US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014

Walla Walla District Update

Embed Size (px)

DESCRIPTION

Walla Walla District Update. LTC Timothy Vail Oct 15, 2014. Agenda. Columbia-Snake River 2017 Extended Outage Planning Programmatic Sediment Management Plan (PSMP) FY15 Budget Outlook. Impacted Navigation Locks on the Columbia-Snake River System. MCR Jetties. Our Process. - PowerPoint PPT Presentation

Citation preview

Page 1: Walla Walla District Update

US Army Corps of Engineers

BUILDING STRONG®

Walla Walla District Update

LTC Timothy VailOct 15, 2014

Page 2: Walla Walla District Update

BUILDING STRONG®

Agenda

Columbia-Snake River 2017 Extended Outage Planning

Programmatic Sediment Management Plan (PSMP)

FY15 Budget Outlook

2

Page 3: Walla Walla District Update

BUILDING STRONG®

Impacted Navigation Locks on the Columbia-Snake River System

MCR Jetties

3

Page 4: Walla Walla District Update

BUILDING STRONG®

Our Process Requirements prioritization and analysis

►Risk-informed decision process with system reliability considerations

►A river systems approach coordinated between Walla Walla and Portland Districts

►Conduct technical requirement review meetings annually

Communicate requirements, risks and the plan

4

Page 5: Walla Walla District Update

BUILDING STRONG®

Walla Walla District Extended Outage Requirements

Operating Project Project Description 2014 2015 2016 2017

Ice HarborDownstream gate mech gear replacement (includes bull gear)

P&S P&S ContractAward Repair

Lower Monumental

Downstream gate mechanical gear replacement

BCOES ContractAward Repair

McNary Downstream miter gate interim repair

P&S Repair

Little GooseDownstream miter gate quoin and structural repair

P&S P&S ContractAward Repair

Lower Granite

Downstream repair nav lock sill plate drain system, ladders, and armor steel

BCOES Repair

• Funding dependent• P&S – Plans & Specifications• BCOES – review to evaluate biddability, constructability,

operability, environmental, sustainability 5

Page 6: Walla Walla District Update

BUILDING STRONG®

Coordination Objectives

Program coordination with stakeholders►Communicate intended outage time frame►Communicate items in President’s Budget (usually February time frame)

Goal: 2017 Extended Outage►Funding dependent ►Expected outage approximately 14 weeks ►Will begin formal coordination when we have

FY16 budget information

6

Page 7: Walla Walla District Update

BUILDING STRONG®

20 Jan 2014 – Sediment Quality Report

15 August 2014 – P&S BCOE Cert

23 Sep 2014 –End of Public Review FPSMP/EIS

30 Oct 2014 – Award Contract

PSMP Schedule (15 August 2014 Update)

15 Nov2014 – Redd Surveys at HLD

8 August 2014 – Complete Revisions to EIS

Sep 2014 – Water Quality Certification

18 Feb 2014 – DMMO Suitability Determination

19 Dec 2013 – Port Permit Public Comment Period Ends

20 Sep 2013 – NWW Complete Draft Response to Comments

15 August 2014 – FEIS Filed with EPA

7 Nov 2013 – Award sediment re-sampling contract

1 Nov 2013 – Receive Port Permit Application

30 July 2014 – BA to NMFS/USFWS

7

15 Dec 2014 – Dredging Start

29 Oct 2014– Permit Decision

28 Oct 2014 – Sign ROD

11 Oct 2013 – NWD submit outstanding issues on DEIS comments to NWW

FEIS

Immediate Need Dredging

Regulatory Permitting

Schedule Drivers• USFWS and NMFS Plan BiOp

Page 8: Walla Walla District Update

BUILDING STRONG®

NWW Budget Trend

2013 20142015

(President’s Budget)

Operations & Maintenance (O&M)* $ 27.6M

$ 44.9M

*** $ 37.2M

Columbia River Fish Mitigation (CRFM)** $ 82.8M

$ 101.6M $ 71.0M

* Includes some non navigation funds for Lucky Peak, etc.** Includes funds for both Portland & Walla Walla District efforts***Includes one time funds-PSMP & other navigation projects.

8

Page 9: Walla Walla District Update

BUILDING STRONG®

Questions?

9