12
Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4 th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459 March 2, 2020 NOTICE TO ALL CONTRACTORS: Proposal #11: 1360-00-76 West Fond Du Lac Avenue 6 Highway Intersections STH 145 Milwaukee County 2595-03-73, WISC 2020073 N 60 th Street West Capitol Drive to W Hampton Ave Local Street Milwaukee County Letting of March 10, 2020 This is Addendum No. 02, which provides for the following: Special Provisions: Revised Special Provisions Article No. Description 4 Traffic Plan Sheets: Revised Plan Sheets Plan Sheet Plan Sheet Title (brief description of changes to sheet) 242 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 244 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 246 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 248 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 250 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 252 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 254 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 256 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 258 DELETE INCORRECT GRADE 82.17 AT STATION 58+25 ON T/L LINE 258 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 260 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor. Sincerely, Mike Coleman Proposal Development Specialist Proposal Management Section

Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation

Wisconsin Department of Transportation

Version 02-2017 Solving tomorrow’s transportation challenges

Division of Transportation Systems Development Bureau of Project Development 4822 Madison Yards Way, 4th Floor South Madison, WI 53705 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459

March 2, 2020

NOTICE TO ALL CONTRACTORS: Proposal #11: 1360-00-76

West Fond Du Lac Avenue 6 Highway Intersections STH 145 Milwaukee County

2595-03-73, WISC 2020073 N 60th Street West Capitol Drive to W Hampton Ave Local Street Milwaukee County

Letting of March 10, 2020 This is Addendum No. 02, which provides for the following: Special Provisions:

Revised Special Provisions Article

No. Description

4 Traffic Plan Sheets:

Revised Plan Sheets Plan

Sheet Plan Sheet Title (brief description of changes to sheet)

242 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 244 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 246 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 248 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 250 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 252 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 254 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 256 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 258 DELETE INCORRECT GRADE 82.17 AT STATION 58+25 ON T/L LINE 258 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T 260 Legend Revision: 8-1/2 INCH REINF. CONC PAV'T to 8.5 - INCH DOWELED CONC PAV'T

The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.

Sincerely,

Mike Coleman Proposal Development Specialist Proposal Management Section

Page 2: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation

ADDENDUM NO. 02

1360-00-76 & 2595-03-73

March 2, 2020

Special Provisions 4. Traffic Replace paragraph two with the following:

The City of Milwaukee will provide all posting of parking restrictions to facilitate construction operations. Contact Mr. Cameron Potter, (414) 286-3276, at least three working days prior to the start of construction operations.

Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised: 242, 244, 246, 248, 250, 252, 254, 256, 258, 260

END OF ADDENDUM

Page 3: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 242 March 2, 2020
Page 4: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 244 March 2, 2020
Page 5: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 246 March 2, 2020
Page 6: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 248 March 2, 2020
Page 7: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 250 March 2, 2020
Page 8: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 252 March 2, 2020
Page 9: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 254 March 2, 2020
Page 10: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 256 March 2, 2020
Page 11: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 258 March 2, 2020
Page 12: Wisconsin Department of TransportationMar 10, 2020  · Wisconsin Department of Transportation Version 02-2017 Solving tomorrow’s transportation challenges Division of Transportation
dotmpc
Text Box
Addendum No. 02 ID 2595-03-73 Revised Sheet 260 March 2, 2020