363
1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning: Village Information Book 100L MIMAP Focus Study Series contain preliminary material and research results and are circulated provisionally in order to stimulate discussion and critical comment. It is expected that the content of the Focus Study Series may be revised prior to their eventual publication in some other form.

Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

1CRC .. Lfb.

MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment

Policies in Bangladesh

Focus Study No. 06

Data Base for Local Level Planning:

Village Information Book

100L

MIMAP Focus Study Series contain preliminary material and research results and are circulated provisionally in order to stimulate discussion and critical comment. It is expected that the content of the Focus Study Series may be revised prior to their eventual publication in some other form.

lmantha
Text Box
This report is presented as received by IDRC from project recipient(s). It has not been subjected to peer review or other review processes. This work is used with the permission of Bangladesh Institute of Development Studies. © 2003, Bangladesh Institute of Development Studies.
Page 2: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

MIMAP-Bangladesh Focus Study No. 06

Data Base for Local Level Planning: Village Information Book

This work was carried out with the aid of a grant from the International Development Research Centre, Ottawa, Canada

The materials presented and the opinion expressed in this Publication are those of the authors and do not necessarily reflect those of BIDS and the International Development Research Centre (IDRC)

April 2003 BIDS

Published by: Bangladesh Institute of Development Studies (BIDS) E # 17 Agargaon, Sher-e-Bangla Nagar Dhaka # 1207 BANGLADESH Tel: +880-2-914 3441-8 Fax: +880-2-811 3023 E-mail: [email protected] Web site: www.bids-bd.org

ii

Page 3: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Data Base for Local Level Planning: Village Information Book

BANGLADESH INSTITUTE OF DEVELOPMENT STUDIES (BIDS)

DHAKA

BANGLADESH ACADEMY FOR RURAL DEVELOPMENT (BARD)

KOTBARI, COMILLA

III

Page 4: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

CONTENTS

A. General

Information Of The Village Page Number

Taitoli

2

Paruara Deokher ! Bogair

70 160 243

71 161 244

72 162 245

73 163 -246 :

6 74 164 247

6 74 164 247

7 75 _j 165 248

8 75 165 248

8 76 _j 166 249

9 76 166 249

9 77 167 250

10 77 167 250

10 78 168 251

11 78 168 251

11 78 168 251

11 79 169 252

12 79 169 252

12 79 169 252

13 80 170 253

23 94 183 271

32 I 107 195 288

41 120 207 306

50 133 218 323

B. Resources

C. Education

E. Employment

F. Livestock And Trees

G. Situation Of Poverty

Table 1: Distribution Of The Household Members According To Different Age Group

Table 2: Educational Qualifications Of The Household Head

Table 3: Distribution Of The Household Head According To Their

A-ge - -- Table 4: Distribution Of The Household According To The Land

Ownership

Table 5: Occupation Of The Households Head

Table 6: Distribution Of The Households By Materials Of Roof Of Main House

Table 7: Distribution Of The Households By Access To Communication Facilities

Table 8: Distribution Of The Households By Nature Of Transport

--Ownership Table 9: Distribution Of The Households By Electricity Facility Table 10: Distribution Of The Households By Having Own Tube

Well

Table 11: Distribution Of The Households By Having Own AgriculturalEqu pment

Age of the Population

Education and Training

Nature of Land Ownership, Its Utilization, Income and Expenditure

Animal and Forest Resources, Source of Water and Nature of Latrine

Employment, Family Planning Method, New Born Baby and Disease

Electricity, Tube Well, Transport Ownership, Production 60 146 230 341 Equipment, Housing, Access to Communication Equipment, Involvement in Development Organization and Credit

iv

Page 5: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

PREFACE

This data book contains information about socio economic status of every

household in four villages selected for pilot implementation of the local level

poverty monitoring system (LLPMS) of MIMAP-Bangladesh. The Bangla version

of the data book has been prepared and circulated at the union level. The

functionaries of the Union Parishad will be able to use this data book for making

information-based decisions.

The Bangladesh Academy for Rural Development (BARD) and MIMAP-

Bangladesh, Bangladesh Institute of Development Studies (BIDS), Dhaka has

jointly designed the data book. It may be mentioned here that the Comprehensive

Village Development Programme (CVDP), an experimental project of BARD, has

introduced the village information book at its project area. The experience of

CVDP has been used in designing this data book. Some young and educated people at the village level have been utilised for gathering the data.

Faculty members of BARD, especially Mr. Md. Habibullah, Mr. Md. Abdul

Quader, Mr. Ranjan Kumar Guha, Mr. Abdullah Al Mamun and Mr. Anwar Pasha

have taken a lot of pain for designing and finalising the data book. Thanks are due to Dr. Quazi Shahabuddin, Director General, BIDS and Mr. Md. Sikander Ali

Mondal, Director General, BARD, Comilla for their keen interest and suggestions in preparing the data book. I also appreciate the painstaking efforts of Mr. Md.

Mahiuddin, Ms. Kamrunnaher, Ms. Hasina Akhter, Md. Humayan Kabir, Mr. Md Shahajahan and Mr. Sahidul Islam for data collection. Finally, all villagers of the four villages and functionaries of the Sreepur Union Parishad deserve special thanks for extending their whole-hearted cooperation in providing information.

It is expected that the data book will be able to sensitise the policy planners about its importance and the respective Union Parishad will prove its effectiveness by using and updating the data book regularly. Our efforts will be to develop a computer based data book on the basis of experience learned from the project for making it more user friendly.

Mustafa K Mujeri Project Leader

MIMAP-Bangladesh v

Page 6: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NAME OF THE VILLAGE:

TALTOLI

Page 7: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Village :Taltoli Union :Sreepur Upazila :Chowdaugram District :Comilla

A. General

Sl. No. Description Break-up of Description Total I Area of the village (In Acres) 53

2 Distance from Upazila Head quarter (In km.) 15

3 Distance from District Headquarter (In km.) 35

4 Distance from nearest Pucca Road (In km) 01

5 Number of Population Male- 242 Female-250

492

6 Sex Ratio 96.8 7 Number of Household 92

8 Household Size 5.34 9 Sex of the Household Head Male- 80 (87)

Female-12 (13) -

10 Number of widows, divorced and separated women 29 11 Religious Status of the household head Muslim- 92(100) 12 Age dependency Ratio (under 15 and above 65+) 29.15

2

Page 8: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

B. Resources

SI. No. Description Break-up of Description Total 1 Number of Ponds Single Ownership-

Joint ownership- 07

2 Number of Kua Single Ownership- Joint ownership-

3 Number of Educational Institute Primary- 0 High School- 0 College- 0

Madrasha- 0 Maktab- 01

4 Total cultivated Land Paddy field 49.6 Seedbed 7.17

5 Number of Mosque 02

6 Number of Graveyard 12

7 Number of Deep tubewell 01

8 Number of Shallow Tubewell 0

9 Pacca road in the village (in Kilometer) 0 10 Number of village shop 0 11 Drainage Pipe 06 12 Total village road 04

3

Page 9: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

C. Education

SI. No. Description Break-u of Description Total 1 School Enrolment Rate (Primary Level) Boy- 27(100) 61(100)

Girl- 34(100) 2 School Enrolment Rate (Secondary level) Boy- 21/21(100) (97.95)

Girl- 27/28 (96) 3 School drop out Rate (Primary Level) Boy-0 (0)

Girl-0 4 School dropout Rate (Secondary level) Boy- 4/21(19) (10.63)

Girl- 1/26(3.84) 5 Literacy Rate (7 years +) Male- 162/205 (79.02)

Female-126/206 (61.16) 6 Number of Illiterate Adult (16+ Male- 43

Female- 80

7 Number of person Attended adult Literacy Programme Male- 0 0 Female-0

8 Number of people passed SSC or HSC Male- 42 55

Female- 13

9 Number of people completed graduation or post graduation Male- 01 02 degree Female- 01

10 Distant of Nearest Educational Institute from the village Primary- 01 km Girls High School-01 km Boys High School-02km Girls College- 01 km College- 02km

11 Number of Disabled Person Male- 12

Female-

4

Page 10: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

D. Health and Sanitation

Si. No. Description Break-up of Description Total 1 Number of Deaths due to pregnancy complication last year 00 2 Number of deaths of children (0-1 years) over last 12

months Boy-00 Girl-01

01

3 Infant Mortality Rate 1/17*1000 59

4 Number of deaths of children (1-4 years) over last 12

months Boy- 00 Girl- 00

0

5 Number of children affected by disease (0-5 Years) Boy- Girl-

07

6 Number of children born last Year 17

7 Number of Persons suffered from disease (5 Years above) over last 12 months

Male- 26 Female-35

8 Sources of water used for Drinking water Tubewell-92 (100) 9 Sources of water used for Cleaning utensils Pond- 45(48.9)

Tubewell- 03(35.9) Both- 14 (15.2)

10 Nature of Latrine use for defecation Open- 07 (07.6) Ring slab- 05(92.4)

11 Distant from the Union Health Centre (In km.) 02

12 Distant from the Upazila Health Complex (In km) 20

5

Page 11: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

E. Employment

SI. No. Description Break-up of Description Total I Number of child Labour (5-14 years) Male- 04

Female-01 05

2 Number of Active labour force Male- 120 Female-95

120

3 Nature of Employment for Male Unemployed- 08

Underem loed-09 4 Nature of Employment for female Unemployed- 08

Underem loyed-15 5 Number of wage Labourer Agricultural-

Non Agricultural- 6 Total Number of People Living Abroad 38

7 Total Number of People Living outside the village in home 01

F. Livestock and trees

S1. No. Description Break-up of Description Total 1 Total number of Poultry 1652

2 Total number of Livestock Cow- 121

Goat- 24

125

3 Total number of Poultry died last year 1076

4 Total number of Livestock died last year Cow-00 Goat-01

01

5 Total number of wood trees 2070 6 Total number of fruit trees 936

6

Page 12: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

G. Situation of Poverty

Sl. No. Description Break-up of Description Total 1 Situation of Poverty among the people According to the Rich- 26.0%

perception of the village people Middle class- 19.5% Poor- 18.1%

Very Poor- 36.4% 2 Situation of Poverty According the criteria of Income Well of- 47%

(CBN Method) Poor- 53%

3 Situation of Poverty According the criteria of capacity to Surplus 17.5%

food consumption Break even 34.8% Occasionally deficit 18.3%

Chronic deficit- 29.5% 4 Situation of Poverty According to the criteria of Calorie Non Poor 45.7%

intake (24 hours recall method) Poor 25.2% Very Poor 29.1%

5 Head count ratio of the poor (Po) 0.53

6 Poverty Gap Index (P1) 0.27

7 Square Poverty Gap Index (P2) 0.19

7

Page 13: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 1: Distribution of the household members according to different age group

Age Group Male Female Total Up to 5 37(15.29) 44(17.60) 81(16.46)

6-10 27(11.16) 34(13.60) 61(12.40) 11-15 21(8.68) 28(11.20) 49(9.96)

15-30 85(35.12) 77(30.80) 162(32.93)

30-64 54(22.31) 55(22.00) 109(22.15)

65+ 18(7.44) 12(4.80) 30(6.10)

Total 242(100.00) 250(100.0) 492(100.00)

Table 2: Educational Qualifications of the Household head

Frequency Valid Percent

Illiterate 56 60.9

Class IV 01 01.1

Class V 11 12.0

Class VII 03 03.3

Class VIII 03 03.3

Class IX 03 03.3

SSC /Dakhil 13 14.2

HSC/Alim 01 01.1

Kamil 01 01.1

Total 92 100.0

8

Page 14: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 3: Distribution of the household head according to their age

Frequency Per cent

Lowest to 25 09 09.8 25-35 28 30.4

35-45 24 26.1

45-55 08 08.7

55 and above 23 25.0

Total 92 100.0

Table 4: Distribution of the Household according to the land ownership

Land ownership Group (in Acre) Number of Household Per cent of Household Less than .05 (Landless) 21 22.8

.05-2.49 (Small Farmers) 61 66.3

2.5-7.49 (Medium Farmers) 10 10.9

Total 92 100.0

9

Page 15: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 5: Occupation of the Households head

Frequency Valid Per cent Farmer 28 30.4

Day labourer 18 19.6

Wage Earner 13 14.1

House wives 09 09.8 Business 06 06.5

Teacher 05 05.4

Mason 04 04.3

Women labourer 02 02.2

Imam 02 02.2

Service 01 01.1

Rickshaw Pulling 01 01.1

Defence Service (Retired) 01 01.1

Driver 01 01.1

Rural Doctor 01 01.1

Total 92 100.0

Table 6: Distribution of the households by materials of roof of main house

Frequency Valid Per cent CI sheet 80 86.8

Chan (straw) 08 08.8 Cement 04 04.4 Total 91 100.0

10

Page 16: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 7: Distribution of the households by Access to Communication facilities

Frequency Valid Per cent

Nil 55 60.4

Twin one 23 25.3

Television black and white 05 05.5

Television color 05 05.5

TV and twin 03 03.3

Radio 01 01.1

Total 92 100.0

Table 8: Distribution of the households by nature of transport ownership

Nature of transport Frequency Valid Per cent

Nil 47 51.6 Rickshaw 02 02.2

Bi-Cycle 43 47.3

Total 92 100.0

Table 9: Distribution of the households by Electricity Facility

Frequency Valid Per cent

No 31 33.0

Yes 61 67.0

Total 92 100.0

11

Page 17: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 10: Distribution of the households by having own tube well

Frequency Valid Per cent

No 52 56.0

Yes 40 44.0

Total 92 100.0

Table 11: Distribution of the households by having Own Agricultural Equipment

Frequency Valid Per cent

Nil 55 59.3

Weedier 10 11.0

Thresher 01 01.1

Weedier and Thresher 26 28.6

Total 92 100.0

12

Page 18: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

AGE OF THE POPULATION

Page 19: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Taltoli A e of the population

Name of the Name of H ousehold Head 0-5 6- 10 11 -15 15 -30 30 -64 65+ Total Household head Bari

(Cluster of U household) c ° c

E u w f E f E Z E E Z w f E H U. 0 U- LL

W d 129

W

1 Mr. Ali Akbar Molla Molla Bari 90 Alim Teacher - - - - - - 3 3 - 1 1 - 4 4 8

2 Mr. Ali Ashab Molla Bari 80 .00 Farmer - - - 1 1 - 1 1 - 1 1 - 3 3 6

3 Mr. Babul Miah Molla Bari 35 .00 Farmer - 2 - - - - 2 3 2 1 - - 4 6 10

4 Mr. Abul Khair Molla Bari 31 .00 Day 1 2 - - - - - 1 1 - - - 2 3 5

Labourer

5 Mr. Delwar Molla Bari 29 .00 Business - 3 - - - - 1 1 - - - - 1 4 5

Hossain

6 Mr. Abul Hossain Molla Bari 25 .00 Farmer - - - - - 1 2 - - 1 - - 2 2 4

7 Mr. Monir Hossain Molla Bari 20 .00 Day Labour - - - 2 - 1 2 1 - - - 1 2 5 7

8 Mr. Joynal Abedin Joynaler Bari 45 Kamel Imam - - - - 1 2 1 - 1 1 - - 3 3 6

9 Mr. Jamal Hossain Joynaler Bari 25 .00 Wage Earner - - - - 1 - 2 1 - 1 - - 3 2 5

10 Mr. Jahangir Joynaler Bari 28 .00 Day 1 1 - - - - 1 1 - - - - 2 2 4 Hossain Labourer

(continued)

14

Page 20: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A ge of the o ulation Name of the Name of H ousehold Head 0 -5 6- 10 11-15 15-30 30 -64 6 5+ T otal

d Household head Bari o (Cluster of c ,o e . household) ° a ! o M c

U. u C7 W a 0

11 Mr. Abdul Khaleq Joynaler Bari 38 Illiterate Wage Earner 1 - - 2 - - 1 1 - - - 2 3 5

12 Mr. Shah Alam Joynaler Bari 30 Illiterate Wage Earner - 1 - - - - 1 1 - - - 1 2 3

13 Mr. Abdur Rab Joynaler Bari 25 Illiterate Day - - 1 - - 1 1 1 - - - 2 3 5

Labourer

14 Mr. Ambar All Ambar All 56 Dakhil Imam - - - - 1 2 3 1 - - 1 1 5 4 9

Munshi Munshi Bari

15 Mr. Mafiz Miah Ambar All 52 5 Farmer 1 1 - 2 1 - 2 - 1 1 - - 5 4 9

Munshi Bari

16 Mr. Delwar Ambar All 35 7 Business - 2 - 2 - 1 - - 1 1 - - 1 6 7

Hossain Munshi Bari

17 Mr. Shamsul Haq Ambar All 30 Illiterate Farmer 1 1 1 1 - - 1 1 - - - 3 4 7

Munshi Bari

18 Mr. Hafez Miah Ambar All 28 Illiterate Day - 1 1 - - - 1 1 - - - - 2 2 4

Munshi Bari Labourer

19 Ms. Amena Begum Ambar All 40 Illiterate House Wife - - - - - 1 - 2 - - - 0 4 4 Munshi Bari

20 Ms. Monwara Ambar All 35 Illiterate Women - - - - - - - - - 1 - - 0 1 1

Begum Munshi Bari Labourer

(continued)

15

Page 21: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A iii

e of the population Name of the Name of H ousehold Head 0 -5 6- 10 11 -15 15 -30 30 -64 65+ Total

Household head Bari o (Cluster of -R o G U

household) C 'a+ 4) d 4) 0) N N C) H

E a is != E E E E E

E E w E aEi

E

16 'O ? V LL- LL LL U. U. LL U. 0

LL 0

21 Mr. Haroon Miah Ambar Ali 25 4 Business 1 - - - - - 1 1 - - - - 2 1 3

Munshi Bari

22 Mr. Abu Taher Ambar All 22 Illiterate Business - 1 1 - - - 1 1 - - - - 2 2 4

Munshi Bari

23 Mr. Shahid Miah Ambar Ali 20 Illiterate Driver - - - - - - 1 1 - - - - 1 1 2

Munshi Bari

24 Mr. Salamatullah Charu Bari 65 Illiterate Farmer - - - - - - 3 - - 1 1 - 4 1 5

(Charu)

25 Mr. Mir Ahmed Charu Bari 50 SSC Service - 1 - - - - 4 1 1 1 - - 5 3 8

26 Mr. Abul Kashem Charu Bari 42 SSC Doctor - - 2 - - - 1 1 1 1 - - 4 2 6

27 Mr. Jahangir Charu Bari 30 Illiterate Day - - - - 1 1 2 1 - 1 - - 3 3 6

Hossain Labourer

28 Ms. Amena Begum Charu Bari 40 Illiterate House Wife - - - - 1 1 - 1 - 1 - - 1 3 4

29 Ms. Selina Begum Charu Bari 38 Illiterate House Wife - - - - 2 - 2 2 - 1 - - 4 3 7

30 Mr. Abdul Khaleq Charu Bari 35 Illiterate Day 1 1 1 2 - - - - 1 2 - - 3 5 8

Labourer

(continued)

16

Page 22: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Ag e of the population Name of the Name of H ousehold Head 0-5 6- 10 11 -15 15-30 30-64 6 5+ T otal

a, Household head Bar! (Cluster of c .0 - c 0 W W household) ° 0 a a a, a, a, a, d M

M LL. "0 0

U 4) LL. U. LL LL U- LL U.

W pr 0

31 Mr. Abul Hashem Charu Bari 27 Illiterate Day 3 - - - 1 1 4 1 5

Labourer

32 Ms. firoza Begum Charu Bari 40 Illiterate Women - - - 1 1 - 1 1 2

Labourer

33 Mr. Sultan Ahmed Charu Bari 56 Illiterate Day 1 1 - 1 - - 2 2 1 1 - - 4 5 9

Labourer

34 Mr. Salim Miah Charu Bari 28 Illiterate Day 2 - 1 1 - - 1 1 - - - - 4 2 6

Labourer

35 Mr. Nur Islam Charu Bari 50 Dakhil Farmer 1 - - - - - 2 1 1 1 - - 4 2 6

36 Mr. Delwar Noor Islam 30 SSC Teacher - 3 1 - - - 3 2 1 1 - - 5 6 11

Hossain Bar!

37 Mr. Fazlur Noor Islam 42 7 Farmer - - - - - 1 2 1 1 1 - - 3 3 6

Rahaman Bari

38 Ms. Amena Begum Noor Islam 60 Illiterate Farmer - - 1 - - - - - - 1 - - 1 1 2

Bari

39 Mr. Momin Miah Noor Islam 35 Illiterate Rickshaw 1 - - 1 1 - - - 1 1 - - 3 2 5

Bar! Puller

40 Mr. Babul Miah Noor Islam 30 Illiterate Business 1 2 - - - - - - 1 1 - - 2 3 5

Bar!

(continued)

17

Page 23: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Ag e of the population Name of the Name of H ousehold Head 0 -5 6-10 11 -15 15 -30 30 -64 6 5+ Total

Household head Bari o (Cluster of a o 2 ̀ c V

household) o

C a + ° a GJ

m N d d

1O ro U

f0 o 4J W

f0

F-

'E + a . E (D w E of E j E E

ai E u E aw

c L°

LL 13 LL U. LL LL L1. U. LL 0

w p. 0

41 Mr. Shahalam Noor Islam 25 Illiterate Business - 2 - - - - 1 1 - - - - 1 3 4

Miah Bari

42 Master All Ashraf Master All 45 SSC Teacher - - - - - 1 3 - 1 1 - 4 2 6

Ashraf Bari

43 Mr. Md. All Akbar Master All 40 Illiterate Farmer - - 1 - 1 1 - 1 1 1 - - 3 3 6

Ashraf Bari

44 Mr. Md. Abu Taher Master All 38 5 Wage Earner 1 1 - - - - - - 1 1 - - 2 2 4

Ashraf Bari

45 Mr. Abul Khair Master All 35 SSC Farmer - 1 2 - - - - - 1 1 - - 3 2 5

Ashraf Bari

46 Mr. Abdul Latif Master All 60 5 Wage Earner - - - - - 1 1 1 1 1 - - 2 3 5

Ashraf Bari

47 Ms. Ambia Khatun Master All 80 Illiterate House Wife - - - - - - - - - - - 1 0 1 1

Ashraf Bari

48 Mr. Momtaz Uddin Sarder Bari 72 9 Farmer 1 - 1 1 1 1 2 - 1 1 1 - 7 3 10

Sarder

49 Mr. Haroonur Sarder Bari 60 9 Retired Army - - 2 - - 1 2 - 2 1 - - 6 2 8

Rashid

50 Mr. Mokhlesur Sarder Bari 65 SSC Teacher - - - - - 2 3 - - 1 2 - 5 3 8

Rahaman

(continued)

18

Page 24: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of H ousehold Head 0 -5 6-10 11 -15 15-30 30-64 6 5+ T otal

a, Household head Bari V (Cluster of o 0 U

household) d 2 5 a a, R

a, v a, a, v . a v '= 3

m f W

E f a£, W E E W

W f

a E

L 1

? U. U. U. IL. U. IL U. W or 0

51 Mr. Shafiqul Islam Sarder Bari 40 5 Farmer - 1 1 1 1 - - 1 1 - - - 3 3 6

52 Mr. Delwar Sarder Bari 35 9 Day - 1 - - - - - 1 1 - 1 - 2 2 4

Hossain Labourer

53 Mr. All Ashraf Sarder Bari 70 8 Farmer - - - - - - - 1 1 1 1 - 2 2 4

54 Mr. Joynal Abedin Sarder Bari 67 SSC Teacher - - - 1 - 1 2 1 - 1 1 - 3 4 7

55 Mr. Sujat Ali Sujat All Bari 70 Illiterate Farmer - - - - - - 1 1 1 1 1 - 3 2 5

56 Mr. Abdur Rab Sujat All Bari 39 Illiterate Day 1 1 - 2 - - - 1 1 - - - 2 4 6 Labourer

57 Mr. Anwar Hossain Sujat Ali Bari 18 5 Mason - - - - - - 2 - - 1 - - 2 1 3

58 Mr. Amir Hossain Sujat All Bari 27 5 Mason 1 - - - - - 1 1 - - - - 2 1 3

59 Ms. Honabi Begum Sujat All Bari 45 Illiterate House Wife - - - - 1 1 - - - 1 - - 1 2 3

60 Mr. Ful Miah Sujat All Bari 37 Illiterate Day 1 - 1 1 - - - 1 1 - - - 3 2 5

Labourer

(continued)

19

Page 25: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of H ousehold Head 0-5 6-10 11 -15 15 -30 30 -64 6 5+ T otal

a, Household head Bari o (Cluster of ' o o V Z. household)

C+ a '

aU CJ d Gl

w d

w Fv w N a d N

To d N H M ' a ra E m E m E ' E M E m C m E

U. 8 W a 0

61 Mr. Babul Miah Sujat Ali Bari 36 Illiterate Wage Earner 1 1 - 2 - 1 1 1 1 1 - - 3 6 9

62 Mr. All Akbar All Akbar 70 Illiterate Farmer - - - - - 2 2 2 - - 1 - 3 4 7

Bari

63 Mr. Abul Khair All Akbar 50 SSC Wage Earner 1 1 - I - - - 1 1 - - - 2 3 5

Bari

64 Mr. Abul Hashem All Akbar 45 5 Farmer 1 1 - - - - - 1 1 - - 1 2 3 5

Bari

65 Mr. Baharul Alam All Akbar 35 5 Farmer - 1 - - - - - 1 1 - - - 1 2 3

Bari

66 Mr. Abdul Aziz All Akbar 30 5 Farmer - 1 - - - - 1 1 - 1 - 1 1 4 5

Bari

67 Mr. Abdul Bari All Akbar 33 SSC Wage Earner 1 1 1 - 1 - - 1 1 - - - 4 2 6

Bari

68 Mr. Mominul Islam All Akbar 35 Illiterate Farmer - 1 - - 1 - - - 1 1 - - 2 2 4

Bari

69 Mr. Tazul Islam All Akbar 32 5 Farmer 2 1 - 1 - - - 2 2 - - 1 4 5 9

Bari

70 Mr. Junab All All Akbar 65 Illiterate Farmer - - - - - - 2 1 - 1 1 - 3 2 5

Bari

(continued)

20

Page 26: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the o ulation Name of the Name of H ousehold Head 0-5 6-10 11 -15 15 -30 30 -64 6 5+ Total

Household head Bari o (Cluster of C c

household) a v o ' 1° '9 '° a i4 '= f E f f E m d

c U.

U U LL. LL LL. LL U. LL,

w p, O

71 Mr. All Ashab All Akbar 70 Illiterate Farmer 1 1 1 1 3 1 4

Bari

72 Mr. Mohan Miah Ali Akbar 40 Illiterate Day 1 - 1 1 - - - 1 1 - - - 3 2 5

Bari Labourer

73 Mr. Manik Miah All Akbar 35 Illiterate Wage Earner - 2 1 - - - 1 1 - - - 2 3 5

Bari

74 Mr. Abu Taheer All Akbar 32 Illiterate Day 2 - - - - - 1 1 - - - 3 1 4

Bari Labourer

75 Mr. Farid Miah All Akbar 35 Illiterate Mason 1 - - - - - - 1 1 - 1 1 3 2 5

Bari

76 Mr. All Ahamed All Akbar 58 Illiterate Day - - - 2 - 1 1 2 1 1 - - 2 6 8

Bari Labourer

77 Mr. All Miah All Akbar 55 Illiterate Day - 1 - - 1 - 1 1 1 - - - 3 2 5

Bari Labourer

78 Ms. Monwara All Akbar 37 Illiterate House Wife - - 1 1 - - - 1 - 1 - - 1 3 4

begum Bari

79 Mr. Sultan Ahmed All Akbar 55 Illiterate Farmer - - - - - 2 1 1 1 - - 3 2 5

Bari

80 Ms. Sreemati All Akbar 40 Illiterate House Wife - - 1 - 1 1 - - - 1 - - 2 2 4

begum Bari

(continued)

21

Page 27: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of H ousehold Head 0-5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head Sari

U (Cluster of c o a) y ?, household) a ro m ro E a . f E a)

E X aai E E aai f £i aw E

U - 7 V W LL LL. U. U. U. LL.

w p+ 0

81 Mr. Nnu Miah All Akbar 82 8 Farmer - - - - - - 2 - - 1 1 - 3 1 4

Munshi Bari

82 Mr. Mokhlesur All Akbar 33 Illiterate Day 2 - - 1 - - - 1 1 - - - 3 2 5

Rahaman Bari Labourer

83 Mr. Suruj Miah Moharam All 65 Illiterate Farmer 1 - - - - - 2 2 1 1 1 - 5 3 8

Bari

84 Mr. Shamsul Moharam All 52 SSC Wage Earner 1 1 1 1 1 1 1 2 1 - - - 5 5 10

Haque Master Bari

85 Mr. Nurul Haq Moharam All 55 7 Wage Earner - - - 1 - - - - 1 1 - 1 1 3 4

Bari

86 Ms. Surjaban Bibi Moharam All 60 Illiterate House Wife - - - - - - - - - 1 - - 0 1 1

Bari

87 Mr. Maharam All Moharam All 85 Illiterate Farmer - 1 1 1 1 2 2 4

Raj Bari

88 Mr. Abdul Mannan Moharam All 45 SSC Wage Earner 1 - 1 - - 1 - 1 1 - - - 3 2 5

Bari

89 Mr. Joynal Abedin Moharam All 43 5 Wage Earner 1 1 2 - - - - 1 1 - - - 4 2 6

Bari

90 Mr. Ful Miah Moharam All 45 8 Day - - - - - - - - 1 1 - - 1 1 2

Bari Labourer

91 Mr. Abdul Wadud Moharam All 42 Illiterate Mason - 1 - 2 1 - - 1 1 1 - 1 2 6 8

Bari

92 Ms. Safia Begum Moharam All 65 Illiterate House Wife - - - - - - - - - - - 1 0 1 1

Bari

22

Page 28: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EDUCATION AND TRAINING

Page 29: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Taltoli Information abo ut Education

i Skill T i ra n ng 6-10 ears child 11-15 years old 16-18 ears old 18+ Age Number of

c U Going Not going

Going Not going person Passed

Number of Subject school after school after Literate Illiterate Literate Illiterate SSC or HSC

a School

Admission School Admission

Person

C d Gl N N d

= Bo Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male E Male Female IL U. IL

1 4 3 - 1 2 - - - - -

2 - 1 1 1 1 1 1 1 - Electrical -

3 - - - - - - - - 2 2 1 1 1 1 - - - - -

4 1 1 - - - -

5 1 1 - - - - - -

6 1 1 1 1 - - -

7 - 2 1 1 1 1 1 - -

8 - - - - 1 2 - - - - - - 2 1 - - 2 1 - - - -

9 1 - - - - 1 - - 1 1 1 - - - -

10 - - - - - - - - - - - - - 1 1 - - - - - -

11 2 - - - - 1 1 - - - - -

12 - - - 1 1 - - -

24

Page 30: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information abo ut Education i i l Tra ng Skil n

6-10 years child 11-15 ears old 16-18 ears old 18+ Age Number of

c Going Not going

Going Not going person Passed

Number of Subject school after school after Literate Illiterate Literate Illiterate SSC or HSC

0 School

Admission School

Admission Person

U)

0 d d a, a

= Bo Boy Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male E Male Female U. U U. U. U

13 1 - - - - 1 - - 1 - - - - 1 - 1 - 1 - - - -

14 - - - - 1 2 - - 2 1 - - 2 - - 1 1 1 - - - -

15 - 2 - - 1 - - - 2 - - - 1 1 - - - - - 1 - Nutrition

16 - 2 - - - 1 - - - - - - 1 1 - - - - - - - -

17 1 1 - - - - - - - - - - 1 2 - - - - - - - -

18 1 - - - - - - - - - - - - - 1 1 - - - - - -

19 - - - - - 1 - - - - - - - 3 - - - - - - - -

20 - - - - - - - - 1

21 - - - - - 1 1 - -

22 1 - - - 1 1

23 - - - 1 1

24 - - - - - - - - - - - - 3 - 1 1 2 - - - - -

25

Page 31: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information abo ut Education Skill T i i ra n ng

6-10 ears child 11-15 ears old 16-18 ears old 18+ Age Number of

0 Going Not going

Going Not going person Passed

Number of Subject school after school after Literate Illiterate Literate Illiterate SSC or HSC

School Admission School Admission

on Person

ai

0 z Boy Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male ' Male Female

U. LL LL U.

25 - 5 2 - - 4 - - - - -

26 2 - 1 2 - - 1 2 - - - - -

27 - - - - 1 1 - - 2 - - - - 1 1 1 2 - - - - -

28 - - - - 1 1 - - - 1 - - - - - 1 - 1 - 1 - Animator

29 - - - - 2 - - - - 1 - - 2 1 - 1 1 1 - - - -

30 1 2 - - - - - - - - - - - - 1 1 - - - - - -

31 - - - - - - - - - - - - - - 1 1 - - - - - -

32 - - - - 1 - - - - - - - - - - 1 - - - - - -

33 - 1 - - - - - - - - - - 1 1 2 2 1 - - - - -

34 1 1 - - - - - - - - - - - - 1 1 - - - - - -

35 - - - - - - - - - - - - 3 1 - 1 2 1 - - - -

36 1 4 2 - 1 1 2 1 1 Animator Animator

26

Page 32: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information abo ut Education Skill Training

6-10 years child 11-15 ears old 16-18 ears old 18+ Age Number of

Going Not going

Going Not going person Passed

Number of Subject School

school after School

school after Literate Illiterate Literate Illiterate SSC or HSC Person o

Admission Admission

O a, a, a, a a = Bo

Y Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male E Male Female

w U.

a, LL

a, LL.

a, LL

a, U.

37 - - - - - 1 - - - 1 - - 3 - - 1 - - - - - -

38 1 - - - - - - - - - - - - - - 1 - - - - - -

39 - 1 1 1 1 -

40 - - - - - - - - - - - - 1 1 - - - - - - - -

41 - - - - - - - - - - - - - 1 1 - - - - - - -

42 - - 1 4 1 - - 4 - - - - -

43 1 - - - 1 1 - - - 1 - - - - 1 1 - - - 1 - Sewing

44 - - - - - - - - - - - - 1 1 - - - - 1 1 Animator Sewing

45 2 - - - - - - - - - - - 1 1 - - 1 - - 1 - Sewing

46 - - - - - 1 - - - - - - 2 2 - - 1 1 1 - Tailoring -

47 - - - - - - - - - - - - - - - 1 - - - - - -

48 1 1 - - 1 1 - - - - - - 4 - - 1 2 - - - - -

27

Page 33: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information abo ut Education Skill T i i ra ng n

6-10 years child 11-15 ears old 16-18 ears old 18+ Age Number of

c U Going

Not going Going

Not going person Passed Number of Subject

V School school after

School school after Literate Illiterate Literate Illiterate SSC or HSC

Person Admission Admission

a,

0 a) a a) a, ai

= Bo Boy Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male E Male Female a) U.

a) a U.

a) U.

a) U.

49 2 - - - - 1 - - - - 1 - 3 - - 1 2 - - - - -

50 - - - - - 2 - - 1 - - - 4 1 - - 3 - 1 1 Driving Sewing

51 1 1 1 1 1 - -

52 - - - - - - - - - - - - 2 - - 1 1 - - - - -

53 2 1 - 1 - - - - - -

54 - 1 - - - 1 - - 1 - - - 2 2 - - 2 2 - 1 - Sewing

55 - - - - - - - - - 1 - - 2 - 1 1 - - - - - -

56 - 2 - - - - - - - - - - - - 1 1 - - - - - -

57 - - - - - - - - 1 - - - 1 - - 1 - - - - - -

58 1 - - 1 - - - - - -

59 - 1 1 - - - 1 - - - - - -

60 1 1 - - - - - - - - - - - - 1 1 - - - - - -

28

Page 34: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information abo ut Education i i

6-10 years child 11-15 ears old 16-18 ears old 18+ Age Number of n ng Skill Tra

Going Not going

Going Not going person Passed

Number of Subject school after school after Literate Illiterate Literate Illiterate SSC or HSC

c School Admission

School Admission

Person

= Boy Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male E Male Female U. U. U. U. U.

61 - 2 - - - 1 - - - - - - 1 - 1 2 - - - - - -

62 - - - - - 2 - - - 1 - - 1 - 2 1 1 - 1 - Electrical -

63 - 1 - - - - - - - - - - 1 1 - - - - - - - -

64 - 1 1 1

65 - - - 1 1

66 - - 1 1 - 2 - - - - - -

67 1 - - 1 1 1 - - 1 - - - - -

68 - - 1 1 - - 1 - - - - - -

69 - 1 - 2 2 - 1 1 1 - - - -

70 - - 2 1 1 1 - - - - - -

71 - - - - - - - - - - - - 1 - 2 1 - - - - - -

72 1 1 - - - - - - - - - - - - 1 1 - - - -

29

Page 35: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information abo ut Education Skill T i i ra n ng

6-10 ears child 11-15 ears old 16-18 ears old 18+ Age Number of

U Going Not going

Going Not going person Passed

Number of Subject school after school after Literate Illiterate Literate Illiterate SSC or HSC

c School Admission

School Admission

Person

N

0 a a 4l a a = Bo

Y Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male E Male Female

U a a m 0)

73 1 1 1 - -

74 1 1 - - - -

75 1 2 - - - - - - -

76 - 2 - - - 1 - - 1 - - 2 - - 1 1 - - - - - -

77 - - - - 1 - - - 1 - - - - - 1 1 - - - - - -

78 1 1 1 1 1 -

79 - - - - - - - - 2 1 1 1 - - -

80 1 - - - - - 1 1 - 1 - - - -

81 - - - - - - - - 2 1 1 - -

82 - 1 - - - - - - - 1 1 - - -

83 - - - - - - - - - - - - 3 1 1 2 1 - - - - -

84 1 1 1 1 1 1 1 1 1 - - - - -

85 - 1 1 2 - - - - - -

30

Page 36: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information abo ut Education ki i i l Tra n ng S l

6-10 years child 11-15 ears old 16-18 ears old 18+ Age Number of V U Going

Not going Going

Not going person Passed Number of Subject school after school after Literate Illiterate Literate Illiterate SSC or HSC

c School Admission

School Admission

Person

d d a a a

= Bo Boy Girl Boy Girl Boy Girl Boy Girl Male E Male E Male E Male E Male Female Male E Male Female U. U- U.

w

86 - - - - 1

87 F - - 1 1 1 1

88 88 1 1 1 1 1

89 2 - - - - - - - - - - - - 1 1 - - - - - - -

91 - 2 1 1 3 - - - - - -

92 1 77T -

1

31

Page 37: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NATURE OF LAND OWNERSHIP, ITS UTILIZATION, INCOME

AND EXPENDITURE

Page 38: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Taltoli

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E

a, Cultivable Pond Kua a, .o C c :Lj V

land y . rn

a r- "0

O p M E UA

a) N V W C N

m M M C O p p 0 !0

O J J U fO t O O C C 4 L 2 O 7 i *+

3 C M = a ., a J a7 u

° L . U

a 0 C a 0 a m z z M z 3

a i My

1 3.04 .00 .98 2.06 .18 1.30 .42 .33 .10 1.00 .06 1.72 .00 .00 .16 .00 70000.00 4500.00

2 2.20 .00 .00 2.20 .12 1.54 .36 .33 .10 1.00 .08 1.90 .00 .00 .18 .00 22000.00 1500.00

3 2.11 .00 .00 2.11 .12 1.71 .18 .34 .10 .00 .00 1.89 .00 .00 .10 .00 41000.00 3000.00

4 .09 .00 .00 .09 .06 .00 .00 .00 .00 .50 .03 .00 .00 .00 .03 .00 12000.00 1000.00

5 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 12000.00 1000.00

6 .38 .00 .20 .18 .10 .08 .00 .00 .00 .00 .00 .08 .00 .00 .00 .00 8400.00 700.00

7 .75 .00 .00 .75 .12 .60 .00 .00 .00 .50 .03 .60 .00 .00 .03 .00 12000.00 1000.00

8 2.08 .00 .00 2.08 .16 1.60 .12 .33 .10 1.00 .10 1.72 .00 .00 .20 .00 48000.00 3000.00

9 1.32 .00 .00 1.32 .12 .90 .10 .33 .10 1.00 .10 1.00 .00 .00 .20 .00 20000.00 1500.00

10 .21 .00 .00 .21 .04 .00 .03 .34 .10 1.00 .04 .03 .00 .00 .14 .00 6000.00 500.00

11 .06 .18 .00 .24 .06 .15 .03 .00 .00 .00 .00 .18 .00 .00 .00 .00 18000.00 1500.00

12 .06 .17 .00 .23 .06 .10 .07 .00 .00 .00 .00 .17 .00 .00 .00 .00 18000.00 1500.00

33

Page 39: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) fu E

U L Cultivable Pond Kua 0 c "a 0

0 c

3 v M land m`

. > +r M

°c . U) c w .. c .. ` , M c > f1 t 'a

4) v) c Y

M v f C c ° = = v 3 3 -' ' 'a. v L. ° O M E fu

H C O CL to p ` Q C N +

n y f0

1

c U O 'Fu

5 0 J] w R) 1L .2:"

O N v J m O- M M O E O 'fl C d + M L. M

w d O . c p j U.

-.c I v C) O

>. .c i v .C

' a °

L. N FA

M

7 +

v `

0 c M c y 0 a m p,

z a z s. M 3 0 3 w °'. f

o fe M fy

z ' 13 .79 .20 .00 .99 .10 .56 .30 .00 .00 .16 .03 .86 .00 .00 .03 .00 20000.00 1500.00

14 .40 .00 .00 .40 .10 .15 .12 .00 .00 .17 .03 .27 .00 .00 .03 .00 30000.00 2500.00

15 .52 .00 .15 .37 .04 .18 .12 .00 .00 .16 .03 .30 .00 .00 .03 .00 20000.00 1000.00

16 .01 .00 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000.00 3000.00

17 .48 .00 .00 .48 .10 .23 .12 .00 .00 .16 .03 .35 .00 .00 .03 .00 6000.00 500.00

18 .01 .00 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 8400.00 700.00

19 .23 .00 .00 .23 .04 .08 .08 .00 .00 .17 .03 .16 .00 .00 .03 .00 9600.00 800.00

20 .04 .00 .00 .04 .01 .00 .00 .00 .00 .17 .03 .00 .00 .00 .03 .00 6000.00 500.00

21 .01 .00 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00

22 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00

23 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00

24 2.44 .20 .00 2.64 .32 2.00 .10 1.00 .20 .20 .02 2.10 .00 .00 .22 .00 82000.00 6000.00

34

Page 40: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E

Cultivable Pond Kua c c o U V 3 rn ; c v land

ar > vg 4MJ °c t U) , - aci a .. v c .. ..

O m c

+ am x t d M M

t; C O 3 >, -0 M y .: E W

6n = U1 CL f o

C fl i p r + O i C U R - V w> M LL `

O 1 0 J L J V

,

L d M ,.., E M C a, 'V d L

,v s

W 0 G- c c -, , N = C r N 1/1 O v O a t . y i . W vl 3 N U, U Z C

e 0° z z a 3 0 3 f N H M z ,

25 3.12 .00 2.00 1.12 .24 .60 .16 .00 .00 1.00 .12 .76 .00 .00 .12 .00 75000.00 4000.00

26 3.56 .00 .00 3.56 .06 3.20 .04 1.00 .24 .20 .02 3.24 .00 .00 .26 .00 70000.00 3000.00

27 .04 .00 .00 .04 .02 .00 .00 .00 .00 .20 .02 .00 .00 .00 .02 .02 .00 .00

28 1.18 .00 .00 1.18 .18 .90 .04 .00 .00 .60 .06 .94 .00 .00 .06 .00 36000.00 3000.00

29 .27 .00 .00 .27 .18 .00 .03 .00 .00 .60 .06 .03 .00 .00 .06 .00 72000.00 6000.00

30 .19 .00 .00 .19 .06 .11 .02 .00 .00 .00 .00 .12 .00 .00 .00 .00 .00 .00

31 .07 .00 .00 .07 .07 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 8400.00 700.00

32 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 3600.00 300.00

33 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 12000.00 1000.00

34 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 12000.00 1000.00

35 4.17 .00 1.00 3.17 .52 2.00 .35 .00 .00 3.00 .30 2.00 .00 .00 .30 .00 60000.00 4000.00

36 2.80 .00 .24 2.56 .12 2.00 .40 .00 .00 1.00 .04 2.40 .00 .00 .04 .00 50000.00 3500.00

35

Page 41: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) , a E

a,

O Cultivable Pond Kua a c u

3 V C

land d v > M 9 . c

.. C v O

ra C 0. t ..i O. O 01 M N C O = 3 ' i+ p L Za E W

H a fy0 C i Q C } i N

E O i C C 1

V m u .0 w > U. t O =

C J !4 H p pp .'4i p

C L ` 0 1Cpp

_ ` U. i' C w N_ + +

O Q1 i C1 u + = f0 u E O Q Q E 0 67

J 6' M u M

0 3 = Cy 0 a m +

Z a z , ro

z 3`0 3 E H O

C1

37 .11 .40 .40 .11 .05 .00 .04 .00 .00 1.00 .02 .00 .00 .00 .02 .00 36500.00 3000.00

38 .06 .32 .00 .38 .06 .32 .00 .00 .00 .00 .00 .32 .00 .00 .00 .00 36000.00 3000.00

39 .07 .00 .00 .07 .05 .00 .00 .00 .00 .34 .02 .00 .00 .00 .02 .00 12000.00 1000.00

40 .07 .00 .00 .07 .05 .00 .00 .00 .00 .33 .02 .00 .00 .00 .02 .00 18000.00 1500.00

41 .07 .00 .00 .07 .05 .00 .00 .00 .00 .33 .02 .00 .00 .00 .02 .00 .00 .00

42 i 3.80 .00 1.80 2.00 .30 .60 .40 .50 .40 1.00 .30 1.00 .00 .00 .70 .00 40000.00 3000.00

43 2.60 .00 1.20 1.40 .30 .40 .30 .50 .40 .00 .00 .70 .00 .00 .40 .00 12000.00 1000.00

44 .46 .00 .00 .46 .24 .20 .00 .00 .00 1.00 .02 .20 .00 .00 .02 .00 36000.00 3000.00

45 .56 .00 .00 .56 .14 .40 .00 .00 .00 1.00 .02 .40 .00 .00 .02 .00 12000.00 1000.00

46 .62 .40 .00 1.02 .18 .72 .08 .00 .00 1.00 .04 .72 .08 .00 .04 .00 65000.00 4000.00

47 .40 .40 .40 .40 .00 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 19600.00 1800.00

48 3.65 .00 .20 3.45 .08 2.85 .20 .14 .25 .33 .03 2.85 .20 .40 .25 .03 84000.00 7000.00

36

Page 42: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E y

c r , v L- Cultivable Pond Kua -o = p C

7

o land L M N a

0 O

O CM M N C O 3 >' !7 AMJ 0 E W o CL

r+ U 0 = °> A

i CL "1 0 96 U. -

3 c " c o = 4j 3 u M 0

0 3 L a a CO p, z a. z M z

49 3.69 .00 .25 3.44 .08 2.80 .20 .14 .25 .33 .11 2.80 .20 .00 .33 .03 96000.00 8000.00

50 3.47 .00 1.30 2.17 .12 1.20 .13 .14 .50 .34 .06 1.20 .13 .16 .50 .06 55000.00 6000.00

51 .82 .40 .15 1.07 .02 .80 .08 .14 .17 .00 .00 .80 .08 .00 .17 .00 44000.00 4000.00

52 .82 .00 .15 .67 .02 .40 .08 .15 .17 .00 .00 .40 .08 .00 .17 .00 24000.00 2000.00

53 1.71 .00 .60 1.11 .04 .60 .14 .15 .33 .00 .00 .60 .14 .00 .33 .00 36000.00 3000.00

54 2.12 .00 .80 1.32 .20 .60 .16 .14 .33 1.00 .03 .60 .16 .00 .36 .03 80000.00 7000.00

55 .85 1.60 .00 2.45 .10 2.00 .20 .14 .03 1.00 .12 2.00 .20 .00 .15 .00 116000.0 3000.00

56 .08 .00 .00 .08 .04 .00 .03 .00 .00 .34 .01 .00 .03 .00 .01 .00 24000.00 2000.00

57 .10 .40 .00 .50 .05 .40 .04 .00 .00 .33 .01 .36 .04 .00 .01 .00 72000.00 2000.00

58 .04 .34 .00 .38 .04 .34 .00 .00 .00 .00 .00 .34 .00 .00 .00 .00 18000.00 1500.00

59 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000.00 2000.00

60 .10 .41 .00 .51 .10 .41 .00 .00 .00 .00 .00 .41 .00 .00 .00 .00 26800.00 1900.00

37

Page 43: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) to E

m

O o Cultivable Pond Kua O C V v

land M > U to c w c >. i O Z ., .n

o O Ol w"

M Oi r C O O

3 >' a+ -W O p M

x N to

ll d t M O N C fl L a C N + tU

" L c M iT

c V A O f a v w> M

U.

