    THE NATIONALCONSTRUCTION

    STANDARD WHATWILL IT MEAN?

    Presented by: Ian Markos, Mary Nizamis

    and Robin Scott

  • 8/9/2019 W42 Safe Work 20005

    4/344

    Click to add text

    To add/duplicate this page, go to CommonTasks button, then New Slide

    AUSTRALIAS NATIONAL OHS

    STRATEGY 2002 - 2012

    NATIONAL VISIONAustralian workplaces free from death, injury and disease

    NATIONAL VISIONAustralian workplaces free from death, injury and disease

    NATIONAL TARGETSSustain a significant, continual reduction in the incidence of

    work-related fatalities with a reduction of at least 20% by 30June 2012 (and with a reduction of 10% being achieved by 30June 2007).

    Reduce the incidence of workplace injury by at least 40% by30 June 2012 (with a reduction of 20% being achieved by 30

    June 2007).

    NATIONAL TARGETSSustain a significant, continual reduction in the incidence ofwork-related fatalities with a reduction of at least 20% by 30June 2012 (and with a reduction of 10% being achieved by 30June 2007).

    Reduce the incidence of workplace injury by at least 40% by30 June 2012 (with a reduction of 20% being achieved by 30

    June 2007).

  • 8/9/2019 W42 Safe Work 20005

    5/345

    NATIONAL OHS STRATEGY2002 - 2012NATIONAL PRIORITIES

    1. Reduce high incidence/severity risks

    2. Improve the capacity of business

    operators and workers to manage OHSeffectively

    3. Prevent occupational disease more

    effectively

    4. Eliminate hazards at the design stage

    5. Strengthen the capacity of Governmentto influence OHS outcomes

  • 8/9/2019 W42 Safe Work 20005

    6/346

    REDUCE HIGHINCIDENCE/SEVERITY

    RISKS

    Focus prevention activities onthe nationally agreed high risksectors:

    Construction

    Transport

    Health & Community

    Services High Risk Plant

  • 8/9/2019 W42 Safe Work 20005

    7/347

    WHY CONSTRUCTION?WHY CONSTRUCTION?

    Construction is one of the highest risk

    industries

    Incidence of workplace accidents morethan twice the national average

    Injury rate more than one and a half timesthe national average

    Standard created to reduce workplacedeath and injury

    Royal Commission recommendeduniform national OHS

    Construction is one of the highest risk

    industries

    Incidence of workplace accidents morethan twice the national average

    Injury rate more than one and a half timesthe national average

    Standard created to reduce workplace

    death and injury

    Royal Commission recommendeduniform national OHS

  • 8/9/2019 W42 Safe Work 20005

    8/348

    November 2003 WRMC agreed NOHSCwould develop national material for the

    construction industry Included national construction standard and

    codes of practice for:

    the prevention of falls from heights, Tilt-up and Precast concrete,

    OHS induction training for construction

    work. Draft was prepared by tripartite

    Construction Reference Group

    Public comment was sought from industry

    Standard declared 27 April 2005 by NOHSC

    November 2003 WRMC agreed NOHSCwould develop national material for the

    construction industry Included national construction standard and

    codes of practice for:

    the prevention of falls from heights, Tilt-up and Precast concrete,

    OHS induction training for construction

    work. Draft was prepared by tripartite

    Construction Reference Group

    Public comment was sought from industry

    Standard declared 27 April 2005 by NOHSC

    HOW DID THE STANDARD

    COME ABOUT?

    HOW DID THE STANDARD

    COME ABOUT?

  • 8/9/2019 W42 Safe Work 20005

    9/34

    9

    NATIONAL STANDARD FORCONSTRUCTION WORKNATIONAL STANDARD FORCONSTRUCTION WORK

    Aims to protect the persons from hazards

    associated with construction work Assigns responsibilities to individuals

    Identify hazards and either eliminate or

    minimise risks

    Aims to protect the persons from hazards

    associated with construction work Assigns responsibilities to individuals

    Identify hazards and either eliminate or

    minimise risks

  • 8/9/2019 W42 Safe Work 20005

    10/34

    10

    WHO DOES THE STANDARDAPPLY TO?WHO DOES THE STANDARDAPPLY TO?

