot community

Saving potential in GWh/a for each community

Concept of measures/actions for pilot community

Analyses of the status quo;Suggestions for improvement

WP 7: dissemination of result

s

Work packages Output

Page 3: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EffCoBuild

WP6 Tasks – national workshops

In national workshops in each community, the project partner selects, together with the stakeholders, one measure, instrument or action contained in the concept (worked out in work package 4), which is considered as most prior and should be implemented first.

Considering the experience from the “best of” examples from other communities, the criteria for the selection of the pilot project will be:

- innovative approach: the measure should be new in the community

- the measure should be clearly perceived by the citizens and media

- the measure should overcome existing barriers for energy efficiency measures at buildings in the community

- the measure should be applicable for many other communities in the country and in the EU (multiplication)

Page 4: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EffCoBuild

WP6 Tasks – joint transnational workshop & adopted pilot project

In a joint transnational workshop, all country partners present their planned pilot projects to the other communities.

Every community will receive feedback and will thus profit from the experience of the other countries in similar actions.

The feedback will be adopted in the pilot projects, and the results of each pilot project will be documented in a report, which will be published at the project homepage.

Page 5: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EffCoBuild

Page 6: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EffCoBuild

WP6 - Outcome

- Organising national workshops with the stakeholders to determine and draft the pilot project in the pilot communities

- Organising the transnational workshop

- Adoption of the pilot projects regarding the feedback from the workshop

- Implementation of the pilot projects

Page 7: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EffCoBuild

WP6 – Timetable & Deliverables

Project phase / Duration of the project (in months) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Work package 1: Project management Work package 2: analyses framework Work package 3: saving potentials Work package 4: concept measures Work package 5: brochure 10 best of Work package 6: pilot/demonstration project Work package 7: Dissemination Work package 8: Common Dissemination Activities

Project meetings X X X X Project deliverables* P

R P

R IR

Project phase / Duration of the project (in months) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Work package 1: Project management Work package 2: analyses framework Work package 3: saving potentials Work package 4: concept measures Work package 5: brochure 10 best of Work package 6: pilot/demonstration project Work package 7: Dissemination Work package 8: Common Dissemination Activities

Project meetings X X Project deliverables* P

R P

R F

R

x

x xx

IRIRDeliverable(s) of WP6- D20 4 national workshops to evaluate final concept for measures and selection of pilot project- D23 draft plan for the pilot projects 10 pages per country- D24 transnational workshop in Jesenice 23-24 October 2007- D25 report on transnational workshop 15 pages - 3 introduction ZRMK and 3 p from each partner about pilot project- D26 final plan for the implementation of pilot projects 20 pages per country-D28 4 pilot pilot project implemented just report

-Move project meeting from 7 2007 to 10 2007 and from 10 2007 to 3 2007-Jesnice meeting 23-24 October 2007

D20 D23D24

D25D26

D28

Jan

2007

July

2007

Jan

2008

PRPRPRPRPRPR

Page 8: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

EffCoBuild

Performance indicators

Work package 6

Performance indicator Quantification

Implementation of a pilot/demonstration project

Workshop national: with at least 20 stakeholders of the community, at least one representative from the local administration entities, regional or national administration entities, building (refurbishing) companies, architects, financing institutes, building owners.

Workshop transnational: participation of all country lead partners. Detailed presentation of each planned pilot project

The pilot project must fulfil the following criteria:

Its effect must address a significant part of the community buildings

More than 50% of the citizens will be informed by the pilot measure/action and the results

Web site, lectures, leaflet encl. to energy bill, article, posters …

Page 9: WP6 Implementation of pilot/demonstration projects Introduction EIE EffCoBuild WP6 Implementation of pilot/demonstration projects Introduction WP leader

Thank you for your attention!Thank you for your attention!