    WATER NETWORK ANALYSIS

    INTRODUCTION

    With the increasing tendency of the government organizations to go digital, more

    and more information from the government sector are converted to electronic format

    everyday. While documents can be typed or scanned directly, complex data formats have

    to be processed separately in specialized ways. One of the main areas that is generating

    special interest in recent years is the application of "Geographical Information Systems"

    (GIS) in local governments. Though GIS can be applied in variety of ways in a

    government organization, application of GIS for utility network information is very

    interesting. Utility networks usually are of three types, Water, Strom Sewer and Sanitary

    Sewer. GIS representation of utility network is usually in the form of a database where

    information are stored in classes or tables. One of the popular suit of GIS applications is

    from ESRI called ArcGIS. This workshop project aims to produce a GIS Database of

    Water and Sanitary sewer network for the City of Rowlett using ESRI's ArcGIS desktop.

    The project can be broadly outlined into three parts. First is the preparation of data for

    the digitization of the network. This includes cataloging all the AsBuilts that are used as

    the basis for the digitization process. Next was the actual digitization process using the

    asbuilts as the base. After all the Sanitary Sewer and Water network has been digitized,

    next step was the validation of the entire network by building a geometric network. With

    the validation of the network, the network is complete and ready for use. In addition to

  • 7/31/2019 Water Network Analysis

    2/20

    the creation of the geometric network, a application for storing and retriving the asbuilts

    and another application which uses the water network to map the parcels affected by

    closing a water valve was also developed.

  • 7/31/2019 Water Network Analysis

    3/20

    OBJECTIVES

    The main objective of this project is to provide a complete water and sanitary

    sewer network. The format adopted is the ArcGIS geodatabase model. First is the

    creation of the geodatabase by digitizing it using the asbuilt diagrams as base. Once it

    has been digitized, the next is to validate the network structure using the network analyst

    extension in ArcGIS. This would ensure the integrity of the network and help to cleanup

    any loose ends and disconnected features. In addition to this, two applications one for

    maintaining asbuilts and another network application which can graphically show the

    parcels affected by shutting off of any valves in a water network is to be developed.

    Below is the summary of the tasks that are indented to be done by the end of the project.

    Water and Sanitary sewer network digitization

    Network analysis using Network analyst extension to validate the integrity of

    the network.

    Hot links from the ArcMap environment to the asbuilt diagrams that thenetwork is based on.

    An application using MapObjects in visual basic to retrive and display theasbuilt diagrams.

    An application in ArcMap, which will be used to show the parcel layers that,will be affected by shutting off water valves in the ArcMap environment.

  • 7/31/2019 Water Network Analysis

    4/20

    DATA

    All the data that is necessary for the creation of the water and sanitary sewer

    network were been provided by the City of Rowlett. The data primarily consists of the

    following.

    AsBuilt diagrams for various subdivisions. Ortho photographs for the City of Rowlett. Road layer shapefile for the City of Rowlett. Parcel layer shapefile for the City of Rowlett. Subdivision layer for the City of Rowlett. City limits shapefile for the City of Rowlett. Regional divisions for the City of Rowlett.

    Source and Sink maps.

    Asbuilt diagrams are basically civil engineering drawings which show the layout for

    the water and sanitary sewer network. They are scale accurate. Asbuilt diagrams are

    based on subdivisions. Each subdivision usually has one asbuilt diagram showing the

    layout of both the water and sanitary sewer network. But this is not strictly true. Some

    subdivisions may have the water and the sanitary sewer diagrams separately.

    The second set of data are the high resolution ortho photographs for the City of

    Rowlett. The ortho photographs help in giving a detailed overview of the city and the

    surrounding and also help in locating features such as water sources and sewer sinks.

  • 7/31/2019 Water Network Analysis

    5/20

    They are also immensely useful in places where ambiguity arises in locating the correct

    orientation of the subdivision with respect to the surrounding road information.

    The road network is the basis for orienting the asbuilt diagrams on the subdivisions.

    Though it is possible to locate the correct subdivision for each asbuilt diagram using the

    name attribute from the subdivision's table, the road network provides the correct

    orientation. The asbuilt diagrams themselves contain information on the surrounding

    roads.

    Parcel layer is one of the most important data set used for the database creation.

    Though the asbuilt diagrams were based on the subdivisions, the water and sewer lines

    themselves in the asbuilt diagrams use the parcels as the guide. This obliviously makes

    sense because it is the parcels that are the smallest units that receive water supply.