    Applies to:

    clients, designers,

    persons with control of a constructionproject or work,

    Persons engaged to undertakeconstruction work and

    construction sites

    Applies to:

    clients, designers,

    persons with control of a constructionproject or work,

    Persons engaged to undertakeconstruction work and

    construction sites

  • 8/9/2019 W42 Safe Work 20005

    11/34

    11

    OBJECTIVES AND PRINCIPLESOBJECTIVES AND PRINCIPLES

    To protect persons from hazardsassociated with construction work:

    To be achieved through

    Hazard identification,risk assessmentand risk elimination or riskminimisation

    Providing information, consultation,planning, documentation, training andother measures to ensure OHS

    To protect persons from hazardsassociated with construction work:

    To be achieved through

    Hazard identification,risk assessmentand risk elimination or riskminimisation

    Providing information, consultation,planning, documentation, training andother measures to ensure OHS

  • 8/9/2019 W42 Safe Work 20005

    12/34

    12

    DEFINITION OF CONSTRUCTIONWORKDEFINITION OF CONSTRUCTIONWORK Any work on or in the vicinity of aconstruction site carried out in connection

    with the construction, alteration, conversion,fitting-out, commissioning, renovation, repair,maintenance, de-commissioning, demolitionor dismantling of any structure, and includes

    Demolition and dismantling of structure andremoval of demolition product and waste

    Assembly/disassembly of pre-fabricated elements

    Work in connection of excavation, landscaping sitepreparation

    Work referred to in definition carried out underwater

    Any work on or in the vicinity of aconstruction site carried out in connectionwith the construction, alteration, conversion,fitting-out, commissioning, renovation, repair,maintenance, de-commissioning, demolitionor dismantling of any structure, and includes

    Demolition and dismantling of structure andremoval of demolition product and waste

    Assembly/disassembly of pre-fabricated elements

    Work in connection of excavation, landscaping sitepreparation

    Work referred to in definition carried out underwater

    DEFINITION OF CONSTRUCTION WORKDEFINITION OF CONSTRUCTION WORK

  • 8/9/2019 W42 Safe Work 20005

    13/34

    13

    HIGH RISK CONSTRUCTION WORKHIGH RISK CONSTRUCTION WORK

    Risk of falling 2m or moreWork ontelecommunications towers

    Disturbing/removingasbestos Demolition work

    Structural alteration withtemporary support

    Work in confined space

    Excavation >1.5m Construction of tunnels

    Use of explosives Work on gas lines

    Work on chemical, fuel orrefrigerant lines Tilt-up/pre-cast work

    Work near energisedinstallations

    Work on or near roadways

    Work where movement ofpowered mobile plant

    Work over or near water anddiving

  • 8/9/2019 W42 Safe Work 20005

    14/34

    14

    MANAGING SAFETY IN THE

    WORKPLACE

    MANAGING SAFETY IN THE

    WORKPLACE

    Responsibility of Clients

    Client must consult with the designerto ensure construction workassociated with the design can be

    carried out without any risk to personsdoing the work

    Client must consult with person with

    control of construction project

    Responsibility of Clients

    Client must consult with the designerto ensure construction workassociated with the design can be

    carried out without any risk to personsdoing the work

    Client must consult with person with

    control of construction project

  • 8/9/2019 W42 Safe Work 20005

    15/34

    15

    Responsibility of Designers hazards identified before

    commencement of work risks to health and safety are

    eliminated or where not practicable

    minimised report to the client in writing the health

    and safety aspects of the design

    detail of report commensurate withdegree of risk identified

    Responsibility of Designers hazards identified before

    commencement of work risks to health and safety are

    eliminated or where not practicable

    minimised report to the client in writing the health

    and safety aspects of the design

    detail of report commensurate withdegree of risk identified

    MANAGING SAFETY IN THEWORKPLACEMANAGING SAFETY IN THEWORKPLACE

  • 8/9/2019 W42 Safe Work 20005

    16/34

    16

    MANAGING SAFETY IN THE

    WORKPLACE

    MANAGING SAFETY IN THE

    WORKPLACE Responsibilities of persons with control:

    responsible for health and safety of

    any person affected by theconstruction work

    ensure information relating to hazard

    identification, risk assessment andcontrol is compiled and recorded

    an OHS management plan (where

    required) includes information ofhazard id, risk assessment

    records and OHS management plans

    are kept until completion of the project

    Responsibilities of persons with control:

    responsible for health and safety of

    any person affected by theconstruction work

    ensure information relating to hazard

    identification, risk assessment andcontrol is compiled and recorded

    an OHS management plan (where

    required) includes information ofhazard id, risk assessment

    records and OHS management plans

    are kept until completion of the project

  • 8/9/2019 W42 Safe Work 20005

    17/34

    17

    Responsibilities of persons with control:

    ensure hazards are identified hazards arising from:

    The construction site

    Design relating to the project

    Working at height

    Hazardous substances

    Presence of asbestos

    Systems of work

    Plant Manual handling

    Layout and condition of the

    construction site Physical working environment

    Responsibilities of persons with control:

    ensure hazards are identified

    hazards arising from:

    The construction site

    Design relating to the project

    Working at height

    Hazardous substances

    Presence of asbestos

    Systems of work

    Plant Manual handling

    Layout and condition of the

    construction site Physical working environment

  • 8/9/2019 W42 Safe Work 20005

    18/34

    18

    Responsibilities of persons with control:

    of a construction project must ensure

    there are effective procedures to identifyand record hazards:

    Prior to commencement of work

    Before & during installation, erection,commissioning and alteration of plant

    Before changes to systems of work

    While work is being carried out to assess risks that may arise from

    construction work

    to control risks

    to review hazard identification, riskassessment and control measures

    to provide information, instruction and

    training

    Responsibilities of persons with control:

    of a construction project must ensure

    there are effective procedures to identifyand record hazards:

    Prior to commencement of work

    Before & during installation, erection,commissioning and alteration of plant

    Before changes to systems of work

    While work is being carried out to assess risks that may arise from

    construction work

    to control risks

    to review hazard identification, riskassessment and control measures

    to provide information, instruction and

    training

  • 8/9/2019 W42 Safe Work 20005

    19/34

    19

    MANAGING SAFETY IN THEWORKPLACEMANAGING SAFETY IN THEWORKPLACE

    Responsibility of persons engaged toundertake construction work:

    Ensure that no other person is put at

    risk from the work

    Undertake their work in accordancewith information, direction,instruction

    and training with which they have beenprovided

    Responsibility of persons engaged toundertake construction work:

    Ensure that no other person is put at

    risk from the work Undertake their work in accordance

    with information, direction,instruction

    and training with which they have beenprovided

  • 8/9/2019 W42 Safe Work 20005

    20/34

    20

    OCCUPATIONAL HEALTH ANDSAFETY MANAGEMENT PLANSOCCUPATIONAL HEALTH ANDSAFETY MANAGEMENT PLANS

    Person with control of a constructionproject where 5 or more persons areworking (or likely to be workingsimultaneously) must ensure:

    a site specific OHS management planis prepared before work commences

    the plan must be monitored,

    maintained and kept up to date duringthe course of the work

    Person with control of a construction

    project where 5 or more persons areworking (or likely to be workingsimultaneously) must ensure:

    a site specific OHS management planis prepared before work commences

    the plan must be monitored,

    maintained and kept up to date duringthe course of the work

  • 8/9/2019 W42 Safe Work 20005

    21/34

    21

    Plan must include (but not inclusive):

