PROJEK PENYELENGGARAAN DAN OPERASI TAPAK PELUPUSAN SISA PEPEJAL DAN CADANGAN PEMBANGUNAN ‘MATERIAL RECOVERY FACILITY (MRF)’ DI PULAU BURUNG, SEBERANG PERAI SELATAN, PULAU PINANG UNTUK MAJLIS PERBANDARAN SEBERANG PERAI & MAJLIS PERBANDARAN PULAU PINANG WELCOME TO ALL PARTICIPANTS TO THE ENVIRONMENTALLY SOUND TECHNOLOGIES & PUBLIC-PRIVATE PARTNERSHIP FOR ORGANIC WASTE MANAGEMENT WORKSHOP 2015 8 TH & 9 TH JUNE 2015

WELCOME TO ALL PARTICIPANTS TO THE ENVIRONMENTALLY …quicdata.biz/pgcaring/wp-content/uploads/2016/11/PLBT... · 2016. 11. 26. · projek penyelenggaraan dan operasi tapak pelupusan

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

  • PROJEK PENYELENGGARAAN DAN OPERASI TAPAK PELUPUSAN SISA PEPEJALDAN CADANGAN PEMBANGUNAN ‘MATERIAL RECOVERY FACILITY (MRF)’

    DI PULAU BURUNG, SEBERANG PERAI SELATAN, PULAU PINANGUNTUK MAJLIS PERBANDARAN SEBERANG PERAI & MAJLIS PERBANDARAN PULAU PINANG

    WELCOME TO ALL PARTICIPANTS TO THE ENVIRONMENTALLY SOUNDTECHNOLOGIES & PUBLIC-PRIVATE PARTNERSHIP FOR ORGANIC WASTE

    MANAGEMENT WORKSHOP 2015

    8TH & 9TH JUNE 2015

  • OPERATION & MAINTENANCE OF SANITARY LANDFILLAND MATERIAL RECOVARY FACILITIES FOR PENANG

  • • Project Background

  • Site Possession 16th July 2012

    Scope of work:

    Design, develop, construct, manage,regulate, and operations in Phase 3 forTwenty (20) Years

    Manage leachate generated by theexisting landfill (Phase 2 and Phase 1)

    Extending the life of existing landfills inPhase 1 until 30th June 2013

    Convert wetlands area of approximately10.12 hectare area adjacent to Phase 2into an Eco Park

  • Executive ChairmanExecutive Chairman

    Deputy ExecutiveChairman

    Deputy ExecutiveChairman

    Chief ExecutiveOfficer

    Chief ExecutiveOfficer

    Chief OperatingOfficer

    Chief OperatingOfficer

    Operation GeneralManager

    Operation GeneralManager

    LandfillLandfillEnvironmentEnvironment Weighbridge &Claim

    Weighbridge &Claim

    Safety & SecuritySafety & Security MRFMRF

    Site ManagerSite Manager

  • • Operation & Development Area• Development Work

  • ZONE B

    ZONE A

    TA

    LP1

    ZONE G

    ZONE CP

    ZONER1

    ZONE F

    ZONEE

    LTP

    MRF

    OC

    ZONE R3

  • Entrance

    Weighbridge

  • Internal Road

    Internal Road & Drainage system

  • Earth Drainage System

    Leachate Pond

  • Office Area

    Drainage System

  • Block & Dry

  • • Operation flow• Operation Area• Operation Equipment• Waste Volume

  • INSPECTIONINSPECTION

    WEIGHBRIDGEWEIGHBRIDGE

    WASTE CELLWASTE CELL

    WASTE UNLOADINGWASTE UNLOADINGTIRE WASHTIRE WASH

    LEVEL AND MANAGELEVEL AND MANAGE

    COMPACTCOMPACT

    WEIGHBRIDGEWEIGHBRIDGE

    SOIL COVERSOIL COVER

    ININ

    OUTOUT

  • ZONE B

    ZON A

    TA

    LP1

    ZONE G

    ZONE CP

    ZONE R1

    ZONE F

    ZONE E

    LTP

    MRF

    OC

    ZONE R3

    ZONE A

  • ZONE G

    ZONE F

    ZONE E

    ZONE H

    ZONE J

    45,000M3

    36,000M3

    75,000M3

    36,000M3

    108,000M3

  • • 4 NOS. BULLDOZER (D6C - 3 NOS., D6H - 1 NO)• 1 NO WATER TRUCK• 3 NOS. EX-200 HITACHI EXCAVATOR• 1 NO. OF EXCAVATOR LONG ARM• 1 NO. OF 580-F BACKHOE• 2 NOS. OF INTERNAL LORRY• 1 NO. OF 25 TON COMPACT ROLLER

  • • Average incoming waste daily is 1700 to 1800 tons• In 2014, total incoming waste to Pulau Burung is

    656,090 tons

  • • Plan layout• Flowchart

  • Incoming waste(MSW,

    Industrial andCommercial

    waste)

    Unloadingwaste at

    Loading area

    Wasteseparated byTrommel andBag Breaker

    Metal sortedout by Magnet

    SeparatorManual Sorting

    Recyclable

    Residual sendto Landfill

    Metal sortedout by Magnet

    Seperator

    Wasteseparated by

    OrganicTrommel

    Residual sendto landfill

    Organic waste,potential toconvert as

    landfill cover

    Upper sieve

    Lower sieve

  • • Leachate Treatment Plant

  • • Technology fromHyflux, Singapore

    • Treatment PlantCapacity : 200 m3/day

    • Using Biological,Chemical And PhysicalProcess

  • InfluentInfluent

    PRE-TREATMENT1. Flocculation2. Sedimentation

    ABRMBR1. MBBR2. Membrane System

    ACFACFLF ROProcessLF RO

    ProcessTreatedWater

    TreatedWater

  • • PLBT obtained the Notification Approval fromDOE for constructing and operating the LeachateTreatment Plant on 29 October 2013 with severalconditions.