    Subdivisions are units that the asbuilts are based on. They can represent any land

    entity as a business development or a housing complex or a place of worship. In addition

    to this, the city limit shapefile and the a shapefile dividing the city into twelve regions

    purely for project management reasons were also used.

    Source and sink maps were provided by the City of Rowlett for locating the water

    sources and sanitary sewer sinks.

  • 7/31/2019 Water Network Analysis

    6/20

    METHODOLOGY

    Overview:

    The general methodology for the project is as follows. First was to create a clean set

    catalogue of georeferenced asbuilt diagrams which will form the basis of the water and

    sanitary sewer network. Next was the design of the geodatabase. The geodatabase was

    designed to accommodate the water and sanitary sewer network in separate geodatasets

    with proper projections. Once the datasets were ready, using the georeferenced asbuilts

    as the reference in the background, the water and sanitary sewer network was digitized

    manually. After the complete network was digitized manually, the network analyst

    extension in ArcGIS was used to validate the network.

    Geodatabase design:

    The GIS database, though not as visible as a GIS map is the backbone of the GIS

    data and has to be modeled carefully. The design is based on the intended GIS

    application. The obvious first step in the water and sanitary sewer network creation is the

    modeling of the geodatabase. The geodatabase is a proprietary ESRI data format for

    storing spatial information. A geodatabase is a physical store of geographic information

    inside a database management system (DBMS). The main advantages of using a

    geodatabase are many. It supports intelligent features, rules, and relationships. The

    geodatabase data model supports, a rich collection of objects (rows in a database table)

    and features (objects with geometry). Also the geodatabase supports advanced

    capabilities such as geometric and logical networks. Vector features can have two, three,

  • 7/31/2019 Water Network Analysis

    7/20

    or four dimensions (x, y, z, and m). The geodatabase was logically divided into water

    and sanitary sewer sections. Both were designed as to accommodate spatial features

    typical of the water or the sanitary sewer features. Each part was designed as a separate

    geodataset. A geodataset is nothing but a fancy folder which contains the physical

    representation of the logical elements of GIS data that share the same geographic

    coordinate system. In the case of the water network, the geodataset contains features

    typical of a water network such as pipes, valves, meters, fire hydrants and water sources.

    In case of the sanitary sewer network, the geodataset contains features typical of the

    sanitary sewer network such as pipes, manholes, clean outs and lift stations.

    The most crucial aspect of the geodataset construction was the coordinate system

    selection. The chosen coordinate system was the NAD 1983 State Plane Texas North

    Central Zone. This is the common system used for a regional level GIS data work.

    In modeling the dataset, the water geodataset was modeled into three separate

    feature classes and the sewer dataset was similarly modeled into three separate feature

    classes. In the case of water, the feature classes were, water lines, water fittings which

    included valves and fire hydrants and water sources. The water lines were line features

    and the water fittings and the sources were point features. In the case of the sanitary

    sewer network, the feature classes were sewer lines, sewer fittings which included

    manholes, lift stations, cleanouts and sinks. As in the case of the water network, the

    sewer lines were line features and the sewer fittings and sinks were point features.

    Geodatabase has many useful features that facilitate error free data construction.

    One these features is the ability to define attribute domains. Attribute domains are used

  • 7/31/2019 Water Network Analysis

    8/20

    to constrain the values allowed in any particular attribute for a table, feature class, or

    subtype. Each feature class or table has a set of attribute domains that apply to different

    attributes and/or subtypes. These attribute domains can be shared across feature classes

    and tables in a geodatabase. This was employed in the construction of the water and

    sewer datasets. The following tables show the feature data and their attribute domains.

    FEATURE NAME FEATURE TYPEATTRIBUTE DOMAIN

    VALUES

    Sewer Fittings Point features CO, MH, LS

    Sewer Line Line features

    4", 6", 8", 10", 12", 15", 18",

    21", 24", 30", 36", 12"ABANDONED, 4" F.M., 6"

    F.M., 8" F.M., 10" F.M., 12"F.M., 16" F.M., 18" F.M.

    Water Fittings Point features M, FH, VALVE

    Water Lines Line features 4", 6", 8", 10", 12", 16", 21"

  • 7/31/2019 Water Network Analysis

    9/20

    Georeferencing the asbuilts:

    Along with the geodatabase creation, another important step was to georeference the

    asbuilt diagrams. The "Georeferencing" toolbar in ArcGIS was used for this purpose.

    The asbuilt diagrams were added into the ArcGIS environment with pyramid creation.