O J V fp S p R

h O C L fC O C 'i ` J 0 LL V .C =

= 3 ° i

c = a 3, a E c M MU c 0 p3 .. m z z w 3 3 } oN z ,0

ev

61 .56 1.00 1.00 .56 .10 .16 .11 .00 .00 1.00 .18 .00 .00 .00 .00 .18 144000.0 3000.00

62 .16 .00 .02 .14 .06 .00 .00 .26 .10 .00 .00 .00 .00 .00 .10 .00 36000.00 3000.00

63 .56 .00 .02 .54 .12 .18 .04 .46 .08 .50 .04 .18 .04 .00 .18 .04 84000.00 2500.00

64 .28 .60 .00 .88 .06 .68 .03 .26 .09 .25 .02 .68 .03 .00 .09 .02 36000.00 3000.00

65 .28 .36 .00 .64 .06 .45 .02 .26 .09 .25 .02 .45 .02 .00 .09 .02 25000.00 2000.00

66 1.84 .12 .04 1.92 .12 1.44 .28 .04 .04 .67 .04 1.44 .28 .00 .04 .04 72000.00 3500.00

67 .88 .00 .04 .84 .08 .66 .08 .04 .04 .33 .02 .62 .08 .00 .02 .04 84000.00 3000.00

68 .33 1.05 .01 1.37 .19 1.05 .02 .04 .01 1.00 .10 1.05 .02 .00 .10 .01 48000.00 2500.00

69 1.82 .00 .40 1.42 .20 1.00 .10 .08 .02 1.00 .10 1.00 .10 .00 .10 .02 72000.00 3500.00

70 .17 .30 .01 .46 .11 .30 .04 .04 .01 .00 .00 .30 .04 .00 .00 .01 48000.00 3000.00

71 .18 .00 .01 .17 .12 .00 .04 .04 .01 .00 .00 .00 .04 .00 .00 .01 120000.0 4000.00

72 .03 .00 .01 .03 .02 .00 .00 .04 .01 .00 .00 .00 .00 .00 .00 .01 30000.00 3000.00

38

Page 44: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a, E a

° Cultivable Pond Kua c c ; land m H r c° _ , m

O H Q C N H C = O

3 O 3 0 C a W o

w C n M o N a C M+ a N °1 C U M o v o w > U. J

a)

w U M CL w4 u E o C dJ + L M 0 ` . C i f0 J LL ,C d, fl =r A

= C a N V 0 u

.0 t ` Q

t + fC

J H

N a+ y j V C

O L c N d m o z o Q z L N z L 3

73 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 96000.00 2500.00

74 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000.00 3000.00

75 .16 .60 .00 .76 .12 .60 .00 .05 .01 .25 .03 .60 .00 .00 .00 .04 84000.00 5000.00

76 .05 .00 .00 .05 .04 .00 .00 .00 .00 .20 .01 .00 .00 .00 .00 .01 24000.00 2000.00

77 .05 .10 .00 .15 .04 .10 .00 .00 .00 .20 .01 .10 .00 .00 .00 .01 21600.00 1800.00

78 .54 .00 .00 .54 .04 .50 .00 .00 .00 .00 .00 .50 .00 .00 .00 .00 20000.00 3000.00

79 .53 .00 .01 .52 .13 .30 .08 .04 .01 .20 .01 .30 .08 .00 .00 .02 36000.00 3000.00

80 .04 .40 .00 .44 .04 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 26400.00 2200.00

81 .79 .00 .01 .78 .13 .60 .03 .04 .01 .20 .01 .60 .03 .00 .00 .02 38000.00 3500.00

82 .08 .18 .00 .26 .07 .18 .00 .00 .00 .20 .01 .18 .00 .00 .00 .01 16000.00 2500.00

83 .51 1.00 .05 1.46 .22 1.24 .00 .04 .05 .00 .00 1.24 .00 .00 .00 .05 102000.0 6000.00

84 1.01 .60 .05 1.56 .12 1.04 .40 .04 .05 .00 .00 1.04 .40 .00 .00 .05 58000.00 4000.00

85 1.57 1.20 .05 2.72 .12 2.20 .40 .04 .05 .00 .00 2.20 .40 .00 .00 .05 110000.0 5000.00

39

Page 45: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a E

w

Cultivable Pond Kua ! . c S

v . land L o M c t c

C

O W U) t d

O O cm M a C O V 3 + E

E W G7 U) CO Q C. {

R y C V L d C N

+ ` 0 L L C

rp ' 01 U C O I 0 7

U O p fC - Y-. tL M

C J D

L = C J w Ch L

! N O L-

. , O "0 M

t .0 C E

N m .i d N Fr 3 H L C -

z a z 6 0 3

N M z f0 CJ

86 .04 .10 .00 .14 .04 .10 .00 .00 .00 .00 .00 .10 .00 .00 .00 .00 11000.00 900.00

87 1.04 .00 .48 .56 .06 .28 .22 .04 .06 .00 .00 .00 .00 .00 .06 .06 48000.00 4000.00

88 .08 .00 .02 .06 .06 .00 .00 .04 .02 .00 .00 .00 .00 .00 .02 .00 60000.00 5000.00

89 .08 .60 .02 .66 .06 .60 .00 .04 .02 .00 .00 .60 .00 .00 .02 .02 60000.00 5000.00

90 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .02 5000.00 400.00

91 .53 .00 .01 .52 .12 .22 .14 .04 .01 1.00 .04 .22 .14 .00 .04 .01 60000.00 5000.00

92 .09 .00 .05 .04 .04 .00 .00 .04 .05 .00 .00 .00 .00 .00 .00 .00 9600.00 800.00

40

Page 46: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ANIMAL AND FOREST RESOURCES, SOURCE OF WATER

AND NATURE OF LATRINE

Page 47: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Taitoli Animal & forest Resources (in Number) Production las t Year (in Taka) Crop Production Sour ces of

of Family Wa ter Egg Poultry Milk Fish

E- L- m M

Poultry Cow Goat Trees 0 C 0 ° y = c

N Wood Fruit 0 a=+

0 Aj + a s c

Aj M C lid (U

No Died No Died No Died CL

E - CL

E CL

E CL

E u, E

E f - x - .D N #A N N (U U Z

0 U U 0 U z z

1 48 20 0 0 0 0 80 25 300 0 500 0 0 0 1000 0 12 3 Tubewell Tubewell Ringslub

2 32 12 2 0 0 0 60 27 250 0 400 150 0 0 1200 0 12 3 Pond Tubewell Ringslub

3 0 0 1 0 0 0 47 11 0 0 0 0 0 0 700 0 12 3 Tubewell Tubewell Ringslub

4 5 0 1 0 0 0 5 1 0 0 0 0 0 0 0 0 2 0 Pond Tubewell Ringslub

5 4 0 0 0 0 0 4 2 0 0 0 0 0 0 0 0 0 0 Tubewell Tubewell Open

6 3 0 1 0 0 0 9 3 0 0 0 0 0 0 0 0 0 0 Tubewell Tubewell Ringslub

7 10 2 2 0 0 0 13 2 100 50 200 0 0 0 0 0 12 0 Pond Tubewell Open

8 50 7 4 0 0 0 70 25 500 200 300 700 1000 2000 2000 0 12 4 Pond Tubewell Ringslub

9 30 5 1 0 0 0 40 15 400 300 400 400 1500 3000 2500 0 12 0 Pond Tubewell Ringslub

10 5 0 2 0 0 0 11 6 100 0 100 300 0 0 0 0 0 0 Pond Tubewell Ringslub

11 5 0 0 0 0 0 12 4 100 200 100 300 0 0 0 0 8 No Tubewell Tubewell Ringslub

42

Page 48: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka ) Crop Production Sour ces of of Family W ater

Egg Poultry Milk Fish W

V L

c Poultry Cow Goat Trees c c c c o c a

= rn w

H Wood Fruit c a a n 0 N C c

o L

00 No Died No Died No Died E N E N E E

E a y U) U) c C .C z E E

U U U 0 V z z Q

12 10 0 0 0 0 0 13 6 50 200 100 200 0 0 0 0 6 No Tubewell Tubewell Ringslub

13 40 15 3 0 0 0 30 15 200 500 200 500 400 2500 500 0 12 Yes Tubewell Tubewell Ringslub

14 12 0 2 0 0 0 15 7 300 420 100 200 300 700 500 0 12 No Both Tubewell Ringslub

15 10 3 2 0 0 0 5 2 20 40 90 300 100 600 500 0 12 No Tubewell Tubewell Ringslub

16 5 0 0 0 0 0 4 1 150 220 0 0 0 0 0 0 0 .00 Both Tubewell Ringslub

17 0 0 0 0 0 0 3 2 0 0 0 0 0 0 0 0 12 No Both Tubewell Ringslub

18 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 .00 Tubewell Tubewell Ringslub

19 0 0 0 0 0 0 3 1 0 0 0 0 0 0 0 0 4 No Both Tubewell Ringslub

20 0 0 0 0 0 0 2 1 0 0 0 0 0 0 0 0 0 .00 Tubewell Tubewell Ringslub

21 15 4 0 0 0 0 35 10 30 100 70 200 0 0 0 0 - No Tubewell Tubewell Ringslub

22 10 0 0 0 0 0 17 5 40 60 100 50 0 0 0 0 - No Both Tubewell Ringslub

23 31 2 0 0 0 0 11 10 70 80 100 40 0 0 0 0 - No Tubewell Tubewell Ringslub

43

Page 49: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Sour ces of of Family Wa ter

Egg Poultry Milk Fish c v

Poultry Cow Goat Trees o 0 0 0 t a of c of

C o Wood Fruit n a a n c U

.N = d

x No Died No Died No Died

3 E N E N E

tn c E _ 0) z 0 0 0 C 0

Z z U U U U 0

24 24 4 2 0 1 0 24 8 500 0 0 600 1000 0 420 500 12 No Both Tubewell Ringslub

25 26 3 4 0 2 0 41 10 600 800 900 870 1200 0 350 0 12 Yes Both Tubewell Ringslub

26 13 1 2 0 1 0 50 12 100 250 0 0 400 0 2000 0 12 Yes Both Tubewell Ringslub

27 6 1 1 0 4 0 65 15 100 300 0 500 0 0 0 0 - No Tubewell Tubewell Ringslub

28 20 4 0 0 0 0 22 6 200 300 100 0 0 0 300 0 10 No Tubewell Tubewell Ringslub

29 8 0 0 0 0 0 47 14 100 100 0 0 0 0 280 0 - No Both Tubewell Ringslub

30 24 7 0 0 1 0 58 17 50 200 0 700 0 0 0 0 4 No Tubewell Tubewell Ringslub

31 11 3 1 0 0 0 90 20 100 300 0 500 0 0 0 0 - No Tubewell Tubewell Ringslub

32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - No Both Tubewell Open

33 6 2 1 0 4 0 7 2 0 0 0 0 0 0 0 0 - No Both Tubewell Open

34 6 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 - No Tubewell Tubewell Open

35 15 4 4 0 0 0 60 11 400 300 500 0 0 0 3000 0 12 Yes Tubewell Tubewell Ringslub

44

Page 50: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Sour ces of of Family W ater

Egg Poultry Milk Fish U

Poultry Cow Goat Trees C c c c C s n IM H C rn w w U1

Wood Fruit .2 °

.2 o- W c v c C

:e 0 av L

No Died No Died No Died CL

E E E 0.

E E a, E L M

+' i h N N N N N C

IA C

w = V Z 0 U U U

U Z z

36 20 8 3 0 0 0 50 10 300 200 500 0 0 0 500 0 12 Yes Tubewell Tubewell Ringslub

37 8 3 1 0 0 0 40 10 200 100 300 0 0 0 180 0 - No Tubewell Tubewell Ringslub

38 8 3 2 0 0 1 0 0 100 0 200 0 0 0 0 0 4 No Pond Tubewell Open

39 9 2 3 0 0 0 15 4 100 100 250 300 0 0 150 0 - No Both Tubewell Ringslub

40 10 3 1 0 0 0 20 3 150 200 200 400 0 0 300 0 - No Pond Tubewell Ringslub

41 8 3 1 0 0 0 14 5 50 100 0 0 0 0 0 0 3 No Pond Tubewell Ringslub

42 80 15 1 0 0 0 200 100 2000 0 1500 0 0 0 3000 5000 12 No Tubewell Tubewell Ringslub

43 40 11 1 0 8 0 45 15 1000 500 600 300 0 0 3000 0 10 No Both Tubewell Ringslub

44 17 9 2 0 0 0 50 11 0 0 200 0 0 0 0 0 11 No Both Tubewell Ringslub

45 3 0 4 0 0 0 100 7 0 0 0 0 1000 4000 0 0 10 No Tubewell Tubewell Ringslub

46 85 35 4 0 0 0 25 62 255 195 1200 0 720 1260 1275 0 12 No Tubewell Tubewell Ringslub

47 17 9 0 0 0 0 0 0 204 195 135 280 0 0 0 0 12 Yes Tubewell Tubewell Ringslub

45

Page 51: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Sour ces of of Family Wa ter

V Egg Poultry Milk Fish

°u 2 t Poultry Cow Goat Trees

c 0 0 ° C

= . c o+ N

C - o C O

U1 Wood Fruit

0 a a a a CL

C . c No Died No Died No Died L- L- E E E N E

c E c . V z E E O O O O

zr, 0 Z z U U U U

48 37 11 3 0 0 0 21 25 2100 0 1500 0 3000 0 2100 2500 12 No Tubewell Tubewell Ringslub

49 90 37 2 0 0 0 70 21 2700 250 1750 0 2100 1100 2150 2700 12 No Tubewell Tubewell Ringslub

50 77 27 5 0 0 0 17 21 270 0 2100 700 1750 700 2700 3000 12 No Tubewell Tubewell Ringslub

51 47 15 3 0 1 0 15 7 165 85 270 300 250 1100 3000 2500 7 No Pond Tubewell Ringslub

52 15 8 0 0 0 0 0 0 0 0 0 0 0 0 1500 1100 6 No Pond Tubewell Ringslub

53 30 11 2 0 0 0 21 17 285 300 0 1700 0 2700 4000 2100 12 Yes Pond Tubewell Ringslub

54 50 70 2 0 0 0 47 23 570 655 875 480 0 0 5000 2000 6 No Pond Tubewell Ringslub

55 10 20 2 0 0 0 80 25 150 250 650 500 950 2000 3000 0 12 Yes Tubewell Tubewell Ringslub

56 30 16 1 0 0 0 12 5 360 236 296 480 0 1160 545 0 - No Pond Tubewell Ringslub

57 18 46 1 0 0 0 10 8 280 480 295 480 1800 0 480 0 12 No Pond Tubewell Ringslub

58 8 16 0 0 0 0 0 9 0 0 335 0 0 0 0 0 4 No Pond Tubewell Ringslub

59 8 18 0 0 0 0 0 0 68 96 480 375 0 0 0 0 - No Pond Tubewell Ringslub

46

Page 52: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka ) Crop Production Sour ces of of Family W ater

Egg Poultry Milk Fish w

U H I .

o Poultry Cow Goat Trees c c c o n p1 h C, 0

(A Wood Fruit .9 'a+ i7

4.0 a y G v1 o E C M Y

No Died No Died No Died L L 0. E

a E y

n E

a E y W

H E X w

c :3

_ a U,, H H N a U H N c c t U z

O 0 0 0 U z z U U U

60 19 30 0 0 0 0 0 5 385 218 568 335 0 0 0 0 9 No Pond Tubewell Ringslub

61 22 9 1 0 0 0 27 29 398 216 680 0 0 5000 780 0 12 No Pond Tubewell Ringslub

62 19 7 2 0 0 0 11 16 125 0 235 465 0 1200 675 396 10 No Pond Tubewell Ringslub

63 12 5 0 0 0 0 9 12 0 0 0 0 0 0 0 0 12 No Pond Tubewell Ringslub

64 11 40 2 0 0 0 6 10 185 187 1050 0 175 0 8910 2100 8 No Tubewell Tubewell Ringslub

65 18 26 2 0 0 0 2 11 225 0 330 280 235 575 4025 678 12 No Tubewell Tubewell Ringslub

66 20 29 2 0 0 0 0 8 188 354 660 480 850 1800 850 0 12 No Pond Tubewell Ringslub

67 22 30 0 0 0 0 0 4 120 188 480 650 0 0 400 0 12 No Pond Tubewell Ringslub

68 12 28 4 0 0 0 21 9 140 188 380 520 2700 2500 800 0 12 Yes Pond Tubewell Ringslub

69 28 42 1 0 0 0 27 30 380 270 670 480 0 0 1100 0 12 Yes Pond Tubewell Ringslub

70 21 17 2 0 0 0 9 7 236 0 170 280 0 0 0 0 6 No Pond Tubewell Ringslub

71 11 31 2 0 0 0 11 9 0 296 0 0 0 0 0 0 0 No Pond Tubewell Ringslub

47

Page 53: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Sources of of Family Water

Egg Poultry Milk Fish

U IA 4w

t Poultry Cow Goat Trees

o 0 0 0 ° a' c u c o H Wood Fruit n C c

a C L L E E

0 No Died No Died No Died E E E E E X C L- o _ U) {3A N $A C C Z Z

Z z V U U 0

72 21 40 2 0 0 0 7 2 0 300 325 240 0 0 0 0 0 No Pond Tubewell Ringslub

73 12 7 0 0 0 0 5 2 285 96 0 0 0 0 0 0 0 No Pond Tubewell Ringslub

74 14 11 1 0 0 0 4 1 0 0 280 0 0 0 0 0 0 No Pond Tubewell Ringslub

75 9 17 0 0 0 0 7 2 0 380 0 0 0 0 1000 0 8 No Pond Tubewell Ringslub

76 6 0 0 0 1 0 0 0 0 0 380 500 0 0 0 0 0 No Pond Tubewell Ringslub

77 7 0 1 0 0 0 0 0 0 0 250 480 0 0 0 0 3 No Pond Tubewell Ringslub

78 5 15 0 0 0 0 0 5 420 0 500 0 0 0 0 0 10 No Pond Tubewell Ringslub

79 12 20 2 0 0 0 0 8 220 250 480 580 800 1200 0 0 4 No Pond Tubewell Ringslub

80 6 20 1 0 0 0 0 4 124 250 380 500 0 0 0 0 5 No Pond Tubewell Ringslub

81 18 22 1 0 0 0 15 8 98 280 320 650 0 0 0 0 10 No Pond Tubewell Ringslub

82 19 18 0 0 0 0 5 4 78 180 280 480 0 0 0 0 4 No Pond Tubewell Ringslub

83 25 22 4 0 0 0 25 15 220 250 400 500 2000 2500 1000 0 12 Yes Pond Tubewell Ringslub

84 16 32 1 0 0 0 36 15 380 0 395 0 585 380 595 0 12 Yes Pond Tubewell Ringslub

48

Page 54: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production las t Year (in Taka) Crop Production Sour ces of of Family Wa ter

Egg Poultry Milk Fish W

U ' n O Poultry Cow Goat Trees C C 0 a

L. c, U) C Cn J 4-

a=i U

Wood Fruit ° ° ° a +' c Q7 U) y C h C

C 'e

0 w L )

No Died No Died No Died CL CL

N CL CL W

G w

a U)

N VA H IA

fn m C C Z

z z U U U U U

85 19 15 2 0 0 0 19 12 175 235 320 0 385 0 580 0 12 Yes Pond Tubewell Ringslub

86 3 7 0 0 0 0 0 0 100 200 0 0 0 0 0 0 4 No Pond Tubewell Ringslub

87 14 18 0 0 0 0 8 15 180 620 650 0 0 0 0 0 6 No Tubewell Tubewell Ringslub

88 15 9 0 0 0 0 0 0 105 0 495 0 0 0 0 0 12 No Tubewell Tubewell Ringslub

89 5 10 3 0 0 0 0 0 120 280 400 0 1200 1000 0 0 8 No Tubewell Tubewell Ringslub

90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - No Pond Tubewell Open

91 2 10 3 0 0 0 10 8 0 0 480 0 1500 4000 1000 0 4 No Pond Tubewell Ringslub

92 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 - No Pond Tubewell Ringslub

49

Page 55: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EMPLOYMENT, FAMILY PLANNING METHOD, NEW BORN BABY

AND DISEASE

Page 56: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Taltoli Inf ormation a bout Em t o ment Adoption of Last one Year

Active Un- Under

Child Family Number of Labour Labour o Planning new born Information about Disease (without considering cold, cough, and fever) force

employed employed 6-14 Method babies

° M W

Number of Nature of Disease Nature of Treatment

p N Ii0 W U patient

f0

W

f0

W

f0

W

+ CO O C V 4J C y C y C

1L U. IL ' a W 4J

W

V 4l

W

` N f0 W z = U U. U U. u

1 3 1 1 1 - - - - 3 - 1 - - 1 1 - Asthma Gastric - Hospital Hospital -

2 1 1 1 - - - - - - - - - - 1 1 - Tuberculosis Pate pathar - Private clinic Pharmachiest -

3 4 3 - 1 - - - - 1 - 1 - - 2 2 - Gastric Gastric - Pharmacist Pharmachiest -

4 1 1 - - - - - - 1 - - - - 1 - - Gastric - - Pharmacist - -

5 1 1 - - - - - - 1 - 1 - - 1 - - Gastric - - Pharmacist - -

6 1 1 - - - - - - 1 - - - - - 1 - Mental - - Private clinic - -

7 1 1 - - - 1 1 1 - - - - - - 1 - - Pressure - - No treatment -

8 1 1 - - 1 - - - - - - - - - -

9 1 1 - 1 1 - 2 - 1 - - - - - - - - - -

10 1 1 - 1 - - - - - - - -

11 1 1 - - - - - - 1 - 1 - - 1 - - Gastric - - Private clinic - -

51

Page 57: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Inf ormation a bout Em t o ment Adoption of Last one Year Active

Un- Under Child Q Family Number of

Labour Labour u Planning new born Information about Disease (without considering cold, cough, and fever)

c force employed employed 6-14 Method babies

V

Npatient of

Nature of Disease Nature of Treatment

f M w c V d

0 10 - L o c E c = g x y C7 M I- E = U y i W L

U. U. (a L

z U- r U :c V U- s V

12 1 1 - 1 - - - - 1 - 1 - - - - -

13 1 1 - - - - - - - - - - - 1 1 - Gout Bat - Private clinic Private clinic -

14 4 1 - 1 - - - - - - - - - 1 1 - Gout Gastric - Private Private doctor -

doctor

15 1 1 - - 1 - - - 1 - - 1 - 1 1 1 Eye Eye Piles Rural doctor Rural doctor kabiraj

16 1 1 - - - - - - 1 - - - - - 1 - - Piles - - Kobiraj -

17 1 1 - 1 - - - - 1 1 - 1 - 1 1 - Pressure Eye - No treatment No treatment -

18 1 1 - - - - - - 1 - - - - - 1 - - Cancer - - Private clinic -

19 - 1 - 1 - - - - - - - - - - 1 1 - Gastric Typhoid - Private doctor Private doctor

20 - 1 - - - - - - - - - - - - - - -

21 1 1 - - - - - - 1 - - - - - 1 - - Stomach pain - - Private doctor -

52

Page 58: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Inf ormation a bout Empl oyment Adoption of Last one Year Active

Un- Under Child n Family Number of

Labour Labour Planning new born Information about Disease (without considering cold, cough, and fever) force

employed employed 6-14 Method babies

U v o o

W c t' Number of

Nature of Disease Nature of Treatment

f 1 f o C 4) U patient

0

N

0

E

0

W

?. m W

f0

E E

U N LL U. U. E o &- Q - y

R M E

" a p E

v a N m E z V

U. U U

U. U a

LL U

22 1 1 - - - - - - 1 - - - - - - 1 - - Pneumonia - - private doctor

23 1 1 - - - 1 - - - - - 1 - - Ligorium - - Private doctor -

24 3 1 - - 1 - - Stomach pain - - Private clinic -

25 4 2 - - - - - - 1 - 1 - 1 1 - - Gastric - - Private doctor

26 1 1 - - - - - - 1 1 - - - 1 - - Typhoid - - Private clinic - -

27 1 2 - - 1 1 1 Gout - - No treatment -

28 - 2 - - - - 1 - Pressure - - Pharmacist -

29 2 2 - - - 1 - 1 - - - - - - - - -

30 1 1 - - - - - - 1 - 1 1 - - - - - - - - - -

31 1 1 - - - - - - 1 - 1 1 - - - - - - - - - -

32 - - - - - 1 - - 1 1 - - - - - - - - - - - -

53

Page 59: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Inf ormation a bout Empl oyment Adoption of Last one Year Active

Un- Under Child Family Number of

Labour Labour o Planning new born Information about Disease (without considering cold, cough, and fever) force

employed employed 6-14 U Method babies v

Number of patient

Nature of Disease Nature of Treatment

3 d w ° = L 47 V fp Ip f0 , c

= E E W y CO j3

W CL

E

° x U IV W R i

L& LL ° i a E

M E

y R E ° z ° U- U

w U. U LL U

33 2 2 1 1 1 1 - - 2 - 2 - - 1 1 - Gout Gout - Rural doctor Rural doctor -

34 1 1 - - - - - - 1 - 1 1 - - - 1 - - Pneumonia Private doctor

35 2 2 - - - - - - 1 - 1 - 1 1 1 1 Gastric Gout Pneumonia Private clinic Private clinic Private clinic

36 3 2 1 - - 1 - - 2 - 2 1 - - - - - - - - - -

37 3 1 - - - - - - 1 1 - - - 1 1 - Asthma Gastric - Private Private doctor -

doctor

38 - 1 - - - - - - - - - - - - 1 - - Gout - - health Centre -

39 1 1 - - - - - - 1 - 1 - - 1 - - Malaria - - Private clinic - -

40 1 1 - - - - - - 1 - 1 - - 1 - - Typhoid - - Private clinic - -

41 1 1 - - - - - 1 - 1 1 - -

42 4 1 - - - - - - 1 1 - - - 1 - - Gastric - Private doctor

54

Page 60: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Inf ormation about Empl oyment Adoption of Last one Year Active Child Family Number of Labour

Un- Under Labour c Planning new born Information about Disease (without considering cold, cough, and fever)

c force employed employed

6-14 Method babies U

t rn W

Number of Nature of Disease Nature of Treatment

C ` c patient

° E E E aEi aEi O0 (7 °

M E o

E 06

E = u u. U. LL E a E ° E a ro E z a, U a,

U. t U f d

LL r U

43 1 1 - - - 1 1 - - - - - - -

44 1 1 - 1 1 - - - - - - -

45 1 1 - 1 1 - - - - -

46 1 1 1 - - - - - 1 1 - - - 1 3 - Diarrhoea Tumour/ - Private clinic Rural doctor -

Gout

47 - 1 - - - - - - - - - - - - - - - - - - - -

48 2 1 - - 2 - 1 1 - 1 - Mental - - Private clinic - -

49 2 1 - - 1 1 1 Depression - - Private clinic -

50 2 1 - - - 1 1 - - - -

51 1 1 - - - 1 1 - - - - -

52 1 1 1 - 1 1 - - - - -

53 2 2 - - - 1 1 - -

54 1 2 - 1 1 - -

55

Page 61: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Inf ormation a bout Empl oyment Adoption of Last one Year Active

Un- Under Child Family Number of

Labour Labour Planning new born Information about Disease (without considering cold, cough, and fever) V force

employed e mployed employed 6-14 Method babies

V

Np bent of Nature of Disease Nature of Treatment

d7 d w 0 C L. N V

f0 ID M >. ` C _ X W x 0 x N m W a E

CL O

= U y C y C y C

N 4. U. LL d 01 M E '° f0

E v ev E U. U U- U U. U

55 3 1 - - - - - - 1 1 - - - - 1 - - Gastric - - Private doctor -

56 1 - - - - 1 - 1 - 1 - 1 1 - Asthma Gout - Rural doctor Rural doctor -

57 2 - - - - 1 - 1 - - - - - - - - - -

58 1 - - - - 1 - - 1 1 - 1 - - - 1 - - Pneumonia - Rural

doctor

59 - 1 - - - - - - - - - - - - - - - - - - - -

60 1 1 - - - - 1 1 - - - - - - - -

61 2 1 - - - 1 - 1 - 1 - - - 1 - - pieumond - - Rural

doctor

62 2 - 1 - - 1 - - 1 1 - - - - - - - -

63 1 - - - 1 - - 1 - 1 - - - - - -

64 1 - - - - 1 - - 1 - 1 - - - - - - -

65 1 - - - - 1 - 1 - 1 1 - - - - -

56

Page 62: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Inf ormation a bout Empl oyment Adoption of Last one Year Active

Un- Under Child Q Family Number of

Labour Labour o Planning new born Information about Disease (without considering cold, cough, and fever) force

employed employed (6-14) Method babies v

U am

W Number of

patient Nature of Disease Nature of Treatment

47 W d d

; o C 10 f0 ? L p C W N x y CO E

O. E

O U 41 C i ! y C y C

LL LL LL. £ p d jp d ro

Z W LL.

't U x W LL U f d

LL U

66 1 1 - - - - - - 1 - - - - - - -

67 1 1 - - - - - - 1 - 1 - - - - - - - - - - -

68 1 1 - - - - - - 1 - 1 1 - - - - - - - - - -

69 2 3 - - - - - - 1 - 1 - - - - - - - - - - -

70 1 2 - - 2 - - - 1 1 - - - - - - - - - - - -

71 2 1 - - 1 - - - 1 1 - - - - - - - - - - - -

72 1 1 - - - - - - 1 - 1 - - - - - - - - - - -

73 1 1 - - - - - - 1 - 1 - - - - - - - - - - -

74 1 1 - - - - - - 1 - 1 - - - - - - - - - - -

75 1 - - - - 1 - - 2 - 1 - - - - - - - - - - -

76 1 1 - - - - - - 1 - 1 - - - - - - - - - - -

77 1 1 - - - - - - 1 - 1 - - - - - - - - - - -

57

Page 63: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

In formation a bout Empl oyment Adoption of Last one Year Active

Un- Under Child Family Number of Labour Labour Planning new born Information about Disease (without considering cold, cough, and fever)

c force empl oyed employed 6-4 Method babies

W of

N Nature of Disease Nature of Treatment

M ° v p bent

f aEi aEi CO C7 E E c c

V = 4. {L U. E C) a 47 f-

4 N E

L ° ! f0 E

L N E Z d

U. U f m

U. .E U

f W LL V

78 - 1 - - - - - - - - - - -

79 2 1 - - - - - - 1 1 - - - - 1 - - Gastric - - Rural doctor -

80 - 1 - - - - 1 - - - - - - - 1 - - Typhoid - - Rural doctor -

81 2 - - - - - - - 1 - - - - 1 - - Asthma - - Private - -

doctor

82 1 1 - - - - - - 1 - 1 1 - 1 - - Malaria - - Private - -

doctor

83 3 1 - - - - - - 1 - 1 1 - - - - - - - - - -

84 2 1 - - - 1 - - 2 1 1 1 - - 1 - - Gastric - - Pharmacist -

85 1 1 - - - - - - 1 - 1 - - - 1 - - Gastric - - Pharmacist -

86 - 1 - - - - - - - - - - - - 1 - - Heart - - Private doctor -

87 1 1 - - - - - - 1 - - - - - - -

88 1 - - - - 1 - - 1 - 1 - - - -

89 1 1 - - - - - - 1 - 1 1 - 1 - - Pressure - Private

doctor

58

Page 64: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Inf ormation a bout Empl oyment Adoption of Last one Year Active

Un- Under Child Family Number of

Labour Labour Planning new born Information about Disease (without considering cold, cough, and fever)

c force employed employed 6-4 m Method babies

u Z arn

w Number of

i Nature of Disease Nature of Treatment

d i i c c L f - W U pat ent

_ o

N

a

a@l Z o

a£i

. CO

7C

W E E

C al = W C a! LL LL a-

W a W F-

E E

L. "0

W f d U U U- U U. U

90 1 1 1 - - 1 - - - 1 - - - 1 - - Exima - - Pharmacist - -

91 1 1 - - - - - - 1 - 1 - - - 2 - - Pate pathar/ - - Kobiraj - liver

92 1 - - -

59

Page 65: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ELECTRICITY, TUBEWELL, TRANSPORT OWNERSHIP, PRODUCTION EQUIPMENT,

HOUSING, ACCESS TO COMMUNICATION

EQUIPMENT, INVOLVEMENT IN DEVELOPMENT ORGANISATION

AND CREDIT

Page 66: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Taltoli Nature of Pattern of Number Nature of Number of Nature of Number of Sources of

a, Having 0 ownership of housing of widow ownership person development person taken loan

0 facilities? = 0- production (roof of radio/ involved in organisation loan :o equipment Material) television Organisation o L O C

0 Electri- Tube- 0 E x city well M f LL f z

1 Yes Yes Cycle Weedier and Semipucca - - 2 - 1 - Money lender Thresher and bank

2 Yes Yes Cycle Weedier and Semipucca - - - - - - -

Thresher

3 Yes Yes Cycle Weedier and CI sheet 1 - - - 1 - Bank

Thresher

4 Yes No - - CI sheet - - - - - - -

5 Yes No - - CI sheet - - - - - - -

6 Yes No Cycle Weedier CI sheet 1 - - - - - -

7 Yes No Cycle Weedier CI sheet 2 - - - - - -

8 Yes No Cycle Weedier and CI sheet - - - - - - -

Thresher

9 Yes Yes Cycle Weedier CI sheet 1 Two in one - - - - -

10 Yes No - - CI sheet - - - - - - -

61

Page 67: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having

c ownership of housing of widow ownership person development person taken loan

v facilities? CL Q, production (roof of radio/ involved in organisation loan

V i equipment Material) television Organisation o 12 o c

c Electri- Tube- o r o E x city well .o f LL

11 Yes Yes - - CI sheet - Two in one - - - - -

12 Yes No - - CI sheet - - - - - - -

13 Yes Yes Cycle Weedier and CI sheet 1 Two in one - - 1 - Bank Thresher

14 Yes Yes Cycle Weedier and CI sheet - Two in one - - - - -

Thresher

15 Yes No Cycle Weedier CI sheet - - 1 - - - NGO

16 Yes No - - CI sheet - - - - - - -

17 No No Cycle - CI sheet 1 - - 1 - 1 NGO

18 No No - - CI sheet - - - - 1 - Mortgage

19 No No - - CI sheet 1 - - - - - -

20 No No - - CI sheet 1 - - - - - -

21 Yes Yes - - CI sheet - television black - - - - -

22 Yes F No Cycle - CI sheet - - - 1 1 1 Bank

62

Page 68: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership of housing of widow ownership person development person taken loan

facilities? U) n production (roof of radio/ involved in organisation loan equipment Material) television Organisation

o L o c

(U (U ' Electri- Tube- iu o A °-' Fa

z city well M M

U U. z

23 Yes No - - Cl sheet - - - 1 - 1 NGO

24 Yes Yes Cycle Weedier and Building - Two in one - - - - -

Thresher

25 Yes Yes Cycle Weedier and Building - television color 1 - 1 - Mortgage

Thresher

26 Yes Yes Cycle Weedier and CI sheet - television black - - - - -

Thresher

27 No No - - CI sheet 1 - - - 1 - Bank

28 No Yes Cycle - CI sheet 1 - - - - 1 Moneylender

29 Yes Yes - - CI sheet 1 - - - 1 - Moneylender

30 No No - Weedier Chan 1 - - - - 1 NGO

31 No No - - CI sheet - - - 1 - 1 BRAC

32 No No - - Chan 1 - - - - - -

33 No No - - CI sheet - - - 1 - 1 BRAC

34 No No Cycle - CI sheet - - - 1 - 1 ASA

63

Page 69: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of a, Having c ownership of housing of widow ownership person development person taken loan

v facilities? = a production (roof of radio/ involved in organisation loan M

:E equipment Material) television Organ sation

O 12

O C

c Electri- Tube- o

E city well o Z LL w z

35 Yes Yes Cycle Weedier and CI sheet - television color - - - - -

Thresher

36 Yes Yes Cycle Weedier and Semipucca 1 television color - - - - -

Thresher

37 Yes No - - CI sheet - Two in one - 1 1 - Mortgage

38 No No Cycle - CI sheet 1 - - - - - -

39 Yes No Rickshaw - CI sheet - Two in one - 1 - 1 ASA

40 Yes Yes Cycle - CI sheet - Two in one 1 1 1 1 ASA

41 No No Rickshaw - CI sheet - Two in one - 1 1 1 MON *NGO

42 Yes Yes Cycle Weedier and Semipucca - Television black - - 1 - Mortgage Thresher

43 Yes No - - CI sheet - - - - 1 - Mortgage

44 Yes Yes Cycle Thresher Building - TV and twin - - - - -

45 Yes Yes - - CI sheet - Two in one - - - - -

64

Page 70: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having

c ownership of housing of widow ownership person development person taken loan

8 facilities? c a, production (roof of radio/ involved in organisation loan

L equipment Material) television Organ sation o +r s o c

Electri- Tube- °7 0 x city well 0 o

a ro f E

z LL LL

46 Yes Yes - Weedier and Semipucca - Two in one - - - - -

Thresher

47 No No - - CI sheet 1 - - - - 1 Moneylender

48 Yes Yes Cycle Weedier and Semipucca - Two in one - - - - -

Thresher

49 Yes Yes Cycle Weedier and CI sheet - - 1 - 1 - Bank

Thresher

50 Yes Yes Cycle Weedier and CI sheet - - - - 1 - Money and Thresher bank

51 Yes No - Weedier CI sheet - - - 1 - 1 Mohila Somitee

52 No No - - CI sheet - - - - - - -

53 Yes Yes Cycle Weedier and CI sheet - - - - - - -

Thresher

54 Yes Yes - - CI sheet - Two in one - 1 - 1 BRAC

55 Yes Yes - Weedier and CI sheet - television black 1 - - - -

Thresher

65

Page 71: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having o ownership of housing of widow ownership person development person taken loan

S facilities? CL production (roof of radio/ involved in organisation loan v L equipment Material) television Organ sation o *' o c

c Electri- Tube-

x city well L z U.

56 No No - - CI sheet - - - - - - -

57 Yes No Cycle Weedier Chan 1 - - - - - -

58 Yes No Cycle - Chan - Two in one - 1 - 1 ASA

59 No No - - CI sheet 1 - - - 1 - Moneylender

60 No No - - CI sheet - Two in one - 1 - 1 Mohila Somitee

61 Yes No - Weedier and CI sheet 1 Two in one - - - - -

Thresher

62 Yes No - - CI sheet - Radio - - - - -

63 Yes Yes - - CI sheet - Two in one - - - - -

64 Yes Yes - Weedier and CI sheet - Twin one - 1 - - -

Thresher

65 Yes No - - CI sheet - - 1 - - - 1

66 No Yes Cycle Weedier and CI sheet 2 - - - - - -

Thresher

67 No No - - CI sheet - - - - - - -

66

Page 72: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership of housing of widow ownership person development person taken loan

0 facilities? CL a production (roof of radio/ involved in organisation loan

M equipment Material) television organ sation 12 W o c

c Electri- Tube- E x city well M f LL

f LL z .

68 Yes No Cycle Weedier CI sheet - - - - - - -

69 Yes Yes - Weedier and CI sheet 1 Two in one - - - - -

Thresher

70 Yes No Cycle Weedier CI sheet - - - - - - -

71 Yes Yes Cycle Weedier and CI sheet - Two in one - - - - -

Thresher

72 No No Cycle - CI sheet - - 1 - 1 - Bank

73 - - - -

74 Yes No - - Chan - - - 1 - 1 ASA

75 Yes Yes Cycle - CI sheet - - - - - - -

76 No No - - Chan - - - 1 - - -

77 No No Cycle - Chan - - - - - - -

78 Yes Yes Cycle - CI sheet 1 Two in one - - - - -

79 No No Cycle - CI sheet - - - - 1 - Moneylender

67

Page 73: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership of housing of widow ownership person development person taken loan

facilities? CL a, production (roof of radio/ involved in organisation loan equipment Material) television Organisation

o c

c Electri- Tube- 0 x city well z U. U.

80 No No - - CI sheet 1 - - - - - -

81 No No Cycle Weedier and CI sheet - - - - 1 - Moneylender

Thresher

82 No No - - CI sheet - - - 1 - 1 ASA

83 Yes Yes Cycle Weedier and CI sheet - Two in one - - - - -

Thresher

84 Yes Yes Cycle Weedier CI sheet - Two in one - - - - -

85 Yes Yes - - CI sheet 1 Television

colour

86 No No - - Chan 1 - - - - 1 Mortgage

87 Yes Yes Cycle - Semipucca - TV and twin - - 1 - Mortgage

88 Yes Yes - - Building - TV and twin - - 1 - Money-lender

89 Yes Yes - - Semipucca - Television 1 - Money-lender

colour

90 No No - - CI sheet - - - - - - -

91 Yes Yes Cycle Weedier and Semipucca 1 Television black - 1 - - -

Thresher

92 No No - - CI sheet 1 - - - - - -

68

Page 74: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NAME OF THE VILLAGE: PARUARA

Page 75: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Village :Paruara Union : Sreepur Upazila : Chowdaugram District : Comilla

A. General

Sl. No. Description Break-up of Description Total 1 Area of the village (In Acres) 78

2 Distance from Upazila Head quarter (In km.) 20 3 Distance from District Head quarter (In km.) 30

4 Distance from nearest Pucca Road (In km) 01

5 Number of Population Male- 402 Female-396

798

6 Sex Ratio 101.51

7 Number of Household 141

8 Household Size 05.7

9 Sex of the Household Head Male- 140 (99.3) Female- 01 (0.7)

10 Religious Status of the household head Muslim- 100%

11 Age dependency Ratio (under 15 and above 65+) 88.21

70

Page 76: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

B. Resources

Si. No. Description Break-up of Description Total 1 Number of Ponds 12

2 Number of Kua 13

3 Number of Educational Institute Primary- 0 High School- 0 College- 0 Madrasha- 0 Maktab- 01

4 Total cultivated Land Paddy field 84.20 Seedbed 07.59

5 Number of Mosque 01

6 Number of Graveyard 03

7 Number of Deep tubewell 01

8 Number of Shallow Tubewell 00

9 Pacca road in the village (In Kilometer) 00 10 Number of village shop 01

11 Drainage Pipe 02

12 Total village road 02

71

Page 77: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

C. Education

SI. No. Description Break-up of Description Total 1 School Enrolment Rate (Primary Level) Boy- 97.9 96

Girl- 94.2 2 School Enrolment Rate (Secondary level) Boy- 93.55 90.14

Girl- 87.5

3 School drop out Rate (Primary Level) Boy- 0 01.05 Girl-2.4

4 School dropout Rate (Secondary level) Boy- 16 10.34 Girl- 6.06

5 Literacy Rate (7 years +) Male- 69.13 62.52 Female55.91

7 Number of person Attended adult Literacy Programme Male- 0 0

Female- 0

8 Number of people passed SSC or HSC Male- 43 68 Female- 25

10 Distant of Nearest Educational Institute from the village Primary- 2

(in KM) Girls High School- 2

Boys High School- 3

Girls College- 2

College- 3

72

Page 78: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

D. Health and Sanitation

SI. No. Description Break-up of Description Total 1 Number of Deaths due to pregnancy complication last year 01

2 Number of deaths of children (0-1 years) over last 12 months 01

4 Number of deaths of children (1-4 years) over last 12 months Boy- 0 Girl- 0

0

5 Number of children affected by disease (0-5 Years) 12

6 Number of children born last Year 15

7 Number of Persons suffered from disease (5 Years above) over last 12 months

Male- 25 Female- 26

51

8 Sources of water used for Drinking water Tubewell- 100%

9 Sources of water used for Cleaning utensils Pond- 95 (67.4) Tubewell- 44 (31.2) Both- 02 (1..3)

10 Nature of Latrine use for defecation Open- 22 Ring slab- 114

Water Scaled 05

11 Distant from the Union Health Centre (In knm.) 2.5

12 Distant from the Upazila Health Complex (In km) 15

73

Page 79: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

E. Employment

SI. No. Description Break-u of Description Total 1 Number of child Labour (5-14 years) Male- 04

Female- 02 06

2 Number of Active labour force Male- 207 Female-165

372

3 Nature of Employment for Male Unemployed- 07 Underemployed-03

10

4 Nature of Employment for female Unemployed- 07

Underemployed- 07 14

5 Number of wage Labourer Agricultural- Non Agricultural-

6 Total Number of People Living Abroad 51

7 Total Number of People Living outside the village in home 20

F. Livestock and trees

S1. No. Description Break-up of Description Total 1 Total number of Poultry 2530 2 Total number of Livestock Cow-183

Goat- 37

220

3 Total number of Poultry died last year 616 4 Total number of Livestock died last year Cow 2

Goat-0 02

5 Total number of wood trees 2658 6 Total number of fruit trees 2068

74

Page 80: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

G. Situation of Poverty

Sl. No. Description Break-up of Description Total 1 Situation of Poverty among the people According to the Rich- 26.0%

perception of the village people Middle class- 19.5% Poor- 18.5% Very Poor- 35.2%

2 Situation of Poverty According the criteria of Income (CBN Well of- 49.5 Method) Poor- 50.5%

3 Situation of Poverty According the criteria of capacity to food Surplus 21.8% consumption Break even 36.3%

Occasionally deficit 17.3% Chronic deficit- 24.6%

4 Situation of Poverty According to the criteria of Calorie intake Non Poor 44.4% (24 hours recall method) Poor 28.4%

Very Poor 27.2%

Table 1: Distribution of the household members according to different age group

Age Group Male Female Total U to 5 91 83 174

6-10 48 52 100

11-15 31 40 71

15-30 86 120 206

30-64 130 88 218

65+ 16 13 29

Total 402 396 798

75

Page 81: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 2: Educational Qualification of the Household head

Frequency Valid Per cent Illiterate 67 48.6 Class III 01 0.7

Class IV 01 0.7

Class V 31 22.5

Class VI 01 0.7

Class VII 10 7.2

Class IX 03 2.2

Class X 12 8.7

SSC 07 5.1

HSC 03 2.2

Graduate 01 0.7

Alem 01 0.7

Total 138 100.0

Table 3: Distribution of the household head according to their age

Frequency Per cent Lowest to 25 13 09.2 25-35 37 27.0

35-45 36 25.5

45-55 19 13.5 55 and above 35 24.8 Total 140 100.0

76

Page 82: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 4: Distribution of the Household according to the land ownership

Land Ownership Group (in Acre) Number of Household Per cent of Household

Less than .05 (Landless) 22 16.3

.05-2.49 (Small Farmers) 101 71.6

2.5-7.49 (Medium Farmers) 15 10.6

Large Farmer 02 01.4

Total 140 100.0

Table 5: Occupation of the House holds head

Frequency Valid Per cent

Farmer 28 19.9

Day laborer 21 14.9

Service 08 05.7

Wage earner 17 12.1

Business 31 22.0

Teacher 02 01.4

House wife 01 00.7

Rickshaw 14 09.9 Rural Doctor 01 00.7

Non Agricultural labour 04 02.8

Others 13 09.2

Total 140 100.0

77

Page 83: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 6: Distribution of the households by materials of roof of main house

Frequency Valid Per cent Chan 08 05.8

Ci sheet 116 83.3

Building 14 10.1

Total 138 100.0

Table 7: Distribution of the households by Access to Communication facilities

Frequency Valid Per cent Nil 73 52.9 Radio 01 0.7

Television black 15 10.9

Television color 06 4.3

two in one 28 20.3

Tv and twin 15 10.9

Total 138 100.0

Table8: Distribution of the households by nature of transport ownership

Nature of transport Frequency Valid Per cent

None 82 59.4

Rickshaw 11 08.0 Cycle 44 31.9

Boat 01 0.7

Total 138 100.0

78

Page 84: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 9: Distribution of the households by Electricity Facility

Frequency Valid Pe rcent No 57 41.3

Yes 81 58.7

Total 138 100.0

Table 10: Distribution of the households by having own tube well

Frequency Valid Per cent

No 52 37.7

Yes 86 62.3

Total 138 100.0

Table 11: Distribution of the households by having Own Agricultural Equipment

Frequency Valid Per cent

None 99 71.7

Weeder 04 2.9

Thresher 15 10.9

Weeder and Thresher 16 11.6

Deep tube well 01 0.7

Power 02 1.4

Low Lift Pump 01 0.7

Total 138 100.0

79

Page 85: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

AGE OF THE POPULATION

Page 86: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Paruara A e of the population

Name of the Name of Household Head 0 -5 6-10 11 -15 15 -30 30 -64 6 5+ To tal Household head Bari

U C

c .N C c v a, a) N a, d , c

a1 r E !

