39
1 Welcome to “Staying Ahead” Webinar Migrating to HP Quality Center Enterprise 11 11/11/2010

Welcome to “Staying Ahead” Webinar - Lithiumhpsws.lithium.com/hpsws/attachments/hpsws/QC_STR/98/1/Migrate t… · Designed to Help Master the End -to-End Application Lifecycle

  • Upload
    buicong

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

1

Welcome to “Staying Ahead” Webinar

Migrating to HP Quality Center Enterprise 11

11/11/2010

2

Agenda

1. Migration features and benefits

2. Customer experience – Alcatel-Lucent

3. PSQS / Education offerings around migration to QC 11

4. Q&A

3

David YuillBTO Apps Product Marketing Manager, EMEA

HP

HP BTO for ApplicationsMigrating to HP Quality Center 11.00

Revolutionizing the delivery of modern applications

Application Modernization: a response to business need

TECHNOLOGY: proprietary, ‘brittle’ARCHITECTURE: silo’d, monolithic TEAMS: local, dedicated, silo’dPROCESS: lengthy, waterfall-basedPLATFORM: on premise

TECHNOLOGY: open, flexibleARCHITECTURE: integrated, composite TEAMS: virtual, CoE, sourcedPROCESS: accelerated, iterativePLATFORM: on premise, SaaS, cloud

Yesterday Today

SAP • ORCL • SOA • Web 2.0 / RIA • Mobile

TRA

D. N

ETW

ORK

S

CLO

UD

NET

WO

RK

…and Real Challenges

How can we ensure new technology does not degrade Quality?

How do we manage the complete “agile” lifecycle?...without breaking

the bank

How can we overcome organizational complexities: new global sourcing

models and multiple personas?

6

And, what does the business need?

Base: 206 IT decision makers with insight into budgeted modernization activities. Source: Clearing Your Path to Modern Applications and Business Agility, Forrester Research, April 6, 2010. A Forrester Consulting thought leadership paper commissioned by Hewlett Packard.

Agility… Innovation… Lower cost…and a better application experience

7

From core delivery to the complete lifecycle

Mastering the Application Lifecycle

repeatability

quality

change-readiness

predictability

The Value of the Complete Application Lifecycle

INCREASE ALIGNMENT

REQUIREMENTS

IDE

DEVELOPMENT

Source Code Management

Business Process

QUALITY

Functional

OPERATIONS

United Operations

STRATEGY

Demandand Portfolio Management

Functional

Risk

Performance

Security

BEST PRACTICES

BRIDGE TO OPERATIONS

3-WAYTRACEABILITY

MANAGE AND MEASURE THE IMPACT OF CHANGE

HP QC 11.00Overview

10

Designed to Help Master the End-to-End Application Lifecycle

HP ALM 11.00 is a Unified Platform

Requirements Management

Requirements Management

Requirements Definition

QualityManagement

Functional Performance Security

DevelopmentManagement

IDE, SCM, Build

IntegrationsDefect Mgmt

Secure Develop-

ment

Foundation

Traceability ReportingProcess Standardization (i.e. Waterfall, Agile)

Extensibility (Open APIs)

Inte

grat

ions

into

Stra

tegy

and

Pla

nnin

g(P

PM, G

ov)

Integrations into Run(D

eployment, A

PM, ITSM

)

Unified for the Core App Lifecycle, Integrated with the Complete App Lifecycle

Application Lifecycle Management

Project Planning & Tracking Enterprise Release Management

11

ALM Platform

Manage and optimize application qualityHP Quality Center

Dashboard

Single Data Repository Reporting Open APIs (REST)

HP Quality Center

Release Management

Requirements Management

Defect Management

Business Models Test LabTest Plan

HP Unified Functional Testing Application Security Testing Business Application

Validation

HP Functional Testing

HP Service Test HP QAInspect HP Business Process Testing

Services

Service Test Management

Test Data Management

Project Workflow

Integrated add-on capability

Core to the HP Quality Center

12

Support the Integral Link Between Business Needs & Application Delivery

HP Quality Center Requirements Management

What’s New– Integration with BPM tools

– Standardized requirements definition with rich text editor

– Template support

– Race relations between requirements, process paths, defects and tests

Benefits– Standardize requirements practices

– Align with the business process

– Support a wide array of functional and non-functional requirements

– Manage change – trace requirements to tests and defects

13

Deliver High-Quality Applications Faster -- Enter the New Efficiency Era in Manual Software Testing

Introducing HP Sprinter

What’s New– Screen capture and annotation

– Annotate defects in manual testing results

– Automatically record testing actions and results in HP ALM and HP QC 11.00

– Automated injection of data

– Mirror testing to test multiple platforms simultaneously

Benefits– Accelerate developer efficiency with clear

defect data included in test results

– Simplify manual testing process with easy-to-use interface for screen capture

– Make testing with multiple data sets quick and simple

– Single click efficiency for testing multiple environments

14

QC Integration with Leading Development Environments

What’s New– Bi-directional synchronization of QC user stories to

TeamForge work tasks

– View Requirements & Defects in Eclipse IDE & update QC Entities from Mylyn Eclipse

– Bi-directional synchronization of defects with TFS bugs & work items and QC Defects

– QC integration via www.collab.net/go/hp or the QC Add-ins page (Eclipse &Visual Studio)

Benefits– Developer tools integration provides complete lifecycle

traceability

– Creates traceability between Requirements, Defects and Source Code

– Ensure collaboration between business analysts, developers and testers

– Quality profiling earlier in the Lifecycle

Developer tools integration providing complete the lifecycle traceability

Conclusion & Next StepsROI and Next Steps

Delivering results with HP BTO Applications software

Reduce the time to market for application and business processesQuality Center

10%Conservative: 8% Probable: 10% Optimistic: 12%

Reduce the time necessary for problem management due to application defects

Quality Center

Conservative: 34% Probable: 41% Optimistic: 47%

41%

Reduce outages due to production defects

Conservative: 28% Probable: 31% Optimistic: 46%

31%Quality Center

Reduce the number and duration of performance degradations

Conservative: 25% Probable: 28% Optimistic: 42%

28%Performance Center

John Novak, CIO

“With HP, we’ve substantially improved our application time-to-market and have had similar results in reducing the number of bugs or problems that we have with our applications after deployment.”

