Upload
leon-hyatt
View
221
Download
1
Embed Size (px)
Citation preview
WELCOMETSG-S Hosted
3GPP2 Femto Cell Workshop15-16 OCTOBER 2007
Hyatt Harborside Boston101 Harborside Drive,
Boston, Massachusetts, USA 02128
Sponsored by Airvana
Wireless SID: FEMTOCELLWireless SID: FEMTOCELL
15 October 2007 DRAFT
2
Online Access to Registration and Contributions
Workshop website: Workshop website: www.3gpp2.org/FEMTOClick “Meeting Electronic Sign In”Click “Meeting Electronic Sign In”
15 October 2007 DRAFT
5
Online Registration (3)
Enter registration data and answer hotel questionsClick “Update/Accept”
15 October 2007 DRAFT
9
Introductions
• Workshop Planning TeamTSG-S Chair – Nick Yamasaki (KDDI) nr-
TSG-S WG1 Chair – Alex Gogic (Qualcomm) [email protected]
Airvana Coordinator – Doug Knisely (Airvana)[email protected]
Workshop Coordinator – Clif Barber (KDDI) [email protected]
• Additional Planning Support– TSG-A Chair Wasuke Sato (KDDI)
– TSG-C Chair Dennis Gentzler (Alltel)
– TSG-X Chair Betsy Covell (Alcatel-Lucent)
15 October 2007 DRAFT
10
Agenda Overview
S00-FEMTO-20071015-001 3GPP2 Femto Cell Workshop Agenda
ITEM AGENDA # TIME SLOT NOTE DAYWelcome 8:00-8:15 AM
1Overview/Tutorial on Femto Cell Technology and High Level Architecture
6 8:15 AM-12:30 PM with one 30 min break
12:30-1:30 PM LUNCH
2 High Level Requirements 2 1:30-3:10 PM with one 30 min break
3 Radio Interface Issues with Femto Cells 8 3:10-6:45 PM8:00 AM-12:05 PM
12:05-1:15 PM LUNCH
1:15-2:00 PM
5 Femto Cell Standardization Work Plan 2 2:00-3:15 PM with one 30 min break
6 Summary of Workshop Outputs 3:15-5:00 PMAdjourn 5:00 PM
MONDAY
4Discussion of Architecture Decision Points
4
TUESDAY
15 October 2007 DRAFT
11
Note to Presenters
• In order to get through on time on Tuesday, time limitations will be strictly enforced.– For presentations longer than xx minutes, I will
provide a 10 minute warning.– For all presentations, I will provide a 5 minutes
warning.
• Please be prepared to start your presentation ON TIME. The clock starts running as soon as the previous presentation is complete.
15 October 2007 DRAFT
12
Agenda 1: Overview/Tutorial on Femto Cell Technology and High Level Architecture
Monday 8:15 AM-12:30 PMMonday 8:15 AM-12:30 PMModerator: Clif BarberModerator: Clif Barber
009 Overview of Femto Cells SAMSUNG 15
8:15-8:30
016 Tutorial on Femto Cell Technology and SIP/IMS-based Femto Network Architectures
AIRVANA 90
8:30-10:00
BREAK 30
10:00-1030
014 Huawei’s view on Femto HUAWEI 20
10:30-10:50
023 Network Architecture - Alternatives and Tradeoffs for 3GPP2 Femto Cells
QUALCOMM 30
10:50-11:20
002 SIP Based Architecture for Integration of 1xRTT Femto Cells TATARA SYSTEMS
30
11:20-11:50
005 Standard Interfaces for Femtocell ALCATEL-LUCENT
15
11:50-12:05
DISCUSSION 25
12:05-12:30
15 October 2007 DRAFT
13
Agenda 2: High Level Requirements
Monday 1:30-3:10 PMMonday 1:30-3:10 PMModerator: Alex GogicModerator: Alex Gogic
003 Status of 3GPP2 Femto Cell Requirements Work
3GPP2 TSG-S 20
1:30-1:50
004 Femto Cell Service Requirements and Issues
KDDI 20
1:50-2:10
DISCUSSION 30
2:10-2:40
BREAK 30
2:40-3:10
15 October 2007 DRAFT
14
Agenda 3: Radio Interface Issues with Femto Cells
Monday 3:10-6:45 PMMonday 3:10-6:45 PMModerator: Ed TiedemannModerator: Ed Tiedemann
SYSTEM SELECTION
008 CDMA System Selection for Mobiles to Find/Use Femtocells
ALCATEL-LUCENT
203:10-3:30
019 Femto Access Control Provisioning and Enhanced System Selection
AIRVANA 303:30-4:00
024 Femto Cells –Search and System Selection QUALCOMM 304:00-4:30
HANDOFFS AND MOBILITY
020 Femto Air Interface Enhancements for Future Mobile Devices
AIRVANA 304:30-5:00
INTERFERENCE MANAGEMENT
021 Femto Air Interface Deployment Modeling, Simulation, and Performance
AIRVANA 205:00-5:20
025 Interference Management in Femto-Cell Deployment QUALCOMM 605:20-6:20
DISCUSSION 256:20-6:45
15 October 2007 DRAFT
15
Agenda 4: Architecture Decision Points
Tuesday 8:00 AM-12:10Tuesday 8:00 AM-12:10Moderator: Betsy CovellModerator: Betsy Covell
017 Femto Network Gateway Architecture and Stage 2 Description AIRVANA 608:00-9:00
026 Femto Network Architecture Considerations NORTEL 209:00-9:20
018 Femto SIP/IMS and Convergence Server (CSRV) Architecture and Stage 2 Description
AIRVANA 459:20-10:05
BREAK 3010:05-10:35
006 IMS Services for Femto Cell ALCATEL-LUCENT
2010:35-10:55
007 Femto Cell Active Hand-offs with Macro Cell ALCATEL-LUCENT
3010:55-11:25
015 Mobility for Femto HUAWEI 2011:25-11:45
DISCUSSION 2511:45-12:10
LUNCH 6512:10-1:15
15 October 2007 DRAFT
16
Agenda 5: Femto Cell Standardization Work Plan
Tuesday 1:15-2:30 PMTuesday 1:15-2:30 PMModerator: Eileen McGrathModerator: Eileen McGrath
003 Status of 3GPP2 Femto Cell Requirements Work (slide 2)
3GPP2 TSG-S
022 Femto Standards Schedule, Work Plan, & Way Forward
AIRVANA 15
1:15-1:30
DISCUSSION 30
1:30-2:00
BREAK 30
2:00-2:30
15 October 2007 DRAFT
17
Agenda 6: Summary of Workshop Outputs
Tuesday 2:30-5:00 PMTuesday 2:30-5:00 PMModerator: Clif BarberModerator: Clif Barber
Review of Workshop Summary
DISCUSSION
ADJOURNMENT
15 October 2007 DRAFT
18
Download Workshop Participants List (1)
Workshop website: Workshop website: www.3gpp2.org/FEMTOClick “Meeting Electronic Sign In”Click “Meeting Electronic Sign In”
15 October 2007 DRAFT
19
Download Workshop Participants List (2)
Enter username/Password: femto/femto
15 October 2007 DRAFT
20
Download Workshop Participants List (3)
Select “Click here to view attendance for a meeting”
15 October 2007 DRAFT
22
Download Workshop Participants List (5)
Save as html file or print as an Adobe file