E N T E

G1

E a T E

a)

E al m a o M o M o iC E

E { U U. U. U. U. LL LL U. (7 Iu & 0

1 Hazi Abid All Abed All Hazi 105 5 Retired N.A N.A N.A N.A N.A N.A 1 1 1 N.A 1 1 3 2 5

2 Md. Abdul Barik Abed All Hazi 60 5 Farmer 1 N.A N.A 1 N.A N.A 2 1 2 1 N.A NA 5 3 8

3 bdur rashid Abed All Hazi 56 S.S.C Retired N.A N.A 1 1 N.A 1 N.A N.A 1 1 N.A NA 2 3 5

4 Md. Abdul Matin Abed Ali Hazi 45 10 Service 1 1 N.A N.A N.A N.A N.A N.A 1 1 N.A NA 2 2 4

5 Md. Monjeel miah Abed All Hazi 33 Illiterate Rickshaw 2 N.A 2 N.A N.A N.A N.A 1 1 N.A N.A NA 5 1 6

6 Md. Abdul Malik Abed All Hazi 64 Illiterate Rickshaw N.A N.A N.A N.A N.A N.A N.A N.A 1 2 N.A NA 1 2 3

7 Md. Kabir Hossain Abed All Hazi 25 5 Driver N.A 2 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 1 3 4

8 Md Fazlur Rahaman Abed All Hazi 35 Illiterate Driver N.A 1 1 N.A N.A N.A N.A 1 1 N.A N.A NA 2 2 4

9 Md. Mustafa Kamal Abed All Hazi 45 Illiterate Rickshaw N.A N.A N.A N.A N.A N.A 2 N.A 1 1 N.A NA 3 1 4

10 Md. Abdul Sobhan Abed All Hazi 43 3 Service N.A N.A N.A 1 N.A N.A 1 N.A 1 1 N.A NA 2 2 4

11 Md. Farid Miah Abed Ali Hazi 40 Illiterate Business N.A 1 N.A 2 N.A N.A N.A 1 1 N.A N.A NA 1 4 5

81

Page 87: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Name of Househol d Head 0 -5 6-10 11-15 15 -30 30 -64 6 5+ Total

w Household head Bari c U o o C +; 9 (V w w (, W a) a)

0

E Ch M

a:.

3 v a, a, d

x W x W W f au L-

UL. V U U U. LL U- U- U. U u, a 0

12 Md. Babul Miah Abed All Hazi 38 Illiterate Rickshaw 1 1 N.A N.A N.A N.A 1 1 1 N.A N.A 1 3 3 6

13 Md. Abdul Gafur Gafur 65 Illiterate Farmer 1 2 1 N.A N.A 1 N.A 2 2 N.A 1 NA 5 5 10

14 Md. Salamat Ullah Gafur 56 Illiterate Rickshaw N.A 1 N.A N.A 1 N.A 5 2 2 1 N.A 1 8 5 13

15 Md Mokhles Sarder Mokhles 60 S.S.C Business N.A 2 N.A 1 N.A N.A 1 1 1 1 N.A NA 2 5 7

sarder

16 Md. Amir Hossain Mokhles 57 5 Business 1 N.A N.A N.A N.A N.A N.A 1 1 N.A N.A NA 2 1 3

sarder

17 Md. Abul Kalam Mokhles 30 Illiterate Rickshaw 2 1 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 3 2 5

sarder

18 Mohammad Hossain Mokhles 45 5 Wage Earner N.A N.A N.A N.A 2 1 N.A N.A 1 1 N.A NA 3 2 5

sarder

19 Md. Nurul Islam Mokhles 42 Illiterate Wage Earner 1 1 N.A 1 N.A 1 N.A N.A 1 1 N.A NA 2 4 6

sarder

20 Md. Minnat All Mokhles 52 10 Service 1 N.A 2 N.A N.A 1 N.A 1 1 1 N.A NA 4 3 7

sarder

21 Md. Salamatullah Ansar All 56 Illiterate Labour 1 1 N.A N.A 1 N.A 1 2 2 1 N.A NA 5 4 9

82

Page 88: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age oft e population Name of the Name of Household Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ Total

Household head Bari C V R o C ° a N a a a N g 0 '

a A a a o m m c £ a 0 f E f E E x E f

W

E E f E l° 7 p U LL LL LL LL LL LL LL w w d 0

22 Md. Ali ashraf Ansar All 45 Illiterate Labour 1 1 1 1 N,A 1 N.A N.A 1 1 N.A NA 3 4 7

23 Md. Julphe Ali Ansar Ali 35 Illiterate Labour 1 N.A 1 2 N.A N.A N.A 1 1 N.A N.A 1 3 4 7

24 Md. All Hossain Ansar Ali 48 Illiterate Unemployed N.A N.A N.A N.A 2 N.A N.A 1 1 1 N.A NA 3 2 5

25 Md. Abdur Sattar Ansar Ali 40 Illiterate Day labourer N.A N.A 1 1 1 N.A N.A 1 1 N.A N.A NA 3 2 5

26 Mr. Khorshed Alam Ansar Ali 35 Illiterate Rickshaw 1 N.A 2 N.A N.A N.A N.A 1 1 N.A N.A NA 4 1 5

27 Md. Jahangir Ansar Ali 25 Illiterate Rickshaw N.A 1 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 1 2 3

ossain

28 Md, Abut Kashem Kashem Ali 65 Illiterate Farmer 1 1 N.A 1 N.A N.A 1 1 N.A 1 1 NA 3 4 7

29 Md. Moslem Miah Kashem Ali 29 5 Business 1 N.A 1 N.A N.A 2 2 1 N.A 1 N.A NA 4 4 8

30 Md. Billal Hossain Master bari 25 8 Wage Earner N.A N.A N.A N.A N.A N.A 1 1 N.A 1 N.A NA 1 2 3

31 Md. Abdul Jabbar Master bari 65 10 Retired 1 N.A N.A N.A N.A N.A 2 2 4 2 1 NA 8 4 12

32 Md. Abdul Majeed Master bari 56 ssc Retired 3 N.A N.A N.A 1 N.A 5 4 1 1 N.A NA 10 5 15

Master

83

Page 89: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Household Head 0-5 6- 10 11 -15 15 -30 30 -64 6 5+ To tal

a, Household head Bari o U jp C C + +

C 2 N w w w N C7 W 0

1 1pp .11.+ Q fU f0 f0 C

U. 0 7 U U. U. U. U. IL LL t7

w & 0

33 Md. Rafiqul Islam Rafiqul Islam 58 10 Farmer 2 1 N.A 1 N.A N.A 1 2 1 1 N.A NA 4 5 9

34 Md Siraj Miah Muhuri 100 Illiterate Farmer N.A N.A 3 N.A N.A N.A N.A 2 2 N.A 1 1 6 3 9

35 Md. Farid Miah Muhuri 62 Illiterate Farmer N.A 1 2 N.A 1 1 N.A N.A 1 1 N.A NA 4 3 7

36 Md. Moslem Miah Muhuri 70 8 Farmer N.A N.A N.A 1 N.A 1 1 1 N.A 1 1 NA 2 4 6

37 Md. Julphe All Muhuri 90 Illiterate Farmer N.A 1 2 1 N.A 2 2 4 5 2 1 1 10 11 21

38 Md. Abul Kashem Muhuri 52 HSC Teacher N.A N.A N.A 1 N.A 2 N.A 1 1 2 N.A NA 1 6 7

Master

39 Md. Abul Hashem Muhuri 60 6 Farmer N.A N.A N.A N.A N.A N.A N.A N.A 1 1 N.A NA 1 1 2

40 Md. Sultan Miah Muhuri 85 Illiterate Farmer 1 3 1 2 1 N.A N.A 2 4 1 1 NA 8 8 16

41 Md. Jalal Uddin Muhuri 27 Illiterate Farmer N.A 2 N.A N.A N.A N.A 1 1 N.A 1 N.A NA 1 4 5

42 Md. Zakir Hossain Muhuri 25 5 Wage Earner 3 N.A N.A N.A N.A N.A 1 1 N.A N.A N.A NA 4 1 5

43 Md. Alam Miah Muhuri 35 5 Wage Earner 1 1 N.A N.A N.A N.A 2 2 2 1 N.A NA 5 4 9

84

Page 90: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Name of Household Head 0 -5 6- 10 11-15 15 -30 30 -64 6 5+ To tal

a, Household head Bari o . C ° a a a a a ai a'

0 1-

rn o + a M W '° 4 m '°

M Tv c

Q M M

LL f U U. U. LL U. U. U. Y.. C7 Lu p+ 0

44 Md. Abdus Sobhan Muhuri 70 SSC Farmer N.A N.A N.A N.A N.A N.A 1 1 N.A 1 1 NA 2 2 4

45 Md Dudu Miah Muhuri 62 9 Retired 1 N.A N.A N.A N.A N.A 1 2 3 1 N.A NA 5 3 8

46 Md. Jahangir Muhuri 34 SSC Farmer N.A 1 N.A N.A N.A N.A 1 2 1 1 N.A NA 2 4 6

Hossain

47 Md. Ataur Rahaman Muhuri 48 Illiterate Farmer N.A N.A N.A 1 1 1 1 N.A 1 1 N.A NA 3 3 6

48 Md. Bazlur Rahaman Muhuri 40 10 Farmer N.A 1 1 1 1 N.A N.A 1 1 N.A N.A 1 3 4 7

49 Md. Abdul Matin Muhuri 28 5 Rickshaw 2 1 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 3 2 5

50 Mohammad All Muhuri 31 10 Business 1 1 N.A 2 N.A N.A N.A 1 1 N.A N.A NA 2 4 6

51 Md. Ibrahim Miah Muhuri 28 5 Rickshaw 1 N.A N.A N.A N.A N.A 1 1 N.A N.A N.A NA 2 1 3

52 Md. Rashed Miah Muhuri 23 4 Labour N.A N.A N.A N.A N.A N.A 1 1 N.A N.A N.A NA 1 1 2

53 Md. Khorshed Alam Muhuri 18 Illiterate Rickshaw N.A N.A N.A N.A 1 1 1 N.A N.A 1 N.A NA 2 2 4

54 Md. Abdul Woadud Adud 50 Illiterate Farmer N.A 1 1 N.A N.A 1 N.A 1 1 N.A N.A NA 2 3 5

85

Page 91: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Name of Household Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ To tal

Household head Bar! o U ro o

c i+ C o- w d w w a a w

0 ,

.E a v o CL

E ai M f E E E E y y 1!

U. 7 U. U. U. UL U. U- LL (7 W Or 0

55 Md Amzad Ali Sarder Adud 80 10 Farmer N.A 1 N.A N.A N.A N.A 1 1 N.A N.A 1 1 2 3 5

56 Md. Salim Ullah Adud 35 Service 1 1 N.A 2 N.A N.A N.A 1 1 N.A N.A NA 2 4 6

57 Md. Rbdur Rashid abdir rashid 65 5 Farmer 1 2 1 1 N.A N.A N.A 2 1 1 1 NA 4 6 10

58 Md. Ruhul Amin Ruhul Amin 37 10 Business 2 N.A 1 1 N.A N.A N.A 1 1 1 N.A NA 4 3 7

59 Md. Siddiqur Siddique 57 Graduate Teacher N.A N.A N.A N.A 1 N.A N.A 1 1 1 N.A 1 2 3 5

Rahaman master

60 Md. Joynal Abedin Siddique 55 SSC Farmer N.A N.A N.A 1 N.A 1 2 N.A 1 1 N.A NA 3 3 6

master

61 Md. Gani Miah Fakir bari 45 9 Service 1 N.A 1 N.A N.A 3 N.A N.A 1 1 N.A NA 3 4 7

62 Md. Nannu Miah Fakir bari 40 alem Farmer 1 N.A 1 N.A N.A 1 N.A N.A 1 1 N.A NA 3 2 5

63 Md. Liaquat All Fakir bari 35 SSC Business N.A 1 N.A N.A N.A N.A N.A 1 1 N.A N.A NA 1 2 3

64 Md. Momtaj Miah Fakir bari 55 8 Farmer N.A N.A N.A N.A N.A N.A 1 1 1 1 N.A NA 2 2 4

65 Md. Basir Ullah Fakir bari 70 8 Retired Army N.A N.A N.A 1 1 1 N.A N.A 1 1 1 NA 3 3 6

86

Page 92: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Name of Household Head 0-5 6-10 11 -15 15 -30 30 -64 6 5+ Total

a, Household head Bari

V M o C a+

= G cu cu a) a' a' d N 0 I-

?' n To i; 7i a io Ta ro R ° c U LL U- U- U- U. LL Wa 0

66 Md. Hasan All Fakir bari 60 8 Retired N.A N.A 1 N.A N.A N.A N.A N.A 1 1 N.A NA 2 1 3

67 Md. Sadek all Fakir bari 65 5 Business N.A N.A N.A N.A N.A 1 N.A N.A 1 1 1 NA 2 2 4

68 Md. Foyej Ahmed Fakir bari 42 Illiterate Farmer N.A N.A N.A N.A N.A N.A N.A N.A 1 1 N.A NA 1 1 2

69 Md. Chan Miah Fakir bari 30 Illiterate Rickshaw 2 1 N.A 1 N.A N.A 1 1 N.A N.A N.A NA 3 3 6

70 Md. Kabir Hossain Fakir bari 26 5 Business 2 N.A N.A N.A N.A N.A 1 1 N.A N.A N.A NA 3 1 4

71 Md. Monirul Islam Fakir bari 25 10 Service N.A N.A N.A N.A N.A N.A 1 1 N.A 1 N.A NA 1 2 3

72 Md. Abdul Barik Abdul barik 45 Business N.A N.A N.A N.A 2 N.A N.A N.A 1 1 N.A NA 3 1 4

73 Md. Bahar Miah Abdul barik 40 8 Wage Earner N.A N.A N.A 2 N.A 1 N.A 1 1 N.A N.A NA 1 4 5

74 Md. Ramjan All Abdul barik 37 5 Business N.A 2 1 N.A N.A N.A N.A 1 1 N.A N.A NA 2 3 5

75 Md Moslem miah Molla 50 10 Doctor N.A N.A N.A N.A 1 1 1 1 1 1 N.A NA 3 3 6

76 Md. Abul Hossain Molla 48 5 Unemployed N.A N.A N.A N.A N.A N.A N.A N.A 1 1 N.A NA 1 1 2

87

Page 93: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Househol d Head 0-5 6-10 11 -15 15 -30 30 -64 6 5+ To tal

a, Household head Bar! C U 0 0 c ..

C ° a w ai w a a a O

T V 3 E E E E

E d d A U. 3 V LL U. U U. U.

w p+ 0

77 Md. Abu Taher Molla 45 5 Farmer 1 1 N.A 1 N.A 1 1 N.A 1 1 N.A NA 3 4 7

78 Md. Monju Miah Molla 35 5 Business 1 1 N.A 1 N.A N.A N.A N.A 1 1 N.A NA 2 3 5

79 Ms. Rahima Begum Molla 65 Illiterate House wife 1 N.A N.A N.A N.A N.A N.A 1 1 1 N.A NA 2 2 4

80 Md. Ayub All Molla 38 Illiterate Day labourer 1 N.A N.A N.A N.A 1 1 1 1 1 N.A NA 3 3 6

81 Md.Abdul Barik Molla 35 Illiterate Business N.A 1 N.A 1 1 1 N.A 1 1 N.A N.A NA 2 4 6

82 Md. Tarek Miah Molla 38 Illiterate Farmer 1 1 N.A N.A N.A N.A N.A 1 1 N.A N.A NA 2 2 4

83 Md. Rahamat All Rahamat All 40 5 Business 1 3 N.A 1 N.A N.A N.A 2 2 N.A N.A NA 3 6 9

84 Md Ayat Ali Rahamat Ali 50 Illiterate Business N.A 1 N.A N.A N.A N.A 1 1 1 1 N.A NA 2 3 5

85 Md. Hiron Miah Rahamat Ali 28 5 Business 1 2 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 2 3 5

86 Md. Khorshed Alam Rahamat Ali 25 10 Business 1 1 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 2 2 4

87 Md. Ayub Ali Rahamat Ali 47 Illiterate Business 1 1 N.A 1 N.A N.A 1 1 1 1 N.A NA 3 4 7

88

Page 94: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age oft e population Name of the Name of Household Head 0 -5 6-10 11 -15 15 -30 30 -64 6 5+ Total

0) Household head Bari c V

ra o C ;.,

C c a a a, ai u w a, O I-

i4 .1-1 to

Q Q CL f E

cu f aa, f w E X a,

E f a, x a, E f E

w ICJ. 3 10 U IL U. IL IL U. U. U. W d 0

88 Md. Abul Basar Rahamat Ali 45 Illiterate Day labourer 2 N.A 1 N.A N.A 1 N.A N.A 1 1 N.A NA 4 2 6

89 Md. Abad Miah Rahamat Ali 40 5 Day labourer N.A 1 N.A N.A N.A N.A N.A 1 1 N.A N.A NA 1 2 3

90 Md. Delu Miah Rahamat Ali 35 Illiterate Day labourer 1 N.A 1 1 N.A N.A 2 1 N.A N.A N.A NA 4 2 6

91 Md, Shajhan Rahamat Ali 32 Illiterate Day labourer 1 1 1 N.A N.A N.A 1 1 N.A N.A N.A NA 3 2 5

92 Md. Rabiul Hossain Rahamat Ali 30 Illiterate Day labourer N.A 2 N.A 1 N.A N.A N.A 1 1 N.A N.A NA 1 4 5

93 Md. Mojammel Haq Fazlul Haq 9 Illiterate Unemployed 1 N.A 1 N.A N.A N.A N.A N.A N.A 1 N.A NA 2 1 3

94 Md. Afjal haq Fazlul Haq 38 Illiterate Day labourer 2 N.A N.A N.A N.A N.A N.A 1 1 N.A N.A NA 3 1 4

95 Md. Sadu Miah Sadu Miah 43 5 Business N.A N.A N.A 2 1 N.A N.A 2 1 N.A N.A NA 2 4 6

96 Md. Sirajul Islam Sirajul Bari 60 Illiterate Day labourer N.A N.A N.A 1 N.A N.A N.A N.A N.A 1 1 NA 1 2 3

97 Md. Abul Kalam Sirajul Bari 34 Illiterate Day labourer N.A 1 N.A N.A N.A N.A N.A 1 1 N.A N.A NA 1 2 3

98 Md. Babul Miah Sirajul Bari 19 Illiterate Day labourer N.A N.A N.A N.A N.A N.A N.A 1 1 N.A N.A NA 1 1 2

89

Page 95: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age oft e population Name of the Name of Househol d Head 0-5 6-10 11-15 15 -30 30 -64 6 5+ To tal

Household head Bari o U c

C fap+

~ 2 N N ai a) a' 4J 0l

0 H

G1 a M E M E ' E E M E T M C C

W p+ 0

99 Md. Amir Hossain Sirajul Bari 39 Illiterate Business 2 1 N.A 1 N.A N.A N.A 1 1 N.A N.A NA 3 3 6

100 Md. Abdul Hakim Sirajul Bari 42 Illiterate Service N.A N.A N.A N.A N.A N.A N.A N.A 1 1 N.A NA 1 1 2

101 Md. Jafar Miah Sirajul Bari 33 Illiterate Day labourer N.A 2 N.A 1 N.A N.A N.A 1 1 N.A N.A NA 1 4 5

102 Md. Hasmat Ali Sirajul Bari 25 Illiterate Rickshaw 2 N.A N.A 1 N.A N.A 1 1 N.A N.A N.A NA 3 2 5

103 Md Jabed All Sirajul Bari 45 Illiterate Day labourer N.A N.A N.A N.A N.A N.A 1 N.A 1 1 N.A NA 2 1 3

104 Md. Nurul Islam Sirajul Bari 38 Illiterate Day labourer N.A N.A N.A N.A N.A N.A 1 N.A 1 1 N.A NA 2 1 3

105 Md. Billal Hossain Sirajul Bari 23 Illiterate Day labourer N.A 1 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 1 2 3

106 Md. Siddiqur Sirajul Bari 48 5 Wage Earner N.A 1 1 N.A 1 1 N.A N.A 1 1 N.A NA 3 3 6

Rahaman

107 Md. Rafiq Miah Sirajul Bari 52 Illiterate Day labourer 2 N.A 2 N.A 2 N.A 1 N.A 1 1 N.A NA 8 1 9

108 Md. Lutfur Rahaman Sirajul Bari 34 5 Wage Earner N.A 1 N.A N.A N.A N.A N.A N.A 1 1 N.A NA 1 2 3

109 d. Abui Hashem Sirajul Bari 31 Illiterate Wage Earner 2 1 N.A 1 1 N.A 1 1 N.A N.A N.A NA 4 3 7

90

Page 96: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Name of Household Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ To tal

a, Household head Bari C U is o C o w y m m y d y 0 F.

E 3 4 A E M E '° E '° E M E 'O E 10

L Q _-

(0

7 u U. LL U. u' U. u' C7

w & 0

110 Md. Rustam Ali Sirajul Bari 30 5 Wage Earner N.A 1 1 N.A N.A N.A 1 1 N.A N.A N.A NA 2 2 4

111 Md. Abdul Rashid Rashid 50 9 Service 1 N.A N.A 1 1 1 N.A N.A 1 1 N.A NA 3 3 6

112 Md. Ramijul Haq Gura Miah 60 Business N.A N.A 2 1 N.A 2 N.A N.A 1 2 N.A NA 3 5 8

113 Md. Mohan Miah Gura Miah 29 Illiterate Day labourer 2 1 N.A N.A N.A N.A 1 1 N.A N.A N.A NA 3 2 5

114 Md. Saleh Ahmed Dudu Miah 34 HSC Business 2 N.A N.A N.A N.A N.A N.A 1 1 N.A N.A NA 3 1 4

115 Md. Ana Miah Dudu Miah 60 Illiterate Farmer N.A 2 N.A 1 N.A N.A N.A 1 2 1 N.A NA 2 5 7

116 d Syed Ahmed Syed bari 43 5 Business N.A N.A N.A 1 N.A 2 2 N.A 1 1 N.A NA 3 4 7

117 Md. Momtaj Miah Ali Miah 48 Illiterate Farmer 1 1 N.A N.A 1 N.A 1 N.A 1 1 N.A NA 4 2 6

118 Md. Aslam Miah Ali Miah 35 5 Wage Earner 2 1 N.A 1 N.A 1 N.A N.A 1 1 N.A NA 3 4 7

119 Md. Samsul Haq Ali Miah 29 5 Wage Earner 2 N.A N.A N.A N.A N.A N.A 1 1 N.A N.A NA 3 1 4

120 Md. Moqbul Ahmed All Miah 34 8 Wage Earner N.A 1 1 N.A 1 N.A N.A 2 1 N.A N.A 1 3 4 7

91

Page 97: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Househol d Head 0-5 6-10 11 -15 15 -30 30 -64 6 5+ To tal

Household head Bar! o V

M o + o a d w w w w w a,

o - Vp

E Q . V 4 7 E Z aaJ aa, aa, aa, E E

L 10 V U. U. U. U. U. U. U. C7

W d O

121 Md. Farid Ahmed All Miah 31 10 Wage Earner N.A 2 N.A N.A N.A N.A N.A 1 1 N.A N.A NA 1 3 4

122 Md. Syed All Mobarak 65 8 Retired N.A N.A N.A N.A N.A N.A 2 1 1 1 1 NA 4 2 6

Majumder Majumder

123 Md. Farid Uddin Mobarak 48 HSC Wage Earner N.A N.A 1 N.A N.A N.A 2 2 2 N.A N.A 1 5 3 8

Majumder Majumder

124 d. Mokosh All Mokosh All 70 Illiterate Farmer 1 1 1 N.A N.A N.A N.A 1 N.A 1 1 1 3 4 7

125 Md. Safar All Mokosh All 50 5 Farmer 1 N.A N.A 1 1 N.A N.A N.A 1 1 N.A NA 3 2 5

126 Md. Year All Mokosh All 40 Illiterate Day labourer 1 1 1 N.A N.A 1 N.A 1 1 N.A N.A NA 3 3 6

127 d. Anar All Mokosh All 36 Illiterate Business 1 1 1 N.A N.A N.A N.A N.A 1 1 N.A NA 3 2 5

128 Md. All Ashraf Mokosh All 49 Illiterate Business N.A N.A N.A N.A N.A N.A N.A 1 1 1 N.A NA 1 2 3

129 Md. Moslem Miah Mokosh All 48 Illiterate Day labourer N.A N.A 1 N.A 1 N.A 2 N.A 1 1 N.A NA 5 1 6

130 Md. Abul Hashem Mokosh All 32 5 Cook 1 1 N.A N.A N.A N.A N.A 2 1 N.A N.A NA 2 3 5

131 Md. Dulal Miah Mokosh Ali 36 Illiterate Day labourer 1 1 1 N.A N.A N.A N.A N.A 1 1 N.A NA 3 2 5

92

Page 98: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Name of Household Head 0-5 6-10 11-15 15-30 30 -64 6 5+ To tal

Household head Bari o C U ro O C

C 21 .2 Q E E M E E M E E E

0 3 LL U W a O

132 Md. Fazar All Mokosh Ali 25 5 Day labourer 1 N.A N.A N.A N.A N.A 1 1 N.A N.A N.A NA 2 1 3

133 md. Jonnal Abedin Mokosh All 35 8 Wage Earner 1 1 N.A N.A N.A N.A N.A 1 1 N.A N.A NA 2 2 4

134 Md. Haresh Miah Mokosh All 30 8 Wage Earner 2 N.A N.A N.A N.A N.A 1 1 N.A 1 N.A NA 3 2 5

135 Md. Matin Miah Matin 45 5 Business N.A 3 N.A N.A N.A 1 1 1 1 1 N.A NA 2 6 8

136 Md. Fatik Miah Matin 38 Illiterate Business 1 N.A N.A N.A 1 1 N.A N.A 1 1 N.A NA 3 2 5

137 Md.Abdul Karim Matin 42 Illiterate Business N.A N.A 1 N.A 1 N.A 1 N.A 1 1 N.A NA 4 1 5

138 Md. Chowdhury Gazi Matin 33 Illiterate Business 1 1 N.A 1 N.A N.A 1 N.A 1 N.A N.A NA 3 2 5

139 Md. Cherag All Cherag All 59 Illiterate Business 2 1 1 N.A N.A N.A 1 2 2 1 N.A NA 6 4 10

140 Md. Jalal Uddin Jalal 60 Illiterate Business N.A N.A N.A N.A N.A N.A 1 1 1 1 N.A 1 2 3 5

141 Md. Khorsad Alam Khorsad 30 Illiterate Rickshaw N.A N.A N.A N.A N.A N.A 1 1 N.A 1 N.A NA 1 2 3

93

Page 99: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EDUCATION AND TRAINING

Page 100: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Paruara Information about Education Number of Skill Training

6-10 years child 11-15 ears old 16-18 ears old 18+ Age Person

0 ?,

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

CO CO CO to (D f m

M a

N

m f IO

m f fO

a f IO

m F E W

1 0 0 0 0 0 0 0 0 0 0 0 0 3 1 0 1 1 0 0 0 - -

2 0 1 0 0 0 0 0 0 0 0 0 0 4 1 0 1 3 0 0 1 - Nutrition

3 1 1 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 0 0 0

4 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

5 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0

7 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 .

8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

9 0 0 0 0 0 0 0 0 0 0 0 0 1 0 2 1 0 0 0 0

10 0 1 0 0 0 0 0 0 0 0 0 0 2 0 0 1 0 0 0 0

11 0 2 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

95

Page 101: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ye ars child 11-15 ears old 16-18 ears old 18+ Age Person

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

£

CO m co CO c CO

a,

E W {L

'o f a,

E a, U.

'a f v E a, U.

'o

a,

E d U.

'v E

m

E , U.

M x m

E a,

U-

to

a,

E a, U.

12 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 2 0 0 0 0

13 1 0 0 0 0 1 0 0 0 0 0 0 2 2 1 0 1 1 0 0

14 0 0 0 0 1 0 0 0 1 0 0 0 2 2 4 2 0 0 0 0

15 0 1 0 0 0 0 0 0 0 0 0 0 2 2 0 0 1 1 0 0

16 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

18 0 0 0 0 2 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0

19 0 1 0 0 0 1 0 0 0 0 0 0 0 1 1 0 0 0 0 0

20 2 0 0 0 0 1 0 0 0 1 0 0 1 0 0 1 0 1 0 1 Sewing

21 0 0 0 0 0 0 1 0 0 0 0 0 2 2 1 1 0 0 0 0

22 1 1 0 0 0 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0

23 1 1 0 1 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0

96

Page 102: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 ears old 18+ Age Person

a 3 ?,

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

Y.

m° C7 co 0

C7 m°

, C7

M

a Ip E w LL.

1° x d M E w U-

2 ro f

a Id

E W U-

M f as f0 E W I.

M f w f0 E W U.

M

a, f0 E W U.

d M E

d 10 E W U.

24 0 0 0 0 0 0 2 0 0 1 0 0 0 0 1 1 0 0 0 0

25 1 1 0 0 1 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

26 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

27 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0

28 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0

29 1 0 0 0 0 2 0 0 0 0 0 0 2 1 0 1 0 0 0 0

30 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 0 0

31 0 0 0 0 0 0 0 0 0 0 0 0 7 3 0 1 4 1 0 0

32 0 0 0 0 1 0 0 0 0 2 0 0 6 3 0 0 2 2 0 1 sewing

33 0 1 0 0 0 0 0 0 0 0 0 0 2 1 0 2 1 1 0 0 .

34 3 0 0 0 0 0 0 0 0 0 0 0 1 1 2 2 0 0 0 0 .

35 2 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

97

Page 103: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 years old 18+ Age Person

0 Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

M

V W m

% i CO

V,

m V

d M

E d U.

`0 f w M E W IL

M f a, M E W U.

M x d N E W IL

! M

a, fO

E m U.

m

a i E W IL

M f a, fO

E W IL

36 0 1 0 0 0 1 0 0 0 0 0 0 2 2 0 0 1 1 0 0

37 2 1 0 0 0 2 0 0 1 2 0 0 7 5 0 0 5 1 0 0

38 0 1 0 0 0 2 0 1 0 0 0 0 1 1 0 2 0 0 0 0

39 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

40 1 2 0 0 1 0 0 0 0 0 0 0 3 3 2 0 2 0 0 0

41 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 0 0 1 Sewing

42 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

43 0 0 0 0 0 0 0 0 0 1 0 0 2 1 2 1 0 1 0 0

44 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 1 1 0 0 0

45 0 0 0 0 0 0 0 0 0 0 0 0 4 3 0 0 1 2 0 0

46 0 0 0 0 0 0 0 0 0 0 0 0 1 2 1 1 1 0 0 0

47 0 1 0 0 1 1 0 0 0 0 0 0 1 1 1 0 0 0 0 0

98

Page 104: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 ears old 18+ Age Person

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

CO t9 IS C7 0 m c9

0 to L7

m g E ' tL to f E '

U. a E '

LL f E

U. f° f ' tL

to f E E U-

10 f E a' LL

48 1 1 0 0 1 0 0 0 0 0 0 0 1 1 0 1 0 0 0 0

49 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

50 0 2 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

51 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

52 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

53 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0

54 1 0 0 0 0 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0

55 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 1 1 1 0 0

56 0 2 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

57 1 1 0 0 0 0 0 0 0 0 0 0 2 2 0 1 1 2 0 0

58 1 1 0 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 0 0

59 0 0 0 0 1 0 0 0 0 1 0 0 1 1 0 1 0 1 0 0

99

Page 105: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 ears old 18+ Age Person

v 0

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

M LL % ..

m L A i A y-

_ fC

U.

N fp

U-

d f9

LL

C! f0

U-

G! f0

U-

y 10

1.

LL

_y f0 E

U-

60 0 1 0 0 0 1 0 0 2 0 0 0 1 1 0 0 1 0 0 1 Sewing

61 1 0 0 0 0 3 0 0 0 0 0 0 1 1 0 0 0 0 0 0

62 1 0 0 0 0 1 0 0 0 0 0 0 1 1 0 0 1 0 0 0

63 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 0 0 0

64 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 1 0 0 0

65 0 1 0 0 1 1 0 0 0 0 0 0 2 1 0 0 1 0 0 0

66 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

67 0 0 0 0 0 0 0 1 0 0 0 0 1 0 1 1 0 0 0 0

68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

69 0 1 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0

70 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

71 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 0 0

100

Page 106: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 ears old 18+ Age Person

U ?

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

m U.

CO

i . m

y- cq

9- CO

L >. CO

i c f0

a f0 E

a, f0 E

2 'o

a 7i E

a f0 E

d .v

a IC E m

a f0 E

N M

a f0 E

72 0 0 0 0 2 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

73 0 1 0 0 0 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0

74 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

75 0 0 0 0 1 0 0 0 0 0 0 0 1 1 1 1 1 1 0 0

76 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

77 0 0 0 0 0 1 0 0 1 0 0 0 1 1 0 0 1 0 0 0

78 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

79 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 1 1 1 0 0 .

80 0 0 0 0 0 1 0 0 0 0 0 0 0 0 2 2 0 0 0 0

81 0 1 0 0 1 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

83 0 1 0 0 0 0 0 0 0 0 0 0 1 0 1 2 0 0 0 0

101

Page 107: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 ears old 18+ Age Person

0 ?.

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

M LL >

, m° - ,,

a-' f a, m E m U.

a-' '° f a, ra

a, U.

a,

f a, Tv

a, LL

d f d .v

a, LL

a, '°

a, R E a, LL

a, '°

a, i a,

LL

ai r0 f

a, M 1= a, U.

84 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 1 0 0 0 0 ,

85 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

86 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

87 0 1 0 0 0 0 0 0 0 0 0 0 1 0 1 2 0 0 0 0 .

88 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 1 Animator

89 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 Animator

90 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 0 0 0

91 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

92 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0

94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

95 0 2 0 0 0 0 1 0 0 0 0 0 0 0 1 2 0 1 0 0

102

Page 108: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 ears old 18+ Age Person

$ Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

LL

CO° co 69 m° c m°

al

E

a) f0 E a)

LL

'a

a) f0

a' 1)..

w 'a

a) f0 E a) U.

a) f0 E a) U.

a f0 E a LL

E

a) 1'0 E a) U.

'a

a) 10

a) LL

96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

99 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

101 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

102 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

103 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 0 0 0

104 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 0 0 0 0

105 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

106 1 0 0 0 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0

107 2 0 0 0 1 0 0 0 0 0 1 0 0 0 1 1 0 0 0 0

103

Page 109: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 ears old 18+ Age Person

0 ?,

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

M 1L

m° c7 m° c7 m0 i m0

i t7

! C1

f0 E

Gl M E U.

d M E W

47

M E

LL f°

G7

M E U.

'0

d fG

E U.

4l M

E tL

108 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

109 0 1 0 0 1 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

110 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

111 0 1 0 0 1 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

112 2 1 0 0 0 1 0 0 0 0 0 0 0 0 1 2 0 0 0 0

113 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

114 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0

115 0 1 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0

116 0 1 0 0 0 2 0 0 1 0 0 0 2 0 0 1 1 0 0 0

117 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 0 0 0 0

118 0 1 0 0 0 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0

119 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

104

Page 110: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 ears old 18+ Age Person

$ Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

V- T. (o m c m

i + CO

,. R

a) f0 E a U.

to f0 E a7 U.

'o f a) fC E a) W-

f a) f0 E a)

U-

' E

a) IC E a) U.

'° a)

f0 E w U.

'° a) 10 E w IL

120 1 0 0 0 1 0 0 0 0 1 0 0 1 1 0 1 0 1 0 0

121 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 1 0 0 0 0

122 0 0 0 0 0 0 0 0 0 1 0 0 3 0 1 1 2 1 1 0 Animator 0

123 1 0 0 0 0 0 0 0 0 0 0 0 4 2 0 1 3 2 1 0 Animator 1

124 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 3 0 0 0 0 1

125 0 1 0 0 1 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0

126 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 1

127 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 1

128 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 1 0 0 0

129 1 0 0 0 1 0 0 0 0 0 0 0 1 0 2 1 0 0 0 0 1

130 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0 0

131 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

105

Page 111: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 ears old 18+ Age Person

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC

or HSC Number of

Person Subject

M U .

CO

L coo

` CO CO

L N _d Ifl

w U-

d !O

w U.

i N (0

w N.

x

N f0

w U.

d z

N f0

w U.

! x

0l M

d U.

x Gl f0

d U-

132 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

133 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

134 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 0 0

135 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 2 0 0 0 0

136 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0

137 1 0 0 0 1 0 0 0 1 0 0 0 0 0 1 1 0 0 0 0

138 0 1 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0

139 1 0 0 0 0 0 0 0 0 0 0 0 2 2 1 1 0 0 0 0 .

140 0 0 0 0 0 0 0 0 0 0 0 0 1 2 1 1 0 0 0 0

141 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0

106

Page 112: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NATURE OF LAND OWNERSHIP, ITS UTILIZATION, INCOME

AND EXPENDITURE

Page 113: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Paruara

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a E a

o t N L Cultivable Pond Kua v u C v }. v

rn M land ego > N 44 c t `'' a=i

v O M r- CL t '0 C 0 O M a+ C 0

'O 3 0 M- IZ3 M s..

° E x

a° b°_'a C+ ° R i is a v u O> LL. ?- O J a J U to t O 0 '0 t 1. d d 0 J N a O a ice a=.+

U .

a v + + 'v ,

0 CM o a m ZG. za d M 30 3 >-

1 4.28 .00 1.66 2.62 .40 1.60 .22 1.00 .40 .00 .00 1.60 .22 .00 .40 .00 200000.0 5000.00

2 1.65 .00 .90 .75 .20 .32 .09 .50 .14 .00 .00 .32 .09 .00 .14 .00 150000.0 5000.00

3 1.65 .00 1.20 .45 .22 .00 .09 .50 .14 .00 .00 .00 .09 .00 .14 .00 60000.00 4000.00

4 1.83 .00 1.40 .43 .20 .00 .09 .50 .14 .00 .00 .00 .09 .00 .14 .00 48000.00 3000.00

5 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000.00 3000.00

6 .05 .00 .00 .05 .02 .00 .00 .13 .03 .00 .00 .00 .00 .00 .03 .00 36000.00 3000.00

7 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 48000.00 3000.00

8 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 45000.00 3000.00

9 .07 .00 .00 .07 .04 .00 .00 .13 .03 .00 .00 .00 .00 .00 .03 .00 42000.00 3500.00

10 .06 .40 .00 .46 .03 .40 .00 .13 .03 .00 .00 .40 .00 .00 .03 .00 40000.00 3000.00

11 .06 .20 .00 .26 .03 .20 .00 .13 .03 .00 .00 .20 .00 .00 .03 .00 60000.00 3000.00

12 .06 .00 .00 .06 .03 .00 .00 .13 .03 .00 .00 .00 .00 .00 .03 .00 36000.00 2000.00

108

Page 114: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) d E

a,

d o L N v Cultivable Pond Kua m o ++

v ' v v+ n n -a land L R vi -W 9. 3: j

13 0 E w d H C o

r% H o i M U

_0 = .0

00 w > LL ? M

IC L-

J C, f0 +

Vq E M .2 L L

L = a o C .O1 f0

LL. { 7

C = C f°

4J

c 0 U

is v O

= C t

Q , i a 3o f0 .L J

N vf ai ++ y '°u 7i: o

0 cd o a O0

Cs a a i

3 3 r x .5 f- z z d z ,0

13 4.12 .00 .70 3.42 .44 2.40 .22 1.00 .36 .00 .00 2.40 .22 .00 .36 .00 100000.0 5000.00

14 .08 .00 .00 .08 .08 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 100000.0 4500.00

15 2.00 .00 .40 1.60 .10 1.40 .04 .00 .00 1.00 .06 1.40 .04 .00 .06 .00 120000.0 4000.00

16 .86 .00 .10 .76 .04 .70 .00 .17 .02 .00 .00 .70 .00 .00 .02 .00 50000.00 2500.00

17 .14 .00 .00 .14 .04 .10 .00 .00 .00 .00 .00 .10 .00 .00 .00 .00 36000.00 2000.00

18 .62 .00 .00 .62 .16 .40 .00 .16 .06 .00 .00 .40 .00 .00 .06 .00 60000.00 3000.00

19 .19 .00 .00 .19 .07 .10 .00 .17 .02 .00 .00 .10 .00 .00 .02 .00 55000.00 2500.00

20 .08 .80 .00 .88 .06 .80 .00 .16 .02 .00 .00 .80 .00 .00 .02 .00 60000.00 4500.00

21 .91 .40 .00 .51 .10 .40 .00 .04 .01 .00 .00 .40 .00 .00 .01 .00 70000.00 3500.00

22 .05 .00 .00 .05 .04 .00 .00 .04 .01 .00 .00 .00 .00 .00 .01 .00 36000.00 2500.00

23 .05 .00 .00 .05 .04 .00 .00 .04 .01 .00 .00 .00 .00 .00 .01 .00 36000.00 3000.00

24 .05 .00 .00 .05 .04 .00 .00 .04 .01 .00 .00 .00 .00 .00 .01 .00 60000.00 3000.00

109

Page 115: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) g L

o _ .. N L Cultivable Pond Kua

V = 3 rn ; o c v land is > =15 C - fl ? a .. c L .. r. o c '0

C H CL .0

C en cu 0

O C O O r0 f W w O 10 10

w CL =

C N M+ f0 L O L C

R O1 V U f0

p O M U r.. > 0

U.

= M

` U c a 2 E ; a o d 03 L. 3u 0 03 M ' O°

p gy z z a z o 3

N Q ,

25 .05 .80 .00 .85 .04 .80 .00 .04 .01 .00 .00 .80 .00 .00 .01 .00 30000.00 2500.00

26 .05 .00 .00 .05 .04 .00 .00 .04 .01 .00 .00 .00 .00 .00 .01 .00 36000.00 2500.00

27 .05 .00 .00 .05 .04 .00 .00 .04 .01 .00 .00 .00 .00 .00 .01 .00 34000.00 2000.00

28 .10 .00 .00 .10 .08 .00 .00 .08 .02 .00 .00 .00 .00 .00 .02 .00 50000.00 3000.00

29 .10 .00 .00 .10 .08 .00 .00 .08 .02 .00 .00 .00 .00 .00 .02 .00 40000.00 2500.00

30 .76 .00 .60 .16 .12 .00 .00 .33 .04 .00 .00 .00 .00 .00 .04 .00 60000.00 2500.00

31 2.36 .80 1.56 .12 1.00 .20 .33 .24 .00 .00 1.00 .20 .00 .24 .00 250000.0 10000.00

32 2.18 .00 1.60 .58 .12 .00 .32 .33 .04 1.00 .10 .00 .32 .00 .14 .00 200000.0 10000.00

33 3.00 .00 .80 2.20 .20 1.60 .20 1.00 .20 .00 .00 1.60 .20 .00 .20 .00 100000.0 5000.00

34 .70 .52 .00 1.22 .16 1.04 .00 .03 .02 .00 .00 1.04 .00 .00 .02 .00 60000.00 2000.00

35 .18 .50 .00 .68 .16 .50 .00 .03 .02 .00 .00 .50 .00 .00 .02 .00 50000.00 2500.00

36 .34 .40 .00 .74 .20 .40 .10 .05 .04 .00 .00 .40 .10 .00 .04 .00 100000.0 8000.00

110

Page 116: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E a

o Cultivable Pond Kua p C = v 3^ C v v land W C > > 10 - n

7

&. a+ 0 E W H .O f0 O p-

fC0 + N O LM

f0 f0 5

.0 V .0 w > U.

O L' p J V M t fl' -i v O 10 C d *+ M L f0 d p a C L 10

_j U. L t ' O Z C a + d

C V1 O

" fa " ' L Q

. ' i. d Vl

° + H

v C

03 M CU 0 a m a' z

a z w 0

f oU '; d z . -

37 2.02 .00 .00 2.02 .20 1.60 .12 .05 .04 1.00 .06 1.60 .12 .00 .10 .00 250000.0 10000.00

38 1.73 .00 .00 1.73 .04 1.50 .16 .03 .02 .25 .01 1.50 .16 .00 .03 .00 60000.00 4000.00

39 .27 .00 .00 .27 .04 .10 .10 .05 .02 .25 .01 .10 .10 .00 .03 .00 24000.00 2000.00

40 1.56 .00 .00 1.56 .04 1.40 .09 .05 .02 .25 .01 1.40 .09 .00 .03 .00 150000.0 4500.00

41 .20 .00 .00 .20 .03 .14 .00 .03 .03 .00 .00 .14 .00 .00 .03 .00 60000.00 2500.00

42 .06 .00 .00 .06 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .03 .00 60000.00 3000.00

43 .16 .80 .00 .96 .03 .80 .10 .03 .03 .00 .00 .80 .10 .00 .03 .00 54000.00 4000.00

44 .52 .80 .00 1.32 .10 .90 .12 .25 .20 .00 .00 .90 .12 .00 .20 .00 72000.00 3500.00

45 1.99 .00 1.40 .59 .24 .00 .32 .04 .03 .00 .00 .00 .32 .00 .03 .00 84240.00 6000.00

46 .88 .80 .00 1.68 .04 1.48 .12 .05 .04 .00 .00 1.48 .12 .00 .04 .00 54000.00 4000.00

47 .88 .40 .00 1.28 .04 1.20 .00 .05 .04 .00 .00 .80 .40 .00 .04 .00 40000.00 3000.00

48 2.78 2.00 .78 .04 .60 .10 .05 .04 .00 .00 .60 .10 .00 .04 .00 45000.00 3500.00

111

Page 117: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) d E

d

O c t , N Cultivable Pond Kua -p 0 ;= Ao

V v 3

`' c

^ en c M land d > ° C y c ?= a

° .. r, p o 2 t v O

.Q a) O Ol w C

M O

d t; C C° a/ p 3 ' + p O . E W

M LO 'O .Q + N III +`- C L C = 01 V R U w > L6

O T J i. C

GJ V J 41

M ! W, E C N + f0 d O C .`

f0 f0 J - U.

N IA ap+ O 3 7C fQ O) rn- V + = f0 U E Q E O V J m V M O 03 M

z' za z 0 3 y.

49 .05 .00 .00 .05 .05 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000.00 3000.00

50 .03 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 35000.00 3000.00

51 .02 .20 .00 .22 .02 .20 .00 .00 .00 .00 .00 .20 .00 .00 .00 .00 30000.00 2500.00

52 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 32000.00 2500.00

53 .06 .30 .00 .36 .02 .30 .00 .05 .04 .00 .00 .30 .00 .00 .00 .04 36000.00 3000.00

54 .18 1.20 .00 1.38 .14 1.20 .00 .00 .00 1.00 .04 1.20 .00 .00 .00 .04 35000.00 2500.00

55 3.10 .00 2.00 1.10 .18 .80 .08 .03 .04 .00 .00 .80 .08 .00 .04 .00 80000.00 4000.00

56 .18 1.20 .00 1.38 .18 1.20 .00 .00 .00 .00 .00 1.20 .00 .00 .00 .00 50000.00 3000.00

57 6.50 .00 3.00 3.50 .26 3.00 .00 .03 .04 1.00 .20 3.00 .00 .00 .24 .00 70000.00 3500.00

58 .49 .94 .00 1.43 .13 1.16 .10 .03 .04 .00 .00 1.16 .10 .00 .04 .00 100000.0 5000.00

59 2.27 .00 .83 1.44 .13 1.00 .27 .04 .04 .00 .00 1.00 .27 .00 .04 .00 90000.00 4000.00

60 8.00 .00 1.40 1.38 .28 .80 .26 .04 .04 .00 .00 .80 .26 .00 .00 .04 80000.00 3000.00

112

Page 118: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) , a E

o

o V L Cultivable Pond Kua v " ; v v ._+ v land o ° ° t C

. t -v N w E C 10 3 ` i+ E W H 0 1A N O M W . +

, M

O I- C -v Q1 C

U f0 0 10

75 U

.n w > LL

O J V f0 t Q 4 E .a C W M G7 0 C L- jp J LL L L y-v= > .1:

C V O U Q 0 J 44 M i 0 6J y O

0 3 C M Y y H E-

CL m 3 a z zn. GJ 6 M 3 0 3 . f MN > m z ,,.

ai

61 5.00 .00 .00 5.00 .20 4.00 .20 1.00 .60 .00 .00 4.00 .20 .00 .60 .00 100000.0 5000.00

62 2.12 .80 .00 2.12 .08 2.00 .00 .03 .04 .00 .00 2.00 .00 .00 .04 .00 50000.00 3000.00

63 2.08 .00 .00 2.08 .08 2.00 .00 .00 .00 .00 .00 2.00 .00 .00 .00 .00 60000.00 3000.00

64 5.06 .00 .00 5.06 .08 4.50 .40 .06 .08 .00 .00 4.50 .40 .00 .08 .00 90000.00 4000.00

65 6.78 .00 1.00 5.78 .34 5.00 .40 .03 .04 .00 .00 5.00 .40 .00 .04 .00 120000.0 4000.00

66 4.76 .00 1.20 3.56 .08 3.20 .24 .03 .04 .00 .00 3.20 .24 .00 .00 .04 80000.00 3000.00

67 .12 .00 .00 .12 .08 .00 .00 .03 .04 .00 .00 .00 .00 .00 .04 .00 35000.00 3000.00

68 .04 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000.00 2000.00

69 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 30000.00 2500.00

70 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 30000.00 2000.00

71 .76 .00 .00 .76 .08 .60 .04 .03 .04 .00 .00 .60 .04 .00 .04 .00 35000.00 2500.00

72 .32 .00 .16 .16 .10 .06 .00 .00 .00 .00 .00 .06 .00 .00 .00 .00 40000.00 3000.00

113

Page 119: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

0) o Cultivable Pond Kua A! v

O U _ U ..