    Statement of responsibilities,

    including names of people withresponsibilities

    Details of arrangements to ensure

    compliance with OHS inductiontraining requirements

    Hazard identification, risk

    assessment and control informationfor all work activities

    Safe work method statements for

    high risk work Copy of plan is available at all times

    Plan must include (but not inclusive):

    Statement of responsibilities,

    including names of people withresponsibilities

    Details of arrangements to ensure

    compliance with OHS inductiontraining requirements

    Hazard identification, risk

    assessment and control informationfor all work activities

    Safe work method statements for

    high risk work Copy of plan is available at all times

    S O OSAFE WORK METHOD

  • 8/9/2019 W42 Safe Work 20005

    22/34

    22

    SAFE WORK METHODSTATEMENTSSAFE WORK METHODSTATEMENTS Apply to any construction site where high-risk

    work is undertaken

    Person in control of a construction project mustensure:

    that a statement is provided by each person incontrol of high risk work before work begins

    All safe work methods are kept up to date and

    reviewed whenever there is change When a person is not complying with the

    statement, they are directed to stop the workimmediately

    If no other person is responsible for writing astatement then the person with control of theproject does so

    Apply to any construction site where high-riskwork is undertaken

    Person in control of a construction project mustensure:

    that a statement is provided by each person incontrol of high risk work before work begins

    All safe work methods are kept up to date and

    reviewed whenever there is change When a person is not complying with the

    statement, they are directed to stop the workimmediately

    If no other person is responsible for writing astatement then the person with control of theproject does so

  • 8/9/2019 W42 Safe Work 20005

    23/34

    23

    Applies to persons with control ofconstruction projects, construction workand undertaking construction work.Exception:

    Visitors to construction siteaccompanied by person who hasreceived OHS induction training

    Persons temporarily at a constructionsite where risk assessment indicatesrisks can be controlled through othermeans

    Applies to persons with control ofconstruction projects, construction workand undertaking construction work.Exception:

    Visitors to construction siteaccompanied by person who hasreceived OHS induction training

    Persons temporarily at a constructionsite where risk assessment indicatesrisks can be controlled through othermeans

    OHS TRAININGOHS TRAINING

    OHS TRAININGOHS TRAINING

  • 8/9/2019 W42 Safe Work 20005

    24/34

    24

    OHS TRAININGOHS TRAINING

    must not direct or allow a person to carryout work unless OHS induction trainingcarried out

    Person must not undertake constructionwork until they have completed OHSinduction training

    maintain records for reasonable after thecompletion of the project

    must not direct or allow a person to carryout work unless OHS induction trainingcarried out

    Person must not undertake constructionwork until they have completed OHSinduction training

    maintain records for reasonable after thecompletion of the project

    GENERAL HEALTH AND SAFETYGENERAL HEALTH AND SAFETY

  • 8/9/2019 W42 Safe Work 20005

    25/34

    25

    Existing Services Ensure existing services at the

    construction site are identified and

    risks assessed by: Type of existing services

    Location and whether underground,overhead or contained withinstructure

    Extent of services

    Risks services present

    Traffic Control

    Pedestrian, traffic or plant movementsat or near a construction site must be

    safely managed to eliminate or controlrisks

    Existing Services Ensure existing services at the

    construction site are identified and

    risks assessed by: Type of existing services

    Location and whether underground,overhead or contained withinstructure

    Extent of services

    Risks services present

    Traffic Control

    Pedestrian, traffic or plant movementsat or near a construction site must be

    safely managed to eliminate or controlrisks

    GENERAL HEALTH AND SAFETYPROVISIONSGENERAL HEALTH AND SAFETYPROVISIONS

  • 8/9/2019 W42 Safe Work 20005

    26/34

    26

    GENERAL HEALTH AND SAFETY

    PROVISIONS

    GENERAL HEALTH AND SAFETY

    PROVISIONS

    Lighting

    Ensure the level of lighting where workis being performed or required to passthrough does not present risks

    Access/Egress

    All persons are provided safe accessand egress from all places whererequired to work or pass