    This helps in fast rendering of the diagrams itself when repositioned. Using the road

    network information in the asbuilt diagram, the diagrams are positioned on their

    respective subdivisions. Once the asbuilt diagram is in place, the parcel layer is made

    visible and a series of control points are placed on the asbuilt diagram connecting it to the

    parcel layer by geographical correctness. The minimum number of control points needed

    for georeferencing a asbuilt is three. But the more the number of control points the more

    accurate is the georeferencing. The first order polynomial (Affine) transformation is used

    for the georeferencing transformation on the asbuilt diagrams. The transformation

    functions are based upon the comparison of the coordinates of source and destination

    points, the so called control points mentioned above. It was generally easier to catalogue

    all the asbuilts into the respective twelve regions and have them organized in in separate

    folders.

    Another prominent problem was the missing of the asbuilts for a significant number

    of subdivisions. This were listed and requested from the City of Rowlett. This asbuilts

    were also georeferenced and added to the catalogue.

  • 7/31/2019 Water Network Analysis

    10/20

    ASBUILT DIAGRAM CORRESPONDING SUBDIVISION

    Network Digitization:

    Once the georeferenced asbuilts are ready, the next step is to digitize the water and

    sewer layers. This was done by using the asbuilt diagrams as the basis and using the road

    network as the guide. The water digitization usually was done in two parts. First was the

    digitization of the water lines then completed by putting all the fittings. In any kind of

    network we have a lot of junctions and edges. ArcGIS permits the use of both simple and

    complex junctions. In this project the water lines were designed to have only simple

    junctions. This necessitates the breaking of the water lines in every place it meets

    another water line.

    WATER LINES AND FITTINGS SEWER LINES AND FITTINGS

  • 7/31/2019 Water Network Analysis

    11/20

    ArcObjects Application:

    The editing method was quiet simple. Either the line or a point feature class was

    made the target layer in the editor toolbar and the using the asbuilt diagram as the basis,

    the features were drawn on the layer. After each line segment or a point feature was

    digitized, the attribute table was opened and the attribute classifying it as a particular line

    size or a type of fitting was entered manually. This type of editing was found to be very

    very time consuming and needed a lot of patience. So an application using ArcObjects

    (the programmable object oriented interface for ArcGIS) was used to create a small tool

    that can speed up the editing process. This tool can be used to directly update the

    database table from the ArcMap interface without opening the editor updater from the

    editor toolbar.

  • 7/31/2019 Water Network Analysis

    12/20

    NETWORK ANALYSIS

    Once the digitization is done, the network elements were in place. But the

    usefulness of the network to represent the logical utility network is itself is not

    guaranteed. The integrity of the network has to be checked to make it logically correct.

    This is done by an network analysis. A network analysis is basically check up of the

    connectivity of the features that make up the network. A computer algorithm analyses

  • 7/31/2019 Water Network Analysis

    13/20

    the elements that make up the network and validates them against a set of rules they have

    to abide by in order to be in a useful network.

    The first step in a network analysis is the construction of a logical network by using

    the geometric elements that we have digitized. The geometric network is the actual set of

    feature classes that make up the network. The logical network is the physical

    representation of the network connectivity. Each element in the logical network is

    associated with a feature in the geometric network. Geometric networks was built using

    ArcCatalog from the simple feature classes that was digitized. In this project all line

    features like water mains and sewer mains were modeled as simple edges they were

    assumed to be broken at every junction. Some of the rules are shown below in the set of

    diagrams.

    Sources and Sinks:

    The most important elements of a network analysis are the sources and sinks. Any

    network has a flow direction which shows the direction of flow of the commodity or

    entity that traverses the network. This flow direction in a network is determined by a set

    of sources or sinks. For example electricity and water flow are driven by sources and

    sinks. Flow is away from sources, such as the power generation station or a pump station,

    and toward sinks such as a water treatment plant (in the case of a wastewater network).

    Junction features in geometric networks can act as sources or sinks. When you create a

    new junction feature class in a network, you can specify whether the features stored in it

    can represent sources, sinks, or neither in the network. If you specify that these features

    can be sources or sinks, a field called AncillaryRole is added to the feature class to record

  • 7/31/2019 Water Network Analysis

    14/20

    if the feature is a source, sink, or neither a source nor a sink. There were three types of

    sources for the water network, Water Tower, Water Booster station and Water station.

    For the sewer it was Lift station. But for the network analysis, all the types were treated

    as equal.