Gt m d c and L (U {/1

c _ ._ _ . , _ .. M m e > >> y o b n

V r? C Z; -0 = i -W O x

C J 10 N O E _ L. 01

O i J LA.

N C 29 f° c a u o = a a a EO a

f0 -j v (i U a o p y o N

Em a

,- m Z z a d z 3 0 3 i , f

,

73 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 70000.00 6000.00

74 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 30000.00 2700.00

75 .82 .00 .00 .82 .20 .40 .10 .03 .08 .33 .04 .40 .10 .00 .04 .08 80000.00 6000.00

76 .12 .40 .00 .52 .08 .40 .00 .00 .00 .34 .04 .40 .00 .00 .04 .00 40000.00 3000.00

77 .22 .60 .00 .82 .08 .60 .10 .00 .00 .34 .04 .60 .10 .00 .04 .00 20000.00 1200.00

78 .10 .00 .00 .10 .06 .00 .00 .03 .04 .00 .00 .00 .00 .00 .04 .00 25000.00 2000.00

79 .05 .00 .00 .05 .05 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

80 .07 .00 .00 .07 .07 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 10000.00 800.00

81 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 10000.00 800.00

82 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

83 .80 .10 .00 .90 .16 .48 .10 .00 .00 1.00 .16 .48 .10 .00 .16 .00 20000.00 1500.00

84 .06 .40 .00 .46 .06 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 25000.00 2000.00

114

Page 120: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E

o

d 0 o _ ,% i Cultivable Pond Kua o c

v 01 M 'fl land i f0 f'0 C N C

' x y n o ° v _ +' O E w jO

O v c L f O c 'i. LM f0 J U. s- t y y ++

L a- O

= L

E ° a E o g L ' v 7 v i

o 3 f0 0 - c M C a U . U)

o M m p . z , ' i 0 3 .C ; z z

85 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

86 .07 .00 .00 .07 .07 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 10000.00 800.00

87 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 9000.00 700.00

88 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 12000.00 900.00

89 .08 .00 .00 .08 .08 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

90 .08 .00 .00 .08 .08 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 16000.00 1100.00

91 .08 .00 .00 .08 .08 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

92 .03 .40 .00 .43 .03 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 12000.00 1000.00

93 .10 .30 .00 .40 .10 .30 .00 .00 .00 .00 .00 .30 .00 .00 .00 .00 14400.00 1200.00

94 .08 .00 .00 .08 .08 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000.00 1500.00

95 .60 .00 .00 .60 .40 .00 .00 .03 .08 1.00 .12 .00 .00 .00 .12 .08 25000.00 2000.00

96 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

115

Page 121: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) IV E a

c Cultivable Pond Kua . c , c ' v

rn M v land .0

1A ° 0. 'p d w c -0 N ++ E W

H a M . .

O t7 'a f E IC a. L O 'D C1 V 1Q c0 .O U A w > ti

C J O

J U O. O +i E 0 13 c N L 10

) ) 0 .0 fG {L 10

O 7 i = = ca + O -N .a = °

d yi

G cL E o a m °G. °o 3 >- M > m z z Q z ,0

97 .05 .00 .00 .05 .05 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 10000.00 800.00

98 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 9000.00 700.00

99 .08 .12 .00 .20 .08 .00 .00 .00 .12 .00 .00 .00 .00 .00 .12 .00 25000.00 2000.00

100 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 10000.00 800.00

101 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000.00 1500.00

102 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000.00 1500.00

103 .09 .30 .00 .39 .09 .30 .00 .00 .00 .00 .00 .30 .00 .00 .00 .00 24000.00 2000.00

104 .09 .10 .00 .19 .09 .10 .00 .00 .00 .00 .00 .10 .00 .00 .00 .00 15000.00 1200.00

105 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1200.00

106 .10 .80 .00 .90 .10 .80 .00 .00 .00 .00 .00 .80 .00 .00 .00 .00 30000.00 2500.00

107 .20 .30 .00 .50 .10 .30 .06 .03 .04 .00 .00 .30 .06 .00 .04 .00 30000.00 2500.00

108 .05 .00 .00 .05 .05 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 12000.00 1000.00

116

Page 122: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a, E

a,

,c ^ Cultivable Pond Kua ! C 0

= 3 v ; C land a C ; C

. c a .. c .. ro c > ,

°p R O L i d 'a M + E M

O i s pf V f0 J f0 U w >_

' U- >`

O ' J V f0 t d O 0 0 C v i. M W 0 C V IC u. L t ± N O

>` C 4+ d Vf

v

O .c a

fC

J '- O H

M

++ ' v L C

0 .t C y d m 7 z O a z L 0

3 M . z . -

109 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000.00 3000.00

110 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 12000.00 1000.00

111 .72 .00 .00 .72 .20 .28 .16 .03 .08 .00 .00 .28 .16 .00 .08 .00 36000.00 3000.00

112 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000.00 2000.00

113 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000.00 1500.00

114 5.00 .00 1.00 4.00 .40 3.00 .40 .03 .04 .50 .16 3.40 .00 .00 .04 .16 50000.00 3000.00

115 5.00 .00 2.00 3.00 .40 2.00 .40 .03 .04 .50 .16 2.40 .00 .00 .04 .16 45000.00 3000.00

116 1.58 .00 .00 1.58 .30 1.00 .20 .06 .08 .00 .00 1.20 .00 .00 .08 .00 36000.00 3000.00

117 2.56 .00 .00 2.56 .20 2.00 .00 .28 .36 .00 .00 2.00 .00 .00 .36 .00 30000.00 2500.00

118 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

119 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000.00 1500.00

120 3.00 .00 .00 3.00 .20 2.44 .20 .00 .00 .50 .16 2.44 .20 .00 .00 .16 40000.00 3000.00

117

Page 123: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres)

O Cultivable Pond Kua c

O N

U rn land

a`, > 05

> 0 r

r.

p O t C

C N 0 O 01 Cn

C N C ±+ O C

3 O

p O m

E m W a)

wk 0

M I . M Oi

a) d. + f0 C L C M CT V f0

p a L7

p y. A LL. :0. O J ,

a1 J V C f0 d O -/ E

O C al + L f0 a)

a) 0 .a '- C ' f0 I-

U. i. t D

y p C y al V) t - .- in C ++ - C

0 z za z 3 3 . f mN d ,0

121 2.80 .00 .00 2.80 .20 2.24 .20 .00 .00 .50 .16 2.24 .20 .00 .00 .16 40000.00 3000.00

122 .80 .00 .00 .80 .16 .64 .00 .00 .00 .00 .00 .64 .00 .00 .00 .00 15000.00 1000.00

123 10.00 .00 3.00 7.00 .40 5.80 .40 .36 .40 .00 .00 5.80 .40 .00 .40 .00 36000.00 3000.00

124 .50 .10 .00 .60 .20 .10 .00 .33 .30 .00 .00 .10 .00 .00 .30 .00 30000.00 2500.00

125 .40 .40 .00 .80 .10 .38 .18 .00 .00 1.00 .14 .38 .18 .00 .00 .14 18000.00 1500.00

126 .30 .40 .00 .70 .10 .50 .10 .00 .00 .00 .00 .50 .10 .00 .00 .00 18000.00 1500.00

127 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000.00 1500.00

128 .40 .00 .00 .40 .06 .34 .00 .00 .00 .00 .00 .34 .00 .00 .00 .00 21000.00 1800.00

129 .10 .20 .00 .30 .10 .20 .00 .00 .00 .00 .00 .20 .00 .00 .00 .00 24000.00 2000.00

130 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 19000.00 1600.00

131 .06 .40 .00 .46 .06 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 24000.00 2000.00

132 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 15000.00 1000.00

118

Page 124: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a, E

a,

d Cultivable Pond Kua U

rn ; land a ry c° s v 3 Z a x . d O Ol M 4j

0 C >4

10 " . _ 45 E

H M O 70 &- d a1 O i 4j U V a w > U

J cMCL M O

{ E >' f0 = , L io

C do Ol U. t Lam=

4+

>. s = C a7 M O L i t' M . i a1 of y 7 U . C

CL = a 1. M

3 3 v .>

wl z z '°

133 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000.00 1500.00

134 .06 .40 .00 .46 .06 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 15000.00 1000.00

135 .16 1.00 .00 1.16 .16 1.00 .00 .00 .00 .00 .00 1.00 .00 .00 .00 .00 15000.00 1000.00

136 .10 .00 .00 .10 .07 .00 .00 .00 .00 .33 .03 .00 .00 .00 .00 .03 14600.00 1200.00

137 .06 .40 .00 .46 .03 .40 .00 .00 .00 .33 .03 .40 .00 .00 .00 .03 24000.00 2000.00

138 .07 .50 .00 .57 .04 .50 .00 .00 .00 .33 .03 .50 .00 .00 .00 .03 36000.00 3000.00

139 1.12 .00 .00 1.12 .40 .40 .00 .33 .32 .00 .00 .40 .00 .00 .32 .00 36000.00 3000.00

140 .36 .80 .00 1.16 .16 .80 .20 .00 .00 .00 .00 .80 .20 .00 .00 .00 24000.00 2000.00

141 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 25000.00 1500.00

119

Page 125: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ANIMAL AND FOREST RESOURCES, SOURCE OF WATER

AND NATURE OF LATRINE

Page 126: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Paruara Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of

(in Number of Famil Latrine Pou ltry Co w Go at Trees Egg Poul try M ilk Fis h

0 Wood Fruit 0 0 0 {' E IM 1A O1

' 'v t 41 C C i7 G _ y a _ p G. _ Q 11 4j t d C .C

LL Z 2 Z is z cdl E ry E E {%j 7 {%j y E O E

IA

U 'A

U U 0 U Z z

1 25 5 4 0 1 0 55 65 350 450 650 0 2500 2000 8000 5000 12 Yes Pond Tubewell Ringslub

2 20 4 1 0 1 0 40 45 250 500 650 0 0 0 5000 0 12 No Pond Tubewell Ringslub

3 6 0 2 0 0 0 35 40 300 0 450 0 1500 2500 5000 0 N.A No Tubewell Tubewell Ringslub

4 7 0 0 0 0 0 30 35 250 0 400 0 0 0 5000 0 N.A No Tubewell Tubewell Ringslub

5 4 6 0 0 0 0 4 7 0 200 380 200 0 0 0 0 N.A No Pond Tubewell Open

6 6 4 1 0 0 0 0 4 0 250 0 300 0 0 1000 0 N.A No Pond Tubewell Ringslub

7 8 3 0 0 0 0 0 2 100 250 0 400 0 0 0 0 N.A No Pond Tubewell Ringslub

8 10 4 0 0 0 0 0 3 120 200 0 350 0 0 0 0 N.A No Pond Tubewell Ringslub

9 15 4 0 0 0 0 8 6 200 250 450 0 0 0 1000 0 N.A No Pond Tubewell Ringslub

10 14 6 0 0 0 0 12 9 175 200 380 250 0 0 1000 0 10 No Pond Tubewell Ringslub

11 20 8 0 0 0 0 2 3 280 200 200 150 0 0 1000 0 6 No Pond Tubewell Ringslub

121

Page 127: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number)

Production last Year (in Taka) Crop Production of Family

Sources of Water Nature of Latrine

Po ultry C ow G oat Trees Egg Poul try M ilk Fis h

c o + Wood Fruit O O O O + C u d 7 w

O y C .y C

U. Z 0 Z n ° 0 Z

v o

L .°1e E

Z

a E

z

n h C

U

- a , C

U

- N

n

C C U

- N

a

C 0

- E y c ° ° E °

U

5 L QN

c

v° c o

12 12 5 0 0 0 0 12 16 250 100 380 0 0 0 1000 0 N.A No Pond Tubewell Open

13 25 8 3 0 0 0 35 40 260 420 650 0 2500 3000 10000 0 12 Yes Pond Tubewell Ringslub

14 20 6 0 0 0 0 0 5 0 450 0 650 0 0 0 0 N.A No Pond Tubewell Open

15 12 5 1 1 0 0 27 18 150 0 280 360 0 0 2500 0 12 Yes Pond Tubewell Ringslub

16 10 6 0 0 0 0 12 11 200 0 280 0 0 0 200 0 12 No Pond Tubewell Open

17 9 2 0 0 0 0 9 2 0 0 150 100 0 0 0 0 6 No Pond Tubewell Open

18 40 20 0 0 0 0 22 28 200 0 580 0 0 0 3000 0 10 No Pond Tubewell Ringslub

19 50 28 2 0 0 0 28 15 380 150 440 0 380 295 1000 0 8 No Pond Tubewell Ringslub

20 10 20 1 0 0 0 12 0 200 0 500 0 0 0 1000 0 12 No Pond Tubewell Ringslub

21 15 4 2 0 0 0 15 12 120 250 450 0 0 0 1000 0 12 No Pond Tubewell Ringslub

22 20 0 0 0 0 0 0 4 140 400 0 500 0 0 500 0 N.A No Pond Tubewell Ringslub

23 20 0 1 0 1 0 0 3 0 500 0 450 0 0 500 0 N.A No Pond Tubewell Ringslub

122

Page 128: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Famil Latrine

Pou ltry Co w Go at Trees Egg Poul try M ilk Fis h

U Wood Fruit c c c c ° y o, 0 0 0 Z, w C w CL

LPL Z U Z Z .15 N (A i N N N N

q,

N ` 3 T .r+ U IA

C C 0

Q D

Z z U U U

24 15 0 0 0 0 0 0 8 80 450 0 500 0 0 500 0 N.A No Pond Tubewell Open

25 12 8 3 0 0 0 0 6 120 250 450 0 1000 5000 500 0 12 No Pond Tubewell Ringslub

26 15 0 0 0 0 0 0 5 150 220 0 400 0 0 500 0 N.A No Pond Tubewell Ringslub

27 7 0 0 0 0 0 0 3 0 0 150 0 0 0 500 0 N.A No Tubewell Tubewell Ringslub

28 12 2 3 0 0 0 25 18 295 100 280 175 580 650 600 0 N.A No Tubewell Tubewell Ringslub

29 11 3 2 0 1 0 12 15 275 180 380 0 0 0 600 0 N.A No Pond Tubewell Ringslub

30 12 4 0 0 0 0 15 12 250 0 450 0 0 0 2000 0 N.A No Pond Tubewell Ringslub

31 30 6 1 0 0 0 18 25 600 0 800 0 0 0 2000 0 12 Yes Tubewell Tubewell Ringslub

32 20 8 1 0 0 0 16 26 500 0 700 0 0 0 4000 0 N.A No Tubewell Tubewell Ringslub

33 25 4 2 0 0 0 25 30 500 0 450 0 0 0 10000 0 12 Yes Tubewell Tubewell Ringslub

34 20 18 0 0 0 0 28 12 225 175 380 0 0 0 2000 0 9 No Tubewell Tubewell Ringslub

35 18 15 3 0 0 0 18 11 275 120 380 0 2500 500 1500 0 8 No Tubewell Tubewell Ringslub

123

Page 129: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

Poultry C ow Goat Trees Egg Poul try M ilk Fis h

U Wood Fruit 0 0 C 0

0 + C C1 y Cl

E U. Z

v 0! z

a 2 z v 2 D

. .a E

Z

.a E

z

a 7 c U)

U

- V1

° O $A C

U

- (A

n J C

U

- (/)

° O C

U

- E 'i c VA C C C E

U

a L J a N

eoa _N it V

c D

36 15 15 3 0 0 0 8 45 480 0 500 0 3000 0 2500 0 12 No Pond Tubewell watersealed

37 32 10 3 0 0 0 45 38 680 0 380 500 4000 0 1000 2000 12 No Pond Tubewell Ringslub

38 8 6 2 0 0 0 5 7 800 0 480 380 500 4000 2000 5000 12 Yes Pond Tubewell Ringslub

39 6 15 1 0 0 0 12 11 250 0 500 400 0 0 250 3000 5 No Pond Tubewell Ringslub

40 20 17 0 0 0 0 12 18 500 0 600 0 0 0 280 360 11 No Pond Tubewell Ringslub

41 12 4 0 0 0 0 0 12 120 200 350 0 0 0 2000 0 7 No Pond Tubewell Ringslub

42 12 3 0 0 0 0 0 10 100 320 400 0 0 0 2000 0 N.A No Pond Tubewell Ringslub

43 20 6 1 0 0 0 10 12 250 200 450 0 0 0 3000 0 12 No Pond Tubewell Ringslub

44 15 3 1 0 0 0 35 45 250 0 460 0 0 0 5000 0 12 Yes Pond Tubewell Ringslub

45 22 8 0 0 0 0 28 45 300 0 500 0 0 0 2000 0 N.A No Pond Tubewell Ringslub

46 15 9 2 0 1 0 20 30 250 200 800 0 1500 2500 3000 0 12 Yes Pond Tubewell Ringslub

47 12 4 1 0 0 0 0 8 180 200 400 0 0 0 3500 0 12 No Pond Tubewell Ringslub

124

Page 130: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Famil Latrine

v Pou ltry Co w Go at Trees Egg Poul try M ilk Fis h 0 Wood Fruit c 0 c 0 c 0 ° r ` a Cn o,

M CL Cx 0. CL E

U. o Z

o_ o Z

!2 o Z M p a m

o E N

E E E 3 N

o E g '-

of fO

o L N H a . Q U G

Z' z U U U U U

48 8 3 0 0 2 0 12 9 200 0 450 0 0 0 3000 0 12 No Pond Tubewell Ringslub

49 10 2 0 0 0 0 10 9 250 300 200 0 0 0 0 0 N.A No Pond Tubewell Ringslub

50 12 6 0 0 0 0 0 4 120 200 0 300 0 0 0 0 N.A No Pond Tubewell Ringslub

51 15 4 1 0 0 0 0 4 0 300 250 400 0 0 0 0 6 No Pond Tubewell Ringslub

52 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 N.A No Pond Tubewell Ringslub

53 20 6 2 0 2 0 0 6 100 250 0 350 1000 2500 0 0 8 No Pond Tubewell Ringslub

54 15 5 3 0 2 0 5 11 200 175 280 185 2000 500 0 0 12 No Pond Tubewell Ringslub

55 16 4 2 0 0 0 45 20 250 0 450 0 2000 2500 2000 0 12 No Pond Tubewell Ringslub

56 15 4 0 0 0 0 20 15 200 0 350 0 0 0 0 0 12 No Pond Tubewell Ringslub

57 20 6 4 0 0 0 20 35 300 0 650 0 2500 2000 10000 0 12 Yes Pond Tubewell Ringslub

58 15 0 2 0 0 0 15 200 250 200 600 0 2500 2000 2000 0 9 No Tubewell Tubewell Ringslub

59 12 0 1 0 0 0 16 80 200 150 650 0 0 0 2000 0 12 Yes Tubewell Tubewell Ringslub

125

Page 131: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

Po ultry C ow G oat Trees Egg Poul try M ilk Fis h

u Wood Fruit 0 0 0 0

0 _

U. Z 2 0 Z N

C Z d C a

Z z

CL

E N C 0

LA

CL

E N C

U

%j 7 C U

(A

CL

E h C

U

N N c) E

U Q ( 0

60 25 3 4 0 0 0 28 26 250 380 580 200 4000 5000 2000 0 12 No Tubewell Tubewell Ringslub

61 20 6 6 1 0 0 200 40 200 150 700 0 2500 4000 6000 5000 12 Yes Pond Tubewell watersealed

62 15 4 3 0 0 0 80 30 250 0 450 0 2000 25000 3000 0 12 Yes Pond Tubewell Ringslub

63 20 0 2 0 0 0 55 25 150 200 350 200 1500 2500 2000 0 12 Yes Pond Tubewell Ringslub

64 25 0 3 0 0 0 40 15 200 150 500 400 2000 1000 2000 0 12 Yes Pond Tubewell Ringslub

65 22 0 2 0 0 0 80 30 250 200 450 0 1500 2000 4000 0 12 Yes Pond Tubewell Ringslub

66 15 0 3 0 0 0 30 35 200 220 500 0 1200 3000 2000 0 12 Yes Pond Tubewell Ringslub

67 12 3 1 0 0 0 0 8 120 300 0 450 0 0 2000 0 N.A No Pond Tubewell Ringslub

68 15 4 0 0 0 0 0 4 0 350 0 250 0 0 0 0 N.A No Pond Tubewell Ringslub

69 11 0 0 0 0 0 0 6 0 300 0 400 0 0 0 0 N.A No Pond Tubewell Ringslub

70 12 0 0 0 0 0 0 3 0 250 0 450 0 0 0 0 N.A No Pond Tubewell Ringslub

71 8 4 0 0 0 0 12 15 100 200 200 450 0 0 2000 0 12 No Pond Tubewell Ringslub

126

Page 132: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

Pou ltry Co w Go at Trees Egg Poul try M ilk Fis h 0 o . Wood Fruit

O O o o ' C vt ate,. vi N 7 0 .=' c

. O Z 2 O Z W O Z

M N

i. w

E Z

a.. C/

E z

a E 7 C U

_ v Vf

d E 7 C

U

- IA

O. E 3 C

U

_ (/)

d E 7

U

_ G1 to

C = 4J = E

U

_+ d E In

C

V C

72 30 4 2 0 0 0 15 5 500 100 300 0 0 0 0 0 4 No Pond Tubewell Ringslub

73 20 5 2 0 0 0 10 7 600 300 200 0 0 0 0 0 N.A No Tubewell Tubewell Ringslub

74 25 2 1 0 0 0 14 3 400 500 300 700 0 0 0 0 N.A No both Tubewell Ringslub

75 30 7 1 0 2 0 20 15 200 500 300 0 700 0 4000 100 12 Yes Tubewell Tubewell Ringslub

76 15 9 1 0 0 0 10 5 350 400 500 0 0 0 0 0 8 No Tubewell Tubewell Ringslub

77 20 4 0 0 0 0 5 7 300 200 300 100 0 0 0 0 8 No Pond Tubewell watersealed

78 19 3 2 0 0 0 6 2 400 350 500 0 0 0 0 0 N.A No Pond Tubewell Ringslub

79 35 8 0 0 0 0 4 3 350 400 200 100 0 0 0 0 N.A No Pond Tubewell Ringslub

80 17 5 2 0 3 0 6 4 500 200 300 200 0 0 0 0 N.A No Tubewell Tubewell Ringslub

81 30 4 2 0 5 0 10 9 100 150 0 0 0 0 0 0 N.A No Pond Tubewell Ringslub

82 5 0 0 0 3 0 5 2 100 150 200 0 0 0 0 0 N.A No Pond Tubewell Ringslub

83 50 3 3 0 0 0 50 10 1500 1000 2000 1000 0 0 0 0 10 No Pond Tubewell Ringslub

127

Page 133: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine . Po ultry C ow G oat Trees Egg Poul try M ilk Fis h

c 0 u Z.

Wood Fruit 0 0

' 0

' 0

0 r C t d 1 y C C

E M U.

G Z N G Z V _N

C C Z

fl G)

r. w .0 E

a. G/

.0 E

CL E 7

C 0

- (/)

43 G E 7 C 0

- N

P G. E

C 0

- N

d E

C

U

- G) (n

++ C 7

am C C C v

'= a G) 7 a

C C N 4i C

84 40 5 2 0 0 0 50 11 700 600 1200 900 0 0 0 0 10 No Both Tubewell Open

85 20 6 1 0 0 0 10 5 300 200 300 200 0 0 0 0 N.A No Tubewell Tubewell Ringslub

86 15 3 2 0 0 0 15 3 400 100 200 300 0 0 0 0 N.A No Tubewell Tubewell Ringslub

87 20 4 2 0 0 0 15 6 300 200 500 200 0 0 0 0 N.A No Pond Tubewell Open

88 30 2 2 0 5 0 29 7 500 200 700 300 0 0 0 0 N.A No Pond Tubewell Open

89 10 0 1 0 0 0 15 3 200 100 300 100 0 0 0 0 N.A No Pond Tubewell Ringslub

90 20 5 2 0 5 0 25 4 300 200 500 400 0 0 0 0 N.A No Pond Tubewell Open

91 15 2 2 0 3 0 10 3 350 200 300 200 0 0 0 0 N.A No Pond Tubewell Open

92 25 4 2 0 0 0 7 3 400 200 300 800 1000 5000 0 0 8 No Pond Tubewell Open

93 15 3 1 0 0 0 10 3 200 150 100 0 0 0 0 0 3 No Pond Tubewell Ringslub

94 10 2 1 0 0 0 11 5 300 100 300 200 500 0 0 0 N.A No Pond Tubewell Ringslub

95 15 2 1 0 0 0 400 50 500 250 400 300 700 0 1000 0 N.A No Tubewell Tubewell Ringslub

128

Page 134: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Famil Latrine . Pou ltry Co w Go at Trees Egg Poul try M ilk Fis h

0 Wood Fruit c c 0

c 0 c ° c i y m Ch >. o '

0 CL

13 CL

43 CL

13 U)

LL 0 z 0 z o 0 z d o v n a, a E

`9; E y a E

N E N (A

o E g a , D o

C C C c 0 Z Z U U U U V

96 20 2 2 0 0 0 30 5 600 200 500 300 500 300 0 0 N.A No Tubewell Tubewell Ringslub

97 10 3 1 0 0 0 10 5 200 150 100 100 0 0 0 0 N.A No Pond Tubewell Open

98 5 0 0 0 0 0 10 1 100 0 0 0 0 0 0 0 N.A No Pond Tubewell Open

99 20 3 2 0 0 0 50 10 200 200 300 250 1000 200 1000 3000 N.A No Pond Tubewell Open

100 2 0 2 0 0 0 30 4 0 0 0 0 0 0 0 0 N.A No Tubewell Tubewell Ringslub

101 20 5 2 0 0 0 10 4 300 100 400 500 1000 1200 0 0 N.A No Tubewell Tubewell Ringslub

102 10 1 0 0 0 0 4 2 150 0 0 0 0 0 0 0 N.A No Tubewell Tubewell Open

103 12 0 2 0 0 0 10 3 200 100 0 0 0 0 0 0 4 No Tubewell Tubewell Open

104 13 0 1 0 0 0 5 4 300 200 400 0 0 0 0 0 10 No Pond Tubewell Ringslub

105 17 2 0 0 0 0 11 6 100 0 0 0 0 0 0 0 N.A No Pond Tubewell Open

106 19 2 2 0 0 0 20 3 500 200 700 300 0 0 0 0 10 No Pond Tubewell Ringslub

107 25 6 3 0 0 0 15 7 400 300 500 300 1000 2000 500 0 12 Yes Tubewell Tubewell Open

129

Page 135: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

M Poultry Cow G oat Trees Egg Poul try M ilk Fis h 0

Wood Fruit 0 0 0 0

° = :.s i H d o, y c r o,

c

(L Z Q z 21 Z .O E

z .0 E

z

CL

N

U

_ m

n y

U

J7

0.

y

U

_ w

n y

U

_ U'

a+.+'' V) E

c U

t o (n Q

c H

v o

108 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N.A No Pond Tubewell Open

109 15 2 1 0 0 0 4 1 400 120 500 400 0 0 0 0 N.A No Tubewell Tubewell Ringslub

110 10 3 2 0 0 0 5 1 200 0 300 100 0 0 0 0 N.A No Tubewell Tubewell Ringslub

111 10 4 3 0 0 0 50 15 300 200 500 300 2000 1500 700 0 12 Yes Pond Tubewell Ringslub

112 15 2 2 0 0 0 10 5 200 150 200 0 0 0 0 0 N.A No Tubewell Tubewell Ringslub

113 5 0 1 0 0 0 3 2 100 0 0 0 0 0 0 0 N.A No Tubewell Tubewell Ringslub

114 20 2 3 0 0 0 200 100 1500 100 300 700 1000 2000 1000 0 12 Yes Pond Tubewell Ringslub

115 25 5 4 0 0 0 175 80 1000 1100 700 600 500 700 0 0 12 Yes Pond Tubewell Ringslub

116 15 6 1 0 0 0 50 10 500 400 500 300 0 0 0 0 12 Yes Pond Tubewell Ringslub

117 20 2 2 0 0 0 25 10 400 200 300 200 0 0 0 0 12 Yes Tubewell Tubewell Ringslub

118 28 5 2 0 0 0 10 5 500 700 500 300 0 0 0 0 N.A No Pond Tubewell Ringslub

119 10 2 1 0 0 0 5 2 300 100 300 200 0 0 0 0 N.A No Tubewell Tubewell Ringslub

130

Page 136: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Famil Latrine . Pou ltry Co w Go at Trees Egg Poul try M ilk Fis h

o cy Wood Fruit 0 0 0 0

+0 ; c i M n >.

M ` " a c LL Z 2 p Z 2

G o z T a ' a E N

a VI

E E y N

E E H {A

E E N N

y c IA N

' ° a i :3

o Q U G

Z z U U U U U

120 20 2 2 0 0 0 50 20 600 500 400 300 0 0 0 0 12 Yes Tubewell Tubewell watersealed

121 30 5 2 0 0 0 100 10 700 500 500 200 0 0 0 0 12 Yes Tubewell Tubewell watersealed

122 10 2 0 0 0 0 10 3 300 200 400 200 0 0 0 0 10 No Tubewell Tubewell Ringslub

123 27 5 2 0 0 0 100 10 600 200 1000 500 0 0 3000 0 12 Yes Tubewell Tubewell Ringslub

124 10 2 2 0 0 0 20 10 200 300 200 400 0 0 1500 7000 11 No Pond Tubewell Ringslub

125 25 3 1 0 0 0 25 5 700 500 1200 500 1000 3000 0 0 12 No Pond Tubewell Ringslub

126 30 5 2 0 0 0 30 10 500 700 300 700 1500 4000 0 0 8 No Pond Tubewell Ringslub

127 10 2 1 0 0 0 10 3 200 300 400 500 500 2000 0 0 N.A No Tubewell Tubewell Ringslub

128 15 3 0 0 0 0 10 4 700 100 600 500 0 0 0 0 2 No Tubewell Tubewell Ringslub

129 10 2 0 0 0 0 220 3 200 200 400 300 0 0 0 0 N.A No Tubewell Tubewell Ringslub

130 15 5 0 0 0 0 0 0 400 300 500 600 0 0 0 0 N.A No Tubewell Tubewell Ringslub

131 15 2 1 0 0 0 4 2 500 300 600 300 0 0 0 0 N.A No Pond Tubewell Ringslub

131

Page 137: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Famil Latrine

Pou ltry C ow G oat Trees Egg Poul try M ilk Fis h = 0 U Wood Fruit

O O °

C i 01 y . .O 0

O D v .C = d C . C

£ 'G V L . a+ O L - 0

O - ++ O - a+ d - .6.0 C E = 0. %a C

C Y

U. Z N Z 4J Z 47 7 w %j 0

W Vf 7

VA (%j 3

'A V1

v

1/1 E ly d (,

E E

O C 0 Q

z z 0 U U 0 U 0 U U

132 5 0 0 0 0 0 7 3 100 50 150 100 0 0 0 0 N.A No Tubewell Tubewell Open

133 25 3 1 0 0 0 5 2 300 400 200 250 0 0 0 0 N.A No Pond Tubewell Open

134 20 5 1 0 0 0 4 2 200 150 500 200 0 0 0 0 4 No Pond Tubewell Ringslub

135 50 5 1 0 0 0 20 10 400 300 400 100 0 0 0 0 9 No Pond Tubewell Ringslub

136 20 3 1 0 0 0 15 5 150 100 200 160 0 0 0 0 N.A No Tubewell Tubewell Ringslub

137 25 2 1 0 0 0 16 8 200 150 300 250 0 0 0 0 3 No Tubewell Tubewell Ringslub

138 27 7 1 0 0 0 10 5 250 200 300 200 0 0 0 0 8 No Pond Tubewell Ringslub

139 50 9 2 0 0 0 50 20 700 500 1000 300 0 0 0 0 7 No Pond Tubewell Ringslub

140 70 10 2 0 0 0 100 15 1000 500 1200 300 0 0 0 0 11 No Tubewell Tubewell Ringslub

141 22 5 0 0 0 0 0 0 150 280 100 380 0 0 0 0 N.A No Tubewell Tubewell Ringslub

132

Page 138: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EMPLOYMENT, FAMILY PLANNING METHOD,

NEW BORN BABY AND DISEASE

Page 139: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Paruara Information about Employment Last one Year

E Information about Disease (without considering cold, cough, and fever)

°_' :5 a, ,n Number of Nature of Disease Nature of Treatment 'o c o

w 4- - U-

o o patient a _j i ¢

. - 0 .- mo M o

d CM C S 0 v

o W o - a b U

Q .0 E T ' = E t v 7 E

M d 7 E .a

M

Q U Z Z

U.

v d d aoi 'a d E

o d aCi

E E m 'a n. f E Male Female Children Male Female Children f E U U. U. U. a, CU

U- a t-

1 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0

2 4 2 0 0 0 0 0 0 1 1 0 1 0 0 0 1 0 Malaria 0 0 Private Doctor

3 1 1 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0

4 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 Harvanga 0 0 Private Doctor

5 1 0 0 0 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0

Heart 6 1 2 0 0 0 0 0 0 0 1 0 0 0 1 1 0

Disease Gout 0 Private Doctor Kobiraj 0

7 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0

8 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0

9 3 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0

10 2 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0

11 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 1 - - Malaria - - Rural Doctor

134

Page 140: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year

a c Information about Disease (without considering cold, cough, and fever) w W Number of Nature of Disease Nature of Treatment

o w CL

U.

c F c patient

. . & ° A 14

OL

° ° O

0 w '0 E C "a 4) U .0 r,

CL r- C .0

z. 'a g UT

U z a z

d a d w R d v a, aCi

° E f E E E m E n c E Male Female Children Male Female Children E V u. U. u. y aa,

LA. V CL E

12 2 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 - -- 0 - - 0

13 3 2 0 0 0 0 0 0 2 0 1 0 0 0 0 0 - - 0 - - 0

14 6 3 0 0 0 0 0 0 2 0 0 0 0 0 0 0 - - 0 - - 0

15 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 1 - - Numunia - - Private Doctor

16 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 - - 0 - - 0

17 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 - - 0 - - 0

18 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 - - 0 - - 0

19 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 - - 0 - - 0

20 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 1 - - Diareheoa - - Rural Doctor

21 3 3 0 0 0 0 0 0 3 1 0 0 0 0 0 0 0 0 - 0 0 0

22 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 -

23 1 1 0 0 0 0 0 1 1 0 1 0 0 1 0 0 Diabetics 0 - Private Doctor 0 0

135

Page 141: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year w B c Information about Disease (without considering cold, cough, and fever) °_'

E v V) Number of Nature of Disease Nature of Treatment L

o a c w n { c w= patient

fl J d w 0 d V 0 C

)p

. o

L w e E

_ CL

J b 3 .n E

Lo

w w w N fLO w U w w

' E f E f E cc E a o M 0 Male Female Children Male Female Children

d) E = U 4) LL u. LL.

y LL. U

CL I--

24 1 1 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 - 0 0 0

25 1 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 Gout - 0 Rural Doctor 0

26 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 - 0 0 0

27 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0 0

28 2 2 0 0 0 0 0 0 1 0 0 0 0 1 1 0 Liver Gastric - 0 0 0

29 2 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0 0

30 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0 0

31 6 3 2 0 0 0 0 0 3 0 0 1 0 0 0 0

32 5 2 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0

33 2 3 0 0 0 0 0 0 2 0 1 1 0 0 1 0 0 Tumour 0 0 Private Doctor 0

34 1 2 0 0 0 1 0 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0

35 1 1 0 0 0 0 0 0 1 0 1 0 0 1 0 0 Gout 0 0 Rural Doctor 0 0

136

Page 142: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year a a 0 Information about Disease (without considerin cold cou h and fever)

E g , g ,

°-' w :5 v Number of Nature of Disease Nature of Treatment oo

CU v c CV

w 0.

LL.

0 Z w a patient (U

.0 o M

p G

L 0

.. J

0 0 L. 0

C 0 10 L.

m U >v°_ E

.0 n vv a' ci 0 ' nc N .no a C d

U s Z

io

Z a

d d d y m y E

V a,

m E v Male Female Children Male Female Children E = LL U- U. a i u. U

o. I-

36 2 1 0 0 0 0 0 0 1 0 1 0 0 0 1 0 0 Heart 0 0 Private Doctor 0

37 6 1 1 0 0 1 0 0 4 1 0 0 0 0 1 1 0 0 Pneumonia 0 Private Doctor Private Doctor

38 1 1 0 0 0 0 0 0 1 0 1 0 0 1 0 0 Stone 0 0 Private Doctor 0 0

39 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 Chicken Pox 0 0 Private Doctor 0 0

40 4 3 0 0 0 0 0 0 3 1 0 0 0 1 0 0 Turner 0 0 Private Doctor 0 0

41 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0

42 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0

43 4 3 0 0 0 0 0 0 2 0 0 2 0 1 0 0 Gastric 0 Private Doctor 0 0

44 1 2 0 0 0 0 0 0 1 1 0 0 0 0 1 0 0 Gastric 0 Private Doctor 0

45 3 3 0 0 0 1 0 0 2 0 0 0 0 1 0 0 Stone 0 Private Doctor 0 0

46 2 2 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0

47 2 1 1 0 0 0 0 0 1 0 1 0 0 1 0 0 Dysentery 0 Private Doctor 0 0

137

Page 143: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year Information about Disease (without considerin cold cou and fever h g , g ,

o+ M i m Number of Nature of Disease Nature of Treatment 0 °' a w f ` °-' w a anent p

v ` O o

i. a/

-oo .. O O

d v o

O1 O t0 .

U z-

>

a o

E w r 3 -o a

O o

.9

ro

U Z Z

U-

0 ai it, 10 a, U ai ° aci

E E E m M a o E Male Female Children Male Female Children

E U U- U U. y u,. U a

48 1 1 0 0 0 0 0 0 1 0 1 1 0 1 1 1 Diarreheoa 0 Diareheoa Private Doctor Private Doctor Private Doctor

49 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0

50 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0

51 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 Gastric 0 0 Private Doctor 0

52 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

53 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 Gastric 0 Private Doctor 0

54 1 1 0 0 0 0 0 0 1 0 1 0 0 1 0 0 Tonsil 0 0 Private Doctor 0 0

55 1 1 0 0 0 0 0 0 1 1 0 1 0 1 0 0 Decentre 0 0 Private Doctor 0 0

56 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

57 1 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0

58 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 Numunia 0 0 Private Doctor

59 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0

138

Page 144: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year

o E Information about Disease (without considering cold, cough, and fever)

. °-' a3i V1 Number of Nature of Disease Nature of Treatment . o

0 w o C patient

v A N J p °'

0/ v o -

.

M 7 0 o C rn o c

C t0 a

v E CL C o ! C N .C y a 7

eo

D V z Q z W

a) O/ a, d it, M d

E V E d

m n Male Female Children Male Female Children y U U- U. u. y LL.

a H

60 2 1 0 0 0 0 0 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0

61 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0

62 1 1 0 0 0 0 0 0 1 0 1 1 0 0 0 1 0 0 Numunia 0 0 Private Doctor

63 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0

64 2 2 0 0 0 0 0 0 1 1 0 0 0 1 0 0 Heart 0 0 Private Doctor 0 0

65 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

66 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0

67 2 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0

68 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0

69 1 1 0 0 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0

70 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

71 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - 0 -

139

Page 145: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment T Last one Year a ,a Information about Disease (without considering cold, cough, and fever)

L .O1 LL 5 0 W Number of Nature of Disease Nature of Treatment 0 N c w n c w a patient

O G

y_

O

n 0 3 O

C1

O O r0

o ar0 .

E 2 =n . a p aE

M U z as z LL

w d a ai

c Z' e`o y U d

? E E m c

Male Female Children Male Female Children d) E U

LL LL U. d a, U. U - I--

72 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 - 0 - - 0 -

73 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - 0 -

74 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 - 0 - - 0 -

75 2 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 - 0 - - 0 -

76 1 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 - Asthma - - Rural Doctor -

77 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 - 0 - - 0 -

78 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - 0 -

79 1 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - 0 -

80 2 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 - 0 - - 0 -

81 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 - -

82 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 - -

83 2 2 0 0 0 0 0 0 2 0 1 0 0 0 0 0 0 0 - -

140

Page 146: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year d

c Information about Disease (without considering cold, cough, and fever) °-' M :5

a3, VA Number of Nature of Disease Nature of Treatment ' " W

c patient

D . i i. C & A C

" p S C

V >`0 ° o 0. .0

y V

Z a s Z E

U.

O7 w N d 1`O y V 07 N

E a c

Male Female Children Male Female Children 2: CO E V U. 1i U. U.

- t-

84 2 1 0 0 0 1 0 0 1 1 0 0 0 1 2 0 Gestric Gout - Rural Doctor Rural Doctor -

85 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - -

86 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 -

87 2 1 0 0 0 1 0 0 1 1 0 0 0 0 0 0 0 0 - -

88 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 - -

89 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - -

90 1 1 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 - -

91 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0

92 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0

93 0 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0

94 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0

95 1 0 0 0 0 0 1 0 0 0 0 0 0 1 2 0 Gout Presure - 0 0

141

Page 147: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year

c E Information about Disease (without considering cold, cough, and fever)

M a3, FA Number of Nature of Disease Nature of Treatment

00 0 d o n L a)

o f w a patient d 10 V

L a) ` 0 -

M 0 7 L 0 Of

C C 0 0 f0 L d

U J L

0 (V

. 0 n J'I .a c

-' n c

W a E E E

0 -" 0) U Z Q d z LL.

O)

M CU

aJ aJ

0 y it,

° a) E

U N 4/ N

M E

E 1O E a 0 E E ° Male Female Children Male Female Children LL w m c7

L E = U i U U - a i 0. F-

96 1 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 Mental 0 - Private Doctor 0 0

97 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0

98 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 - 0 0

99 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0

100 1 0 0 0 0 1 0 0 1 1 0 0 0 0 0 0 0 0 - 0 0

101 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0

102 1 1 0 0 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0

103 1 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0

104 2 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0

105 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0

106 1 1 0 0 0 0 0 0 1 0 0 0 0 1 2 0 Gout Komor 0 Pharmacist Pharmacist 0 batha

142

Page 148: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year

c Information about Disease (without considerin cold cou h and fever) g , g ,

°-' 1O { a3i ,n Number of Nature of Disease Nature of Treatment o

V w

U.

c W. a patient cu (U i > O d L . 0

o n t0

O O

C1 C

O f0 L .

U >`G = C.C O

Z Z V a U.

d m E

d m a 0 d 9 Male Female Children Male Female Children L.7 U. U. U.

CU N LL. U

107 2 1 0 0 1 0 0 0 0 0 0 0 0 1 2 0 Diarrhoea Gout 0 Pharmacist Pharmacist 0

108 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

109 1 1 0 0 0 0 0 0 1 0 0 0 0 1 0 3 Gestric 0 Pneumonia Rural Doctor 0 Rural Doctor

110 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

111 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0 0

112 1 1 0 0 0 0 0 1 0 1 0 0 0 1 2 0 Gestric Gout - Pharmachiest Pharmachiest 0

113 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0 0

114 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0 0

115 2 1 0 1 0 0 0 0 1 1 0 0 0 1 0 0 Presure 0 - Rural Doctor 0 0

116 2 1 0 0 0 0 0 0 1 1 0 0 0 1 0 0 Gout 0 - Pharmachiest 0 0

117 2 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 - 0 0 0

118 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 - 0 0 0

143

Page 149: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year Information about Disease (without considering cold, cough, and fever)

O1 M = v Number of Nature of Disease Nature of Treatment r c w a c w Z O

patient N O O

O ..i O O t 0

v C Cf O C

A a' d

o 0 = n n a E

a M v z as z

N N d y it, T 0

61

E V d N y

v to d Male Female Children Male Female Children

U. LL N E U U- U a 1-

119 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 - 0 0 0

120 1 1 0 1 0 0 0 0 1 0 1 0 0 0 0 0 0 0 -s 0 0 0

121 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

122 3 1 1 0 0 1 0 0 1 1 0 0 0 1 0 0 Gout 0 0 Pharmachiest 0 0

123 4 2 0 1 0 0 0 0 2 0 1 0 0 0 0 0 0 0 0 0 0 0

124 1 1 0 0 0 0 0 0 1 1 0 1 0 1 2 0 Presure Gout 0 Rural Doctor Rural Doctor 0

125 1 1 0 0 0 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0

126 1 1 0 0 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0

127 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0

128 1 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0

129 2 1 0 0 0 0 0 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0

130 1 1 0 0 0 0 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0

144

Page 150: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year Information about Disease (without considerin cold cou h and fever) g , g ,

:5 a3, 1A Number of Nature of Disease Nature of Treatment o' °1 0 3 w a a i

w patient 0p p L d 0 7 CI

C 0 R

O J i C- V 0 J N V C

E 2 .

s = .0

U z a z LL

a ar d

0 aoi y

E v ° aci

E d w

n f v Male Female Children Male Female Children

M f f E V U. LL LL LL - I.-

131 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 - 0 - - - -

132 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - -

133 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - - -

134 1 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - - -

135 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 - 0 - - - -

136 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 - 0 - - - -

137 1 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - - -

138 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 - 0 - - - -

139 3 2 0 1 0 0 0 0 2 1 0 0 0 0 0 0 - 0 - - - -

140 2 2 0 0 0 0 0 0 1 1 0 0 0 0 0 0 - 0 - - - -

141 1 1 0 1 0 0 0 0 0 0 0 0 0 0 2 0 - Lequria - - No treatment -

145

Page 151: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ELECTRICITY, TUBEWELL, TRANSPORT OWNERSHIP, PRODUCTION EQUIPMENT,

HOUSING, ACCESS TO COMMUNICATION

EQUIPMENT, INVOLVEMENT IN DEVELOPMENT ORGANISATION

AND CREDIT

Page 152: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Paruara

Having c t: Cn

c Number of Number of

facilities? a a w 0 c 0 o o person involved person taken

0 r 0 CL .2 t o , 3 0 x in Organisation Nature of loan E L n w 0 ° L L@ development Sources of

0 c C, 3

.

c o . L c O organisation loan

U 0 c z o 0. W

0 0 . E

Z Male Female Male Female . a z a v z

0

1 Yes Yes 0 Weeder and Tinbldg .00 TV and twin .00 .00 .00 .00

Thresher

2 Yes Yes Cycle Weeder and Ci sheet .00 TV and twin .00 .00 .00 .00

Thresher

3 Yes Yes 0 0 Tinbldg .00 TV and twin .00 .00 .00 .00

4 Yes Yes 0 0 Ci sheet .00 TV and twin .00 .00 .00 .00

5 No No Rickshaw 0 Ci sheet .00 0 .00 1.00 BRAC .00 1.00 BRAC

6 No Yes Cycle 0 Chan 1.00 0 .00 1.00 BRAC & Bank 1.00 1.00 BRAC & Bank

7 No No 0 0 Ci sheet .00 0 .00 1.00 BRAC .00 1.00 BRAC

8 No No Boat 0 Chan .00 0 .00 1.00 GB .00 1.00 GB

9 Yes No Rickshaw 0 Ci sheet .00 Twinone .00 1.00 GB .00 1.00 GB

10 Yes Yes Rickshaw 0 Ci sheet .00 Twinone 1.00 1.00 ASA .00 1.00 ASA

11 Yes Yes 0 0 Ci sheet 1.00 0 .00 .00 .00 .00

12 No No 0 0 Chan .00 0 1.00 .00 .00 .00

147

Page 153: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Num

ber

of

Num

ber

of Having

a w

y =

o . . o person

involved

person

taken

. facilities?

c a w

° ° c o e a

'-^

in O

r

anisation

9 f loan M

s

o g o , ' o W

Nature

o

v L W

t T)

° fl.