    Lighting

    Ensure the level of lighting where workis being performed or required to passthrough does not present risks

    Access/Egress

    All persons are provided safe access

    and egress from all places whererequired to work or pass

  • 8/9/2019 W42 Safe Work 20005

    27/34

    27

    Public Access

    Ensure members of public are notexposed to health and safety risksarising from the construction work

    Adequate perimeter fencing is installedon the construction site before workcommences and maintained for the

    period of work Signs placed on each site, names and

    contact details of persons with control,

    including after hours contact number

    Public Access

    Ensure members of public are notexposed to health and safety risksarising from the construction work

    Adequate perimeter fencing is installedon the construction site before workcommences and maintained for the

    period of work Signs placed on each site, names and

    contact details of persons with control,

    including after hours contact number

    Emergency Procedures Emergency Procedures

  • 8/9/2019 W42 Safe Work 20005

    28/34

    28

    Emergency Procedures

    All workers in the event of danger are

    able to evacuate all work areas quickly Specific emergency exits, routes and

    plans are displayed

    Rescue arrangements for injuredpersons are in place

    Emergency evacuation procedures are

    practised regularly where indicated byrisk assessment

    Emergency Procedures

    All workers in the event of danger are

    able to evacuate all work areas quickly Specific emergency exits, routes and

    plans are displayed

    Rescue arrangements for injuredpersons are in place

    Emergency evacuation procedures are

    practised regularly where indicated byrisk assessment

    First-aid and medical attention First-aid and medical attention

  • 8/9/2019 W42 Safe Work 20005

    29/34

    29

    First-aid and medical attention

    First aid to be accessible

    provision of trained personnel must beadequate for initial treatment

    Electricity Supply

    Electrical installations,equipment andapparatus are installed, protected,used , maintained and tested toeliminate risk of electric shock

    Housekeeping

    Site must be kept orderly and tidy

    Access ways kept clear and non-

    slippery Safe systems for collecting,storing and

    disposing of waste materials

    Plant secured when not in use

    First aid and medical attention

    First aid to be accessible

    provision of trained personnel must beadequate for initial treatment

    Electricity Supply

    Electrical installations,equipment andapparatus are installed, protected,used , maintained and tested toeliminate risk of electric shock

    Housekeeping Site must be kept orderly and tidy

    Access ways kept clear and non-

    slippery Safe systems for collecting,storing and

    disposing of waste materials

    Plant secured when not in use

    Exposure to the elements Exposure to the elements

  • 8/9/2019 W42 Safe Work 20005

    30/34

    30

    Exposure to the elements

    Ensure safety of persons where any

    risk of exposure to adverse weatherconditions

    Amenities

    Ensure persons have access toamenities for their welfare andpersonal hygiene

    posu e to t e e e e ts

    Ensure safety of persons where any

    risk of exposure to adverse weatherconditions

    Amenities

    Ensure persons have access toamenities for their welfare andpersonal hygiene

  • 8/9/2019 W42 Safe Work 20005

    31/34

    31

    TRANSITIONAL PERIODSTRANSITIONAL PERIODS

    2 year transitional period for commercialand civil construction sectors

    3 year transitional period for housingsector

    2 year transitional period for commercialand civil construction sectors

    3 year transitional period for housingsector

  • 8/9/2019 W42 Safe Work 20005

    32/34

    32

    WHAT DOES ALL THIS MEAN FORTHE INDUSTRYWHAT DOES ALL THIS MEAN FORTHE INDUSTRY

    Standard to be incorporated into SAsOHS&W Regulations, 1995

    After transitional period expires industry

    must comply with requirements of theNational Standard

    Industry will be advised when this will

    occur

    Standard to be incorporated into SAsOHS&W Regulations, 1995

    After transitional period expires industry

    must comply with requirements of theNational Standard

    Industry will be advised when this will

    occur

  • 8/9/2019 W42 Safe Work 20005

    33/34

    33

    QUESTIONS?QUESTIONS?