23
WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop 15-16 OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA 02128 Sponsored by Airvana Wireless SID: FEMTOCELL Wireless SID: FEMTOCELL

WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop 15-16 OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA 02128 Sponsored

Embed Size (px)

Citation preview

WELCOMETSG-S Hosted

3GPP2 Femto Cell Workshop15-16 OCTOBER 2007

Hyatt Harborside Boston101 Harborside Drive,

Boston, Massachusetts, USA 02128

Sponsored by Airvana

Wireless SID: FEMTOCELLWireless SID: FEMTOCELL

15 October 2007 DRAFT

2

Online Access to Registration and Contributions

Workshop website: Workshop website: www.3gpp2.org/FEMTOClick “Meeting Electronic Sign In”Click “Meeting Electronic Sign In”

15 October 2007 DRAFT

3

Online Registration (1)

Enter username/Password: femto/femto

15 October 2007 DRAFT

4

Online Registration (2)

Enter e-mail addressClick “Submit Form”

15 October 2007 DRAFT

5

Online Registration (3)

Enter registration data and answer hotel questionsClick “Update/Accept”

15 October 2007 DRAFT

6

Online Registration (4)

Click “Back to FEMTO Home Page”

15 October 2007 DRAFT

7

Download Contributions (1)

Click “Meeting Contributions”

15 October 2007 DRAFT

8

Download Contributions (2)

15 October 2007 DRAFT

9

Introductions

• Workshop Planning TeamTSG-S Chair – Nick Yamasaki (KDDI) nr-

[email protected]

TSG-S WG1 Chair – Alex Gogic (Qualcomm) [email protected]

Airvana Coordinator – Doug Knisely (Airvana)[email protected]

Workshop Coordinator – Clif Barber (KDDI) [email protected]

• Additional Planning Support– TSG-A Chair Wasuke Sato (KDDI)

– TSG-C Chair Dennis Gentzler (Alltel)

– TSG-X Chair Betsy Covell (Alcatel-Lucent)

15 October 2007 DRAFT

10

Agenda Overview

S00-FEMTO-20071015-001 3GPP2 Femto Cell Workshop Agenda

ITEM AGENDA # TIME SLOT NOTE DAYWelcome 8:00-8:15 AM

1Overview/Tutorial on Femto Cell Technology and High Level Architecture

6 8:15 AM-12:30 PM with one 30 min break

12:30-1:30 PM LUNCH

2 High Level Requirements 2 1:30-3:10 PM with one 30 min break

3 Radio Interface Issues with Femto Cells 8 3:10-6:45 PM8:00 AM-12:05 PM

12:05-1:15 PM LUNCH

1:15-2:00 PM

5 Femto Cell Standardization Work Plan 2 2:00-3:15 PM with one 30 min break

6 Summary of Workshop Outputs 3:15-5:00 PMAdjourn 5:00 PM

MONDAY

4Discussion of Architecture Decision Points

4

TUESDAY

15 October 2007 DRAFT

11

Note to Presenters

• In order to get through on time on Tuesday, time limitations will be strictly enforced.– For presentations longer than xx minutes, I will

provide a 10 minute warning.– For all presentations, I will provide a 5 minutes

warning.

• Please be prepared to start your presentation ON TIME. The clock starts running as soon as the previous presentation is complete.

15 October 2007 DRAFT

12

Agenda 1: Overview/Tutorial on Femto Cell Technology and High Level Architecture

Monday 8:15 AM-12:30 PMMonday 8:15 AM-12:30 PMModerator: Clif BarberModerator: Clif Barber