++

c

,.. o

a,

s W ,

development

Sources

of

loan E

o c o v c organisation M

0

z 3 c a °o E

z 3 v M

ale

Fem

ale

Male

Fem

ale

LL

M Z

° 1`O

W

F z

a

13

Yes

Yes

Cycle

Weeder

and

Tinbldg

.00

TV

and

twin

.00

.00

.00

.00

Thresher

14

.00

.00

.00

.00

15

Yes

Yes

Cycle

Weeder

and

Ci

sheet

.00

Television

black

.00

.00

Mortgage

1.00

.00

Mortgage

Thresher

16

No

No

0

0 Ci

sheet

.00

0 1.00

.00

Mortgage

1.00

.00

Mortgage

17

No

No

0 0 Ci

sheet

.00

0 .00

1.00

AS

A

.00

1.00

AS

A

18

Yes

Yes

Cycle

0 Ci

sheet

.00

Tw

inone

1.00

.00

Som

itee

.00

.00

Som

itee

19

Yes

Yes

0 0 Ci

sheet

.00

Television

black

1.00

1.00

Som

itee

.00

.00

Som

itee

20

Yes

Yes

0 0 Ci

sheet

.00

Television

black

.00

.00

.00

.00

21

Yes

Yes

Rickshaw

0 Ci

sheet

.00

Television

black

.00

.00

.00

.00

22

No

No

0 0 Ci

sheet

.00

0 .00

1.00

AS

A

.00

1.00

AS

A

23

No

Yes

0

0 Chan

1.00

0 .00

1.00

BR

AC

.00

1.00

BR

AC

24

No

No

0 0 Chan

.00

0 .00

1.00

GB

.00

1.00

GB

148

Page 154: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having c Number of Number of w facilities.

a CL

r- w c

,A M o .- oo c o

w. , person involved person taken o U

= o o o 3 o. , r in Organisation Nature of loan

?, 12 L E

E w o o 0 ° L °' development Sources of

E u °' 0 c , 3 °

a, o - o Z

E c &. ;. a

M c o Z

organisation loan

LL aa, c °'

° o E c Male Female Male Female

v I- m Z a" z M

25 Yes Yes 0 Thresher Cisheet .00 Twinone .00 .00 .00 .00

26 No No 0 0 Ci sheet .00 0 .00 .00 .00 .00

27 No No 0 0 Chan 1.00 0 .00 1.00 GB .00 1.00 GB

28 Yes Yes 0 0 Ci sheet 1.00 Television black .00 2.00 GB .00 2.00 GB

29 Yes Yes Cycle 0 Ci sheet 1.00 0 .00 1.00 ASA .00 1.00 ASA

30 Yes No 0 0 Tinbldg 1.00 Twinone .00 .00 0 1.00 .00 Moneylender

31 Yes Yes Cycle Thresher Tinbldg .00 Television black .00 .00 .00 .00

32 Yes Yes Cycle Thresher Ci sheet .00 TV and twin .00 .00 .00 .00

33 Yes Yes Cycle Weeder and building .00 TV and twin .00 .00 .00 .00

Thresher

34 No Yes 0 Weeder Ci sheet .00 Twinone .00 1.00 BRAC .00 1.00 BRAC

35 No No 0 Thresher 0 .00 0 .00 1.00 .00 .00

36 Yes Yes 0 0 Tinbldg .00 Television black 1.00 .00 .00 .00

149

Page 155: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Num

ber

of

Num

ber

of Having

n w

Ch

:. 0 3: C

, c

person

involved

person

taken facilities?

CL C

:E

° c c a o

' o o ' in

Organisation

Nature

of

loan f M w

L0=

a c

w o

r , development

Sources

o

loan E

, o c 0

..

c organisation

3

o Z 3

a C

r o

Z 3 M

ale

Fem

ale

Male

Fem

ale

U. 0

ul

F-

z

37

Yes

Yes

Cycle

Weeder

and

Tinbldg

.00

TV

and

twin

1.00

.00

.00

.00

Thresher

38

No

No

Cycle

0

Ci

sheet

.00

0

.00

.00

Mortgage

1.00

.00

Mortgage

39

Yes

Yes

0 0 Ci

sheet

.00

0 .00

.00

moneylender

1.00

.00

moneylender

40

No

Yes

Cycle

Weeder

and

Ci

sheet

.00

0

1.00

.00

.00

.00

Thresher

41

No

No

0 0 Ci

sheet

1.00

0 .00

1.00

.00

.00

42

No

No

Cycle

0 Ci

sheet

1.00

0 .00

.00

.00

.00

43

Yes

Yes

Cycle

Weeder

Cisheet

1.00

0

.00

.00

.00

.00

44

Yes

Yes

0

Thresher

Ci

sheet

.00

Tw

inone

.00

.00

.00

.00

45

Yes

Yes

0 0

Tinbldg

.00

TV

and

twin

.00

.00

.00

.00

46

Yes

Yes

Cycle

0 0 1.00

Tw

inone

.00

.00

.00

.00

47

No

No

0 0

Ci

sheet

.00

0

.00

.00

Bank

1.00

.00

Bank

48

Yes

Yes

Cycle

Thresher

Ci

sheet

1.00

Tw

inone

.00

.00

Bank

1.00

.00

Bank

150

Page 156: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having c 3 Number of Number of

- facilities? a.

0 c H 3

0 c .o '~

person involved person taken o o

U . w- o 0-.2 r - o o n > 'r in Organisation Nature of loan

L- L r. a, t; E o 12 a , a 0

w 4l In *; development Sources of

E cv 3 o c , 3 U 0 organisation loan

0 Z o a o 0 E Z o Male Female Male Female 0) W

7 F-

IC Z d " z i 49 No No Rickshaw 0 Ci sheet .00 Twinone .00 1.00 ASA .00 1.00 ASA

50 Yes Yes Cycle Power Ci sheet .00 Twinone .00 1.00 ASA .00 1.00 ASA

51 Yes No Rickshaw 0 Ci sheet .00 0 .00 1.00 BRAC .00 1.00 BRAC

52 .00 .00 .00 .00

53 Yes No 0 0 Ci sheet 1.00 0 .00 1.00 BRAC .00 1.00 BRAC

54 No Yes Cycle 0 Ci sheet .00 Twinone 1.00 .00 moneylender 1.00 .00 moneylender

55 Yes Yes 0 Weeder and Ci sheet .00 Television black .00 .00 moneylender 1.00 .00 moneylender Thresher

56 Yes No Cycle spr*llp Ci sheet .00 Twinone .00 .00 .00 .00

57 Yes Yes 0 Thresher Ci sheet 1.00 Twinone .00 .00 .00 .00

58 Yes Yes Cycle 0 Ci sheet 1.00 0 1.00 .00 Bank 1.00 .00 Bank

59 Yes Yes Cycle Thresher Tinbldg 1.00 Television black .00 .00 .00 .00

60 Yes Yes Cycle Weeder and Ci sheet .00 TV and twin 1.00 .00 Somitee 1.00 .00 Somitee Thresher

151

Page 157: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having o 3 C Number of Number of

facilities? H o w . o c

S

H - ! ° o "- o o , person involved person taken v

o U

. O- o a o ; (U

= o W

, o n

s in Organisation Nature of loan

- 12 8

E ' ° 0) 3

o o w o W 07

% o +; development Sources of

E o C a -

M coCr io M

++ 41 Zc o organisation loan

LL o Z 3 c W 0 o E cv Male Female Male Female w W

o I- ra z a v z

61 Yes Yes Cycle Weeder and Tinbldg Televisioncolor .00 .00 .00 .00

Thresher

62 Yes Yes Cycle Weeder and Ci sheet 0 .00 .00 .00 .00

Thresher

63 Yes Yes Cycle Thresher Tinbldg 0 1.00 .00 .00 .00

64 Yes Yes Cycle DTW 0 Television black 1.00 .00 .00 .00

65 Yes Yes Cycle Thresher Ci sheet Twinone 1.00 .00 .00 .00

66 Yes Yes Cycle Thresher Tinbldg Televisioncolor .00 .00 .00 .00

67 Yes No 0 0 Ci sheet 0 .00 .00 .00 .00

68 Yes Yes Rickshaw 0 Ci sheet Twinone .00 1.00 BRAC .00 1.00 BRAC

69 Yes No Rickshaw 0 Ci sheet Twinone .00 1.00 BRAC .00 1.00 BRAC

70 No No 0 0 Ci sheet 0 .00 1.00 BRAC .00 1.00 BRAC

71 Yes Yes Cycle 0 Ci sheet .00 Twinone .00 .00 .00 .00

72 Yes Yes 0 Weeder and Ci sheet .00 Twinone .00 .00 Bank 1.00 .00 Bank

Thresher

152

Page 158: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having

o c

Num

ber

of

Num

ber

of

facilities?

a. 'A

a

w 0 ° &

.a

r o

.. o "

person

involved

person

taken

o 0

0=

w _a

o

- o

3

- ' 0 aL

in O

rganisation

Nature

of

loan . 4J

12

L E ' a

if

w o

w °

°_' L 0' developm

ent

Sources

of - 3

o c

a,

3

v fO

°°

c c f° ° o organisation

loan

o

Z c a W

0

E

z c 'o

Male

Fem

ale

Male

Fem

ale

a ui

~

m z

M

z

73

Yes

Yes

0 0 Ci

sheet

.00

Televisioncolor

.00

.00

.00

.00

74

Yes

Yes

Cycle

0 Ci

sheet

.00

0 .00

.00

.00

.00

75

Yes

Yes

Cycle

0 Ci

sheet

.00

Television

black

.00

.00

.00

.00

76

No

Yes

0 0

Ci

sheet

.00

0 .00

.00

AS

A

.00

1.00

AS

A

77

Yes

Yes

Cycle

0 Ci

sheet

.00

Television

black

.00

.00

.00

.00

78

Yes

Yes

Cycle

0

Ci

sheet

.00

Tw

inone

.00

.00

.00

.00

79

Yes

Yes

0 0

Ci

sheet

1.00

0

.00

.00

.00

.00

80

No

No

Cycle

0 Ci

sheet

1.00

0 .00

.00

AS

A

.00

1.00

AS

A

81

No

No

Cycle

0 Ci

sheet

.00

0 .00

.00

AS

A

.00

1.00

AS

A

82

No

No

0 0 Ci

sheet

.00

Tw

inone

.00

.00

.00

.00

83

Yes

Yes

Cycle

Tractor

Ci

sheet

1.00

Television

black

.00

.00

.00

.00

84

Yes

Yes

Rickshaw

0 Ci

sheet

.00

Tw

inone

.00

.00

AS

A

.00

1.00

AS

A

85 I Yes

No

0 0 Ci

sheet

.00

Tw

inone

.00

.00

AS

A

.00

1.00

AS

A

153

Page 159: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having 0 C 3: C Number of Number of

facilities? o - 0 -. h - 2 o '- 0 person involved person taken

o U

. E t .- o no

= o , 3 o a in Organisation Nature of loan

12 E L 12 ' E 0 0 L. °'

:3 12 'm development Sources of

E 'D 3 c = V 4.0 v

(U c o- i s M 4j 0) 4-0

c o organisation loan

u ° Z c fl. ° o E Z "a Male Female Male Female U f0 (U Z f0 c W Z

86 Yes No Cycle 0 Ci sheet .00 0 .00 .00 ASA 1.00 .00 ASA

87 Yes Yes Cycle 0 Ci sheet .00 Television black .00 .00 ASA .00 1.00 ASA

88 No No 0 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

89 Yes No Cycle 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

90 No No 0 0 Ci sheet .00 0 .00 .00 GB .00 1.00 GB

91 No No 0 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

92 No No 0 0 Ci sheet 1.00 0 .00 1.00 ASA .00 1.00 ASA

93 No Yes 0 0 Ci sheet 1.00 0 .00 1.00 ASA .00 1.00 ASA

94 No No 0 0 Ci sheet .00 0 .00 1.00 ASA .00 1.00 ASA

95 Yes Yes Cycle 0 Ci sheet .00 0 .00 .00 Bank 1.00 .00 Bank

96 No No 0 0 Ci sheet 1.00 0 .00 .00 .00 .00

97 No No 0 0 Ci sheet .00 0 .00 .00 .00 .00

98 No No 0 0 Ci sheet .00 0 .00 .00 .00 .00

154

Page 160: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having c c 3 Number of Number of a (A . o person involved person taken

o facilities? a t w o a o y . o , 3 0 0. H 00

= in Organisation Nature of loan , 12 t E L. - L a' development Sources of

c M C o

f C a = c organisation loan

3 a, o z 3 0. d

° ° o E Z o v Male Female Male Female

d ' H M z d z w

99 No No 0 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

100 No No 0 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

101 No No 0 0 Ci sheet 0 .00 .00 GB .00 1.00 GB

102 No No Rickshaw 0 Ci sheet 0 .00 .00 ASA .00 1.00 ASA

103 No No Rickshaw 0 Ci sheet 0 .00 .00 ASA .00 1.00 ASA

104 No No 0 0 Ci sheet 0 .00 .00 ASA .00 1.00 ASA

105 No No 0 0 Ci sheet 0 .00 .00 .00 .00

106 Yes Yes 0 0 Ci sheet TV and twin .00 .00 .00 .00

107 Yes Yes 0 0 Ci sheet Twinone .00 .00 .00 .00

108 Yes No 0 0 Ci sheet 0 .00 .00 .00 .00

109 No No 0 0 Ci sheet Twinone .00 .00 .00 .00

110 Yes Yes 0 0 Ci sheet Twinone .00 .00 .00 .00

111 Yes Yes 0 0 Ci sheet 1.00 Televisioncolor .00 .00 .00 .00

155

Page 161: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Num

ber

of

Num

ber

of Having

o w

y 0 w

o person

involved

person

taken c facilities?

C

a t

° C

c o a o

° 0 3

c a H

>

in O

rganisation

Nature

of

loan U L-

12

3 1 a o o

r development

Sources

of l E

3 v c° Q

c

n Z

o organisation

oan

M o

z 3 a d

a, o

Male

Fem

ale

Male

Fem

ale

W

z

a

z

112

No

Yes

0 0 Ci

sheet

1.00

0

.00

1.00

AS

A

.00

1.00

AS

A

113

No

Yes

0 0 0

.00

0

.00

1.00

AS

A

.00

1.00

AS

A

114

Yes

Yes

0 Weeder

and

Ci

sheet

.00

0 .00

.00

.00

.00

Thresher

115

No

Yes

0

Weeder

and

0

.00

0 .00

.00

.00

.00

Thresher

116

No

Yes

0

Weeder

and

0 .00

radio

.00

.00

.00

.00

Thresher

117

Yes

Yes

0

Thresher

Ci

sheet

.00

TV

and

twin

.00

.00

.00

.00

118

Yes

Yes

0 0 Ci

sheet

.00

TV

and

twin

.00

.00

.00

.00

119

Yes

Yes

0

0

Cisheet

.00

0

.00

.00

.00

.00

120

Yes

Yes

0

Thresher

Cisheet

.00

0

.00

.00

.00

.00

121

Yes

Yes

0 0 Ci

sheet

.00

Televisioncolor

.00

.00

.00

.00

122

Yes

Yes

0

Thresher

Cisheet

.00

0

.00

.00

.00

.00

156

Page 162: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having tf CM Number of Number of

facilities? a IA a o c y ° c o

. y person involved person taken ° o-

, o a o - o 3 o a in Organisation Nature of loan

21 Lo = E °' :3 12 development Sources of

1 1

o c 0, 3

V a, to c ° c a 44 W M c o rganisation oan

U ° Z c d E Z c Male Female Male Female 47 7 f' 10 Z - z W

123 Yes Yes 0 Weeder and building 1.00 Televisioncolor .00 .00 Bank 1.00 .00 Bank Thresher

124 No Yes 0 Thresher Ci sheet .00 Twinone .00 .00 .00 .00

125 Yes Yes Cycle 0 Ci sheet .00 TV and twin .00 .00 .00 .00

126 Yes No Cycle Weeder Ci sheet .00 0 .00 .00 .00 .00

127 No Yes Cycle 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

128 Yes Yes 0 0 Cisheet .00 0 .00 .00 .00 .00

129 Yes Yes 0 0 Cisheet .00 0 .00 .00 .00 .00

130 No Yes 0 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

131 No No 0 0 Ci sheet .00 0 .00 .00 ASA .00 1.00 ASA

132 No No 0 0 Chan .00 0 .00 .00 .00 .00

133 No Yes 0 0 Ci sheet .00 Twinone .00 .00 .00 .00

134 No Yes 0 0 Ci sheet 1.00 0 .00 .00 .00 .00

135 Yes Yes Cycle 0 Ci sheet .00 Television black .00 .00 .00 .00

157

Page 163: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having o 3 Number of Number of , facilities?

a VA o

.- ,-. , - o - o person involved person taken 0

. r ;- 0 n o t '

o 3 o. t in Organisation Nature of loan

?, - In ,.. , G E i ° 12 a w o o '- L w ° 12 7@ development

Sources of E -y 0C aco' cw. d c organisation

loan

L 3 L C Z 0- a,

° °' o

a E

o Z c 'v Male Female Male Female t;

N .0 3 M

0 M

z W F- Z

136 No Yes 0 0 Ci sheet .00 0 .00 1.00 .00 1.00

137 No No 0 0 Chan .00 0 .00 .00 .00 1.00

138 No No 0 0 Ci sheet 1.00 0 .00 .00 .00 1.00

139 Yes Yes 0 0 Ci sheet .00 TV and twin .00 .00 .00 .00

140 Yes Yes 0 Weeder Ci sheet 1.00 0 .00 .00 .00 1.00

141 .00 1.00 ASA .00 1.00 ASA

158

Page 164: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NAME OF THE VILLAGE: DEOKHER

Page 165: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Village :Deokher Union Sreepur Upazila : Chowdaugram District : Comilla

A. General

SI. No. Description Break-up of Description Total 1 Area of the village (in Acres) 81

2 Distance from Upazila Head quarter (in knm.) 15

3 Distance from District Headquarter (in km.) 35 4 Distance from nearest Pucca Road (in km) 01

5 Number of Population Male- 391

Female- 380 771

6 Sex Ratio 102.89

7 Number of Household 133

8 Household Size 05.79 9 Sex of the Household Head Male- 127 (95.5)

Female- 06 (4.5)

10 Number of widows, divorced and separated women 24 11 Religious Status of the household head Muslim- 100%

12 Age dependency Ratio (under 15 and above 65+) 107.82

160

Page 166: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

B. Resources

Sl. No. Description Break-up of Description Total 1 Number of Ponds 08

2 Number of Kua (ditches) 12

3 Number of Educational Institute Primary- 0

High School-0 College- 0

Madrasha- 0

Maktab- 01

4 Total cultivated Land Paddy field 59.43 Seed bed* 05.83

5 Number of Mosque 02

6 Number of Graveyard 04

7 Number of Deep tubewell 01

8 Number of Shallow Tubewell 00

9 Pacca road in the village (In Kilometer) 00 10 Number of village shop 00

11 Drainage Pipe 02

12 Total village road 02

161

Page 167: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

C. Education

S1. No. Description Break-up of Description Total 1 School Enrolment Rate (Primary Level) Boy- 93.1 94.3

Girl- 95.1

2 School Enrolment Rate (Secondary level) Boy- 95.7 94.5 Girl- 93.3

3 School drop out Rate (Primary Level) Boy- 2.5 01.01 Girl- .00

4 School dropout Rate (Secondary level) Boy- 36.3 26.09 Girl- 16.7

5 Literacy Rate (7 years +) Male- 60.59 56.65 Female 52.72

7 Number of person Attended adult Literacy Programme Male-0 0 Female-0

8 Number of people passed SSC or HSC Male- 19 27 Female- 8

9 Number of people completed graduation or post graduation Male- 04 04 degree

10 Distant of Nearest Educational Institute from the village Primary- 01

Girls High School- 01

Boys High School- 02.5

Girls College- 01

College- 02.5

162

Page 168: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

D. Health and Sanitation

SI. No. Description Break-up of Description Total 1 Number of Deaths due to pregnancy complication last year 00 2 Number of deaths of children (0-1 years) over last 12 months Boy-O1

Girl-00 01

4 Number of deaths of children (1-4 years) over last 12 months Boy- 0

Girl- 0 00

5 Number of children affected by disease (0-5 Years) 13

6 Number of children born last Year 28

7 Number of Persons suffered from disease (5 Years above) over last 12 months

Male- 37

Female-38 8 Sources of water used for Drinking water Tubewell- 100%

9 Sources of water used for Cleaning utensils Pond- 88

Tubewell- 35

Both- 10

10 Nature of Latrine use for defecation Open 41 (30.8) Ring slab 86 (64.7) Water sealed 6 (4.5)

11 Distant from the Union Health Centre (in km.) 02 12 Distant from the Upazila Health Complex (in km) 15

163

Page 169: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

E. Employment

SI. No. Description Break-up of Description Total 1 Number of child Labour (5-14 years) Male- 06 07

Female-O1

2 Number of Active labour force Male- 187 338 Female- 151

3 Nature of Employment for Male Unemployed- 17 29 Underemployed- 12

4 Nature of Employment for female Unemployed- 10 32 Underemployed-22

5 Number of wage Labourer Agricultural- 35 39 Non Agricultural 04

6 Total Number of People Living Abroad 33

F. Livestock and trees

S1. No. Description Break-up of Description Total 1 Total number of Poultry 1603

2 Total number of Livestock Cow-141 Goat-35 179

3 Total number of Poultry died last year 697

4 Total number of Livestock died last year Cow 10

Goat-8 18

5 Total number of wood trees 1747

6 Total number of fruit trees 1200

164

Page 170: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

G. Situation of Poverty

S1. No. Description Break-up of Description Total I Situation of Poverty among the people According to the Rich- 6.0%

perception of the village people Middle class- 37.5% Poor- 19.5% Very Poor- 34.5%

2 Situation of Poverty According the criteria of Income (CBN Well of- 40.1% Method) Poor- 59.9%

3 Situation of Poverty According the criteria of capacity to food Surplus 13.7% consumption Break even 32.1%

Occasionally deficit 19.8% Chronic deficit- 34.4%

4 Situation of Poverty According to the criteria of Calorie intake Non Poor 61.0% (24 hours recall method) Poor 20.0%

Very Poor 19.1%

Table 1: Distribution of the household members according to different age group

Age Group Male Female Total Up to 5 84 86 170

6-10 44 62 106

11-15 47 45 92

15-30 99 99 198

30-64 98 75 173

65+ 19 13 32

Total 391 380 771

165

Page 171: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 2: Educational Qualification of the Household head

Frequency Valid Per cent

Illiterate 97 72.9

Class III 01 0.8

Class V 12 9.0

Class VI 01 0.8

Class VII 02 1.5

Class VIII 04 3.0

Class IX 02 1.5

Class X 06 4.5

SSC 04 3.0

HSC 02 1.5

Alem 01 0.8

Dakhel 01 0.8

Total 133 100.0

Table 3: Distribution of the household head according to their age

Frequency Per cent

Lowest to 25 11 08.3

25-35 35 26.3

35-45 37 27.8

45-55 22 16.5

55 and above 28 21.1

Total 133 100.0

166

Page 172: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 4: Distribution of the Household according to the land ownership

Land ownership Group (in Acre) Number of Household Per cent of Household

Less than .05 (Landless) 50 37.6

.05-2.49 (Small Farmers) 72 54.1

2.5-7.49 (Medium Farmers) 10 7.5

Large farmer 01 0.8

Total 133 100.0

Table 5: Occupation of the House holds head

Frequency Valid Per cent

Farmer 30 22.6

Day laborer 35 26.3

Wage earner 11 8.3

Business 22 16.5

Teacher 01 0.8

Mason 01 0.8

House wife 06 4.5

Rickshaw Puller 12 9.0

Non Agricultural Labourer 04 3.0

Others 11 8.4

Total 133 100.0

167

Page 173: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 6: Distribution of the households by materials of roof of main house

Frequency Valid Per cent Chan 12 9.0

CI sheet 115 86.5

Cement 06 4.5

Total 133 100.0

Table7: Distribution of the households by Access to Communication facilities

Frequency Valid Per cent

None 95 71.4

Radio 03 2.3

Television black 08 6.0

Television color 03 2.3

Two in one 18 13.5

Television and two in one 04 3.0

Radio & Television 02 1.5

Total 133 100.0

Table 8: Distribution of the households by nature of transport ownership

Nature of transport Frequency Valid Per cent

None 80 60.2

Rickshaw 19 14.3

Cycle 33 24.8

Motorcycle 01 0.8

Total 133 100.0

168

Page 174: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 9: Distribution of the households by Electricity Facility

Frequency Valid Per cent No 50 37.6

Yes 83 62.4

Total 133 100.0

Table 10: Distribution of the households by having own tube well

Frequency Valid Per cent No 85 63.9 Yes 48 36.1

Total 133 100.0

Table 11: Distribution of the households by having Own Agricultural Equipment

Frequency Valid Per cent

None 98 73.7

Weeder 07 5.3

Thresher 03 2.3

Weeder and Thresher 22 16.5

STW 01 0.8

Power tiller 02 1.5

Total 133 100.0

169

Page 175: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

AGE OF THE POPULATION

Page 176: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Deokher Age of the o ulation

Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand head Total

ai

U io O 0r u d GJ C7 N N M IV

pp

E E E E E E 47 E

M UL.

Q U' U

E W LL

E d IL.

f m ii..

f W LL.

E W LL.

X N U.

f m U.

w pr 0

1 Md Abdul Mannan Munshi 52 - Farmer 1 1 - - 1 2 - 1 1 - - 5 2 7

2 Md. Manik Miah Munshi 37 3 Rickshaw Puller - 1 - 1 1 1 - 1 1 - - - 2 4 6

3 Md. Julfikar Haider Munshi 75 SSC Retired 1 - - - - - 1 3 - 1 1 - 3 4 7

4 Md. Mominul Haq Munshi 56 SSC Farmer - - - - 2 1 - - 1 1 - - 3 2 5

5 Md. Kamanul Haq Munshi 55 SSC Farmer - - - - - - 2 1 1 1 - - 3 2 5

6 Md. Joynal Abedin Master Munshi 62 HSC Retired - 1 - - 1 - - 2 2 1 - - 3 4 7

7 Md. Abdul Khaier Munshi 44 SSC Wage Earner - - - 1 1 - - - 2 1 - - 3 2 5

8 Md. Mokiesur Rahaman Munshi 57 - Day labourer - - - - 1 - - 1 1 1 - - 2 2 4

9 Md. Abdul Rashid Munshi 55 - Farmer 1 - - - - - 2 1 1 1 - - 4 2 6

10 Md. Rafiqul Islam Munshi 35 - Driver 1 - 1 2 - - - 1 1 - - - 3 3 6

11 Ms. Firoja Begum Munshi 53 - House wife 2 1 - - - - - 1 1 1 - 1 3 4 7

171

Page 177: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total

o U c is o

C a . r 4l d7 C) G) d dl £ a d m E

d m E

d m E

GJ

m E N m E

0l m E

N m E

ro U.

a ig . f a U-

E d U.

m U.

f a) U.

E 4, U.

f a) U.

d U-

W O' O

12 Md. Abdur Rashid Munshi 42 - Wage Earner 1 - - - - - 1 1 1 - - 1 3 2 5

13 Md. Amir Hossain Munshi 70 - Farmer 1 - 2 - - 2 1 - 1 1 5 3 8

14 Md. Abdul Hannan Munshi 54 HSC Retired 1 - - - 1 - 2 2 2 1 - - 6 3 9

15 Md. Shafiullah Munshi 50 10 Farmer - - - - 1 1 3 - 1 1 - - 5 2 7

16 Md Siddiqur Rahaman Munshi 85 - Farmer 1 - - 2 - - - 1 1 - 1 1 3 4 7

17 Md. Abu[ Kashem Munshi 38 10 Farmer 2 - 1 - - - - 1 1 - - 1 4 2 6

18 Md. Abdul Razzak Munshi 54 - Farmer - - - - 1 4 - 1 1 - - 5 2 7

19 Md. Mafizur Rahaman Munshi 44 10 Farmer - - 1 - 1 - 1 - 1 1 - - 4 1 5

20 Hazi Harmuz Miah Munshi 72 - Farmer 1 1 - 2 2 2 2 2 1 1 - 6 8 14

21 Md. Jayder Ali Hazi Jayder Hazi 90 - Farmer 2 - - 1 1 1 - 1 1 - 1 1 5 4 9

22 Md. Abdul Gafur Jayder Hazi 50 - Business 1 1 - 1 2 - 2 2 1 1 - - 6 5 11

172

Page 178: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bar! Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total a)

U l o G i3 y d G)

W N

N 4)

a) G)

N 4) G) 0)

a CL f U) E f w E A f E IJ

m E E

m f E a,

m f E a m f E a) U- 3 Lp V LL LL LL U- U. U. LL

w d O

23 Md. Abdul Malek Jayder Hazi 40 - Farmer 1 1 1 1 - 1 2 3 5

24 Md. Abdur Rashid Jayder Hazi 45 5 Business 1 1 1 - 1 - 1 1 - - 5 1 6

25 Md. Hazier Rahaman Hazal Hazi 70 - Farmer - - - - 1 1 3 - - 1 1 - 5 2 7

26 Md. Kamal Haq Hazal Hazi 40 - Wage Earner - 1 - 1 - 1 1 - 1 1 - - 2 4 6

27 Md. Zaharui Haq Hazal Hazi 35 - Wage Earner - 1 1 - - 2 - - 1 1 - - 2 4 6

28 Md. Babul Haq Hazal Hazi 27 - Day labourer - - - - - - 1 1 - - - - 1 1 2

29 Ms. Asia Begum Hazal Hazi 60 - House wife - - 1 1 1 - 1 - - 2 2 4

30 Md. Abad Miah Hazal Hazi 44 - Day labourer 2 - - 1 - - 1 - 1 1 - - 4 2 6

31 Md. Nurul Islam Hazal Hazi 60 9 Farmer 2 - 1 - 2 1 1 3 2 1 - - 8 5 13

32 Md. Abad Miah Torab All 43 - Wage Earner 2 - - 1 - I - - 1 1 - - 3 3 6

33 Md. Monir Hossain Torab All 32 - Business - 2 - - - - - 1 1 - - - 1 3 4

173

Page 179: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total d V o c o

Q V 3 N £1 N Gl Z G/ d d v

u U. U- U- I U- U-

u, a 0

34 Md. Mafiz Miah Torab Ali 35 7 Wage Earner 1 2 - 1 - 1 1 - - 1 4 3 7

35 Md. Joynal Abedin Bora Bari 60 6 Farmer - - - 1 4 1 1 1 - - 6 2 8

36 Md. Areber rahaman Bora Bari 30 - Day labourer 1 1 2 - - 1 1 - - - - 4 2 6

37 Md. Mostafa Kamal Rubel Bora Bari 15 10 Student - 2 - - 1 - 1 - 1 - - 1 4 5

38 Md. Moqbul Ahmed Khalifa Bora Bari 75 Dakhel .00 - - - - - - - - - 1 1 - 1 1 2

39 Md. Abul Kashem Bora Bari 36 10 Business - - - 1 1 1 - 1 1 - - 3 2 5

40 Md. Abu Hanif Bora Bari 34 5 Farmer 2 1 1 1 - - 1 1 - - - 4 3 7

41 Md. Ali Newaz Bora Bari 65 - .00 - - - - - 1 2 - - 1 1 - 3 2 5

42 Md. Hares Miah Bora Bari 36 - Day labourer 1 1 1 1 - - - 1 1 - - - 3 3 6

43 Md. Moslem Miah Bora Bari 32 - Business 2 - - - - - - 1 1 - - - 3 1 4

44 Md. All Hossain Bora Bari 62 - .00 - - - - - 1 1 1 1 2 - 2 4 6

174

Page 180: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total a)

U c ° G/ as a) al a) w W

a a c - CL E E ) m

E as m x

£ o

m f E W

m 1 E aj

m 2 E

W m E E

W LL i0 V U. N. U. U. LA. U. {L Wa 0

45 Md. Nurul Amin Bora Bari 26 8 Business - 1 1 1 - - - - 1 2 3

46 Md. Ali Ahmed Bora Bari 58 - Business 2 1 1 1 2 2 2 1 - - 7 5 12

47 Md. Abul Kashem Bora Bari 39 - Day labourer 2 1 1 1 - - 1 1 - - - 4 3 7

48 Md. Habibur Rahaman Bora Bari 37 - Day labourer 1 1 1 - 1 1 - - - 3 2 5

49 Md. Abdul Malek Bora Bari 33 - Rickshaw Puller 2 1 - 1 1 1 - - - 3 3 6

50 Ms. Badiunesa(Anwara) Bora Bari 40 - House wife - - - 1 1 - - 1 - - 1 2 3

51 Md. Abdul Malek Bora Bari 31 - Day labourer 1 2 - - - - - 1 1 - - - 2 3 5

52 Md. Nabalak Miah Bora Bari 29 - Business 1 1 - - 1 1 - - - - 2 2 4

53 Md. Jarul Haq Bora Bari 45 - Business 1 - - 1 1 - 2 1 1 - - 3 4 7

54 Md. Kamal Haq Bora Bari 35 - Day labourer 1 - - 2 - - - 1 1 - - - 2 3 5

55 Md. Hafez Miah Bora Bari 36 - Business - - - 1 - - - 1 1 - - - 1 2 3

175

Page 181: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total W

o c

G +

= a d al al aJ al aJ

m a ' f f C f C f f x x LL

= W C

C ) U.

C ) C U. C LL C U. m

w p+ O

56 Ms. Razia Khatun Bora Bari 47 - House wife - - - - 1 1 - 1 - - 2 1 3

57 Md. Shafiqur Rahaman Bora Bari 54 5 Wage Earner - - - - 1 1 1 1 - - 3 1 4

58 Md. Farid Miah Bora Bari 38 7 Wage Earner - 1 - - 1 1 1 2 1 1 - - 3 5 8

59 Md. Foyej Ahamed Bora Bari 58 - Farmer - - - 1 - 2 2 - 1 - - - 3 3 6

60 Md. Momtaz Miah Bora Bari 65 - Rickshaw Puller - - - - 1 1 - 1 1 - 2 2 4

61 Md Abdur Rashid Bora Bari 53 - Day labourer 1 1 - 2 - 1 1 - - 5 1 6

62 Md. Ali Newaj Bora Bari 41 - Labourer 1 1 - - - - 1 1 1 - - 3 2 5

63 Md. Suruj Miah Bora Bari 80 - .00 1 1 - - - - - 1 1 - 1 1 3 3 6

64 Ms. jahanara begum Bora Bari 26 - House wife - 1 - - - 1 1 - - - - - 3 3

65 Md. Ruhul Amin Bora Bari 40 - Rickshaw Puller 1 1 1 - 1 - - - 1 1 - - 4 2 6

66 Md. Monu Miah Bora Bari 80 - Farmer 1 2 1 2 2 1 1 1 6 5 11

176

Page 182: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total

U iQ O O o = , ai a a ai N ai m £

m E O E m E

m E

' m E m

E m E

U. v LL U U. U. U. U. ,i W a 0

67 Md. Sayed Ahmed Bora Bari 52 - Business - 1 1 1 1 2 1 1 1 - - 4 5 9

68 Md. yasin Miah Bora Bari 65 - Farmer 1 - - - - - - 1 1 1 1 - 3 2 5

69 Md. Abdul Majid Bora Bari 75 - .00 - 3 - 1 - 1 1 - 1 1 2 6 8

70 Md. Abdul gafur Bora Bari 49 - Business 1 1 2 1 - 2 - 1 1 - - 5 4 9

71 Md. Ayub All Bora Bari 26 - Day labourer 1 1 - - - - 1 1 - - - - 2 2 4

72 Md. Abdul Barik Bora Bari 45 5 Day labourer - 2 - 1 - - - 1 1 - - - 1 4 5

73 Md. Abdul Halim Bora Bari 30 - Labourer 2 1 1 - - - 1 1 - - - - 4 2 6

74 Md. Abul Hashem Bora Bari 35 - Day labourer - 1 1 - - 1 - 1 1 - - - 2 3 5

75 Md. Abdur Satter Bora Bari 30 - Labourer - 1 - - - - 1 1 - - - - 1 2 3

76 Md. Abdul Malek Moulavi (South) 48 - Day labourer 3 - 1 1 1 - - 1 1 - - - 6 2 8

77 Md. Shafiqur Rahaman Moulavi (South)

40 - Farmer - 1 1 1 1 1 1 1 3 4 7

177

Page 183: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total a o U

c c

c ° a d d d a a a d d d a ar a a

U. (5 V U. U. LL LL LL U. LL

LL p+ O

78 Md. Aslam Miah Moulavi (South) 36 - Rickshaw Puller 1 1 1 - 1 1 1 - - 3 3 6

79 Md. Rostam All Moulavi (South) 43 5 Business 1 - - 1 2 3 1 1 1 - - 6 4 10

80 Md. Farid Miah Moulavi (South) 38 5 Business - 1 1 2 - - - 1 1 - - 3 3 6

81 Md. Kalu Miah Moulavi (South) 30 - Day labourer 1 2 - - 1 1 - - - - 2 3 5

82 Md. Shafiqur Rahaman Moulavi (South) 50 10 Day labourer 1 - 1 - 1 - - 1 1 - - 2 3 5

83 Md. Babul Miah Moulavi (South) 40 8 Mason - 1 1 1 - 1 - - 1 1 - - 2 4 6

84 Md. Khokan Miah Moulavi (South) 27 8 Business - 1 - - 1 1 - - - - 1 2 3

85 Md. Abul Khyer Moulavi (South) 18 9 Business - - - - - - 1 1 - - - - 1 1 2

86 Md. Abdul Mannan Moulavi (South) 32 - Day labourer 2 1 - 1 - - - 1 1 - - - 3 3 6

87 Ms. Arshadi Begum Moulavi (South) 42 - House wife - - - 2 2 - - - - 1 - - 2 3 5

88 Md. Yasin Miah Moulavi (South) 55 5 .00 - - - - - - - - 1 1 - - 1 1 2

178

Page 184: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total

v° o c + = ° w w w

.9 d -6 .2

am

7i A! w a,

Q .

o. m E

m E

m E m

E m E

m E is E ILL U W ILL U. U. U ti U.

W Q+ 0

89 Md. Monjur Hossain Moulavi (South) 30 - Day labourer 1 1 2 1 1 - - - - 2 4 6

90 Md. Matin Miah Moulavi (South) 25 - Day labourer 1 - - - - - 1 1 - - - - 2 1 3

91 Md. Joynal Abedin Moulavi (South) 35 - Day labourer 2 1 - - - - - 1 1 - - - 3 2 5

92 Md. Ali Ullah Molavi 35 - Day labourer 1 1 2 - 1 - 1 1 - - 2 5 7

93 Md. Khalil Miah Moulavi (South) 24 - Day labourer - 2 - - - - 1 1 - - - - 1 3 4

94 Md. Julphe Ali Moulavi (South) 75 - Farmer - 2 2 1 1 1 1 1 1 1 5 6 11

95 Md. Wazi Ullah Moulavi (South) 70 - Farmer - 1 - - - - 1 1 - 1 1 - 2 3 5

96 Md. Bazlu Miah Moulavi (South) 50 - Day labourer 1 1 - 1 1 1 - - 1 1 - - 3 4 7

97 Md. Hafez Miah Molavi 50 - Day labourer - 2 - 2 2 - 1 - 1 1 - - 4 5 9

98 Md. Fayez Ahmed Molavi 45 - Day labourer 1 - 1 - - 1 - 1 1 1 - - 3 3 6

99 Md. Abad Miah Molavi 38 - Day labourer 1 1 - 1 - 2 1 1 1 1 - - 3 6 9

179

Page 185: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total

o c c

C

° d d ai v d a a

a 4.0

1

CL m m

E 4 f f d f 4 4 = f a i i a 4) a i i a

W o, o

100 Md. Abdur Rahim Moulavi (South) 39 5 Wage Earner - 1 1 1 1 1 2 3 5

101 Md. Abdul Karim Moulavi 28 - Day labourer - 1 - - - - 1 1 - - - - 1 2 3

(South)

102 Md. Abdul Khaleq Molavi 45 - Day labourer - - - 1 - - - - 1 1 - - 1 2 3

103 Md. Abdur Rashid Molavi 43 - Day labourer 2 - 2 - - 2 - - 1 1 - - 5 3 8

104 Md. Chanu Miah Molavi 35 - Business - 2 1 1 - - - - 1 1 - - 2 4 6

105 Md. Nur Miah Molavi 36 - Rickshaw Puller - 1 2 1 1 - - - 1 1 - - 4 3 7

106 Md. Mokhlesur Rahaman Molavi 30 - Day labourer - - - 1 1 - 1 1 - - - - 2 2 4

107 Md. Abed All Abed All 52 5 Farmer 1 1 - - - - 4 2 1 1 - - 6 4 10

108 Md. All Hossain Abed All 28 5 Farmer 1 1 - - - - 1 1 - - - - 2 2 4

109 Md. Mostafizur Rahaman Abed All 40 5 Farmer 2 - - 1 3 - - - 1 1 - - 6 2 8

180

Page 186: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 11-15 15-30 30-64 65+ Total Grand

head Total

U M O G

= a) (D d W d/ a W

rn -W

U. U U U. U. U. U... U- U.,.

W Cy 0

110 Md. )aural Haq Abed All 45 - Business - 2 2 - - - - 1 1 - - 3 3 6

111 Md. Amor All Masjeed 70 - Farmer 1 1 - - - - 1 1 - - 1 - 3 2 5

112 Md. Mokosh All Masjeed 25 - Day labourer 1 1 - - - - 1 1 - - - - 2 2 4

113 Md. Abdul Mannan Masjeed 30 8 Business 1 1 - - - - 1 1 - - - - 2 2 4

114 Md. Momtaz miah Masjeed 25 - Day labourer - - - - - - 2 1 - 1 - - 2 2 4

115 Md. Nazir Ahmed Masjeed 60 - Farmer 1 - 1 - 2 1 - - 3 2 5

116 Md. Nazir Ahmed Masjeed 20 - Rickshaw Puller - 1 - - - - 1 1 - - - - 1 2 3

117 Md. Abdur rahaman Masjeed 41 - Business 1 1 - 2 - 2 - 1 1 - - 2 6 8

118 Md. All Akbar Sarder Sarder 72 - Day labourer 1 - - 1 - - - - - 1 1 1 2 3 5

119 Md. Hazier Rahaman Sarder 35 - Rickshaw Puller 1 2 - - - - - 1 1 - - - 2 3 5

120 Moulana Abdul Kader Moulavi

42 Alim Teacher 1 - 1 2 - - - - 1 1 - - 3 3 6 (North)

181

Page 187: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Age of the population Name of the Household Name of Bari Household Head --5 6-10 1i-15 15-30 30-64 65+ Total Grand

head Total a,

o U c c ° a, d a, a, a, a, a,

CM iv f f E E

LL c = aa,

LL f aa,

LL aa,

LL aa,

LL aa,

LL aa,

LL a i U. =

W & 0

121 Md. Abdul Khaleq Moulavi 55 - Rickshaw Puller 1 2 1 1 - - - - 1 1 - - 3 4 7 (North)

122 Md. Nurul Islam Nurulislam 65 - Farmer - 1 - - - - - - 1 1 1 - 2 2 4

123 Md Amir Hossain Nurulislam 35 - Wage Earner - 1 1 - - 1 1 1 1 - - - 3 3 6

124 Md. Akter Hossain Nurulislam 30 - Day labourer - 2 - 2 - 1 1 - - - - 1 5 6

125 Md. Tazul Islam Nurulislam 55 - Rickshaw Puller 1 1 - 1 - - - - - 1 1 - 2 3 5

126 Md. Khorshed Alam Nurulislam 22 - Rickshaw Puller - - - - - - 1 1 - - - 1 1 2

127 Md Monir Hossain Nurulislam 30 - Wage Earner - - - - - - 1 - 1 - - 1 1 2

128 Md. Moktul Hossain Nurulislam 55 - Business - - 2 - - 2 2 - 1 1 - - 5 3 8

129 Md. Zafar Miah Nurulislam 35 - Business 2 1 - 1 - - - 1 1 - - - 3 3 6

130 Md. Abdul Hakim Abdul Hakim 27 - Farmer - - 1 1 - 1 2 1 - - - - 3 3 6

131 Md. Abdullah Abdul Hakim 24 5 Day labourer - 1 - - - - 1 1 - - - - 1 2 3

132 Md. Shahadat Abdul Hakim 22 - Rickshaw Puller - - - - - - 1 1 1 1 2

133 Md. Nizam Uddin Abdul Hakim 24 - Labourer 1 - - - - - 1 1 - - - 2 1 3

182

Page 188: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EDUCATION AND TRAINING

Page 189: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Deokher Information about Education Number Skill Training

6-10 years child 11-15 years old 16-18 years old 18+ Age of person Going Not going Going Not going Literate Illiterate Literate Illiterate Passed Number Subject

U School school after School school after SSC or of Person Admission Admission HSC

m U. , i >

m M

a i a f0

ai f0

a a f0

a f0

CO C7 CO i9 CO m to f E m E , E

W E a)

M x E CU

M f E , E CU

U. U. LL. U. U- U. U

1 1 0 0 0 0 0 0 1 1 0 0 0 1 0 1 1 0 0 0 0

2 0 1 0 0 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0

3 0 0 0 0 0 0 0 0 0 1 0 0 2 3 0 0 1 1 0 0

4 0 0 0 0 2 1 0 0 0 0 0 0 1 1 0 0 1 0 0 0

5 0 0 0 0 0 0 0 0 1 1 0 0 2 1 0 0 1 1 0 0

6 0 0 0 0 1 0 0 0 0 0 0 0 2 3 0 0 1 2 0 0

7 0 1 0 0 1 0 0 0 0 0 0 0 2 1 0 0 1 1 0 1 Sewing

8 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 2 0 0 0 0

9 0 0 0 0 0 0 0 0 1 0 0 0 1 1 1 1 0 0 0 1 Sewing

10 1 2 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

11 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 3 0 0 0 0

184

Page 190: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 ears child 11-15 years old 16-18 ears old 18+ Age of person

0 ?.

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

co LL >.

L -- m°

i C7 m°

% C7 m°

i t7 f°

d fC

E ti

M f d IC E Ui

M

d IC

E LL

f

a, fO

E LL

M

a, fC E LL

10

a, to

E LL

a C E LL

12 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 0 0 0

13 2 0 0 0 0 0 0 0 0 1 0 0 1 1 1 1 0 0 0 0

14 0 0 0 0 1 0 0 0 1 0 0 0 3 2 0 1 3 2 0 0

15 0 0 0 0 1 1 0 0 0 0 0 0 4 1 0 0 0 0 0 0

16 0 2 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0

17 1 0 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0 0 0

18 0 0 0 0 0 1 0 0 1 0 0 0 4 0 0 1 1 0 0 0

19 1 0 0 0 1 0 0 0 1 0 0 0 1 0 0 1 0 0 0 0

20 0 2 0 0 0 2 0 0 0 0 0 0 4 1 1 2 0 0 0 0

21 0 1 0 0 1 1 0 0 0 0 0 0 1 1 1 1 0 0 0 0

22 0 1 0 0 2 0 0 0 0 0 0 0 0 2 3 1 0 0 0 0

23 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0

185

Page 191: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 years child 11-15 years old 16-18 years old 18+ Age of person

M Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

E

LL CO c CO - 0 CO W M f

d

E ' U-

M f a

E ' U.

M 2

ai

E a U-

ai

E ' U-

M f a

E N U.

M

ai

E w N.

M f a E a'

24 1 0 0 0 0 0 1 0 0 0 0 0 2 0 0 1 1 0 0 0

25 0 0 0 0 1 1 0 0 2 0 0 0 1 0 1 1 0 0 0 0

26 0 1 0 0 0 0 0 1 1 0 0 0 0 0 1 1 0 0 0 0

27 0 0 0 0 0 2 0 0 0 0 0 0 0 1 1 0 0 0 0 0

28 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0

29 1 0 0 0 0 0 0 0 0 0 0 0 1 1 0 1 0 0 0 0

30 0 1 0 0 0 0 0 0 1 0 0 0 0 0 1 1 0 0 0 0 .

31 1 0 0 0 2 1 0 0 0 2 0 0 2 0 1 2 1 0 0 0 .

32 0 1 0 0 0 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

34 2 0 0 0 1 0 0 0 0 0 0 0 1 0 0 2 0 0 0 0 .

35 0 0 0 0 1 0 0 0 1 0 0 0 3 1 1 1 1 0 0 0 .

