Workshop on IEC 61850 - 8 GOOSE Messages
Workshop on IEC 61850 - 8
GOOSE Messages
Author : Eng. Andrej Sepcic
Location: South Africa
Trainer : Andrej Sepcic
Workshop on IEC 61850 - 8 GOOSE Messages
- In order to have better connectivity in SS
1. Device to the Device communication2. Device to Client communication3. Finding the data successfully
Reasons why IEC 61850 got introduced
Now different types of IED and IED’s from different Producers can talk to each other
Workshop on IEC 61850 - 8 GOOSE Messages
- Now all the major producers “speak the same language”ABB, Areva, SEL, GE, Siemens, Schneider and many more
- Speed Quicker than Cu connections
- Protocol with sub protocols (7)
- Evolved in time meeting the needs of new devices (flexible)
Other facts about IEC 61850
Workshop on IEC 61850 - 8 GOOSE Messages
- MMS Manufacturing Messaging SpecificationFor client to device communication ( slower )
- GOOSE – Generic Object Oriented Substation EventFor client to device communication ( super fast )
- We perceive that IED have IEC 61850 Servers and Clients in them (definition)
Other facts about IEC 61850
Workshop on IEC 61850 - 8 GOOSE Messages
• A physical device
IED – Intelligent Electronic Device - A Protective Relay
Workshop on IEC 61850 - 8 GOOSE Messages
- Number varies greatly between producersSEL has a number of LN close to 5GE even less ( before 1 )SIMENES has many
- Source of the confusion on how to get the data and where to get it
Logical Nodes
Workshop on IEC 61850 - 8 GOOSE Messages
- Groupings of data within that Logical Node ( what this data can do )
- MX - Measurement Data ( Voltage, Current, frequency…)- ST - Status Data (Health, Behavior, Position…)- CO - Control Data ( Switch ON/OFF… )- DC - Descriptions ( A, V, Hz, VA, W…)
- Under FC there are Data Objects (DO)
Functional Constraints = FC
Workshop on IEC 61850 - 8 GOOSE Messages
- And the Data class here are called Data Attributes
Data objects – are finally the classed that contain data
Workshop on IEC 61850 - 8 GOOSE Messages
How to use all this knowledge to test Relays ?
• Europrot – Protecta Multifunctional relay
Workshop on IEC 61850 - 8 GOOSE Messages
DRTS 64 – with IEC 61850 – 8 accessory
How to use all this knowledge to test Relays ?
Workshop on IEC 61850 - 8 GOOSE Messages
How to use all this knowledge to test Relays ?
• This is the configuration in which we are going to test Relay
Workshop on IEC 61850 - 8 GOOSE Messages
How to use all this knowledge to test Relays ?
We are going to use Distance application in TDMS
Workshop on IEC 61850 - 8 GOOSE Messages
We have imported the RIO file
And this is how we are going to connect the DRTS and the Relay
Workshop on IEC 61850 - 8 GOOSE Messages
There are two ways how to stop the generation
Using real contacts c1 – C12 or using virtual contacts
Workshop on IEC 61850 - 8 GOOSE Messages
Choosing “Explore Now” and pressing Start Exploring the SW will start sniffing the traffic on the Substation Bus
The GOOSE messages will appear here
Workshop on IEC 61850 - 8 GOOSE Messages
We tested Distance Protection using binary contacts to stop generation and we can see good results
Workshop on IEC 61850 - 8 GOOSE Messages
If we desire to use GOOSE message as a signal to stop the generation, we will first need to set a virtual contact
Workshop on IEC 61850 - 8 GOOSE Messages
As we assigned a certain GOOSE message to be a Virtual Contact, we can observe all the assigned Virtual Contact in the appropriate Tab
We also need to add “X” at “OR” column, to make the VC stopping valid
Workshop on IEC 61850 - 8 GOOSE Messages
Then we should choose “Use virtual Contacts to STOP the test” in Exploring Options
We also need to Tick the “Ignore binary inputs C1- C12 to stop the test”
Workshop on IEC 61850 - 8 GOOSE Messages
After that we START the test – in this case we used “Click and Test” option
Workshop on IEC 61850 - 8 GOOSE Messages
As the GOOSE message becomes “True”, the DRTS 66 intercepts that message and STOPS the counter. The measured time can be seen here
Workshop on IEC 61850 - 8 GOOSE Messages
In the result table you can see the same result and also the fact that the Virtual Contact ( VC ) was the one stopping the DRTS generation
Once all the zones are tested you will get a Result Table as this one
Workshop on IEC 61850 - 8 GOOSE Messages
The SW also gives you the option to do Publishing of intercepted GOOSE Messages
The first step is to choose the message that you need to Publish
Workshop on IEC 61850 - 8 GOOSE Messages
Once the message is chosen, it will appear in the “Goose Publishing” Tab
Here you can Start and Stop the publishing of the chosen messages
Workshop on Distribution Relay Testing & Smart Grid
During Publishing the screen will look like this
Publishing is often used to verify the behavior of the other IED in the same network
Workshop on Distribution Relay Testing & Smart Grid
Software also enables us to Open Substation file ( *.SLD or *.ICD ) and see the GOOSE signals assigned in all the IED’s