009 Overview of Femto Cells SAMSUNG 15

8:15-8:30

016 Tutorial on Femto Cell Technology and SIP/IMS-based Femto Network Architectures

AIRVANA 90

8:30-10:00

BREAK 30

10:00-1030

014 Huawei’s view on Femto HUAWEI 20

10:30-10:50

023 Network Architecture - Alternatives and Tradeoffs for 3GPP2 Femto Cells

QUALCOMM 30

10:50-11:20

002 SIP Based Architecture for Integration of 1xRTT Femto Cells TATARA SYSTEMS

30

11:20-11:50

005 Standard Interfaces for Femtocell ALCATEL-LUCENT

15

11:50-12:05

DISCUSSION 25

12:05-12:30

15 October 2007 DRAFT

13

Agenda 2: High Level Requirements

Monday 1:30-3:10 PMMonday 1:30-3:10 PMModerator: Alex GogicModerator: Alex Gogic

003 Status of 3GPP2 Femto Cell Requirements Work

3GPP2 TSG-S 20

1:30-1:50

004 Femto Cell Service Requirements and Issues

KDDI 20

1:50-2:10

DISCUSSION 30

2:10-2:40

BREAK 30

2:40-3:10

15 October 2007 DRAFT

14

Agenda 3: Radio Interface Issues with Femto Cells

Monday 3:10-6:45 PMMonday 3:10-6:45 PMModerator: Ed TiedemannModerator: Ed Tiedemann

SYSTEM SELECTION

008 CDMA System Selection for Mobiles to Find/Use Femtocells

ALCATEL-LUCENT

203:10-3:30

019 Femto Access Control Provisioning and Enhanced System Selection

AIRVANA 303:30-4:00

024 Femto Cells –Search and System Selection QUALCOMM 304:00-4:30

HANDOFFS AND MOBILITY

020 Femto Air Interface Enhancements for Future Mobile Devices

AIRVANA 304:30-5:00

INTERFERENCE MANAGEMENT

021 Femto Air Interface Deployment Modeling, Simulation, and Performance

AIRVANA 205:00-5:20

025 Interference Management in Femto-Cell Deployment QUALCOMM 605:20-6:20

DISCUSSION 256:20-6:45

15 October 2007 DRAFT

15

Agenda 4: Architecture Decision Points

Tuesday 8:00 AM-12:10Tuesday 8:00 AM-12:10Moderator: Betsy CovellModerator: Betsy Covell

017 Femto Network Gateway Architecture and Stage 2 Description AIRVANA 608:00-9:00

026 Femto Network Architecture Considerations NORTEL 209:00-9:20

018 Femto SIP/IMS and Convergence Server (CSRV) Architecture and Stage 2 Description

AIRVANA 459:20-10:05

BREAK 3010:05-10:35

006 IMS Services for Femto Cell ALCATEL-LUCENT

2010:35-10:55

007 Femto Cell Active Hand-offs with Macro Cell ALCATEL-LUCENT

3010:55-11:25

015 Mobility for Femto HUAWEI 2011:25-11:45

DISCUSSION 2511:45-12:10

LUNCH 6512:10-1:15

15 October 2007 DRAFT

16

Agenda 5: Femto Cell Standardization Work Plan

Tuesday 1:15-2:30 PMTuesday 1:15-2:30 PMModerator: Eileen McGrathModerator: Eileen McGrath

003 Status of 3GPP2 Femto Cell Requirements Work (slide 2)

3GPP2 TSG-S

022 Femto Standards Schedule, Work Plan, & Way Forward

AIRVANA 15

1:15-1:30

DISCUSSION 30

1:30-2:00

BREAK 30

2:00-2:30

15 October 2007 DRAFT

17

Agenda 6: Summary of Workshop Outputs

Tuesday 2:30-5:00 PMTuesday 2:30-5:00 PMModerator: Clif BarberModerator: Clif Barber

Review of Workshop Summary

DISCUSSION

ADJOURNMENT

15 October 2007 DRAFT

18

Download Workshop Participants List (1)

Workshop website: Workshop website: www.3gpp2.org/FEMTOClick “Meeting Electronic Sign In”Click “Meeting Electronic Sign In”

15 October 2007 DRAFT

19

Download Workshop Participants List (2)

Enter username/Password: femto/femto

15 October 2007 DRAFT

20

Download Workshop Participants List (3)

Select “Click here to view attendance for a meeting”

15 October 2007 DRAFT

21

Download Workshop Participants List (4)

Select “Detailed Version”

15 October 2007 DRAFT

22

Download Workshop Participants List (5)

Save as html file or print as an Adobe file

15 October 2007 DRAFT

23

Thank You!For more information, please visit

http://3gpp2.org

Thank You to Airvana for their sponsorship of this

workshop!