186

Page 192: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 ears child 11-15 years old 16-18 ears old 18+ Age of person

U Z,

Going School

Not going school after

Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

a

CO C7 CO C7 m

C7 m C7 E U.

d E

LL.

y a,

E U.

w

E U.

y

E U.

a

E U-

y °1

E U.

36 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

37 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0

38 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

39 0 1 0 0 0 0 1 0 1 0 0 0 1 1 0 0 1 0 0 0

40 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

41 0 0 0 0 0 0 0 1 0 0 0 0 2 0 1 1 1 0 0 0

42 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

43 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0

44 0 0 0 0 0 1 0 0 0 1 0 0 0 1 2 1 0 0 0 0

45 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 1 Sewing

46 0 0 0 0 1 1 0 0 0 1 0 0 2 0 2 2 0 0 0 0

47 0 1 0 0 1 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

187

Page 193: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 ears child 11-15 years old 16-18 years old 18+ Age of person

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

E U. .

° CO

% . 0 CO - . 0 ` 0

Co

dJ R

C! f0 E ' f

d f0 E LL

1° f N f0 E

U. 'Q x

_N M E U.

47

R

N M E

LL

N 10

E

W f0 E

48 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

49 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

50 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 0 0

51 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

53 0 1 0 0 0 0 1 0 0 1 0 0 0 0 1 2 0 0 0 0

54 0 2 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

55 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

56 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 1 0 0 0 0

57 0 0 0 0 1 0 0 0 0 0 0 0 2 0 0 1 0 0 0 0

58 0 0 0 0 1 1 0 0 0 0 0 0 2 2 0 1 0 0 0 0

59 0 1 0 0 0 1 0 1 1 0 0 0 0 0 2 0 0 0 0 0 .

188

Page 194: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 ears child 11-15 years old 16-18 ear s old 18+ Age of person

Going School

Not going school after Admission

Going School

Not going school after

Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

£ M

m c to - m t to c f°

a

E a U-

M f a

E a LL

f _d

E a LL

a

E a U-

x

_d

E a U-

'a

a

E a,

LL

' F

a

E a U.

60 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1 0 0 0 0

61 1 0 0 0 1 0 1 0 0 0 0 0 0 0 1 1 0 0 0 0

62 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0

63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0

64 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0

65 1 0 0 0 1 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

66 1 0 0 0 0 0 0 0 0 0 0 0 1 0 3 3 0 0 0 0

67 0 1 0 0 0 0 1 0 0 0 0 0 2 1 1 1 0 0 0 0

68 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 1 0 0 0 0

69 0 0 0 0 0 1 0 0 0 0 0 0 0 0 2 2 0 0 0 0

70 0 2 0 0 0 0 1 0 1 0 0 0 1 0 1 1 0 0 0 0

71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

189

Page 195: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 years child 11-15 years old 16-18 years old 18+ Age of person

3 T

Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

E

m° m° m° 0 1a

x

m

E LL

.a

x

a

E LL

ro

x

ai

E U.

x m

E LL

' x

a,

E U. x

m

E w x

a E U.

72 0 1 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

73 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

74 1 0 0 0 0 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0

75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

76 1 1 0 0 0 0 1 0 0 0 0 0 0 0 1 1 0 0 0 0

77 1 1 0 0 0 1 0 0 1 0 0 0 0 0 1 1 0 0 0 0

78 0 1 0 0 1 0 0 0 0 0 1 0 0 0 1 1 0 0 0 0 .

79 0 0 0 0 1 2 0 0 1 0 1 0 1 1 1 1 0 0 0 0 .

80 0 1 0 0 2 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

82 0 1 0 0 0 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

83 1 1 0 0 0 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 .

190

Page 196: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 ears child 11-15 years old 16-18 ear s old 18+ Age of person

3 Going School

Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

M M

CO c7 m t9 m° V CO C7 M x

a

E d U.

x N

E w U.

x 47

E w

LL

iv x C7

E w L M f

N

E m LL

M x N

E w U.

M

Gl

E LL

84 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

85 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

86 0 1 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

87 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0

88 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

89 0 2 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

92 0 2 0 0 0 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0

93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

94 1 0 0 0 0 1 0 0 0 0 0 0 0 1 3 2 1 1 0 0

95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0

191

Page 197: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 ears child 11-15 years old 16-18 ear s old 18+ Age of person

$ a

Going School

Not going school after

Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

LL. m L

C7 m°

L L7 CO

L C7 CO

L (9

to ffl E

LL M f f

E U.

M f fC

E U

° M f fa

E U

M a E LL

M f .o E ii E

ro E Ui

108 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

109 0 1 0 0 3 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0

110 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

111 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 0 0 0 0

112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

113 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

114 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0

115 0 0 0 0 0 0 0 0 0 0 0 0 2 0 1 1 2 0 0 0

116 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

117 0 2 0 0 0 2 0 0 0 0 0 0 0 0 1 1 0 0 0 0

118 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 0 0 0 0

119 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

193

Page 198: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 ears child 11-15 years old 16-18 ears old 18+ Age of person

Going Not going Going Not going Literate Illiterate Literate Illiterate Passed Number Subject $ School school after School school after SSC or of Person ?, Admission Admission HSC

£ a, a, a, a a a, a,

m° m° m° m° M F E

m M f E

m ' F E

a, '° f E

w '° S

E w

'° f E m S

E w

U. U. U. LL. U. U.

96 0 1 0 0 1 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0

97 0 2 0 0 1 0 1 0 0 0 1 0 0 0 1 1 0 0 0 0

98 0 0 0 0 0 1 0 0 0 0 0 0 0 1 1 1 0 0 0 0

99 0 1 0 0 0 1 0 0 0 0 0 0 0 0 2 2 0 0 0 0

100 1 0 0 0 0 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0

101 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

102 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

103 2 0 0 0 0 2 0 0 0 0 0 0 0 0 1 1 0 0 0 0

104 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

105 2 1 0 0 1 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

106 0 1 0 0 0 0 1 0 0 0 0 0 0 0 1 1 0 0 0 0

107 0 0 0 0 0 0 0 0 0 0 0 0 5 2 0 1 0 0 0 0

192

Page 199: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number Skill Training 6-10 years child 11-15 years old 16-18 years old 18+ Age of person

Going School

Not going school after

Admission

Going School

Not going school after

Admission

Literate Illiterate Literate Illiterate Passed SSC or

HSC

Number of Person

Subject

E LL. >.

CA

i . m°

i C7

> m°

L m°

L 0 '°

a

E U.

M

m

E tL

'v f a

E .o

m l E

ILL

M

ai m E IL

'° d IO E IL

a IC E W

120 1 2 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 0 0 0

121 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

122 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 0 0 0 .

123 1 0 0 0 0 1 0 0 0 0 1 0 0 0 1 1 0 0 0 0

124 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

125 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

126 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

127 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0

128 2 0 0 0 0 2 0 0 1 0 0 0 1 0 1 1 0 0 0 0 .

129 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

130 1 1 0 0 0 0 0 0 0 0 1 0 0 0 1 1 0 0 0 0 .

131 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

132 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

133 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 .

194

Page 200: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NATURE OF LAND OWNERSHIP, ITS UTILIZATION, INCOME

AND EXPENDITURE

Page 201: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Deokher

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

E r ft Cultivable Pond Kua . 0 c land L N o c c C

O O 'O C. w C M

-+ to C c y -' 'C 3 3 _+ V L ++

0 W Z c 0 Q

ul C. 10

y L Q, N M+ L O L c

M R -0 a1

c u O ru

O O .C U

0 r... > r0

N o

. I L c O

N V J U

c N C. !Q H 0 `/ E o O m O r+ .n L. M w

N O a "' A= L ( .J

L U. w M

L d O L

.C C v a + 3a c`m t Q o = a °1 ' =. < =° a

w 3 oZ f0U

3 w 0 f 0 y M

- z z z 30 . M

1 .10 .80 .00 .90 .10 .80 .00 .00 .00 .00 .00 .80 .00 .00 .00 .00 70000 3000

2 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 40000 3000

3 2.50 .00 .80 1.70 .16 1.20 .14 .00 .20 .00 .00 1.20 .14 .00 .20 .00 40000 4000

4 2.78 .00 1.60 1.18 .18 .56 .24 .00 .20 .00 .00 .56 .24 .00 .20 .00 60000 3000

5 2.62 .00 1.20 1.42 .18 .80 .24 .00 .20 .00 .00 .80 .24 .00 .20 .00 98000 6000

6 3.10 .00 2.24 .86 .10 .30 .14 .00 .32 .00 .00 .30 .14 .00 .28 .04 54800 3000

7 1.22 .00 .70 .52 .10 .00 .10 .00 .32 .00 .00 .00 .10 .00 .28 .04 84000 4500

8 .04 .20 .00 .24 .02 .20 .00 .00 .02 .00 .00 .20 .00 .00 .02 .00 25000 2100

9 .18 .80 .00 .98 .02 .94 .00 .00 .02 .00 .00 .94 .00 .00 .02 .00 60000 3500

10 .07 .40 .00 .47 .02 .40 .00 .00 .05 .00 .00 .40 .00 .00 .05 .00 40000 3000

11 .03 .12 .00 .15 .02 .12 .00 .00 .01 .00 .00 .12 .00 .00 .01 .00 30000 2500

12 .37 .00 .28 .09 .05 .00 .00 .00 .04 .00 .00 .00 .00 .00 .04 .00 90000 5000

196

Page 202: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

a! '-

M t , n Cultivable Pond Kua V c , c

"- Ch M v 0" land U 10 ar *,

M

° C t '" C d

° -OD y y

V- C M C C ' O C O -0 '= 0 O L C - E W >

M a 0 I C. M f 4l >.. y i i C C1 U fp jp U .fl >_ U- .

V 0 J C +C+

.C.1 L7 0J

m M d

H i r1 . E O

d7 +-+ it f0 y N O C i 10 J a.

N. V C N vl

y am= r, 0 7 i C

0 3 s FA -- 0 CL in z z °- '°

Z 3 0 3 f0 N

N w

13 1.84 .40 .00 2.24 .17 1.74 .15 .00 .18 .00 .00 1.80 .09 .00 .08 .10 65000 3000

14 2.61 .00 1.40 1.21 .23 .72 .04 .00 .22 .00 .00 .72 .04 .00 .18 .04 90000 5000

15 1.08 .00 .26 .82 .08 .58 .10 .00 .00 .00 .06 .58 .10 .00 .06 .00 80000 3000

16 3.61 .00 1.79 1.82 .08 1.20 .36 .00 .12 .00 .06 1.20 .36 .00 .14 .04 85000 4000

17 5.26 .00 .00 5.26 .16 4.40 .46 .00 .12 .00 .12 4.40 .46 .00 .20 .04 95000 5000

18 1.08 .98 .00 2.01 .16 1.43 .22 .00 .20 .00 .00 1.43 .22 .00 .16 .04 95000 4000

19 .91 .00 .32 .59 .09 .28 .10 .00 .12 .00 .00 .28 .10 .00 .08 .04 24000 2000

20 7.80 .00 2.20 5.60 .50 4.00 .80 .00 .18 .00 .12 4.00 .80 .00 .30 .00 200000 7000

21 5.20 .00 1.40 3.80 .14 2.80 .40 .00 .36 1.00 .10 2.80 .40 .00 .36 .10 96000 5000

22 1.13 .20 .00 1.33 .05 1.20 .06 .00 .02 .00 .00 1.00 .26 .00 .00 2.00 72500 4000

23 .19 .30 .00 .49 .09 .30 .04 .00 .02 1.00 .04 .30 .04 .00 .06 .00 45000 3000

24 .41 .00 .20 .21 .09 .00 .06 .00 .02 1.00 .04 .00 .06 .00 .06 .00 84000 4000

197

Page 203: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E 1

E Cultivable Pond Kua 8

M land L o :M C z d 4- CL

.1.0 E C d C L2

I' o G C N d C i C = G1 U V w U.

0 U CL

U C

19 CJ -

h L Ol \ U _ 'C

(0 y r O Q E O (0 J

N (A

M ' . (0 O V 1

M C O

03 Y C (A t°- a (n Za z a G) L.

z 30` r M N M Q w

25 2.03 .00 .70 1.33 .37 .80 .00 .00 .16 .00 .00 .80 .00 .00 .16 .00 75000 3000

26 .09 .40 .00 .49 .09 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 60000 3500

27 .09 1.60 1.60 .09 .09 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 56000 3000

28 .09 .00 .00 .09 .09 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 30000 2000

29 .27 .20 .00 .47 .15 .20 .08 .00 .04 .00 .00 .20 .08 .00 .04 .00 30000 2000

30 .49 .00 .00 .49 .10 .36 .03 .00 .00 .00 .00 .36 .03 .00 .00 .00 36000 3000

31 .00 1.20 2.30 .16 1.60 .40 .00 .14 .00 .00 1.60 .40 .00 .14 .00 90000 5000 .00

32 .40 .00 .50 .08 .40 .00 .00 .00 1.00 .02 .40 .00 .00 .02 .00 65000 3000 .40

33 .24 .00 .24 .00 .24 .00 .00 .00 .00 .00 .24 .00 .00 .00 .00 36000 3000 .24

34 .00 .00 .18 .14 .00 .00 .00 .04 .00 .00 .00 .00 .00 .04 .00 72000 3500 .00

35 .19 .10 1.27 .10 .80 .10 .00 .27 .00 .00 .80 .10 .00 .27 .00 80000 5000 .19

36 .10 .00 .12 .02 .10 .00 .00 .00 .00 .00 .10 .00 :00 .00 .00 24000 2000 .10

198

Page 204: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a Z. E

m

E r v Cultivable Pond Kua C: 0 4' 0 = c

u- = v, ; land ° . H a c c - z roo -0 "o C+ w c i v V °w ,

M CL 0

w L

c + . _ O U

c ° y

c y .

c O

= E `

E o a. y y

v N 7 '°U _

o 0 3 ca

FA a

U' i z = a z >- y z d 0

37 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000 2000 .00

38 .00 .00 .11 .03 .00 .00 .00 .08 .00 .00 .00 .00 .00 .08 .00 10000 800 .00

39 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 72000 4000 .00

40 .99 .00 1.73 .08 1.16 .00 .00 .49 .00 .00 1.16 .00 .00 .49 .00 70000 4000 .99

41 .16 .60 .00 .76 .03 .70 .00 .00 .03 .00 .00 .70 .00 .00 .03 .00 20600 1800

42 .01 .00 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 19200 1600

43 .01 .00 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 30000 2500

44 .05 .00 .00 .05 .02 .00 .00 .00 .03 .00 .00 .00 .00 .00 .03 .00 48000 3000

45 .01 .00 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 31600 1800

46 .13 .00 .00 .13 .06 .00 .00 .00 .07 .00 .00 .00 .00 .00 .07 .00 101000 4500

47 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 21600 1800

48 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18500 1500

199

Page 205: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) d E

Cultivable Pond Kua a . _ 0 U w C U. G!

land . N 'ra =

p c H = ' n .

z .d i c V U

O fp . V M U. p

J f0 J V

' M M O

CL f0 +

E W

m y-

O &"' c

O 01

= i J 1 .o

L= y t 0 C 7

3 a 3 0 2 F W f- u z z z 3 ,0 } 49 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 21600 1800

50 .04 .00 .00 .04 .01 .00 .00 .00 .03 .00 .00 .00 .00 .00 .03 .00 18400 1800

51 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000 2000

52 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

53 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000 2000

54 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 33600 2800

55 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000 2000

56 .10 .10 .00 .20 .06 .10 .04 .00 .00 .00 .00 .10 .00 .00 .00 .00 36000 2000

57 .64 1.20 .00 1.84 .12 1.56 .08 .00 .08 .00 .00 1.56 .08 .00 .08 .00 72000 3000

58 3.46 .00 .00 3.46 .26 2.80 .20 .00 .20 .00 .00 2.80 .20 .00 .20 .00 140000 6000

59 .06 1.60 .00 1.66 .06 1.60 .00 .00 .00 .00 .00 1.60 .00 .00 .00 .00 72000 3500

60 .12 .00 .04 .08 .08 .00 .00 .00 .04 .00 .00 .00 .00 .00 .04 .00 36000 3000

200

Page 206: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

a,

E ^ N L Cultivable Pond Kua °' V c c U. w N-O M land G ? 7 O H c , 41 E c J x ° n O M . c ° v 3 'p ' E p V c

CL

0 H C c 0 73 0 10 M

L J V M d fC

+ y-1 E m O ++ f0 d7 O .0 .0 c i. f0

J L t N - N N O O L+ d7 L 2 0 3 i c

' °' 3 °1 e cn z z z

61 .57 .19 .40 .36 .13 .00 .00 .00 .23 .00 .00 .00 .00 .00 .23 .00 50000 2100

62 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000 2700

63 .22 .00 .00 .22 .02 .11 .02 .00 .07 .00 .00 .11 .02 .00 .07 .00 36000 2400

64 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 17000 1400

65 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000 2800

66 1.01 .00 .40 .61 .07 .40 .05 .00 .09 .00 .00 .40 .05 .00 .09 .00 72000 4000

67 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 70000 3500

68 .75 .00 .00 .75 .12 .60 .00 .00 .03 .00 .00 .60 .00 .00 .03 .00 50000 3500

69 .39 .00 .00 .39 .08 .24 .00 .00 .07 .00 .00 .24 .00 .00 .07 .00 40000 2500

70 .10 1.20 .00 1.30 .08 1.22 .00 .00 .00 .00 .00 1.22 .00 .00 .00 .00 72000 3000

71 .05 .20 .00 .25 .01 .24 .00 .00 .00 .00 .00 .24 .00 .00 .00 .00 24000 2000

72 .23 .40 .00 .63 .04 .56 .00 .00 .03 .00 .00 .56 .00 .00 .03 .00 30000 2500

201

Page 207: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) ?

d E L ,

E t , a- Cultivable Pond Kua .n c 4. 8

w 3 land a`, c >

o _ _ O 0'0 d o w C .4 M H C +' O C p C O E

W Z g o .d +`- c 01 U M 'R w? U. :p..

J Cl -J V iC t O W 0 'O m i. a O C J L t d N ` a.+ 0 U

r_

3 C " c = a Ea c " o 3 o L C > z z z

73 .01 1.20 .00 1.21 .01 1.20 .00 .00 .00 .00 .00 1.20 .00 .00 .00 .00 36000 3000

74 .01 .80 .00 .81 .01 .80 .00 .00 .00 .00 .00 .80 .00 .00 .00 .00 36000 3000

75 .00 .60 .00 .60 .00 .60 .00 .00 .00 .00 .00 .60 .00 .00 .00 .00 30000 1000

76 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

77 .04 .12 .00 .16 .04 .12 .00 .00 .00 .00 .00 .12 .00 .00 .00 .00 18000 1500

78 .06 .15 .00 .21 .06 .15 .00 .00 .00 .00 .00 .15 .00 .00 .00 .00 18000 1500

79 .22 .85 .00 1.07 .16 .85 .00 .00 .00 .00 .06 .85 .00 .00 .06 .00 24000 2000

80 .11 .20 .00 .31 .07 .20 .00 .00 .00 .00 .04 .20 .00 .00 .00 .04 18000 1500

81 .11 .10 .00 .21 .05 .12 .00 .00 .00 .00 .04 .12 .00 .00 .00 .04 12000 1500

82 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

83 .10 .00 .00 .10 .06 .00 .00 .00 .00 .00 .04 .00 .00 .00 .00 .04 18000 1500

84 .10 .00 .00 .10 .06 .00 .00 .00 .00 .00 .04 .00 .00 .00 .00 .04 24000 2000

202

Page 208: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E t ̂ N L Cultivable Pond Kua °

o

0 .' v ` ^ v land L v W '-p ° V) C ~" a

CL = ° x c ° v 3 p v L. 06 M L U is r a W E .° CO O .0 L ,0 U 0

0 = L

Ta -+ LL. L = a. 4j O U

C ° O c Vf O

" IS O

= V

°1 E a i

.4 - E o

m L J

L r N h of . y 7 '° i y C

0 3 c d a a L 3 3 : 2= y

F.- n z z d z ,0

85 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

86 .03 .47 .00 .50 .03 .40 .00 .00 .07 .00 .00 .40 .00 .00 .07 .00 18000 1500

87 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

88 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

89 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

90 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

91 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

92 .24 .36 .06 .54 .05 .37 .05 .00 .07 .00 .00 .37 .05 .00 .07 .00 36000 3000

93 .15 .40 .00 .55 .05 .47 .03 .00 .00 .00 .00 .47 .03 .00 .00 .00 24000 2000

94 2.25 .00 .00 2.25 .15 1.87 .16 .00 .07 .00 .00 1.87 .16 .00 .07 .00 36000 3000

95 .43 .00 .00 .43 .08 .28 .00 .00 .07 .00 .00 .28 .00 .00 .07 .00 18000 1500

96 .06 .30 .00 .36 .06 .30 .00 .00 .00 .00 .00 .30 .00 .00 .00 .00 18000 1500

203

Page 209: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) V E L

N Cultivable Pond Kua -o 0

M land a > > y c ? n '- .. , c 0 -0'0 N

.C w C M O C i D a+ E

W Z m A LO '17 L C M+ O - d L O L O1 10

U m .a V 0 w IL

O J 0

O V J

IC C D y 0 I u E

O 10 0 m d 4:

L. .0 (p ` GJ O d O i O L f0 J L U. a. t N Vl

L 'a IV 0 0 -W i L C 0

U C a +

f0 y

c ` [ c a o = a °' I-- p0. a E L. J o f U '° 3 M o

0 3 I a :2 y 5 F- cn z z a z 3 ,0 3 . E

97 .04 .18 .00 .22 .04 .18 .00 .00 .00 .00 .00 .18 .00 .00 .00 .00 17000 1400

98 .04 .40 .00 .44 .04 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 21000 1700

99 .12 .50 .00 .62 .04 .58 .00 .00 .00 .00 .00 .58 .00 .00 .00 .00 18000 1500

100 .04 .60 .00 .64 .04 .60 .00 .00 .00 .00 .00 .60 .00 .00 .00 .00 20000 1800

101 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

102 .92 .00 .00 .92 .05 .80 .00 .00 .07 .00 .00 .80 .00 .00 .07 .00 24000 2000

103 .95 .00 .00 .95 .05 .83 .07 .00 .00 .00 .00 .83 .07 .00 .00 .00 23000 1900

104 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

105 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

106 .06 .20 .00 .26 .06 .20 .00 .00 .00 .00 .00 .20 .00 .00 .00 .00 24000 2000

107 1.02 .00 .00 1.02 .06 .80 .10 .00 .00 .00 .06 .80 .10 .00 .06 .00 36000 3000

108 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 12000 1000

204

Page 210: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w

E Cultivable Pond Kua V o } emu c LL

C v land _ M w U) 41 0

-- y C , , ? n O p x d O pl

= M N

,w+ Vl C C O +

13 O C 3 p = L a+

O f0 E M Z C

M Vl O M OL

N L d C M

N L L C lp Gl U O fp

O O V

p .0 Y-. > lL J L d J V = 0. O ei E

O m 4! i.+ 0 L. lp N O C i IC J L

U. L t L. = W N 7 ' +L+

CM L- -- x '0 . E 0 _ W Vl

03 y 1n z z°' L. Z 0 3 >- f M

109 1.12 .00 .00 1.12 .06 .90 .10 .00 .00 .00 .06 .90 .10 .00 .06 .00 40000 3000

110 1.12 .00 .00 1.12 .06 .90 .10 .00 .00 .00 .06 .90 .10 .00 .06 .00 24000 2000

111 1.04 .00 .00 1.04 .08 .80 .06 .00 .10 .00 .00 .80 .06 .00 .10 .00 18000 1500

112 .20 .00 .00 .20 .10 .00 .00 .00 .10 .00 .00 .00 .00 .00 .10 .00 12000 1000

113 .82 .00 .00 .82 .08 .60 .04 .00 .10 .00 .00 .60 .04 .00 .10 .00 12000 1000

114 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

115 .27 .00 .00 .27 .12 .00 .05 .00 .10 .00 .00 .00 .05 .00 .10 .00 15000 1200

116 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

117 .65 .00 .00 .65 .06 .40 .08 .00 .00 .00 .11 .40 .08 .00 .00 .11 21000 1800

118 .16 .40 .00 .56 .09 .40 .00 .00 .07 .00 .00 .40 .00 .00 .07 .00 18000 1500

119 .15 .80 .00 .95 .07 .81 .00 .00 .00 .00 .07 .81 .00 .00 .07 .00 36000 3000

120 .49 .80 .00 1.29 .08 1.04 .10 .00 .00 .00 .07 1.04 .00 .00 .00 .07 36000 3000

121 .10 .00 .00 .10 .10 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 19000 1600

205

Page 211: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres)

Cultivable Pond Kua a, .

c p + 0 c =

`L. += rn ; land W

m > y > H - C

a m C L

0 M W

p C fO + O y L Lam. C O1 U 5 V . 0.0- (L 4J .a J J U C M

f0 Z CL O

M E O CO

+ M N + 6 fp 0l O M.- C N J LL z- t y

7 4-I

U C 0 3f0

GJ

C Nl CU"

.. o = . 3a L- a c 0

_ L r O N 15

++ N O '°" = o

0 3 IS E i--

0) n z z a d Z 0 #A m M

122 .59 .30 .00 .89 .16 .50 .07 .00 .16 .00 .00 .50 .07 .00 .16 .00 18000 1500

123 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

124 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

125 .52 .40 .00 .92 .20 .40 .16 .00 .16 .00 .00 .40 .16 .00 .16 .00 21000 1800

126 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

127 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 21000 1800

128 .16 .40 .00 .56 .16 .40 .00 .00 .00 .00 .00 .40 .00 .00 .00 .00 24000 2000

129 .06 .00 .00 .06 .06 .00 .00 ,00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

130 .04 .00 .00 .04 .04 .00 .00 ,00 .00 .00 .00 .00 .00 .00 .00 .00 36000 3000

131 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

132 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

133 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

206

Page 212: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ANIMAL AND FOREST RESOURCES, SOURCE OF WATER

AND NATURE OF LATRINE

Page 213: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Deokher Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water

Egg Poultry Milk Fish of Family U) v V

c Poultry Cow Goat Trees

o C C 0 a oh = C

U) Wood Fruit a Q a E

06 g o m ° c

No Died No Died No Died CL E E t .

E N (A E= s

i 2 45 C p 0) E

O o o O U . z = Z U U U U

N Q

1 12 6 2 0 0 2 15 25 0 900 180 410 0 4000 0 0 12 No Tubewell Tubewell Ringslub

2 19 15 0 0 1 0 0 0 0 600 0 0 0 0 0 0 0 No Pond Tubewell Open

3 15 17 2 1 0 0 25 20 0 1000 1150 0 4500 0 5000 0 12 Yes Tubewell Tubewell Ringslub

4 23 16 2 0 1 0 60 12 1000 0 1500 0 1500 2160 5000 0 12 Yes Tubewell Tubewell watersealed

5 25 18 2 0 0 0 65 15 250 400 900 0 1550 1650 5000 0 12 Yes Tubewell Tubewell watersealed

6 15 20 2 1 0 0 80 30 600 1000 395 0 2500 0 4000 0 12 Yes Tubewell Tubewell Ringslub

7 0 0 0 0 0 0 60 20 0 0 0 0 0 0 5000 0 0 No Tubewell Tubewell Ringslub

8 10 12 2 1 2 2 0 2 250 500 250 0 1000 4000 500 0 5 No Pond Tubewell Open

9 15 5 1 1 1 0 10 7 0 500 400 0 0 0 500 0 7 No Pond Tubewell Ringslub

10 30 16 1 0 0 0 0 7 480 353 600 520 0 0 1000 560 12 Yes Pond Tubewell Ringslub

11 20 0 1 0 3 0 0 4 100 250 250 500 0 0 1000 0 4 No Pond Tubewell Ringslub

12 0 0 0 0 0 0 20 5 0 0 0 0 0 0 2000 0 0 No Pond Tubewell Ringslub

208

Page 214: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production las t Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

C

Poultry Cow Goat Trees c LX °' c+ J c c c c C

d Wood Fruit 0

a 0

a 0 a E o 'c° w c d

0 U) No Died No Died No Died .. .. E E E E

_ u, N E f w

_ .0 h H h H N c c . m C C

° C 0 U z

z z 0 U c 7

13 20 10 2 0 0 0 0 25 100 250 500 0 0 0 5000 0 12 Yes Pond Tubewell Ringslub

14 10 15 2 0 1 0 20 30 200 300 500 0 0 0 5000 0 12 Yes Tubewell Tubewell Ringslub

15 11 18 2 0 0 0 42 15 0 0 400 0 2000 3000 4000 0 12 Yes Tubewell Tubewell Ringslub

16 15 2 0 0 0 45 15 210 400 500 0 1000 2000 4000 0 12 Yes Tubewell Tubewell Ringslub

17 ]25 8 2 0 0 0 60 40 120 600 700 0 0 0 9000 0 12 Yes Pond Tubewell Ringslub

18 20 18 4 0 0 0 70 25 200 500 800 0 2000 5000 5000 0 12 Yes Pond Tubewell Ringslub

19 17 10 0 0 4 0 10 8 0 800 0 500 0 0 4000 0 12 No Pond Tubewell Open

20 20 8 6 0 0 0 40 50 200 300 600 0 25000 3000 10000 0 12 Yes Pond Tubewell Ringslub

21 25 0 4 0 0 0 40 50 250 500 1500 0 3000 0 5000 0 12 Yes Pond Tubewell watersealed

22 14 0 2 0 0 0 15 10 120 400 300 0 0 0 1500 0 12 Yes Tubewell Tubewell Ringslub

23 2 0 0 0 0 0 20 15 0 0 0 0 0 0 2000 0 6 No Tubewell Tubewell Ringslub

24 24 15 1 0 0 0 20 12 0 1000 1200 0 0 0 2000 0 0 No Pond Tubewell Ringslub

25 25 12 1 0 0 0 22 55 160 350 1000 0 0 0 4800 0 12 Yes Pond Tubewell Ringslub

26 13 4 2 0 0 0 0 2 0 180 250 0 0 3500 0 0 6 No Pond Tubewell Ringslub

209

Page 215: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

a d n c 0

Poultry Cow Goat Trees c c c c & c c C c Wood Fruit n a a n c E

N M c ° No Died No Died No Died L L E d E m E E Z = E f

L U 3 0 0 = .a N CA N N N N :a E E C

U C U

C

U C 0

V Z Z z

27 15 0 0 0 0 0 0 2 400 0 300 250 0 0 0 0 0 No Pond Tubewell Ringslub

28 15 8 0 0 0 0 25 4 180 210 400 0 0 0 0 0 0 No Pond Tubewell Ringslub

29 12 2 0 0 1 0 0 15 150 200 0 400 0 0 0 0 6 No Pond Tubewell Ringslub

30 30 25 2 0 3 2 0 30 360 250 655 0 1000 1800 0 0 6 No Pond Tubewell Open

31 25 8 3 0 0 0 30 25 100 250 500 0 0 0 3000 0 12 Yes Pond Tubewell Ringslub

32 15 0 0 0 0 0 12 10 0 256 800 0 0 0 1000 0 12 No Pond Tubewell Ringslub

33 4 8 1 0 0 0 0 0 106 225 160 380 0 0 0 0 6 No Pond Tubewell Ringslub

34 25 9 1 0 1 0 11 26 380 175 360 235 0 0 500 200 0 No Pond Tubewell Ringslub

35 20 12 1 2 0 0 10 10 120 220 600 0 1000 1500 0 0 12 No Tubewell Tubewell Ringslub

36 12 8 0 0 0 0 0 6 80 200 300 0 0 0 0 0 4 No Tubewell Tubewell Ringslub

37 6 7 0 0 0 0 0 5 0 300 0 320 0 0 0 0 0 No Pond Tubewell .00

38 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 No Pond Tubewell .00

39 15 0 0 0 0 0 10 5 350 0 400 0 0 0 0 0 0 No Pond Tubewell Ringslub

40 15 8 2 0 0 0 20 4 180 210 500 0 1500 2000 0 0 12 Yes Pond Tubewell Ringslub

210

Page 216: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

a' a) V Poultry Cow Goat Trees C C C c .. a v, o,

y Wood Fruit c a n 0 c° c v 3 No Died No Died No Died L

. E a, a E E E a, E h E E is y

0 .0 .a N IA 4n

N 0 Vl IA Z

0 U 0 U U

Z Z U Q

41 8 4 2 0 0 0 5 10 120 280 300 450 0 0 0 0 12 No Pond Tubewell Ringslub

42 12 0 2 0 0 0 0 4 150 250 0 250 0 0 0 0 0 No Pond Tubewell Open

43 16 5 2 0 0 0 0 5 280 175 200 350 0 0 0 0 0 No Pond Tubewell Open

44 12 6 0 0 0 0 0 4 120 400 200 500 0 0 0 0 0 No Pond Tubewell Ringslub

45 0 1 0 0 0 0 0 0 0 0 300 500 0 0 0 0 0 No Pond Tubewell Ringslub

46 29 8 0 0 0 0 0 12 200 400 700 0 0 0 0 0 0 No Pond Tubewell Ringslub

47 5 0 0 0 0 0 0 0 0 450 250 200 0 0 0 0 0 No Pond Tubewell .00

48 5 5 0 0 0 0 0 0 0 500 200 350 0 0 0 0 0 No Pond Tubewell .00

49 7 4 2 0 0 0 0 0 120 400 400 0 0 0 0 0 0 No Pond Tubewell .00

50 7 8 0 0 0 0 0 4 140 380 150 350 0 0 0 0 0 No Pond Tubewell .00

51 13 0 0 0 0 0 0 0 250 160 225 330 0 0 0 0 0 No Pond Tubewell Open

52 3 5 0 0 0 0 0 0 120 250 0 0 0 0 0 0 0 No Pond Tubewell Open

53 15 10 0 0 0 0 0 0 210 295 250 450 0 0 0 0 0 No Pond Tubewell Open

54 9 5 0 0 0 0 0 2 220 200 600 0 0 0 0 0 0 No Pond Tubewell Open

211

Page 217: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

Cc

0 VA I- Poultry Cow Goat Trees o .. a c+ o,

41

c c c c r c ._ c 0 Wood Fruit

0 C L

0 0 E ° o m

c 3 No Died No Died No Died .. L

_ =

w f 0/ U 7 _ V vii N N N C C C

C C

U C U

C U

U Z Z z U Q

55 19 5 0 0 0 0 0 0 280 310 360 395 0 0 0 0 0 No Pond Tubewell Open

56 10 4 0 0 5 2 30 2 0 380 250 480 0 0 0 0 2 No Pond Tubewell Open

57 12 6 0 0 0 0 6 20 360 0 500 0 0 0 0 1000 12 No Tubewell Tubewell Ringslub

58 2 10 1 0 0 0 12 26 215 160 280 0 0 0 0 1000 12 No Tubewell Tubewell Ringslub

59 5 4 2 0 0 0 20 15 0 0 400 0 0 0 0 0 12 Yes Pond Tubewell Ringslub

60 9 20 1 0 0 0 0 3 235 385 380 600 0 0 0 0 0 No Pond Tubewell Ringslub

61 14 6 1 0 0 0 30 10 110 400 600 0 2800 0 1500 15000 0 No Pond Tubewell Ringslub

62 3 4 0 0 0 0 15 8 120 0 0 250 0 0 0 0 0 No Pond Tubewell Open

63 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 1 No Pond Tubewell Ringslub

64 3 4 0 0 0 0 0 0 0 140 0 250 0 0 0 0 0 No Pond Tubewell Ringslub

65 4 5 0 0 0 0 0 3 0 180 0 200 0 0 0 0 0 No Pond Tubewell Open

66 20 6 4 0 1 0 25 20 200 300 500 0 2800 4000 2500 0 6 No Pond Tubewell Ringslub

67 0 9 0 0 1 0 10 4 0 0 400 0 0 0 0 0 0 No Pond Tubewell Ringslub

68 15 5 3 2 0 0 30 16 200 400 500 0 1500 2500 1000 0 8 No Pond Tubewell Ringslub

212

Page 218: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production las t Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

d w

H i v Poultry Cow Goat Trees

' c c C C -r 5 E = c Wood Fruit a n n

i :

E y o y c c No Died No Died No Died E E n E Z E y E f i i a c

d

_ .O N N h y N N C C ,

M

E E C 0

C C C 0

V v Z z z U V

69 7 4 1 0 0 0 22 10 80 450 10 250 0 0 0 0 6 No Pond Tubewell Ringslub

70 4 5 2 0 0 0 0 8 120 250 250 0 4000 0 0 0 12 No Pond Tubewell Ringslub

71 11 5 0 0 0 0 0 0 125 310 200 275 0 0 0 0 6 No Pond Tubewell Open

72 13 3 2 0 0 0 9 18 225 185 380 0 500 2000 0 0 9 No Pond Tubewell Ringslub

73 9 3 0 0 0 0 0 0 120 280 600 500 0 0 0 0 12 Yes Pond Tubewell Ringslub

74 ' 12 5 0 0 0 0 0 3 240 0 0 380 0 0 0 0 8 No Pond Tubewell Open

75 6 0 0 0 0 0 0 0 125 380 360 250 0 0 0 0 12 No Pond Tubewell Open

76 15 9 0 0 0 0 4 3 300 200 200 2000 0 0 0 0 0 No Pond Tubewell Ringslub

77 11 0 0 0 4 0 7 4 200 300 400 500 0 0 0 0 6 No Pond Tubewell Ringslub

78 17 4 1 0 0 0 9 2 400 500 200 800 0 0 0 0 7 No Pond Tubewell Ringslub

79 25 6 2 0 0 0 20 10 500 800 300 1100 0 0 0 0 11 No Tubewell Tubewell Open

80 15 7 2 0 0 0 25 15 300 500 200 800 0 0 800 2000 8 No Pond Tubewell Ringslub

81 20 3 2 0 0 0 15 10 400 700 300 700 0 0 900 1500 12 No Tubewell Tubewell Open

82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 No Tubewell Tubewell Open

213

Page 219: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

a) y

b Poultry Cow Goat Trees c o . a m o, c c c

'D y C O Wood Fruit

O

n O . O

a O

c ° o O

M c a+ to No Died No Died No Died E a E u, E a E a, y E a w . c

_ a in N h N c 5 ' 0

O v O

z 3 Z O z U U U ' "

83 20 5 0 0 0 0 10 5 300 400 200 600 0 0 600 800 0 No Pond Tubewell Ringslub

84 10 0 0 0 0 0 12 7 200 100 100 100 0 0 1000 1200 0 No Pond Tubewell Ringslub

85 6 0 0 0 0 0 6 3 100 200 100 0 0 0 0 0 0 No Tubewell Tubewell Ringslub

86 9 3 0 0 0 0 8 5 100 200 300 1000 0 0 500 0 6 No Pond Tubewell Ringsiub

87 11 4 1 0 5 0 6 3 200 100 150 200 0 0 0 0 0 No Pond Tubewell Ringslub

88 2 0 0 0 0 0 3 2 0 0 0 0 0 0 0 0 0 No Pond Tubewell Open

89 5 1 0 0 0 0 0 0 0 0 200 0 0 0 0 0 0 No Both Tubewell Ringslub

90 7 2 0 0 0 0 3 3 100 0 300 200 0 0 0 0 0 No Pond Tubewell Open

91 6 1 0 0 0 0 4 3 200 100 100 0 0 0 0 0 0 No Pond Tubewell Ringslub

92 12 3 2 0 0 0 17 8 500 200 500 300 0 0 400 0 6 No Both Tubewell Ringslub

93 19 4 2 1 0 0 10 4 300 400 400 500 500 2200 0 0 12 Yes Both Tubewell Ringslub

94 25 5 4 0 0 0 50 15 500 400 600 1000 600 1500 1000 0 12 Yes Both Tubewell Ringslub

95 17 3 3 0 0 0 25 12 300 400 400 600 0 0 0 0 4 No Both Tubewell Ringsiub

96 15 5 1 0 0 0 10 3 200 500 300 800 0 0 0 0 5 No Pond Tubewell Open

214

Page 220: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

. c

c Poultry Cow Goat Trees 0 EL CM IM

C C C C c C Wood Fruit ++ a y n a c

E y c c 1° c

c d

No Died No Died No Died a E

n E

n E E

_ e N E

y ai

S0' .0 . N h N N N In C C IQ z > > U

U Z z U U U

97 10 3 1 0 0 0 10 5 100 100 200 600 0 0 0 0 6 No Tubewell Tubewell Ringslub

98 11 2 1 0 0 0 6 3 150 150 300 900 0 0 0 0 8 No Pond Tubewell Ringslub

99 17 5 1 0 0 0 15 4 300 500 400 1100 0 0 0 0 12 No Both Tubewell Open

100 20 3 0 0 0 0 20 10 200 600 200 1500 0 0 0 0 12 No Pond Tubewell Open

101 10 2 1 0 0 0 16 9 150 450 100 300 0 0 0 0 0 No Tubewell Tubewell Ringslub

102 16 3 3 0 0 0 9 3 250 500 900 200 500 1500 1500 500 12 Yes Pond Tubewell Ringslub

103 11 6 3 0 0 0 10 4 300 600 100 300 600 2500 0 0 12 Yes Tubewell Tubewell Ringslub

104 17 4 1 0 0 0 12 3 200 800 250 900 0 0 0 0 0 No Tubewell Tubewell Open

105 20 3 0 0 0 0 20 9 250 900 500 1100 0 0 0 0 0 No Tubewell Tubewell Ringslub

106 0 0 2 0 0 0 7 5 0 0 0 0 500 2000 0 0 8 No Pond Tubewell Ringslub

107 15 4 3 0 0 0 11 9 300 500 400 700 1500 3000 1500 0 12 Yes Tubewell Tubewell Ringslub

108 0 0 0 0 0 0 9 6 0 0 0 0 0 0 0 0 0 No Both Tubewell Ringslub

109 0 0 0 0 0 0 11 14 0 0 0 0 0 0 1000 0 12 Yes Pond Tubewell Ringslub

110 0 0 1 0 0 0 17 7 0 0 0 0 0 0 1200 0 12 Yes Pond Tubewell Ringslub

215

Page 221: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

O d 5

Poultry Cow Goat Trees o - a m v, o, c c c a '

Wood Fruit n o 3 rn

R c c o

No Died No Died No Died E E E E H d

a i iR

= N N N N N N C = 0 U U U

O u Z Z z

111 0 0 2 0 0 0 5 6 0 0 0 0 0 0 1800 0 8 No Tubewell Tubewell Ringslub

112 0 0 2 0 0 0 9 7 0 0 0 0 0 0 1300 0 0 No Tubewell Tubewell Open

113 0 0 2 0 0 0 1 2 0 0 0 0 0 0 1700 0 8 No Tubewell Tubewell Ringslub

114 0 0 0 0 0 0 3 1 0 0 0 0 0 0 0 0 0 No Pond Tubewell Open

115 0 0 1 0 0 0 19 14 0 0 0 0 0 0 2000 0 0 No Tubewell Tubewell watersealed

116 15 4 1 0 0 0 8 4 200 500 300 1000 0 0 0 0 0 No Pond Tubewell Ringslub

117 20 6 1 0 0 0 10 5 300 800 200 1100 0 0 0 0 12 No Pond Tubewell Ringslub

118 10 4 2 0 0 0 15 10 200 200 100 200 0 0 1900 600 7 No Tubewell Tubewell Open

119 15 7 2 1 0 0 30 10 400 600 300 800 300 800 0 0 11 No Pond Tubewell Ringslub

120 10 3 2 0 0 0 17 11 100 200 150 200 500 1000 2000 700 12 Yes Both Tubewell Ringslub

121 13 5 1 0 0 0 9 6 200 500 100 500 0 0 0 0 0 No Tubewell Tubewell Ringslub

122 7 3 0 0 0 0 20 11 100 200 150 300 0 0 250 500 8 No Both Tubewell Open

123 11 2 0 0 0 0 6 5 200 400 200 300 0 0 0 0 0 No Tubewell Tubewell watersealed

124 18 5 1 0 0 0 7 3 130 800 400 600 0 0 0 0 0 No Pond Tubewell Ringslub

216

Page 222: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number) Production last Year (in Taka) Crop Production Source s of Water Egg Poultry Milk Fish of Family

V c

v Poultry Cow Goat Trees c 0 -' EL p1 '" J c c c c c c 0

Wood Fruit 0 a

0 a

0 a

0 w E w

41 o

o N

U, M C c 0

d No Died No Died No Died E E E E u, N E d

i a 3 U c `

_ IV O Vf

N N N h H H C C 0 v y

} , ro 2

0 U C V

Q Z Z U U

125 7 0 3 0 0 0 10 5 150 300 150 300 400 1800 1500 0 8 No Pond Tubewell watersealed

126 10 2 2 0 1 0 6 2 200 500 300 1000 500 1500 0 0 0 No Pond Tubewell Ringslub

127 8 1 0 0 0 0 4 3 100 400 300 150 0 0 0 0 0 No Pond Tubewell Open

128 15 3 1 0 0 0 15 5 500 900 400 1200 0 0 0 0 5 No Tubewell Tubewell Open

129 17 5 1 0 0 0 20 6 150 450 600 1500 0 0 0 0 0 No Tubewell Tubewell Ringslub

130 12 8 0 0 0 0 10 3 200 600 150 500 0 0 0 0 0 No Pond Tubewell Ringslub

131 20 5 0 1 0 0 9 4 200 250 600 1200 0 0 0 0 0 No Pond Tubewell .00

132 10 4 0 0 0 0 11 6 100 300 300 500 0 0 0 0 0 No Tubewell Tubewell .00

133 13 3 0 0 0 0 15 7 100 700 200 600 0 0 0 0 0 No Tubewell Tubewell Open

217

Page 223: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EMPLOYMENT, FAMILY PLANNING METHOD,

NEW BORN BABY AND DISEASE

Page 224: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Deokher In formation a bout Em plo ment Adoption Last one Year

Active a2 of Family Number of Labour

Un- Under Child Labour Planning new bom Information about Disease (without considering cold, cough, and fever) force employed employed (6-14) Method babies

o d U v o, Number of

Nature of Disease Nature of Treatment r w patient v d d d T

a m c m o a

° o E E

_ LL. m E

0 U d E m i d d c

E a r '° E E '° E z 0

U- t U d

LL t U z 0,

LL U

1 3 1 1 0 0 0 0 0 1 0 0 0 0 2 0 0 Diarrhoea/Gout .00 - Rural Doctor .00 .00

2 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 - .00 .00 .00

3 1 1 0 0 1 0 0 0 1 0 0 0 0 0 0 0 .00 .00 - .00 .00 .00

4 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 - .00 .00 .00

5 3 1 1 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 - .00 .00 .00

6 1 2 0 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00 - .00 .00 .00

7 2 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 .00 Asthma - .00 Rural Doctor .00

8 1 2 0 0 0 0 1 0 1 0 0 0 0 1 0 0 Gastric .00 - .00 Rural Doctor

9 3 2 0 0 0 0 0 0 2 0 0 1 0 1 1 0 Asthma Pain Rural Doctor Rural Doctor .00

10 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 Diarrhoea Skin - .00 Kobiraj .00

11 1 2 0 0 0 0 0 0 1 0 0 1 0 0 0 1 .00 .00 Diarrhoea .00 .00 Rural Doctor

12 2 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

219

Page 225: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

I nformation about Empl oyment Adoption Last one Year Active

Un- Under Child Labour d of Family Number of

Labour Planning new born Information about Disease (without considering cold, cough, and fever) force employed employed (6-14) 0 Method babies

0

o Number of Nature of Disease Nature of Treatment

u, patient ! O C a V 10 fa t0 7C o E C E

W E

W

E x E W

CO , E E 2 V y a W a N LL U. U-

a H A eao E To E z X a U- r a

LL V S a

U. V

13 2 1 0 0 0 0 0 0 1 0 0 0 0 2 0 0 Eye .00 .00 Private Doctor .00 .00

14 3 2 1 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00 .00 .00 .00 .00

15 3 1 1 0 1 0 0 0 1 0 0 0 0 0 1 0 .00 e&t .00 .00 Private Doctor .00

16 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00 .00 .00 .00 .00

17 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 2 .00 Gastric Diarrhoea/ .00 Private Doctor Private Doctor

Phenomonea

18 4 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 .00 Gastric .00 .00 Rural Doctor .00

19 1 1 0 0 1 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

20 4 2 0 0 1 0 0 0 2 0 0 1 0 0 0 0 .00 .00 .00 .00 .00 .00

21 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 bat Kobiraj

22 3 3 0 0 0 0 0 0 2 0 0 0 0 0 1 0 Gastric Rural Doctor

23 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 bat Rural Doctor

24 3 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00

220

Page 226: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

In formation a bout Emplo yment Adoption Last one Year Active O of Family Number of Labour

Un- Under Child Labour planning new bom Information about Disease (without considering cold, cough, and fever) force

employed employed (6-14) U 0 Method babies o U

d v t o,

w ,

Number of atient Nature of Disease Nature of Treatment

d N

v d w d it M

p

d N 10 R . . 0 E E x f

LL CO c7 a CL

E 0 x U v d d d aa)) U. LL. E

E NO E E z a, t U W U _

U Z as

U- t U 25 4 1 2 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00

26 2 2 0 0 0 1 0 0 1 0 0 0 0 0 0 0 .00 .00

27 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 Typhoid Private Doctor

28 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00

29 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00

30 2 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00

31 3 3 0 0 0 0 0 0 2 0 0 2 0 0 1 0 .00 Asthma .00 .00 Private Doctor .00

32 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 .00 .00 Harnia .00 .00 Private Doctor

33 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

34 1 1 0 1 0 0 0 0 1 0 0 0 0 0 1 0 .00 Asthma .00 .00 pharmachiest .00

35 3 2 0 0 0 1 0 0 1 0 0 0 0 3 0 0 Pania .00 .00 Homeo .00 .00

36 1 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 .00 .00 .00 Homeo .00 .00

37 0 2 0 0 0 1 0 0 0 0 0 1 0 0 0 0 .00 .00 .00 .00 .00 .00

221

Page 227: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

I nformation about Empl oyment Adoption Last one Year Active

Un- Under Child Labour a, of Family Number of

Labour employed employed (6-14)

Planning new born Information about Disease (without considering cold, cough, and fever) force Method babies

0 0 o Number of

Nature of Disease Nature of Treatment

3 e T T iu o C G7 v

patient

= E 0

d f o

d f aEi

. CO

7C o E

E

= E v d d °' aci

d d U. U. E a Fy E ` E

Z f d W t u

f d U E Q f w U v

38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

39 2 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

40 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00 .00 .00 .00 .00

41 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

42 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

43 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

44 1 3 0 0 0 0 0 0 0 0 0 0 0 1 0 0 gestric .00 .00 pharmachiest .00 .00

45 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 1 .00 .00 Skin de .00 .00 Private Doctor

46 4 2 0 0 0 0 0 0 3 0 0 1 0 0 1 0 .00 pain .00 .00 Private Doctor .00

47 1 1 0 0 0 0 0 0 1 0 0 1 0 1 0 0 Asthma .00 .00 pharmachiest .00 .00

48 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00 .00 .00 .00 .00

49 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

50 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 .00 diareheo .00 .00 Rural Doctor .00

222

Page 228: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

In formation a bout Emplo yment Adoption Last one Year Active

Un- Under Child Labour d of Family Number of

Labour employed employed (6-14)

planning new born Information about Disease (without considering cold, cough, and fever) force U Method babies

o v

d o, Number of

Nature of Disease Nature of Treatment r w patient a! i d d . o c Z° a) v

' o m a 0 E c )i LL

Z LL

m c7 n E s U y m d m d A iv . . E a f- )a E A E )o E z f a)

U- . U f 6) U U

f d LL U

51 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

52 1 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 gestric .00 pharmachiest .00 .00

53 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00 .00 .00 .00

54 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

55 1 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 Diarrhoea .00 pharmachiest .00 .00

56 1 1 1 0 0 0 0 0 0 0 0 0 0 0 1 0 .00 Gastric .00 pharmachiest .00

57 3 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 .00 Eye .00 Private Doctor .00

58 2 2 0 0 0 1 0 0 1 0 0 0 0 1 1 0 heart disease pain Private Doctor Private Doctor .00

59 3 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

60 2 1 0 0 0 1 1 0 1 0 0 0 0 1 0 0 urinery .00 Rural Doctor .00 .00

61 1 1 0 0 0 0 1 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

62 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 .00 jaundice .00 Kobiraj

63 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 .00 Gastric .00 .00 notreatment

223

Page 229: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

I nformation about Empl oyment Adoption Last one Year Active

Un- Under Child Labour d of Family Number of

Labour employed employed (6-14)

3 Planning new born Information about Disease (without considering cold, cough, and fever) force 3 Method babies

v Number of c Nature of Disease Nature of Treatment

Uj patient W) ! T i ! i C I-- e 0 d . i c E S i x m L7 .a E S V d7

y y N N t U. U. E - 4) A E I-

M E P m E z d U. V

4/ LL.

t U Z y U t 64 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

65 1 1 0 0 0 0 0 0 1 0 0 1 0 1 0 0 gestric/Gout .00 .00 Rural Doctor .00

66 2 2 0 0 0 0 0 0 2 0 0 0 0 1 1 0 heart disease malaria .00 Private Doctor Private Doctor

67 3 2 0 0 0 0 0 0 2 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

68 2 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

69 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

70 3 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

71 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 .00 .00 phenumoi .00 .00 Private Doctor

72 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

73 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

74 1 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 bat .00 .00 Rural Doctor .00 .00

75 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

76 1 1 0 0 1 1 1 0 1 0 1 1 0 1 0 1 bat .00 phenumoi Rural Doctor .00 Rural Doctor

224

Page 230: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

In formation a bout Emplo yment Adoption Last one Year Active

Un- Under Child Labour a) Ck

of Family Number of Labour

employed employed (6-14) .

