Deployment GTTI Cagliari 3 Airspan BS will be on a 17 storey buildings which is built on a 150m hill.
Citation preview
NETWORK RESEARCH LAB
WIMAX STATUS @ UCLA
Giovanni PauUCLA
NETWORK RESEARCH LAB
GTTI Cagliari 2
Status• Connection to Mesoscale Infrastructure
• Openflow switches are purchased and delivered• Backbone side Open Switch is Installed but yet to be confirgured• BTS side there is a missing 20-25meters of fiber that need to be run cross floors, work
order has been submitted on-hold for Facility Management to Proceed.
• Installation of the Airspan BST• Location selected (Top o Spraul Hall)• Pole Installed• On Hold for
• Power Supply • Network (we may go wireless on that)
• FCC Related• Renewed Experimental License• Coordination with Clear Started
NETWORK RESEARCH LAB
GTTI Cagliari 3
Deployment
Airspan BS will be on a 17 storey buildings which is built on a 150m hill.
NETWORK RESEARCH LAB
GTTI Cagliari 4
Envisioned Timeline• Connection to Mesoscale Infrastrucutre
• 3-4 weeks depending on the Facility management• Preliminary setup of the VLAN (backbone side) could start in about 1.5
weeks.
• Airspan Installation• About 4 additional Weeks
• 2 Weeks to Power• 2 Weeks for Installation
• Delays may come if Facility des not bring Power. • Experiments
• Planning multiple-path network-coded tcp experiments with MIT• Once Connected to ION we will be able to run Nation Wide experiments.