    WATER SOURCE IN ORTHO

    PHOTOGRAPHSEWER SINK IN ORTHO PHOTOGRAPH

    The approximate locations for the sources and sinks for the City of Rowlett were

    provided by the city. Using this approximate location and the road network as a guide,

    the ortho photographs revealed the exact location of the sources and sinks. A new feature

    class was added into the existing water and sewer datasets to accommodate this sources

  • 7/31/2019 Water Network Analysis

    15/20

    and sinks. In the project, since the exact location of the sources and sinks were not

    known, one of the valve fittings or an fire hydrants was assumed to be a source for water

    and a manhole the sink in case of a sewer system and the network analysis was

    completed. After the exact location of the sources and sinks were found out from the

    ortho photographs, the new feature class for the sources and sinks were created and the

    network was recreated and then validated again which seem to work fine.

    WATER NETWORK SOURCES SEWER NETWORK SINKS WATER TOWER WATER BOOSTER STATION WATER STATION

    LIFT STATION METERING STATION

    Flow types:

  • 7/31/2019 Water Network Analysis

    16/20

    Once the geometric network is constructed and the sources and sinks are

    determined, next is to set the flow direction. This is done by using the set flow direction

    in the network analyst extension. Any edge feature like that of an water main or a sewer

    main has one of three categories of flow direction. Determinate flow direction,

    Indeterminate flow direction and Uninitialized flow direction. Determinate flow direction

    for an edge is specified as either with or against the direction in which the feature was

    digitized. This is usually determined by the edge features connectivity to the nearest

    source or sink. Indeterminate flow in a network occurs when the flow direction cannot be

    uniquely determined from the topology of the network, the locations of sources and sinks,

    and the enabled or disabled states of the features. Indeterminate flow commonly occurs

    for edges that form part of a loop, or closed circuit. It can also occur for an edge whose

    flow is determined by multiple sources and sinks, where one source or sink is driving the

    flow in one direction through the edge, but another source or sink is driving it in the

    opposite direction. For example, an edge that has a source at both of its ends will have

    indeterminate flow. Uninitialized flow direction in a network occurs in edges that are

    isolated from the sources and sinks in the network. This can happen either if the edge is

    not topologically connected through the network to the sources and sinks or if the edge is

    only connected to sources and sinks through disabled features. Usually the indeterminate

    and the uninitialized flow are the two problem areas that need to be corrected. The

    indeterminate flow can be corrected only when we have the information regarding the

    direction of flow of each and every segment of the simple edge that participate in the

    network. Since the exact information regarding the flow of the edges were not available,

    the indeterminate flow was ignored. The only correction that was made regarding the

  • 7/31/2019 Water Network Analysis

    17/20

    network was the uninitialized flow. This was mainly done by checking the connectivity

    of the features with each other.

    FLOW TYPES IN A NETWORK

    Corrections:

    After the flow types were identified, as mentioned earlier, the indeterminate flow

    was ignored due to lack of information. The uninitialized flow was corrected by

    connecting the disconnected ends and resetting the flow directions. Another important

    problem that was encountered is the non breaking lines due to faulty digitization. As

    mentioned earlier, the network was designed to contain only simple edges. Any edge that

  • 7/31/2019 Water Network Analysis

    18/20

    is not broken and snapped resulted in a uninitialized flow. This was corrected by

    breaking up the lines in the appropriate places.

    NETWORK APPLICATION

    One of the main issues involved in water networks is determining the set of parcels

    that are affected by a particular portion of the network. Thus it can be immensely useful

    if we can determine which areas will be affected by closing a particular valve in a water

    network.

    An application for determining the parcel layers that will be closed by turning off a

    particular valve was designed by storing the IDs of the valves that supply water to a

    parcel in the attribute table of the parcels. Once this valves are chosen and a radio button

    is turned off in the ArcGIS application in the ArcMap environment, it will selectively

    darken the parcels that are affected by turning off the valve.

  • 7/31/2019 Water Network Analysis

    19/20

    ASBUILT BROWSER

    Another application for retrieving the asbuilt diagrams from the hard disc was also

    developed. It serves as an simple display tool and helps in retrieval of the asbuilt by

    doing a search by name, zooming functions etc.

    CONCLUSION

    The project aims at building a complete water and sewer network from scratch using

    the asbuilt diagrams as guide. The network was validated using the network analyst

    extension. The water network contains water lines designated by their sizes and fittings

    by their types such as valves or fire hydrants. The sewer network contains the sewer

  • 7/31/2019 Water Network Analysis

    20/20

    mains designated by their sizes and the sewer fittings designated by their types such as

    man holes and clean outs. In addition to this, hotlinks from the ArcMap interface were

    made to the asbuilt diagrams so that by clicking on any of the subdivision, the respective

    asbuilt could be brought up in the default viewer. Other applications included the asbuilt

    browser, valve application to show the number of parcels that are affected by closing a

    particular valve were developed.