0 Planning new born Information about Disease (without considering cold, cough, and fever) force U Method babies

o U

d o) Number of

Nature of Disease Nature of Treatment L W e' patient y N a) a) O C (a V o 1

cc O - . )O

iE p

`y q E LL

g U

m L7 ? V i . . W

E f f z a) LL V a)

LL s V

a) LL V

77 1 1 1 0 0 0 0 0 1 1 0 0 0 1 0 0 gestric .00 .00 Rural Doctor .00 .00

78 1 1 1 0 0 0 0 0 1 1 0 0 0 1 1 0 bat Gastric .00 pharmachiest pharmachiest .00

79 2 2 1 0 1 0 0 0 1 1 0 1 0 1 0 1 gestric .00 Skin de pharmachiest .00 pharmachiest

80 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

81 1 1 0 0 0 0 0 0 1 0 1 1 0 0 0 0 .00 .00 .00 .00 .00 .00

82 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 .00 .00 .00 .00 .00 .00

83 1 1 0 0 0 0 0 0 1 1 0 0 0 0 0 1 .00 .00 phenumoi .00 .00 Rural Doctor

84 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 1 .00 .00 diareheoa .00 .00 .00

85 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 .00 .00 .00 .00 .00 .00

86 1 0 0 0 0 0 0 0 1 0 1 0 0 0 1 0 .00 Asthma .00 .00 Rural Doctor .00

87 2 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

88 1 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 gestric .00 .00 Rural Doctor .00 .00

89 1 1 0 0 0 0 0 0 1 0 1 1 0 0 0 0 .00 .00 .00 .00 .00 .00

225

Page 231: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

I nformation about Employment Adoption Last one Year Active

Un- Under Child Labour W of Family Number of

Labour 3 Planning new bom Information about Disease (without considering cold, cough, and fever) fo employed employed (6-14) Method b bi V rce a es

o V

0 Number of Nature of Disease Nature of Treatment

w patient d a d o C

m i i CO

E Z V y 4/ V N U. f U.

Z d t V N U.

x W U.

90 1 1 0 0 0 0 0 0 1 0 1 0 0 1 0 0 18.00 .00 .00 Rural Doctor .00 .00

91 1 1 0 0 0 0 0 0 1 1 0 2 0 0 0 0 .00 .00 .00 .00

92 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 .00 .00 .00 .00

93 1 1 0 0 0 0 0 0 1 0 1 0 0 0 0 0 .00 .00 .00 .00

94 2 2 1 1 0 0 0 0 2 1 1 0 0 1 0 0 Gastric .00 Rural Doctor .00

95 1 1 0 1 1 0 0 0 1 1 0 0 0 1 1 0 harvanga bat Rural Doctor Rural Doctor

96 1 1 0 0 0 1 0 0 1 1 0 0 0 0 0 0 .00 .00 .00 .00

97 1 1 0 0 1 1 0 0 1 1 0 0 0 0 1 0 .00 presure .00 Pharmacist

98 2 1 0 1 0 1 0 0 2 1 0 0 0 0 1 0 .00 bat .00 Pharmacist

99 1 1 0 0 0 1 0 0 1 0 1 0 0 0 0 0 .00 .00 .00 .00

100 1 1 0 1 0 0 0 0 2 1 0 0 0 0 1 0 .00 bat .00 Rural Doctor

101 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

102 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

226

Page 232: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

In formation a bout Emplo yment Adoption Last one Year Active

Un- Under Child Labour a1 of Family Number of

Labour emplo ed employed (6-14)

3 Planning new born Information about Disease (without considering cold, cough, and fever) force

y U Method babies o a1

o, Number of Nature of Disease Nature of Treatment t w patient

c E E E 0 ° E c Z E d

U f d

U f y

LL

m (7 n a E S U aci

ar aci N c

- . . E a 61 is E M F E '`a m

F E 'fl a1

U. a1

AL. t U

d s U

103 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

104 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

105 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00 .00

106 1 1 0 0 0 0 1 0 1 0 0 0 0 1 0 2 18.00 .00 Diarrhoea pharmacist .00 Pharmacist

107 3 2 0 0 1 1 0 0 2 0 0 1 0 1 1 0 bat presure .00 Rural Doctor Rural Doctor .00

108 1 1 0 0 0 1 0 0 1 0 0 0 0 0 0 1 .00 .00 Diarrhoea .00 .00 Pharmacist

109 1 1 0 1 0 0 0 0 1 0 0 1 0 1 0 0 pressure .00 .00 pharmacist .00 .00

110 1 1 0 0 0 0 0 0 1 0 0 0 0 0 1 0 .00 bat .00 .00 pharmachiest .00

111 1 0 1 0 0 0 0 0 1 0 0 0 0 1 0 0 presure .00 pharmachiest .00

112 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00

113 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00

114 2 1 0 0 0 0 0 0 1 0 0 0 0 1 0 0 gestric .00 pharmachiest .00

115 2 1 1 1 0 0 0 0 0 0 0 0 0 1 1 0 presure bat pharmacist pharmachiest

227

Page 233: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

I nformation about Empl oyment Adoption Last one Year Active

Un- Under Child Labour a of Family Number of

Labour employed employed (6-14) M

Planning new born Information about Disease (without considering cold, cough, and fever) , force Method babies U a

Number of ° Nature of Disease Nature of Treatment

u, patient M d T d A o C L a i o >.

O ` L r0 °° E E E ° _

p E E m E m C7 .D E CL E = V y d y

4) y

W U. U. a - .v E V 10 E _ f0 E 'fl

z W ;C X 0/ U

y :E

116 1 1 0 0 0 1 0 0 1 0 0 0 0 0 1 0 .00 presure .00 Rural Doctor

117 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00

118 1 1 0 0 1 1 0 1 1 0 0 0 0 1 2 0 bat presure Rural Doctor Rural Doctor

119 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00

120 1 1 0 0 0 1 0 0 0 0 0 0 0 1 1 0 pressure bat Private Doctor Private Doctor

121 1 1 D 0 0 1 0 0 1 0 0 0 0 0 1 0 .00 bat .00 .00 Rural Doctor

122 1 1 1 0 0 1 0 0 1 0 0 0 0 1 1 0 bat bat .00 Rural Doctor Rural Doctor

123 1 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

124 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

125 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

126 1 1 0 0 0 1 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

127 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

128 2 1 1 0 1 1 0 0 0 0 0 0 0 0 1 0 .00 pressure .00 .00 Private Doctor

129 1 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 .00 .00 .00 .00 .00

228

Page 234: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

In formation a bout Emplo yment Adoption Last one Year Active

Un- Under Child Labour m of Family Number of

Labour planning new born Information about Disease (without considering cold, cough, and fever) f employed employed (6-14) U 0

Method babies orce o m

= w Number of

atient Nature of Disease Nature of Treatment v a

w v d d w. o d .o `

p d o E c i f aEi aEi f aEi

CO E x° cu ai °' aci m i ac U. U. U- E n A E v` A E M E z F (5 u. r U f W

U. r C7 f cu

LL. U

130 1 1 0 0 1 1 0 0 2 0 0 0 0 1 1 0 Diarrhoea Abortion .00 pharmachiest

131 1 1 0 0 0 1 0 0 1 0 0 1 0 0 1 0 .00 bat .00 .00 .00

132 1 1 0 1 0 0 0 0 1 0 0 0 0 0 0 0 .00 .00 .00 .00 .00

133 1 1 0 1 0 0 0 0 1 0 0 1 0 0 0 0 s

229

Page 235: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ELECTRICITY, TUBEWELL, TRANSPORT OWNERSHIP, PRODUCTION EQUIPMENT,

HOUSING, ACCESS TO COMMUNICATION EQUIPMENT,

INVOLVEMENT IN DEVELOPMENT ORGANISATION

AND CREDIT

Page 236: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Deokher Nature of Pattern of Number Nature of Number of Nature of Number of Sources of

Having ownership housing of widow ownership person development person taken loan .o facilities? CL

>a of (roof of radio/ involved in organisation loan 3 ° production Material) television Organisation

c equipment E

Electri- Tube- o city well v Z LL F z

1 No Yes Rickshaw Thresher Ci sheet 0 Nil 0 1 ASA 0 1 ASA

2 No No Rickshaw 0 Ci sheet 0 Nil 0 1 1 0 moneylender

3 Yes Yes 0 Weeder and Ci sheet 0 Nil 0 0 1 0 moneylender Thresher

4 Yes Yes 0 Weeder and Tinbldg 0 Television 0 0 0 0

Thresher black

5 Yes Yes Cycle Weeder and Tinbldg 0 Television 0 0 Bank 1 0 Bank Thresher color

6 Yes Yes Cycle Weeder and Ci sheet 0 Radio& Teliv 0 0 1 0 moneylender Thresher

7 Yes Yes 0 0 Ci sheet 0 Television

0 0 1 0 moneylender black

8 No No 0 0 Ci sheet 1 Nil 0 0 0 0

9 Yes No Cycle STW Ci sheet 0 Radio& Teliv 0 0 0 0

10 Yes No 0 Weeder Ci sheet 0 Nil 0 0 0 0

231

Page 237: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? U)

o, of (roof of radio/ involved in organisation loan 3 i = production Material) television Organ sation 2.1 c equipment E

Electri- Tube- o d d

city well o w f w z

11 Yes No 0 0 Ci sheet 2 Twin-in one 0 0 0 0

12 Yes No 0 0 Ci sheet 1 Nil 0 0 0 0

13 Yes No 0 Weeder and Ci sheet 0 Television 0 0 0 0

Thresher black

14 Yes Yes Cycle Weeder and Ci sheet 0 TV and twin 0 0 0 0

Thresher

15 Yes Yes Cycle Weeder and Ci sheet 0 Twin-in one 0 0 1 0 moneylender Thresher

16 Yes Yes 0 Weeder and Ci sheet 0 Nil 0 0 0 0

Thresher

17 Yes Yes Cycle Weeder and Ci sheet 1 Twin-in one 0 0 0 0

Thresher

18 Yes Yes 0 Weeder and Ci sheet 0 Nil 0 0 0 0

Thresher

19 Yes No 0 0 Ci sheet 0 Nil 0 0 0 0

20 Yes Yes Motorcycle Powertiller Tinbldg 0 TV and twin 0 0 0 0

21 Yes Yes Cycle Weeder and Tinbldg 0 Television 0 0 Bank 1 0 Bank

Thresher black

232

Page 238: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? CL of (roof of radio/ involved in organisation loan

3 V production Material) television Organ sation

'. o equipment

M Electri- Tube- c o

city well o f f z U. U.

22 Yes Yes Cycle Weeder and Ci sheet 0 Twin-in one 0 0 Bank 1 0 Bank

Thresher

23 Yes Yes 0 Powertiller Ci sheet 1 Nil 0 0 Bank 1 0 Bank

24 Yes Yes Cycle Weeder and Ci sheet 0 TV and twin 0 0 0 0

Thresher

25 Yes No Cycle Thresher Ci sheet 0 Nil 0 0 moneylender 1 0 moneylender

26 Yes No 0 0 Ci sheet 0 Nil 0 0 0 0

27 No No 0 0 Ci sheet 0 Nil 0 1 0 0

28 No No 0 0 Ci sheet 0 Nil 0 0 0 0

29 No No 0 0 Ci sheet 1 Nil 0 1 BRAC 0 1 BRAC

30 No No 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

31 Yes Yes Cycle Weeder and Ci sheet 0 Twin-in one 0 0 0 0

Thresher

32 Yes No 0 0 Ci sheet 0 Nil 1 1 GB 0 1 GB

233

Page 239: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? of (roof of radio/ involved in organisation loan

U M L. production Material) television Organ sation 12

o c equipment

M Electri- Tube- d a,

city well f z U_ U.

33 Yes No 0 0 Ci sheet 0 Television 0 1 BRAC 0 1 BRAC

black

34 Yes No 0 0 Ci sheet 1 Nil 0 1 10.00 1 1 10.00

35 Yes Yes Cycle Weeder and Ci sheet 0 Twin-in one 0 0 Bank 1 0 Bank Thresher

36 Yes No 0 0 Chan 0 Nil 0 0 0 0

37 Yes Yes 0 0 Ci sheet 1 Nil 0 1 10.00 1 1 10.00

38 Yes No 0 0 Ci sheet 0 Nil 0 0 0 0

39 Yes No Cycle 0 Ci sheet 0 Twin-in one 0 0 Bank 1 0 Bank

40 Yes Yes Cycle Weeder and Ci sheet 0 TV and twin 0 1 10.00 1 1 10.00 Thresher

41 Yes No Cycle Weeder and Ci sheet 0 Nil 0 0 Bank 1 0 Bank Thresher

42 Yes No 0 0 Ci sheet 0 Nil 0 0 0 0

43 Yes No Cycle 0 Ci sheet 0 Nil 0 0 0 0

234

Page 240: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? CL of (roof of radio/ involved in organisation loan

0 U production Material) television Organisation 12

'I o w equipment

M Electri- Tube- o a, W

city well o f aaii f w z

44 No Yes 0 0 Ci sheet 1 Nil 0 1 Mohila Somitee 0 1 Mohila

Somitee

45 No No 0 0 Chan 0 Nil 0 1 ASA 0 1 ASA

46 Yes No Cycle Weeder Ci sheet 0 Radio 0 1 BRAC 0 0 BRAC

47 No No 0 0 Chan 0 Nil 0 0 0 0

48 No No 0 0 Ci sheet 0 Nil 0 1 0 0

49 Yes No Rickshaw 0 Ci sheet 2 Nil 0 1 GB 0 1 GB

50 No Yes 0 0 Ci sheet 1 Nil 0 1 GB 0 1 GB

51 No No Rickshaw 0 Chan 0 Nil 0 0 0 0

52 No No Cycle 0 Ci sheet 0 Nil 0 1 BRAC 0 1 BRAC

53 Yes Yes 0 0 Chan 0 Nil 0 1 BRAC 0 1 BRAC

54 No No Cycle 0 Chan 1 Nil 0 1 ASA 0 1 ASA

55 No No Rickshaw 0 Chan 0 Nil 0 1 Bank 1 0 Bank

56 Yes No Cycle 0 Chan 1 Nil 0 0 0 0

235

Page 241: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? CL a of (roof of radio/ involved in organisation loan

43 :° production Material) television Organ sation 12 '. IV o equipment

M Electri- Tube- o W W

city well LL z U_

57 Yes Yes Cycle Weeder Tinbldg 0 Television 0 0 0 0

color

58 Yes Yes 0 Weeder and Tinbldg 1 Television 0 0 0 0

Thresher color

59 Yes No Cycle 0 Ci sheet 0 Twin-in one 0 2 ngo 0 2 ngo

60 Yes No Cycle 0 Ci sheet 0 Nil 1 1 ASA 0 1 ASA

61 No No Cycle 0 Ci sheet 0 Twin-in one 0 0 Bank 1 0 Bank

62 Yes No Cycle Weeder and Ci sheet 0 Twin-in one 0 1 10.00 1 1 10.00

Thresher

63 No No Rickshaw 0 Ci sheet 0 Twin-in one 0 1 GB 0 1 GB

64 No No 0 0 Ci sheet 1 Nil 0 0 0 0

65 No No Rickshaw 0 Ci sheet 0 Nil 0 1 0 0

66 Yes Yes 0 Weeder and Ci sheet 0 Twin-in one 0 0 Bank 1 0 Bank

Thresher

67 No No 0 0 Ci sheet 0 Nil 0 0 0 0

236

Page 242: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

.a facilities? CL a of (roof of radio/ involved in organisation loan

3 T = production Material) television Organ sation 2

c equipment E

Electri- Tube- 0

o a w

city well M W z LA_ U.

68 No Yes 0 Weeder and Ci sheet 0 Nil 0 0 Bank 1 0 Bank Thresher

69 Yes Yes 0 0 Cisheet 0 Nil 0 0 Bank 1 0 Bank

70 Yes Yes 0 0 Ci sheet 0 Nil 0 0 0 0

71 Yes No Cycle 0 Ci sheet 0 Radio 0 0 0 0

72 Yes No 0 Weeder Ci sheet 0 Nil 0 0 0 0

73 Yes No 0 0 Ci sheet 0 Television 0 1 ASA 0 1 ASA

black

74 No No 0 0 Chan 0 Nil 0 1 ASA 0 1 ASA

75 No No 0 0 Chan 0 Nil 0 1 ASA 0 1 ASA

76 No No 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

77 Yes No 0 0 Ci sheet 0 Nil 0 1 GB 0 1 GB

78 Yes No Rickshaw 0 Ci sheet 0 Twin-in one 0 1 ASA 0 1 ASA

79 Yes Yes Rickshaw 0 Ci sheet 0 Nil 0 0 0 0

237

Page 243: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? CL of (roof of radio/ involved in organisation loan

3 I°_ s production Material) television Organ sation ? w equipment

M Electri- Tube- O C

o O O

city well o f LL z

80 No Yes 0 0 Ci sheet 0 Nil 0 1 GB 0 1 GB

81 Yes No Rickshaw Weeder Ci sheet 0 Nil 0 0 0 0

82 No No 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

83 No No 0 0 Ci sheet 0 Nil 0 1 GB 0 1 GB

84 Yes Yes 0 0 Ci sheet 0 Nil 0 1 GB 0 1 GB

85 Yes Yes 0 0 Chan 0 Nil 0 1 ASA 0 1 ASA

86 Yes No 0 0 Ci sheet 1 Nil 0 0 0 0

87 Yes No Cycle 0 Ci sheet 1 Nil 0 0 0 0

88 No No 0 0 Ci sheet 0 Nil 0 1 GB 0 1 GB

89 Yes Yes 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

90 Yes Yes 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

91 No Yes 0 0 Chan 0 Nil 0 1 GB 0 1 GB

92 No No 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

238

Page 244: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? c o, of (roof of radio/ involved in organisation loan production Material) television Organ sation

21 o equipment E

Electri- Tube- o city well d E

z

93 Yes No Cycle 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

94 Yes Yes 0 Weeder Ci sheet 0 Nil 0 0 0 0

95 Yes No 0 0 Ci sheet 0 Nil 0 0 0 0

96 Yes No 0 0 Ci sheet 0 Nil 0 0 GB 0 1 GB

97 Yes No 0 0 Ci sheet 0 Twin-in one 0 0 ASA 0 1 ASA

98 Yes No 0 0 Ci sheet 0 Nil 0 0 GB 0 1 GB

99 Yes Yes 0 0 Ci sheet 0 Twin-in one 0 0 GB 0 1 GB

100 Yes Yes 0 0 Ci sheet 0 Twin-in one 0 0 ASA 0 1 ASA

101 Yes Yes 0 0 Ci sheet 0 Nil 0 0 0 0

102 Yes Yes 0 Weeder and Ci sheet 0 Nil 0 0 0 0

Thresher

103 Yes No 0 Weeder Ci sheet 0 Nil 0 0 0 0

104 Yes No 0 0 Ci sheet 0 Nil 0 0 0 0

105 Yes No Rickshaw 0 Ci sheet 0 Twin-in one 0 0 0 0

239

Page 245: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? CL n of (roof of radio/ involved in organisation loan $ L. n production Material) television Organ sation L Z. o c equipment E

Electri- Tube- o U. city well a w

E z U- LL

106 No No 0 0 Ci sheet 0 Radio 0 0 0 1 GB

107 Yes No 0 0 Ci sheet 0 Nil 0 0 GB 0 0

108 Yes No 0 0 Ci sheet 0 Nil 0 0 0 1 ASA

109 Yes Yes 0 0 Ci sheet 1 Nil 0 0 ASA 0 1 ASA

110 Yes No 0 0 Ci sheet 0 Nil 0 0 ASA 0 0

111 No No 0 0 Ci sheet 0 Nil 0 0 0 0

112 Yes No 0 0 Ci sheet 1 Nil 0 0 0 0

113 Yes No 0 0 Ci sheet 0 Television 0 0 0 0

black

114 No No 0 0 Ci sheet 1 Nil 0 0 0 0

115 No No Rickshaw 0 Ci sheet 0 Nil 0 0 0 0

116 No No 0 0 Ci sheet 0 Nil 0 0 0 0

117 No No Cycle Thresher Ci sheet 0 Nil 0 0 0 0

118 No Yes Cycle 0 Ci sheet 0 Nil 0 0 0 0

240

Page 246: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Nature of Pattern of Number Nature of Number of Nature of Number of Sources of Having c ownership housing of widow ownership person development person taken loan

facilities? CL of (roof of radio/ involved in organisation loan

U ;_ a production Material) television Organisation L

o c equipment

M Electri- Tube- o o city well E W w z

119 No No Rickshaw 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

120 No Yes Cycle 0 Ci sheet 0 Nil 0 0 0 0

121 No No Rickshaw 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

122 No Yes 0 0 Ci sheet 0 Nil 0 0 1 0

123 No No 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

124 No No 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

125 No Yes 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

126 No No Rickshaw 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

127 Yes No Cycle 0 Ci sheet 0 Twin-in one 0 0 0 0

128 Yes Yes Rickshaw 0 Ci sheet 1 Television 0 1 i 1 0 Bank

black

129 Yes No Cycle 0 Ci sheet 1 Nil 0 1 ASA 0 1 ASA

130 No Yes 0 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

131 No No Rickshaw 0 Ci sheet 0 Nil 0 0 0 0

132 No No Rickshaw 0 Ci sheet 0 Nil 0 1 ASA 0 1 ASA

133 No No Rickshaw 0 Ci sheet 0 Nil

241

Page 247: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NAME OF THE VILLAGE: BOGAIR

Page 248: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Village : Bogair Union : Sreepur Upazila : Chowdaugram District : Comilla

A. General

Si. No. Description Break-up of Description Total 1 Area of the village (in Acres) 163

2 Distance from Upazila Head quarter (in km.) 20

3 Distance from District Head quarter (in km.) 35

4 Distance from nearest Pucca Road (in km) 0.5

5 Number of Population Male- 566 Female- 475

1041

6 Sex Ratio 119

7 Number of Household 181

8 Household Size 5.75

9 Sex of the Household Head Male- 175

Female- 06 -

11 Religious Status of the household head Muslim- 99.45% Hindu- 0.55%

12 Age dependency Ratio (under 15 and above 65+) 84.9

243

Page 249: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

B. Resources

SI. No. Description Break-up of Description Total 1 Number of Ponds 12

2 Number of Kua 30

3 Number of Educational Institute Primary- 01

High School-01 College- 01

Madrasha- 00 Maktab- 01

4 Total cultivated Land Paddy field 105

Seedbed* 22

5 Number of Mosque 02

6 Number of Graveyard 04

7 Number of Deep tubewell 02

8 Number of Shallow Tubewell 03

9 Pacca road in the village (In Kilometer) 0.25

10 Number of village shop 03

11 Drains e Pipe 03

12 Total village road (number) 03

244

Page 250: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

C Education

SI. No. Description Break-up of Description Total 1 School Enrolment Rate (Primary Level) Boy- 91.5 90.97

Girl- 90.2 2 School Enrolment Rate (Secondary level) Boy- 88.75 88.65

Girl- 88.52

3 School drop out Rate (Primary Level) Boy-4.11 02.92

Girl-1.56 4 School dropout Rate (Secondary level) Boy-24.56 16.82

Girl- 8.00 5 Literacy Rate (7 years +) Male- 68.25 63.06

Female57.85 6 Number of Illiterate Adult (16+ Male- 58.65 51.62

Female- 42.91

7 Number of person Attended adult Literacy Programme Male- 0 0

Female-0 8 Number of people passed SSC or HSC Male- 77 106

Female- 29

9 Number of people completed graduation or post graduation Male- degree Female-

10 Distant of Nearest Educational Institute from the village Primary- In the village Girls High School- In the village Boys High School- Ikm Girls College- In the village College- 1.5km

11 Number of Disabled Person Male- Female-

245

Page 251: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

D. Health and Sanitation

Si. No. Description Break-up of Description Total 1 Number of Deaths due to pregnancy complication last year 0

2 Number of deaths of children (0-1 years) over last 12 months 1

4 Number of deaths of children (1-4 years) over last 12 months Boy- Girl-

0

5 Number of children affected by disease (0-5 Years) Boy- Girl-

0

6 Number of children born last Year 40

7 Number of Persons suffered from disease (5 Years above) over last 12 months

Male- Female-

8 Sources of water used for Drinking water Tubewell- 100%

9 Sources of water used for Cleaning utensils Pond- 80 Tubewell- 75

Both- 25

10 Nature of Latrine use for defecation Open- 16

Ring slab- 145

Water Sealed 19

11 Distant from the Union Health Centre (in km.)

12 Distant from the Upazila Health Complex (in knm.) 25

246

Page 252: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

E. Employment

Si No. Description Break-up of Description Total 1 Number of child Labour (5-14 years) Male- 16

Female-04 20

2 Average Number of Active labour force Male- 1.51

Female-1.15 02.67

3 Nature of Employment for Male Unemployed- 5.54% Underemployed-5.54%

4 Nature of Employment for female Unemployed- 6.76 Underemployed-12.08

5 Number of wage Labourer household Agricultural- 22

6 Total Number of People Living Abroad 81

F. Livestock and trees

SI. No. Description Break-up of Description Total 1 Total number of Poultry 4417 2 Total number of Livestock Cow-326

Goat- 08

3 Total number of Poultry died last year 1925

4 Total number of Livestock died last year Cow-12 Goat-

12

5 Total number of wood trees 7059 6 Total number of fruit trees 3004

247

Page 253: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

G. Situation of Poverty

Sl. No. Description Break-up of Description Total 1 Situation of Poverty among the people According to the Rich 21.2

perception of the village people Middle class-24.4 Poor- 22.1

Very Poor- 32.3

2 Situation of Poverty According the criteria of Income (CBN Well of- 38

Method) Poor- 62

3 Situation of Poverty According the criteria of capacity to food Surplus 32.0 consumption Break even 29.5

Occasionally deficit 22.4 Chronic deficit- 16.2

4 Situation of Poverty According to the criteria of Calorie Non Poor 68.5 intake (24 hours recall method) Poor 16.8

Very Poor 14.7

Table 1: Distribution of the household members according to different age group

Age Group Male Female Total Upto5 57 64 121

6-10 84 72 156

11-15 80 62 142

15-30 147 134 281

30-64 163 119 282

65+ 35 24 59

Total 566 475 1041

248

Page 254: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 2: Educational Qualification of the Household head

Frequency Valid Per cent

Illiterate 120 66.3

Class IV 01 0.6

Class V 06 3.3

Class VI 02 1.1

Class VII 04 2.2

Class VIII 19 10.5

Class IX 03 1.7

SSC /Dakhil 15 8.3

HSC/Alim 05 2.5

Graduation 04 2.2

Post graduation 01 0.6

Fazel 01 0.6

Total 181 100

Table 3: Distribution of the household head according to their age

Frequency Per cent

Lowest to 25 11 06.1

25-35 47 26.0

35-45 46 25.4

45-55 36 19.9

55 and above 41 22.7

Total 181 100.0

249

Page 255: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 4: Distribution of the Household according to the land ownership

Land ownership Group (in Acre) Number of Household Percent of Household

Less than .05 (Landless) 30 16.7

.05-2.49 (Small Farmers) 137 76.1

2.5-7.49 (Medium Farmers) 13 07.2

Total 180 100.0

Table 5: Occupation of the House holds head

Frequency Valid Per cent Farmer 78 43.1

Day labourer 22 12.2

Service 07 03.9

Wage earner 20 11.0

Business 23 12.7

Teacher 09 05.0

Mason 04 02.2

House wife 04 02.2

Carpenter 03 01.7

Imam 02 01.1

Rickshaw Pulling 03 01.7

Doctor Rural 02 01.1

Tailor 02 01.1

Washman 01 00.6

Kabiraj 01 00.6

Total 181 100.0

250

Page 256: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 6: Distribution of the households by materials of roof of main house

Frequency Valid Per cent Chan 19 10.6

Ci sheet 155 85.5

Building 07 03.9 Total 181 100.0

Table 7: Distribution of the households by Access to Communication facilities

Frequency Valid Per cent Nil 102 56.67 Twin one 40 22.22 Television black and white 18 10.00 Television color 09 05.00 TV and twin 10 05.56 Radio 01 00.56 Total 180 100.00

Table 8: Distribution of the households by nature of transport ownership

Nature of transport Frequency Valid Per cent

Nil 92 51.11

Rickshaw 12 06.67

BI-Cycle 74 41.11

Micro bus 01 00.56 Motor cycle and microbus 01 00.56 Total 180 100.00

251

Page 257: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Table 9: Distribution of the households by Electricity Facility

Frequency Valid Per cent

No 42 23.3

Yes 138 76.7

Total 180 100.0

Table 10: Distribution of the households by having own tube well

Frequency Valid Per cent No 86 47.8

Yes 94 52.2

Total 180 100.0

Table 11: Distribution of the households by having Own Agricultural Equipment

Frequency Valid Per cent

Nil 117 65.00

Weedier 06 03.33

Thresher 18 10.00

Weedier and Thresher 35 19.44

Shallow Tube well 04 02.22

Total 180 100

252

Page 258: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

AGE OF THE POPULATION

Page 259: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Bociair A e of the o ulation

Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal Household head (Cluster of

0 household) o v 10 O

c w C {°0 0 a 0 d 0 0 ur ?'

E

.-' n m f E M f E M f E M f E m f E m E E f E

0 13 0 _ 1x1

co {L 0

U. 0 0

U. 0

U. 0

Y. U.

1 Mr Kala miah majumder Majumder 55 - Business 2 2 2 1 1 - 2 4 2 1 - - 9.00 8.00 17.00

2 Mr Julfu Miah Majumder Majumder 50 - Farmer - - - 1 - - 3 2 1 1 - - 4.00 4.00 8.00

3 Mr Saied All Majumder 47 - Farmer 1 - - 1 - - - - 1 1 - - 2.00 2.00 4.00

4 Mr. Abdur Rahaman Majumder 68 - Farmer - - - - - 1 3 - - 1 1 - 4.00 2.00 6.00

5 Mr. Abdur Rashid Majumder 35 9 Business - - 1 - 1 1 - 1 1 - - - 3.00 2.00 5.00

6 Mr. All Akbar Majumder 75 - Farmer 1 - - - 1 1 2 1 1 1 1 - 6.00 3.00 9.00

7 Mr. All Ahmed Hazi Majumder 60 - Farmer 1 1 - - 1 1 4 2 1 1 - - 7.00 5.00 12.00

8 Mr. Younes Miah Majumder 57 - Farmer 1 1 - 1 - - 1 1 1 2 - - 3.00 5.00 8.00

9 Mr. Shah Alam Majumder Majumder 42 SSC Doctor - - - - - 1 1 - 1 1 - - 2.00 2.00 4.00

10 Mr. Abdul Matin Majumder 50 Graduate Teacher - - 1 - 1 - 5 - 1 1 - - 8.00 1.00 9.00

11 Mr. Bachu Miah Majumder 35 8 Farmer - - - 2 1 - - 1 1 1 - - 2 4 6

254

Page 260: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the o ulation Name of the Name of Bari Househo ld Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of household)

U

C

C i0 C

07 d 4! a' 47 Cl GJ C 10 +' 3

N d d E

dl d d E

G7

0 E V V

w {L

x w U.

f IL w {L

x V U.

2 aL

f d I l

U. Q Iu 0

.

c t0

C7

12 Mr. Satter Miah Majumder 34 8 Service 1 1 1 2 1 - - 1 1 1 1 1 5 6 11

13 Mr. Sirajul Islam Majumder 70 - Farmer - - - - - - - - - - 1 1 1 1 2

14 Mr. AAbdul Malek Majumder 42 SSC Teacher - 1 - 1 - 1 - 1 1 1 - - 1 5 6

15 Mr. Ahidur Rahaman Majumder 38 - Farmer - 2 1 2 - - - 2 1 - - 1 2 7 9

16 Mr. Sidiquer Rahaman Majumder 40 - Day labourer 1 - 1 1 - 1 1 1 2 - - - 5 3 8

17 Mr. Atar Islam Majumder 44 - Day labourer 1 1 1 1 1 3 2 5

18 Mr. Sayeduzzaman Majumder 47 - Day labourer 1 1 1 1 1 3 4

19 Mr. Atarezzaman Majumder 47 8 Service 1 1 1 1 3 1 4

20 Mr abdul Zalil Majumder 42 Alem Doctor - - 2 - - - - - 1 1 - - 3 1 4

21 Mr Nazrul Islam (Nazir) Majumder 40 8 Business 1 1 1 1 1 2 3 5

22 Mr. Abul kalam Majumder 32 7 Tailor 1 1 1 1 2 3

255

Page 261: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the o ulation Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of household) a

o c M 0 2 U +

n d A

4l d A

d v m

d ar m

a. v A

d d eo

N d To

N

E rs 4_. o f d x E x m f E F E f d f aci 0 10

U- 10 V U U. W. U. U. {L. U. U. F-

.

W O C

23 Mr Abdul Karim Majumder 48 Alem Imam - - - - - - 1 1 1 1 - - 2 2 4

24 Mr. Abdul Khaleque Majumder 45 - Farmer - - - - - - 2 1 1 1 - - 3 2 5

25 Mr. Momtaz Miah Majumder 40 8 Farmer - - - - - - - 1 1 1 - - 1 2 3

26 Mr. Zainal Abedin Majumder 35 6 Day labourer - - 1 - 1 - - - 1 1 - - 3 1 4

27 Mr. Ruhul Amin Majumder 40 - Farmer 1 1 - 2 2 - 2 1 1 - - - 6 4 10

28 Mr. Abu Zafar Majumder 38 7 Farmer - 1 2 1 1 - - 1 1 - - - 4 3 7

29 Master Fazlye Rahaman Majumder 42 SSC Teacher - - 1 - 1 1 3 - 1 1 - - 6 2 8

30 Mr. Abdul Latif Majumder 41 - Farmer - - 2 - 2 - 1 - 1 1 - - 6 1 7

31 Mr. Abdul Kader Majumder 25 SSC Wage earner - - - - - - 1 - - 1 - - 1 1 2

32 Mr. Abdul Hakim Chairman 75 - Farmer - - 1 - 1 1 1 1 - 1 1 - 4 3 7

33 Mr Abul Hashem Chairman 55 HSC Business - - - - 1 1 1 1 1 1 - 4 2 6

256

Page 262: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A 99ee of he population Name of the Name of Bar! Househo ld Head 0 -5 6-10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of a, household) o m o =

n E Te E To E A E To E Te E iv E E c. S w x w w w F w x w F CU G

M LL. Oz y = x L. U. LL I. LL U. LL. H

34 Mr Izzat All Chairman 90 - Farmer 2 - - - - - 1 1 1 1 1 - 5 2 7

35 Mr. Salamatullah Chairman 40 - Day labourer 1 1 1 1 1 2 3 5

36 Mrs Ayesha Chairman 35 - Service - - - - - - - 2 - 1 - - - 3 3

37 Mr Siraj Chairman 32 8 Business 1 1 - 1 - - - - 1 1 - - 2 3 5

38 Mr All Ashraf Chairman 70 - Farmer - 2 1 1 - - - - - 1 1 - 2 4 6

39 Mr. Nur Islam Chairman 58 - Service - - - 1 - - 1 1 1 1 1 - 3 3 6

40 Mr. All Azam Chairman 45 - Farmer - 1 - - 2 - - 1 3 1 - - 5 3 8

41 Mr. Amir Hossain Chairman 55 - Farmer - - 1 - 1 1 1 - 1 1 - - 4 2 6

42 Mr. Moslem miah Chairman 50 - Farmer - - - - - - 2 - 1 1 - - 3 1 4

43 Mr. Abdul Mannan Chairman 30 - Farmer - - 1 - 1 - 1 1 1 - - - 4 1 5

44 Mr. Nurul Amin Chairman 35 - Wage earner - 1 1 1 1 - - 1 1 - 3 3 6

257

Page 263: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the o ulation Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of household)

U c ,-, y a a d as a a d `° To m m M m ie a

E a f E

w x a£i f w E

w v wE wE o li v ( (t ,

V LL. LL. LL. LL. LL. U. LL. 1

. W O' C

L M L7

45 Mr. Jamal Miah Chairman 32 - Wage earner 1 1 - - - - - 2 3 - - 1 4 4 8

46 Mr. Julphe Ali Chairman 70 - Farmer 1 - - - 1 1 - 1 1 - 1 1 4 3 7

47 Mr Abdur Rashid Sarder 55 - Farmer 1 - - - - 1 1 1 1 - 1 1 4 3 7

48 Mr. Abdul Khaleque Sarder 50 - Farmer - - 2 2 3 1 1 - 1 1 - - 7 4 11

49 Mr. Joynal Sarder 45 - Farmer 1 - 1 1 1 1 - 1 1 - - - 4 3 7

50 Mr. Hares Miah Sarder 36 - Day labourer 2 - - 2 - - - 1 1 - - - 3 3 6

51 Mr Mokhles Miah Sarder 35 - Day labourer 1 1 2 - 2 - - - 1 1 - - 6 2 8

52 Mr Amanullah Sarder 32 - Day labourer - - 1 1 - - - - 1 1 - - 2 2 4

53 Mr Khokan Miah Sarder 28 - Day labourer 1 2 - - - - 1 1 - - - - 2 3 5

54 Mr. Liton Miah Sarder 24 - Day labourer 1 - - - - - 1 1 - - - 1 2 2 4

55 Mr. Eshaque Miah Sarder 35 - Day labourer 1 - I - 1 1 - - 1 1 - 1 4 3 7

258

Page 264: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A ge of the population Name of the Name of Bari Househo ld Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of d household) o M o 0

1- d S

eo E

° f . E

am f to E

! f E m f ;

E w f ii

E d -M

E o M , ; V aa,

U. U. i a

LL as

U- as LL aa, IL f aa, U- 1

W O

56 Mr. babul Miah Sarder 30 4 Washman - 1 - 2 - - 1 1 - - - - 1 4 5

57 Mr. Abul Khyaer Sarder 35 SSC Teacher 2 - - - - - - - 1 1 - - 3 1 4

58 Mr Dinear Nabi Sarder 27 - Day labourer - 1 - - - - 3 - 1 1 - 1 4 3 7

59 Mr. Amanullah Munshi Sarder 35 8 Teacher 2 - - - 1 - - - 1 1 - - 4 1 5

60 Mr. Abu Sayed Sarder 42 8 Tailor - 1 1 - 1 1 1 - 1 1 1 - 5 3 8

61 Mr. habibur rahaman Sarder 55 SSC Farmer - - 1 - 1 - 1 1 - 1 1 - 4 2 6

62 Mr. Ali ullah Sarder 40 8 Business - 1 2 1 1 - - - 1 1 - - 4 3 7

63 Mr Sirazul Islam barikmaster 50 - Business - - - - 1 2 1 - 1 1 1 - 4 3 7

64 Mr Abdul Barek barikmaster 52 SSC Teacher - - - - 1 2 1 1 1 1 - - 3 4 7

65 Mr. Maktul hossain Suruj Miah 60 - Day labourer - - - - 1 - - 1 1 - 1 1 3 2 5

66 Mr Suruj Miah Suruj Miah 65 - Mason - 1 1 1 - 3 1 - 3 - 1 - 6 5 11

259

Page 265: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of household)

o V R o C a, O ° al a1 w w a/ a) a)

A A m ' E

CL ° E a, f w 2 E f N f

0 f a, F

d 0

u v U O

u u. LA- u. u. LL u. F-

"' O' A

67 Mr. Bazlur Rahaman Suruj Miah 55 7 Farmer - 1 - - 3 - 1 - 1 1 - - 5 2 7

68 Mr. Maqbul Ahmed Suruj Miah 40 - Day labourer 1 - - 2 2 2 1 1 1 - - - 5 5 10

69 Mr. Haroon Miah Suruj Miah 35 - Wage earner - - 2 - - - 2 1 1 - - - 5 1 6

70 Mr. Anna Miah Suruj Miah 28 - Mason 1 1 1 - 2 1 3

71 Mr.Abdul Aziz Hazi Bari 55 - Farmer 1 1 1 - 1 2 3

72 Mr. Abul Kashem Hazi Bari 35 - Day labourer - - 1 - 2 1 1 1 - - - - 4 2 6

73 Mr. Abdus Satter Hazi Bari 27 5 Carpenter 1 - - - - - 1 1 - - - - 2 1 3

74 Hazi Abdul Malek Malek hazi 70 8 Farmer 1 1 1 - - - 3 2 - - 1 1 6 4 10

75 Mr Rehan Uddin Malek hazi 45 Graduate Business 1 - 1 - 1 - 1 1 1 1 - - 5 2 7

76 Mr Moqbul Ahmed Malek hazi 43 5 Wage earner - 1 - 1 - 2 1 1 1 - - - 2 5 7

77 Mr Abdul Khalek Malek hazi 40 9 Wage earner - - 1 - 1 1 1 1 1 - - - 4 2 6

260

Page 266: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bari Househo ld Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of a, household) o 10 o 0 U o r7 -+ d d G/ N N 4! a!