    • Currently still in T & C Process and will comply allthe DOE Regulation and Standard for effluentdischarge, when the system is fully operate.

    • PLBT will officially notify the DOE and otherrelevant agencies when the LTP is fully operationwith capacity 200m3/day.

  • Test Parameters StdSpecs.No UnitBefore

    TreatmentAfter RO

    Treatment

    (Range) (Average)

    1 Temperature oC 40.0 28 30

    2 pH Value 5.5 - 9.0 8.0 7.53 BOD5 @ 20oC mg/L 20 900-2000 24 COD mg/L 400 2500-4000 1005 Suspended Solids mg/L 50 500-1000 500 0

    • * For Ammoniacal Nitrogen (AN) , we are trying to study and upgrade the process to achieved Standard• For Heavy metal and other parameter, all results analysis comply with the DOE Standard.

  • • Daily in-situ testing was carry out every hour to make sure the treatmentprocess in a good condition

    • Daily sampling and testing for important parameter as COD, AmmoniacalNitrogen and Colour at Internal Lab (PLBT)

    • Weekly sample will sent to External Lab (Spectrum Laboratories Sdn Bhd)

  • YSI EXO 1 IN-SITU METERpH, Temp, Dissolved

    Oxygen(DO), Turbidity,Salinity, Conductivity,TDS, Depth, Pressure

    TSS IN-SITU METERTSS, Turbidity, MLSS

  • DRB 200, COD REACTORChemical Oxygen

    Demand, COD

    COLORIMETER 890COD, AmmoniacalNitrogen, Colour &

    Heavy Metal

  • • Leachate treated – 50 to 100 m3/day depend onquality of the raw leachate.

    • Refer to the agreement, LTP must treat leachate200m3/day.

    • The consultant still working to maximize thecapacity of the treatment process.

    • The existing plant will be modify to fulfill theagreement.

    • Planning of the modification will start on May2015 and will be fully operated with maximumcapacity 200m3/day end of this year.

  • • Monitoring (environmental purposes)

  • • 7 Location for water, 2 location for Air & Noise• Leachate Pond (1), Leachate Ditch (2), Wetland

    (1), JPS Canal (1), River Water (1), Seawater (1),Air (2), Noise (2)

    • Monthly Report Submission- Department of Environmental (DOE)- Seberang Perai Municipal Council (MPSP)- Penang City Council (MBPP)- Penang Fishery Department

  • LeachatePond

    Perimeter 1

    JPS

    Wetland

    River Water

    Perimeter 2Sea Water

  • • From result analysis up to Feb. 2015(Accreditation Lab), there are no pollution fromlandfill to other external water source at JPScanal, river and sea.

    • Our reference to DOE also, there are no directpollution to river or sea from landfill.

    • For water quality at Wetland, Leachate Ditch andLeachate Pond, its still under landfill area and willbe treated before discharge to external watersources.

  • Location : Near Site office, LTP Location: Near Guard House

  • Location : Near Site office, LTP Location: Near Guard House

  • POINT DATEL10

    dB(A)L50

    dB(A)L90

    dB(A)Total Leq

    dB(A)*DOE Guideline

    Leq, dB(A)

    Point N1(near guard

    house)

    Baseline Data(8-9/3/13)

    67.5 55.5 49.5 64.165

    (15-16/1/15) 69.0 58.5 54.7 69.7(17-18/2/15) 65.0 59.3 47.3 62.0

    Point N2(near site

    office)

    Baseline Data(8-9/3/13)

    58.5 56.0 54.0 56.765

    (15-16/1/15) 67.2 62.1 54.1 65.4(17-18/2/15) 68.5 64.6 57.9 65.5

    Noise generated by passing by vehicles (motorcycles and lorries)

  • Frequency: every 3 month (7 location surroundingTPPB)

    1) In Front Of JPS Water Gate2) Sungai Tengah3) In Front Of Old EESB Jetty, 200 meter from

    landfill4) About 500 meter from landfill5) About 1.5 kilometer from landfill6) Fish Farming Area, about 2.6 kilometer from

    landfill7) Sungai Udang Shell Farming Area, about 3

    kilometer from landfill

  • • No correlation between landfill operations andthe pollution levels either in marine water orsediment samples. No pollution was identifieddirectly from TPPB

    • Seawater fall under Class II and III, suitable forfisheries, recreational, body contact and wateractivity.

  • • Plan• MRF

  • INSPECTIONINSPECTION

    WEIGHBRIDGEWEIGHBRIDGE

    DISCHARGE AREADISCHARGE AREA

    WASTE UNLOADINGWASTE UNLOADINGTIRE WASHTIRE WASH

    OVERHEAD CRAWLEROVERHEAD CRAWLER

    BAG BREAKER & TROMMELBAG BREAKER & TROMMEL

    WEIGHBRIDGEWEIGHBRIDGE

    MANUAL & AUTOMATED SORTERMANUAL & AUTOMATED SORTER

    ININ

    OUTOUT

    RECOVERED ITEMRECOVERED ITEMBALERBALER

    RESIDUERESIDUETo LandfillTo Landfill

  • • Separation recyclables such as plastics, bottlesand metals

    • Separation organics waste from the recyclablesitems

    • Manually sorting by labors

    • Reducing volume of waste before entering landfillcell

    • Controlling Leachate volume

    • Decreased the green houses gasses

    • Baler

    • Compress the waste

    • More orderly

    Trommel and conveyor system