Level of improvement based on HP ROI model data from IDC

17

Next StepsChart Your Course for Mastering the Application Lifecycle• Learn more

• www.hp.com/alm

• Join a community

• http://h30501.www3.hp.com/

• Consider an ALM Transformation workshop

• Evaluate a solution

• HP ALM 11.00 trial download www.hp.com/alm

• HP Software Universe & CommunicationsWorld 2010 Barcelona, Nov 30 – Dec 2

• http://www.hp.com/eur/software/universe2010

Outcomes that matter.

19

Vijay DahadEnvironment Manager

Alcatel-Lucent

Migrating to HP QC 10 – Alcatel-Lucent experience

20

– It was a two-in-one migration involving:• Migration to HP SaaS• Upgrade from QC9.2 to QC10

– Large number of projects to be migrated

– Huge repository size

– Required to keep downtime to minimum due to busy project schedules

Challenges faced

21

– Planning– Pilot– Communication– Migration

• Ensure no loss of data• Ensure no loss of access• Minimal downtime• Work on prevention of issues rather than resolving issues later

– Projects were prioritised & sequenced during migration– New phased approach involving:

• Migration of full repository a week before the migration day• Migration of delta of repository on the day of migration

– Verification & Handover

Migration Details

22

– More internal communications to describe the changes in new version

– Internal communication – common issues and resolutions

Lessons Learned

23

QC10 Upgrade

– Enhanced Dashboard capabilities

SaaS Migration

– Globally accessible

– Save on efforts and resources from maintenance of in-house instance

Benefits of Upgrade & Migration

Outcomes that matter.

25

Eyal AradQC Practice Lead

HP SW Professional Services

Migrating to QC&ALM 11 Education/PS QS offerings

26

… Great products, but can I really get the most of it ?

IDC Performance impact study 2009:“Aside from the technology, the most important factor in determining the success

of a particular IT solution is the skill of the IT functional team.

Over 60% of IT Managers believe that the skill of their teams is the most important success factor for critical IT functions.”

When teams are properly trained, they derive more value from Technology, and “their functional performance can be dramatically improved .”

… Customers Enablement …

27

… Great products, but can I really get the most of it ?

HP Software

Professional Services & EducationCan help YOU

… Customers Enablement …

28

THE VALUE OF TRAINING

REDUCE COSTS REDUCE RISK REDUCE TIME

29

INITIAL TRAINING FOR QC & ALM 11

– Quality Center 11 Essentials [4 days]

– Quality Center 11 Skills Update [1 day]

– Quality Center 11 Site Administration [2 days]

– Application Lifecycle Management 11 [1 day]

– Further ALM classes to follow soon

For additional details visit: www.hp.com/software/education

30

Training Options

– Instruction Led Training (ILT)• Public training • Private training

– Virtual Instructor Led Training (VILT)

– Technical Training On-demand (TTO)

– Labs On-demand (LOD)

For additional details visit: www.hp.com/software/education

31

HPSW QS Offerings for QC & ALM 11

32

QuickStarts Overview

New QS for ALM 11.0

•Set of New QuickStarts•Release Date 1st Oct, 2010•Datasheets Available

33 Footer Goes Here6

2 Options to “Quickstart” your ALM Solution

•Basic ALM product implementation and configuration•Mentoring and Knowledge transfer•Covers QC/PC , ASC

ALM Foundation Package ALM Supplement Package

•Basic ALM product implementation and configuration•Mentoring and Knowledge transfer•Add-on QTP, BPT (QC/PC Foundation required)•Includes Upgrade and Migration to ALM 11

Get ALM 11 up and running…

Expand and Upgrade…

Duration 2 weeks on site

34

QC QuickStarts List

•HH587A1 HPS+S ALM QC Foundation QC•HH589A1 HPS+S ALM QTP Supplement QS•HH590A1 HPS+S ALM BPT Supplement QS

Application Lifecycle Management – 2 Weeks Duration

•HH594A1 HPS+S ALM QC Upgrade Supplement QS

ALM Upgrades – 2 Weeks Duration

35

Get the Quickstarts Data Sheets

36

– Based on HP’s experience deploying our products in thousands of engagements

– Helps you develop the skills needed to maintain, enhance and expand your QC implementation after the engagement is complete

– Provides the shortest path to achieving returns on your investment

– Fixed price/fixed scope approach

– Proven methodology to mitigate migration risk

Initiate ExecutePlan Close

WHY HP FOR YOUR QC MIGRATION

37

HP Quality Center Upgrade QuickStart

Activities and Deliverables• Kickoff meeting• QC new features mentoring• QC upgrade planning• QC development site upgrade• QC pilot projects upgrade• QC projects configuration• Mentoring for the new features• Post engagement review

Time Frame • Two weeks on-site

Why HP Software Services?• Learn from the most experienced QC and QTP consultants available• Follow a carefully scoped and planned migration path developed by the experts

38

HPSW QS Offerings - For More Information

For more information, contact your HP Software Professional Services representative or email HP Software Professional Services in your region.

• AMS: [email protected]• EMEA: [email protected]• APJ: [email protected]

•TRAININGS: for additional details visit: www.hp.com/software/education

Outcomes that matter.