E c = f aa, E a£i f aa, f aa' f aa' f aEi f E w c

1L y 7 V 1L 11 11 U- U. U- U-

Q W O'

O E C7

78 Mr Shafiqur Rahaman Malek hazi 38 8 Wage earner 1 1 1 1 1 1 2 4 6

79 Mr. Abdul Mannan Malek hazi 35 Fazel Service 1 1 1 2 1 3

80 Mr. Rafiqul Islam Malek hazi 30 Post Service 1 - - - - 1 1 - - - - - 2 1 3

Graduate

81 Mr. Abdul Karim Malek hazi 48 - Business - - 1 2 - - 1 2 2 1 - - 4 5 9

82 Mr Momtaz Miah Malek hazi 46 - Farmer - - - - - - 1 1 2 2 - - 3 3 6

83 Mr. Lutfar Rahman Malek hazi 45 - Day labourer - - - - - 1 1 1 1 1 - - 2 3 5

84 Mr. Moslem Miah Malek hazi 47 8 Farmer - - 1 - - 1 1 - 3 1 - - 5 2 7

85 Mr. Alkas Miah Malek hazi 45 SSC Business - - - - 1 1 1 1 1 1 - - 3 3 6

86 Mr. Younes Miah Malek hazi 42 8 Business - - 1 - - 1 2 1 1 1 - - 4 3 7

87 Mr Eshaq Miah Malek hazi 38 8 Wage earner - - - - 1 - 1 - 1 1 - - 3 1 4

88 Mr. Sekandar All Malek hazi 45 - Farmer - - - 1 - 1 - - 1 1 - - 1 3 4

261

Page 267: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of a, household) o U

c R o c 41 .2 v a a ar a ai ar

a d m Ta

a m m m

ai ra

E n o f E

i W f aa, E W F aa, E

E 0) S E i a f a a i 0

1i y .D U U. tL u. U. IL U. 1L 1-

Q W O

89 Mr. Rostem all Malek hazi 45 - Day labourer 1 - 1 1 1 - - 1 2 1 - - 5 3 8

90 Mr. Mokesh All Malek hazi 44 5 kabiraj 1 1 1 1 2 2 4

91 Mr. All Azam Malek hazi 40 - Wage earner 1 1 1 3 - 3

92 Mr. Ismail Miah Mafek hazi 45 - Farmer 1 2 - 2 - - 1 - 1 1 - - 3 5 8

93 Mr. Abul kalam Malek hazi 30 - Day labourer - 1 1 - - 1 2 1 2 1 - - 5 4 9

94 Ms. Hosneya Ara Malek hazi 25 - House wife - - - - - - 1 - - 1 - - 1 1 2

95 Mr. Abdul Aziz Khalekbsc 60 - Mason - 1 - - - - - 2 2 2 - - 2 5 7

96 Mr. Abdul Khalek Khalekbsc 55 Graduate Teacher - - - - - 1 2 - 1 1 - 1 3 3 6

97 Mr Abdul Mannan Khalekbsc 53 - Farmer - - - - 3 - 1 3 1 1 - - 5 4 9

98 Mr. Abdul Rashid Khalekbsc 35 - Service 2 - - - - - - 1 1 - - - 3 1 4

99 Mr Abdul Hameed Khalekbsc 45 - Farmer - - - - - - 2 1 1 1 - - 3 2 5

262

Page 268: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bari Househo ld Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of d household) o V

m o a+ 0 y N N W U N y W d 4/ 92 d) GJ Ql y

E 7 N

f v f w f w E d

w E 0

UM v 7 v U- U- U. LL U- U. U. W a 0

100 Mr. Akhtruzzaman Khalekbsc 40 SSC Wage earner 1 1 1 1 2 3

101 Mr. Abdul Majeed Khalekbsc 68 - Farmer 1 - - - - - 1 1 - 1 1 - 3 2 5

102 Mr. Abdul Mateen Khalekbsc 34 - Farmer 1 1 1 1 2 3

103 Mr. Abdul Latif Khalekbsc 32 - Farmer 1 1 1 1 1 1 3 3 6

104 Mr. Joynal Abedeen Khalekbsc 57 - Farmer 1 1 1 1 2 2 4

105 Mr. Abdul Kashem Khalekbsc 40 - Farmer - - 1 - - 2 - - 1 1 - - 2 3 5

106 Mr. Kala Miah Khalekbsc 35 - Farmer - - 1 - 2 - - 1 1 1 - - 4 2 6

107 Mr. Ana Miah Khalekbsc 65 - Farmer - - 2 2 - - - 1 - - 1 - 3 3 6

108 Mr. Chand Miah Khalekbsc 60 - Farmer 2 - 3 1 - - 1 1 1 - - - 7 2 9

109 Mr. Ali Ahmed Khalekbsc 31 - Farmer 1 1 1 1 2 3

110 Mr. Sabu Miah Khalekbsc 28 - Farmer 1 1 1 1 2 3

263

Page 269: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the o ulation Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of w household) c

Z) U c ° d d d d a d

E n. is

F aEi

m aEi

M F aEi

m aEi

m aEi

m aEi

ro aEi c i u v u u. u. u. F-

"'0' O

111 Mr. habu Miah Khalekbsc 26 - Farmer - 1 2 1 - - - 1 1 - - - 3 3 6

112 Mr. Shajhan Khalekbsc 18 - Rickshaw - - - - 1 2 1 - - 1 - - 2 3 5

Puller

113 Mr. All Akbar Khalekbsc 58 - Farmer - - - - - - 1 2 3 1 - - 4 3 7

114 Mr. Delwar Khalekbsc 31 - Wage earner - - 2 - - - - 1 1 - - - 3 1 4

115 Mr. All Asahraf All Ashraf 4

116 Mr. All Hayder Hazi All Ashraf 3

117 Mr. Abu Sayeed All Ashraf 40 - Business 1 1 1 1 1 2 3 5

118 Mr. Abul Kalam All Ashraf 30 SSC Business 1 - - - - 1 2 1 - 1 - - 3 3 6

119 Mr. Abul Hashem All Ashraf 40 - Farmer - 1 1 1 1 - - 1 1 - - - 3 3 6

120 Mr. farid Miah All Ashraf 35 - Farmer 1 1 2 - - - - 1 1 - - - 4 2 6

121 Mr. Abdur rahim All Ashraf 70 - Mason - - - 1 1 - 1 - - 1 1 - 3 2 5

264

Page 270: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bar! Househo ld Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of a, household)

c°v mo c ° d d d a, d

cu a, d

v E W E f W

v f

d E WE E WE f WE c

M U.

; -0 H {L LL U. IL U. U. U. I

1L O' O

122 Mr. Sabu Miah All Ashraf 20 - Rickshaw - - - - - - 1 - - - - 1 1 1 2

Puller

123 Mr. Nazir Ahmed Ali Ashraf 31 - Carpenter - - 2 - 1 - - 1 1 - - - 4 1 5

124 Mr. Shah Alam All Ashraf 22 - Farmer 1 - - - 1 1 1 1 - - - - 3 2 5

125 Mr. Abbas Ali All Ashraf 85 - Farmer - 1 1 1 1 - - - 1 1 1 - 4 3 7

126 Mr. Abdur Rahman All Ashraf 50 - Farmer - - - - 1 - 1 1 1 1 - - 3 2 5

127 Mr. Sayeedezaman All Ashraf 60 - Farmer - 1 - 2 - 2 - - 1 1 - 1 1 7 8

128 Mr. julphe All Hameed All 70 - Farmer - - - - - - 2 2 - - 1 1 3 3 6

129 Mr. Haroon Miah Hameed All 35 - Wage earner - - - 1 - 3 1 1 1 - - - 2 5 7

130 Mr. Abdul Khalek Hameed All 32 - Wage earner - 1 - - - - - 1 1 - - - 1 2 3

131 Mr. Abul Hasheem Hameed All 45 - Farmer - - - - 1 - - 1 1 1 - - 2 2 4

132 Mr. Abul Kasheem Hameed All 50 - Farmer - - - - 1 - 1 1 1 1 - - 3 2 5

265

Page 271: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of d household)

o l O C

E f w x y f aa, E w f N d) f E a

1i 'D 7 V 0 LL U. V. LL. U. U LL.

Q "' C g e o

133 Munshi All Miah Munshi 75 - Imam - - 1 - - - 2 2 1 1 1 - 5 3 8

134 Mr. Ali Azim Munshi 65 - Farmer - 1 - - 1 - 3 1 1 1 1 - 6 3 9

135 Mr. Abdur Rashid Munshi 60 Alem Farmer - - - - 2 1 1 - 1 2 - - 4 3 7

136 Mr. Abdul Khalek Munshi 55 SSC Farmer - - - - 1 - 1 - 1 1 - - 3 1 4

137 Mr. Abdul Malek Munshi 52 8 Wage earner - - 1 - - 2 - - 1 1 - 1 2 4 6

138 Mr. Abdus Sobhan Munshi 65 - Farmer - 1 - - - - 2 1 - 1 1 - 3 3 6

139 Mr. Abdul Kashem Munshi 50 SSC Business - - 1 - - - 1 1 1 1 - - 3 2 5

140 Mr. Abu Taher Munshi 45 SSC Wage earner 1 - - 1 - - 1 - 1 1 - - 3 2 5

141 Mr. Abul Kalam Munshi 32 HSC Teacher - 1 1 - - - - 1 1 - - - 2 2 4

142 Mr. Abdus Satter Munshi 30 SSC Wage earner 1 - - - - - 1 1 - - - - 2 1 3

143 Mr. All Ashraf Munshi 67 - Farmer - 1 - - - - 1 - 1 1 1 - 3 2 5

266

Page 272: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bari Househo ld Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of household) 0

U f0 0 CC '++

C W W W W W W W

W W W W W N 'ra W

v E W S W f W S W

F W aa, 0 ii v D 7 v U- U. L U- LL U-

W d O

144 Mr. Ali Akbar Munshi 48 8 Farmer - - - 2 - 1 - 1 1 1 - - 1 5 6

145 Mr. Abdur Rasheed Munshi 60 - Business 1 - - 1 1 - 2 1 1 1 - - 5 3 8

146 Mr Fareed Miah Munshi 35 9 Wage earner 1 1 - - - - - 1 1 - - - 2 2 4

147 Mr. Alkas Miah badshar 75 - Farmer - - - - - - 3 - - 1 1 - 4 1 5

148 Mr. Moslem Miah badshar 70 - Farmer - - - - - - 1 1 1 1 1 - 3 2 5

149 Mr. Maqbul Ahmed badshar - - -.00 - - - - - - - - - - - - - - -

150 Mr. Rosteem All badshar 48 8 Farmer - 4 - - 1 - 1 2 2 - - 1 4 7 11

151 Mr. Tazu Islam badshar 48 - Farmer - - 2 1 - - - 2 1 1 - - 3 4 7

152 Mr. Eshaq Miah badshar 40 - Wage earner - 1 2 - - - - 1 1 - - - 3 2 5

153 Ms. Anwara badshar 35 - House wife 1 - 1 1 - - - 1 1 1 - - 3 3 6

154 Mr Jashemuddin badshar 23 5 Farmer 1 1 1 1 2 3

267

Page 273: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the o ulation Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ Total

Household head (Cluster of a, household)

V c

o

a 4 CD d v

m (v

m

ai

Ta

d m

w

E f aa, aa, *j E a,

E i a 0 E a 4 ) o

LL ,a (5 V 0

U. tL 1L {L Y. Y. 1L

.< W a C I O

155 Master Bazlur rahaman Master Bari 70 Graduate Teacher 1 1 - - - - 2 2 2 1 1 - 6 4 10

156 Mr. All Azam Master Bari 75 - Farmer - 1 1 1 - - - 1 1 1 1 - 3 4 7

157 Mr. Bachu Miah Master Bari 50 - Day labourer - 1 1 1 - - 1 1 1 - - - 3 3 6

158 Mr. Lal Miah Master Bari 38 7 Wage earner - - - 1 - - 1 1 - - - 1 2 3

159 Mr. Samsul Haque Shamsul Haque 60 - Farmer - - - 1 - 1 1 - 1 1 - - 2 3 5

160 Mr. Hossain All Hosain All 110 6 Farmer - - - - - - - - - - 1 1 1 1 2

161 Mr. Moslem Miah Hosain All 70 - Farmer - - - - - - 2 1 1 1 1 - 4 2 6

162 Mr. Bachu Miah Hosain All 50 - Farmer - - 1 1 1 - - - 1 1 - - 3 2 5

163 Mr. Korban All Hosain All 40 - Farmer - - 2 - 1 - - - 1 1 - - 4 1 5

164 Mr. Idris miah Hosain All 75 - Farmer - - - 1 - - 2 2 1 1 1 - 4 4 8

165 Mr Hares Miah Hosain All 55 5 Business - - 2 - 2 - 1 - 1 1 - - 6 1 7

268

Page 274: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the population Name of the Name of Bari Househo ld Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of d household) o M

o 0 ° ' ° A

o. 4l A

E ro R E

al A F

E W

eo 'R E m E

2 m W

E 2 m E 1°

E - 3 fa ° v

F w U.

E a, U.

f d U.

F a U-

F a IL

f v F d U.

c L { 7

tL a V 0 10

L7

166 Mr. Abu Taher Hosain All - - Business 2 1 - - - - - - 1 1 - - 3 2 5

167 Mr. Abdul Kashem Hosain All 45 - Business - 1 1 - 1 - - - 1 1 - - 3 2 5

168 Mr. Jamal Miah Hosain Ali 30 SSC Business - - - - - - 1 1 - - - 1 1 2 3

169 Mr. Abul Hossain Hosain All - - -.00 - - - - - - - - - - - - - - -

170 Mr. Nurul Islam Hosain All 48 - Farmer 1 - - - - - 2 1 1 1 - 1 4 3 7

171 Mr. Haroon Miah Hosain All 46 - Wage earner 1 1 - - - - 1 1 1 1 - 1 3 4 7

172 Mr, Julphe All Hosain All 44 - Day labourer - 1 - 2 - 1 - 1 1 - - - 1 5 6

173 Mr. Charu miah Hosain Ali 40 - Day labourer - - 3 1 1 - - - 1 1 - - 5 2 7

174 Mr. Fazlye Rahaman Hosain All 50 8 Day labourer - - - - 1 - 1 - 1 1 - - 3 1 4

175 Ms. Harisa Bibi Hosain Ali 70 - House wife - - - - - - - - - - - 1 - 1 1

176 Mr. Abdul Latif Hosain All 32 8 Farmer 3 - - - - - - 1 1 - - - 4 1 5

269

Page 275: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

A e of the o ulation Name of the Name of Bari Househol d Head 0 -5 6- 10 11 -15 15 -30 30 -64 6 5+ T otal

Household head (Cluster of a: household) o = 2 U = i+ v

A al

E W

al

E M

a)

E `e

al

E A a)

E o a,

E To

a)

E !9 E - n o f , , f a, f 0 F a, Z , x w 0 M y 7

W

V O

LL. LL. LL- U. U. LL- F-

. a = 1 O

177 Mr. Abdul Majeed Hosain Ali 21 - Business - - - - - - 1 1 - - - - 1 1 2

178 Mr. Abdul Kalam Hosain Ali 17 - Farmer - - - - - 1 1 - - - - 1 1 2 3

179 Mr. Younes Miah Hosain Ali 28 - Farmer 1 - - - - - 1 1 - - - - 2 1 3

180 Mr. Siraj miah Siraj 60 - Business - - - - - - 2 - 1 1 - - 3 1 4

181 Mr. Dilu Miah Siraj 35 - Business - 1 - 2 - - - 1 1 - - - 1 4 5

182 Mr. Zahirul Islam Siraj 16 - Rickshaw - - - - - 1 3 - - 1 - - 3 5

Puller

183 Ms. Sreematinesa Siraj 35 - House wife - - - - - - 1 - - 1 - - 1 1 2

184 Mr. Akhtaruzzaman Akhtaruzzaman 63 - Business - 1 - - - - - 2 2 1 - - 2 4 6

185 Mr. Vajaharee Sutra dhar Akhtaruzzaman 60 5 Carpenter 3

270

Page 276: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EDUCATION AND TRAINING

Page 277: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Boaair Information about Education Number of Skill Training

6-10 years child 11-15 years old 16-18 years old 18+ Age person Passed

Going School Not going Going Not going Literate Illiterate Literate Illiterate SSc or HSC Number of Subject school after School school after Person Admission Admission

M V- ` % " i >` i >- .

a Ip

a f0

d Ip

a, f0

a !0 N

a f0

N 10

m c m c m c CO L7 fcQ G E a, rR G E ccto i E d rr i E

a, 'ccQ L E d

cR i E d 2 E U. U- U- U. U. U. U.

1 2 1 - - 1 - - - - - - - 3 3 1 2 - 2 2 1 fish animator

2 - 1 - - - - - - - 2 - - 3 - 1 1 1 - - - - -

3 1 1 1 -

4 1 1 2 - 1 1 2 - - - - -

5 1 1 1 1 1 - - - - - - - -

6 1 1 1 - 2 - 1 2 1 - - - - -

7 1 1 1 - 3 1 1 2 - - 1 - animator -

8 1 - 1 1 1 2 - - 1 - fish -

9 - 1 2 1 - - 2 - 1 - doctor -

10 1 - - - 1 - - - 3 - - - 3 1 - - 5 - - - - -

11 - 2 - - 1 - - - - 1 - - 1 1 - - - - - - - -

272

Page 278: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 ears old 18+ Age person Passed

o U

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

CO° U m° m° m0 E M E

LL

'° E IL

M E

U.

'° E

U.

M E U.

M E

U-

12 1 2 - - 1 - - - - 1 - - 2 2 - - - - - - - -

13 - - - - - - - - - - - - - - 1 1 - - - - - -

14 - 1 - - - 1 - - - - - - 1 1 - 1 1 - 1 - Animator -

15 1 2 - - - - - - - 2 - - - - 1 1 - - - - - -

16 1 1 - - - 1 - - - - - - 2 - 1 1 - - - - - -

17 1 1 - - - - - - - - - - - - 1 1 - - - - - -

18 - 1 - - - - - - - - - - - - 1 1 - - - - - -

19 - - - 1 - 1 1 1 - - - - - - - -

20 2 - - - - - 1 - - 1 - - - - - -

21 - 1 - 1 - - 1 1 - - - - 1 - Fish -

22 - - - - - - - - - - - - 1 1 - - - - 1 - Tailoring -

23 - - - - - - - - 1 - - - 1 1 - 1 1 - 1 - Electrical -

273

Page 279: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

o U

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

M IL- >

00 L c m

L is

'J coo

L c

>+

m L c f°

a f0 E lL

c i a 10

E LL

c i a 14

E W

a f0 E LL

cro i m 10

E IL

cio L

ai f0 E

- 1II

a f0 E

LL.

24 1 - 1 1 1 1 1 - - -

25 - - - - 1 1 1 - 1 - - - -

26 1 1 - - 1 1 - - -

27 - 2 - - 2 1 1 1 1 - -

28 2 1 - - 1 1 1 -

29 1 - - - 1 1 - - 2 - - - 2 - - 1 3 - 1 - Electrical -

30 2 - - - 2 - - - 1 1 1 -

31 - - - - 1 1 - -

32 1 - - - 1 1 1 1 1 1 1

33 - - - - 1 1 - - - 1 - - 2 - - - 2 - - - - -

34 - - - - - - - - 1 1 - - - - 1 1 2 2 - - - -

35 - 1 - - - 1 - - - - - - 1 1 - - - - - - - -

274

Page 280: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

o U

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

LL > CO c7

, m° c co c7

> m°

! a, M

a, U-

f d ro

a, U.

! '° E

a, rn

m U.

'° a, M

d U-

! '° f a,

ro

o, U.

d `° f

a, ro E a, Y.

a a, ra E ar

LL

36 - - - 1 - 2 - - - - - -

37 - 1 - - - 1 - - - - - - - - -

38 1 1 1 1 - - - - - -

39 - 1 - - 1 1 1 1 - - - - - - - -

40 - - - - 2 - - - - - - - 2 1 1 1 - - - - - -

41 1 - - - 1 1 - - 1 - - - - - 1 1 - - - - - -

42 - - - - - - - - 1 - - - 1 - - 1 - - - - - -

43 1 - - - 1 - - - 1 - - - - - - 1 - - - - - -

44 1 1 - - - - 1 - - - - - - - 1 1 - - - - - -

45 - - - - - - - - - - - - 3 2 - 1 1 2 - - - -

46 - - - - 1 1 - - - 1 - - - - 1 1 - - - - - -

47 - - - - 1 - - - 1 - - - - 1 1 2 1 2 - fish -

275

Page 281: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 years old 18+ Age person Passed

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

>` m

i c

` CO

. >` m

i ` m

i a f0 E

ai fp E

a, f0 E U.

_a IC E U.

a l0 E U.

10

U 10

E U.

f0 E U.

48 2 2 - - 1 1 1 - 2 - - - - -

49 - 1 - 1 - - 1 1 1 - - -

50 - 2 1 1 - 1 - nutrition

51 2 1 1 1 1 - -

52 1 1 - - -

53 - 1 1

54 - 1 1 1

55 - 1 1 1 1

56 - - 1

57 - 1 1 - -

58 - 1 1 - -

59 - - 1 1 - -

276

Page 282: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ye ars child 11-15 ears old 16-18 years old 18+ Age person Passed

o U

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

M

CO

% 0 m° m

% c

` co

i d f0

a, f0 E a,

10

ai fa E a, U.

x

aJ fa- E a,

U. f0

a, f0 E a U.

a, fa E a, U-

d 'a 2

a, Ip E a, U.

a, fa E a,

U-

60 1 - - - 1 - 1 1 1 tailoring -

61 1 - - - 1 - - - - - - - 2 1 - 1 1 - - - - -

62 2 1 - - 1 - - - - - - - 1 - - 1 - - - - - -

63 - - - - 1 2 - - - - - - 3 1 - - - - - - - -

64 - - - - 1 2 - - 1 - - - 1 2 - - 2 1 - - - -

65 - - - - 1 - - - - - - - 1 1 1 1 - - - - - -

66 1 1 - - - 3 - - 1 - - - 4 - - - - - - - - -

67 - - - - 3 - - - 1 - - - 1 - - 1 - 2 1 - fish -

68 - 2 - - 2 2 - - 1 - - - - - 1 1 - - - - - -

69 2 - - - - - - - 1 - - - 2 - - 1 - - - - -

70 1 - - - - 1 1 - - - - - -

71 - - - 1 1 1

277

Page 283: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 years old 18+ Age person Passed

o U

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

i 43

` m°

i + m°

i >` m°

i c7

IC E a,

'a f Ifl E a) U.

d '° f fC

E d U.

2 '° f0 E w

U-

'a f f0 E d

U-

ro z !p E d

U-

'o x 10 E w

U-

72 - - - 2 1 1 1 - -- -

73 - - - - - 1 1 - - - --

74 1 - - - - - - - 1 - - 3 2 - 1 2 1 - - -- --

75 1 - - - 1 - - - 1 - - - 1 2 - - 1 - - - -- --

76 - 1 - - - 2 - - - - - - 1 - 1 1 - - - - -- --

77 1 - - - 1 1 - - 1 - - - 1 1 - - 3 - - -- --

78 - 1 - - 1 1 - - - - - - 1 1 - - - - - - -- --

79 - - - - - - - - - - - - 1 1 - - 1 1 - - -- --

80 - - - - - - - - - - - - 1 - - - 1 1 - - -- --

81 1 2 - - - - - - 1 1 - - 2 1 - 1 - 1 - - -- --

82 - - - - - - - - 1 - - - 1 2 1 1 - - - - -- --

83 - - - - - 1 - - 1 1 - - - - 1 1 - - - - -- --

278

Page 284: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

o U 21

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

M U-

CO w CO w co W CO° f W

d M f

W

E d IL

a

E m IL

M

a/

E a U.

a7

E d U-

'° a) To E a IL

'° aJ ro E d

84 1 - 1 1 2 - 1 1 - - - - -- --

85 - - - - 1 1 - - 1 - - - 1 - - 1 1 - - - -- --

86 1 1 1 2 1 - 1 2 - - - -- --

87 - - - 1 1 1 1 1

88 - 1 - - - 1 - - - - - - 1 1

89 1 1 - - 1 - - - - - - - - 1 2 1 - - - - -- --

90 - - - - 1 1 - - - - - - - - 1 1 - - - - -- --

91 - - - - - - - - - - - - - - 1 - - - - - -- --

92 - 2 - - - - - - - - - - - - 1 1 - - - - -- --

93 - - 1 1 1 1 - - - - -- --

94 - - 1 - 1 - - - - -- --

95 - - - - - - - - - 1 - - 1 1 1 2 - 1 - 1 - sewing

279

Page 285: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

o U 2.

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

M LL >.

0 i >

m0

c . co

` m0

` 2 a: f

a iC E W U-

M E

a f0 E W U

a ' E

a m E W U.

2 M f

a 7i E W

U-

A M E

a 7i E a,

U-

9 '° f a 7i E a)

U-

a M x

a f0 E W U.

96 - - - - - 1 - - 1 - - - 2 1 - 1 1 - - - -- --

97 - - - - - - 2 - - - - - 1 3 1 1 - 1 - - -- --

98 - - - - - - - - - - - - - - 1 1 - - - - -- --

99 1 1 1 1 - - - - - -- animator

100 1 1 - - 1 1 - 1 -- sewing

101 1 2 1 - - - - -- --

102 1 1 1 - - - - -- --

103 1 1 - - 1 - - - - - - - - - 1 1 - - - - -- --

104 - 2 2 - - - - -- --

105 1 - - - - 1 - 1 - - - - - - 1 1 - - - - -- --

106 1 - - - 2 - - - - 1 - - - - 1 1 - - - - -- --

107 1 2 - - - - - - - - - - - - 1 1 - - - - -- --

280

Page 286: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 ears old 16-18 years old 18+ Age person Passed

o U

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

M u-

° i . m°

. C7

a co

i c7

a m° 1°

d R E U.

d m E

v .v

d R LL

ai

1° f a R E U.

m

d io E W 1d

w m E LLi

o E Ii

108 2 - 1 - 1 1 1

109 - - - - 1 1

110 - - 1 1

111 1 - - - - - - - - - - - - - 1 1 - - - - -- --

112 - 1 1 I 1 - - -

113 - - 1 1 1 1 2 1 - - - - -- --

114 2 1 1

115

116

117 - 1 - 1 - 1 1

118 - - - - - 1 - - - - - - 2 1 - 1 2 - - - -- --

119 1 1 - - - - - - - - - - - - 1 1 - - - - -- --

281

Page 287: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 ears child 11-15 years old 16-18 years old 18+ Age person Passed

o U

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

0 rr7 0 i7 m° m°

ra F

a E a

LL

ro

a

E av U.

a

E a 1L

ro x a

E a,

N-

'° f a, 7i £ a, IL

A! '° f a)

E a, IL

M f a,

E a tL

120 2 1 1 -

121 - - - 1 1 1 1 1 1 -

122 1 1 - -

123 1 1 1 1 1

124 1 1 1 1

125 1 1 1 2 1 - - - - -- --

126 1 1 1 1 1 - - - - -- --

127 - 2 - - - 2 - - - - - - - - 1 2 - - - - -- --

128 - - - - - - - - - - - - 2 2 1 1 - - - - -- --

129 - - - - - - 1 - - - - - - 1 1 - - - - -- --

130 - 1 1 - - - 1 - - -- --

131 - 1 1 1 1 - - - - 1 -- sewing

282

Page 288: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

o Going School Not going

school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

° 0 m° m°

'v F

a,

E a, IL

'a f a,

E a,

{a-

'o f a,

E a, U.

'o F

v E a,

LL

'o f a,

E a, tL

'° f a,

E a,

LL

"' f a,

£ d Y.

132 - - 1 1 1 1 1 1 sewing

133 1 - - - - - - - 1 - - - 3 2 - 1 3 2 - - -- --

134 - - - - 1 - - - - - - - 5 2 - - 3 - - - -- --

135 - - - - - 1 2 - - - - - 2 - - 1 - - - - -- --

136 - - - - - - 1 - - - - - 2 1 - - 1 - - -- --

137 1 - - - - 2 - - - - - - 1 - - 2 - - - - -- --

138 - - - - - - - - 1 1 1 - - - 1 1 1 - - - -- --

139 1 - - - - - - - - 1 - - 2 1 - - 2 - - - -- --

140 - 1 - - - - - - - - - - 1 1 - - 1 1 - - -- --

141 1 - - - - - - - - - - - - 1 - - 1 - - - -- --

142 - - - - - - - - - - - - 1 1 - - 1 1 - - -- --

143 - - - - - - - - - - - - - - 1 1 - - - - -- --

283

Page 289: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

o Going School Not going

school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

m Z c

>` m

i c

>`

m i c

>` CO f f0

E a, U-

' f tC

E 0 U.

'° F f0 E a,

LL

2 '° f f0

E a,

a f0 E a,

2 R f 10

E w U.

2 M f 10

E a,

144 - 2 - - - 1 - - 1 - - - - 1 - - - - - - -- --

145 - 1 - - - - 1 - 1 - - - - - 1 1 1 1 - - -- --

146 - - 1 1 - - - 1 - - -- --

147 2 - 1 1 1 - - - -- --

148 1 2 - - 1 1 1 - - -- --

149 - - - - - - - - -- --

150 - - - - 1 - - - - - - - 3 2 - - 1 - - - -- --

151 2 1 - - - - - - - - - 2 1 1 -

152 2 - - - - - - - - - - 1 1

153 1 1 1 1

154 - - 1 2 - - - - -- --

155 4 3 - - 3 2 2 - fish&live --

284

Page 290: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

o Going School Not going

school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

CO CO m c CO .v

d

E U.

M i a,

E U.

1!!° G

d

E M G

U

E U-

.v G

N

E LL

cc i N

E U

M L

al

E LL

156 1 1 - - 2 1 - - - - -- --

157 1 1 - - 1 1 1 - -

158 - - - - 1 1

159 - 1 1 1 1 1 1

160 - - - 1 1

161 - - - - - - - - 1 - - - 2 1 1 1 - 1 - 1 -- sewing

162 - 1 1 - - - 1 - - - - - - - 1 1 - - - - -- --

163 2 - - - 1 - - - - - - - - - 1 1 - - - - -- --

164 - 1 - - - - - - - 1 1 - - 1 3 1 - - - 1 -- sewing

165 2 - - - 2 1 - 1 1

166 - - - - - - - 1 1

167 1 - - - 1 - 1 1

285

Page 291: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

Going School Not going school after Admission

Going School

Not going school after Admission

Literate Illiterate Literate Illiterate SSc or HSC Number of Person

Subject

LL

° CO m° i.7 CO

76 E W

2 '° f E

W LL

F a) LL

.a f ro E (U

U-

r a,

LL

°-) f E d LL

E a LL

168 1 1 1 1 - -

169 - - -

170 2 1 1 2 1 - - - -- --

171 1 2 1 - - - -- --

172 - 2 1 1

173 2 1 1 1 1 -

174 1 1 1 1

175 1 -

176 1 1

177 1 1 1 sewing

178 1 1 1

179 1 1

286

Page 292: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Education Number of Skill Training 6-10 years child 11-15 ears old 16-18 years old 18+ Age person Passed

Going School Not going Going Not going Literate Illiterate Literate Illiterate SSc or HSC Number of Subject o school after School school after Person U Admission Admission

R

LL

d d W N d f0

41

Ta N (0

C2 C7 0 i9 m C7 CO

0 L7 1a E f0

E E f0 E f0 f Ui

j p E d m

180 - - - - - 1 1 1 1

181 - 2 - - 1 1

182 - - - 1 - 1 1 - 1

183 - 1 1

184 - - - 1 1 1 1

185

287

Page 293: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

NATURE OF LAND OWNERSHIP, ITS UTILIZATION, INCOME

AND EXPENDITURE

Page 294: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Bociair

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E

Cultivable Pond Kua c c o 01 n c land L Cl

ro > > _ c CL

7 > a, i O

N .

w C M

H C1 O ' C C O a W

N a R L C C F O

C C 1 G V M U w

C . s J U Id t o

O rl E O

10 C + - N 0 Id O L7 , C L J

fp LL

O O = c +d+ fQ

N L fA o -_ U p v

= R t U

. a y L a y/ E ` cC

Q L ..i

L N 1A V.. M

O a + JA N V i C

0 O cs

v, i°- a CO A" z 'a z 0 3 f

M ru z '- ai

1 1.13 .00 .13 1.00 .10 .80 .05 .08 .03 .20 .02 .85 .00 .00 .05 .00 85000 6000

2 1.18 .22 .00 1.40 .10 1.20 .05 .08 .03 .20 .02 1.25 .00 .00 .05 .00 50000 3000

3 1.15 .05 .00 1.20 .10 .87 .18 .08 .03 .20 .02 1.05 .00 .00 .05 .00 55000 3000

4 2.19 .00 .00 2.19 .10 1.79 .25 .08 .03 .20 .02 2.04 .00 .00 .05 .00 52000 3500

5 .79 .21 .00 1.00 .10 .75 .10 .08 .03 .20 .02 .85 .00 .00 .05 .00 40000 3000

6 3.28 .00 .28 3.00 .40 1.87 .60 .08 .03 1.00 .10 2.47 .00 .00 .13 .00 61000 4000

7 4.19 .00 .19 4.00 .40 2.70 .67 .08 .03 1.00 .20 3.37 .00 .00 .23 .00 68000 4500

8 2.15 .85 .00 3.00 .40 1.60 .67 .08 .03 3.00 .30 2.27 .00 .00 .33 .00 85000 6000

9 3.17 .00 .17 3.00 .60 1.74 .60 .33 .03 .33 .03 2.34 .00 .00 .06 .00 36000 2500

10 3.18 .00 .18 3.00 .54 1.70 .70 .33 .03 33 .03 2.40 .00 .00 .06 .00 72000 6000

289

Page 295: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

a,

bie Cul

Pond Kua 0 M

M ,,, -o and y

= a O

> = Oy N'd w S

M +O+ N C

C 4.0 'O O

-±+ L+r O M E x

N y O O a Vl O' M

N M a C N M + d o L o a, c M

-o En

c V M p 7 a t7

p n v. > M u. J c is O. f0 O

, r E O

>, .a c +- a Lr to d p c L o 'i LL s = 0 > i =

C N N C U

v O O

t 3 a i E a i i d to yr y

3 O v p

C 3 C= y G . CO z z M

Z 3 L-

° a' fm

11 3.18 .00 .00 3.18 .60 2.12 .40 .03 .03 2.52 .00 .00 .06 .00 45000 3000

12 2.13 .00 .00 2.13 .41 1.21 .22 .25 .04 1.43 .00 .00 .21 .08 52000 4000

13 2.05 .00 .00 2.05 .25 1.52 .00 .25 .03 1.52 .00 .00 .28 .00 40000 3200

14 1.00 .00 .00 1.00 .20 .42 .10 .25 .03 .42 .00 .10 .28 .00 42000 3000

15 1.20 1.00 .00 2.20 .10 1.42 .40 .25 .03 1.82 .00 .00 .28 .00 25000 1200

16 .20 .20 .00 .40 .10 .00 .05 .25 .00 .00 .00 .05 .25 .00 23000 2600

17 1.25 .00 .00 1.25 .05 .92 .25 .03 .00 1.17 .00 .00 .03 .00 12000 1000

18 1.50 .00 .00 1.50 .05 1.37 .00 .03 .05 1.37 .00 .00 .08 .00 14400 1200

19 1.28 .00 .00 1.28 .05 1.15 .05 .03 .00 1.20 .00 .00 .03 .00 45000 3000

20 1.00 .15 .00 1.15 .10 1.02 .00 .03 .00 1.02 .00 .00 .03 .00 25000 2000

21 6.30 .00 .00 6.30 1.00 .60 2.00 1.00 2.50 1.00 .20 2.06 .54 .00 2.70 .00 120000 6000

290

Page 296: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E

Cultivable Pond Kua '0 O C ",

3 rn ; c .o land o 0 -C a .. c Z c .0,0 4M

C 'G r- 13 LU

V O M OO '0 2! G C m 10 F 0J

E f0 a. O + " C = T U 9 .0 U w > U- ` y_ y V J d

10 H v O C OJ d O - C 7 i d Ch L- O U

Z 3

` Q

+ t M

J H

M N V M

C

0 3 C= Cy O d to A, Z 7a Z

L o 3 3 07 r my >M z ,

22 1.11 .00 .00 1.11 .10 .71 .10 .00 -.00 1.00 .20 .81 .00 .00 .20 .00 42000 3000

23 .20 .00 .00 .20 .05 .10 .00 .00 -.00 1.00 .05 .10 .00 .00 .05 .00 18000 1500

24 1.17 .00 .00 1.17 .10 .77 .10 .00 -.00 1.00 .20 .87 .00 .00 .20 .00 48000 4000

25 1.25 .00 .00 1.25 .06 .95 .04 .33 .20 .00 -.00 .00 .00 .20 .00 18000 1500

26 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 -.00 .00 .00 .00 .00 .00 20000 1500

27 .92 .00 .00 .92 .10 .52 .10 .33 .20 .00 -.00 .62 .00 .00 .20 .00 24000 2000

27 .68 .32 .00 1.00 .10 .62 .08 .33 .20 .00 -.00 .70 .00 .00 .20 .00 48000 3000

29 3.80 .00 .30 3.50 .40 2.00 .25 1.00 .60 1.00 .25 2.25 .00 .00 .85 .00 60000 3500

30 1.15 .00 .00 1.15 .20 .65 .10 .00 -.00 1.00 .20 .75 .00 .00 .20 .00 24000 2000

31 .40 .00 .00 .40 .10 .25 .00 . .00 .05 .25 .00 .00 .05 .00 24000 2000

32 3.10 .00 .00 3.10 .15 2.49 .15 .24 .07 2.64 .00 .00 .31 .00 50000 3750

291

Page 297: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E a,

o N Cultivable Pond Kua a! v c ,, o 0

rn ; land , a y c a ,-. t .a v o a ,o O1 C . H v

O -o = v L + E ui

a 1A Q 1G

W L a. C

+ w E

o L c M M ,0 o,

c f0

O O M V

O w. > - M u. >.

c J '- J" c. 4

O m

L.. io d o d ' c L -

N V a d 0 a i t = c + O H O

V O t `

Q t0

J l

O

L 7 V

C

C c= > O CO O z 7 a z L M z L 3 0 Sti !O- E y M ,

33 3.17 .00 1.17 2.00 .15 1.48 .10 .27 .00 1.58 .00 .00 .27 .00 75000 5000

34 2.40 .00 .00 2.40 .15 1.75 .10 .40 .00 1.75 .10 .00 .40 .00 47000 3000

35 .05 .00 .00 .05 .05 .00 .00 .00 .00 .00 .00 .00 .00 .00 20000 1500

36 .40 .00 .00 .40 .10 .13 .05 .06 .06 .18 .00 .00 .12 .00 18000 1500

37 1.45 .55 .00 2.00 .10 1.20 .30 .30 .10 1.50 .00 .00 .40 .00 48000 4000

38 1.85 .15 .00 2.00 .10 1.20 .30 .30 .10 1.50 .00 .00 .40 .00 24000 2000

39 .40 .30 .00 .70 .05 .50 .05 .10 .00 .55 .00 .00 .10 .00 24000 1500

40 .40 .25 .00 .65 .05 .37 .05 .12 .06 .42 .00 .00 .18 .00 30000 2500

41 .40 .00 .00 .40 .05 .25 .05 .05 .00 .30 .00 .00 .05 .00 23000 1900

42 2.20 .40 .00 2.60 .10 1.50 .40 .40 .20 1.90 .00 .00 .60 .00 38000 2400

43 1.10 .00 .00 1.10 .10 .90 .10 .00 .00 .90 .10 .00 .00 .00 36000 3000

292

Page 298: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) N E

o s , ; Cultivable Pond Kua U

v ;' v CD M c -a land W ?. O Ri

2 s q C 2, aCi CL _ .. M C 0

O H w cm

C O V 3: 70 0 O

E Uj O C Q. C P1 ` M C O 0 3 40 +a Z+ = 4l J V f0 t O u O t Y+ O O .L m i ul aO+ O 3 7E C

> CO z a L '° z 3 0 M

, Q

44 .06 .20 .00 .26 .06 .20 .00 .00 .00 .00 .20 .00 .00 .00 36000 3000

45 .30 .00 .00 .30 .10 .06 .00 .14 .00 .06 .00 .00 .14 .00 72000 6000

46 .10 .00 .00 .10 .10 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000 2000

47 2.15 .00 .30 1.85 .20 .85 .55 .20 .05 1.25 .15 .00 .25 .00 46000 3000

48 1.10 .00 .00 1.10 .10 .60 .05 .30 .05 .65 .00 .00 .35 .00 65000 4500

49 1.10 .00 .00 1.10 .10 .55 .10 .30 .05 .55 .10 .00 .35 .00 28800 2800

50 .11 .00 .05 .06 .02 .04 .00 .00 .00 .00 .04 .00 .00 .00 20000 1900

51 .05 .15 .00 .20 .05 .15 .00 .00 .00 .00 .15 .00 .00 .00 .00 8400 700

52 .50 .00 .30 .20 .05 .10 .00 .05 .00 .00 .10 .00 .00 .05 .00 12000 1000

53 .04 .10 .00 .14 .04 .10 .00 .00 .00 .00 .10 .00 .00 .00 .00 12000 1000

54 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 8400 700

293

Page 299: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E a

0 0 C4 Cultivable Pond Kua 2 u

.v v 3 o ; v land L v .

H C CI

O 2 t V Q N O C1 w = r? -0 +Ol+

1A C C O +' = a 3 .

4, O E x

W U)

U) 0 "a W M r 75

JO- U.

:

CM V 0 E .60 'n U

03 °._ cN 1°-

a m p. z °a z I. M z 3`0 3 f w ,M

55 .25 .15 .00 .40 .15 .15 .00 .10 .00 .00 .15 .00 .00 .10 .00 7200 600

56 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000 3000

57 .10 .00 .00 .10 .10 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

58 1.07 .00 .00 1.07 .10 .77 .00 .20 .00 .00 .77 .00 .00 .20 .00 36000 3000

59 1.09 .00 .00 1.09 .10 .69 .20 .10 .00 .00 .89 .00 .00 .10 .00 38000 2400

60 1.25 .00 .00 1.25 .14 .81 .20 .10 .00 .00 1.01 .00 .00 .10 .00 36000 3000

61 1.50 .00 .00 1.50 .20 .91 .15 .24 .00 .00 1.06 .00 .00 .24 .00 28800 2400

62 .40 .00 .00 .40 .06 .18 .10 .06 .00 .00 .28 .00 .00 .06 .00 25000 1500

63 .40 1.00 .00 1.40 .20 .85 .00 .25 1.00 .10 .85 .00 .00 .25 .10 12000 1000

64 1.70 .30 .00 2.00 .20 1.00 .40 .40 .00 .00 1.40 .00 .00 .40 .00 85000 6000

65 .30 .00 .00 .30 .10 .05 .05 .10 .00 .00 .00 .10 .00 .10 .00 36000 3000

294

Page 300: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a,

o Cultivable Pond Kua v C o

3 c land a > > H _ a ., _ .. ,, n3 c M 0 x A to C 3 f0 0 f0 O

1A Cp O A d I

2 N C

0' C N , 0 M

LM

C O O .2 .0 U. O =

J 2 w V

L,

M d O Vl

E O

C t d .O L.

M i Gl 0 C y_ L 19 J L lL W IA 21A &.

L " c o a E a s o a roi U E 03 -C a I > CO z a z M z W, (n

66 1.10 .00 .00 1.10 .10 .75 .10 .10 1.00 .05 .85 .00 .00 .15 .00 48000 4000

67 .78 .22 .00 1.00 .10 .50 .15 .25 .00 .00 .65 .00 .00 .25 .00 38000 1500

68 .28 .00 .00 .28 .10 .00 .18 .00 .00 .00 .18 .00 .00 .00 .00 30000 2500

69 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 36000 3000

70 .04 .20 .00 .24 .04 .20 .00 .00 .00 .00 .20 .00 .00 .00 .00 36000 3000

71 .20 .20 .00 .40 .20 .20 .00 .00 .00 .20 .00 .00 .00 .00 30000 2500

72 .30 .30 .00 .60 .19 .41 .00 .00 .00 .41 .00 .00 .00 .00 36000 3000

73 .20 .00 .00 .20 .20 .00 .00 .00 .00 .00 .00 .00 .00 .00 42000 3500

74 3.45 .00 1.00 2.45 .30 1.37 .58 .05 .15 1.95 .00 .00 .20 .00 65000 4000

75 1.35 .00 .00 1.35 .15 1.11 .06 .00 .03 .82 .35 .00 .03 .00 45000 3000

76 1.05 .00 .20 .85 .10 .50 .12 .10 .03 .50 .12 .00 .13 .00 36000 3000

295

Page 301: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E a

Cultivable Pond Kua a, c O c = IM ; v . land M o rcc Zk

CL 0 N 4.0

V) C O O p O 1C U4

CJ H 0 R O

s. M O d C

CL + N f0 C1

C U IQ M V O .a Y- > M

U.

O J N a- J U

M 0. M t O p O

E C L W O O : C . f0 U. i. t y y >` .a+

M C R C R ci- V 19 = a V E a L. E

E p Q J +O+ 4 R 3 V W 03 C CO Z za z 3 0 3 r ,

77 1.15 .00 .20 .95 .10 .65 .07 .10 .03 .50 .22 .00 .13 .00 45000 3000

78 2.20 .00 .20 2.00 .10 1.45 .30 .10 .05 1.75 .00 .00 .15 .00 80000 4000

79 1.17 .00 .00 1.17 .10 .82 .15 .10 .00 .97 .00 .00 .10 .00 50000 3000

80 1.12 .00 .00 1.12 .10 .82 .10 .10 .00 .92 .00 .00 .10 .00 48000 3000

81 1.11 .00 .00 1.11 .05 .94 .10 .00 1.25 .02 1.04 .00 .00 .02 .00 46000 3000

82 .50 .40 .25 .65 .10 .31 .09 .05 1.00 .10 .40 .00 .00 .15 .00 36000 3000

83 .85 .00 .00 .85 .10 .55 .15 .05 .00 .00 .70 .00 .00 .05 .00 12000 1000

84 2.12 1.20 .00 3.32 .15 2.50 .32 .20 1.00 .15 2.82 .00 .00 .35 .00 55000 3000

85 1.50 .00 .00 1.50 .15 .65 .40 .20 1.00 .10 1.05 .00 .00 .30 .00 45000 3000

86 2.20 .00 .30 1.90 .30 1.00 .30 .20 1.00 .10 1.30 .00 .00 .30 .00 55000 3000

87 2.00 .00 1.00 1.00 .10 .60 .10 .20 .00 .00 .70 .00 .00 .20 .00 35000 1800

296

Page 302: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E

o s .. N Cultivable Pond Kua -a c 'v v 3 ; o land o > y c C 75 .. v .. , C 2 x fl C

.d O O1 `~ C

M N

y y C

C O ' p

3 '+ p

. L + fp O

E W CD p y j d

M y

C CL C M+ p

E M ` L L C O

C V

O O

p U

p M ' = C -- H O O gyp i p = U.

C (= A W FA

3 L C

o = 0 E

A a 3 ° i 4j t= v 03 cM

V M Eg CO z a z 0 z 3 ` 3 M

>

88 1.21 .30 .00 1.51 .20 1.21 .05 .05 .00 .00 1.26 .00 .00 .05 .00 18000 1000

89 .21 .00 .00 .21 .11 .05 .00 .05 .00 .00 .05 .00 .00 .05 .00 20000 1000

90 1.50 1.00 .45 2.05 .30 1.45 .10 .05 1.00 .15 1.55 .00 .00 .20 .00 12000 1000

91 .20 .00 .00 .20 .10 .00 .05 .05 .00 .00 .00 .00 .00 .05 .00 36000 3000

92 2.15 .00 1.00 1.15 .10 .70 .15 .10 1.00 .10 .85 .00 .00 .20 .00 56000 3000

93 .05 .00 .00 .05 .05 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000 2000

94 .30 .00 .00 .30 .10 .14 .00 .00 1.00 .06 .00 .14 .00 .06 .00 12000 1000

95 .73 .00 .00 .73 .08 .50 .07 .33 .08 .00 -.00 .50 .57 .00 .08 -.00 36000 3000

96 1.23 1.20 .60 1.83 .08 1.60 .07 .33 .08 .00 -.00 .00 .07 .00 .08 -.00 43200 3000

97 .83 .00 .60 .23 .08 .00 .07 .33 .08 .00 .00 .00 .07 .00 .08 -.00 30000 2500

98 .03 .17 .00 .20 .03 .17 .00 .00 .00 .00 .00 .17 .00 .17 .00 .00 22800 1900

297

Page 303: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

O

Cultivable Pond Kua

Ch M M v land M y° M c s

U1

C

O = v .d O Q1 M N C O 3 ++ E

MU) O i p = N d ,. i O i O V _ O O a w > 1i

O L J V M O. O

E 0

.

_ O+

° M y W.0 C O J i lL

N Vl L +O+

47 3 ' '' 3 1° c = y" o a O p a O c U o f '° " o 0 3 .c y H CO

., z z a i z 3 0 3 - E M VA Q Y

99 1.46 1.00 1.00 1.46 .13 1.00 .18 .50 .15 .00 .00 1.18 .18 .00 .15 .00 70000 5000

100 2.00 .00 1.54 .46 .13 .00 .18 .50 .15 .00 .00 .00 .18 .00 .15 .00 70000 3000

101 .03 .20 .00 .23 .03 .20 .00 .00 .00 .00 .00 .20 .00 .00 .00 .00 36000 3000

102 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000 2000

103 .03 .00 .00 .03 .03 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 24000 2000

104 .08 .00 .00 .08 .06 .00 .00 .16 .02 .00 .00 .00 .00 .00 .02 .00 21600 1800

105 .35 .00 .00 .35 .06 .22 .03 .00 .00 .17 .04 .25 .00 .00 .04 .00 36000 3000

106 .35 .00 .12 .23 .06 .10 .03 .00 .00 .16 .04 .13 .00 .00 .04 .00 24000 2000

107 .75 .00 .00 .75 .06 .60 .05 .00 .00 .16 .04 .65 .00 .00 .04 .00 25000 2000

108 .45 .00 .30 .15 .05 .06 .00 .00 .00 .16 .04 .06 .00 .00 .04 .00 72000 6000

109 .06 .00 .00 .06 .01 .00 .04 .00 .00 .25 .01 .00 .04 .00 .01 .00 36000 3000

298

Page 304: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

c Cultivable Pond Kua o -W

3 ; c

land d > > a .. L .. .. ra o 0 x w CL

tM -0 r 3 0 .0 i +p W V! N O

L L C C

N d om. C t` C G1 V M is U d O

= L y

y t d J c f0 d = `i E

O C t 47 r:+ f i.,

p y 0J p d c - i f0 J L

L N ul aO+ d 7 C c m

t /l c E a a E c i ro 0 0 M CR > F-

a z z a Q L 1° z 3 0 3 , r M

110 .06 .00 .00 .06 .01 .00 .04 .00 .00 .25 .01 .00 .04 .00 .01 .00 24000 2000

111 .06 .00 .00 .06 .01 .00 .04 .00 .00 .25 .01 .00 .04 .00 .01 .00 36000 3000

112 .06 .00 .00 .06 .01 .00 .04 .00 .00 .25 .01 .00 .04 .00 .01 .00 24000 2000

113 .57 1.60 .00 2.17 .24 1.90 .00 .00 .00 .75 .03 1.90 .00 .00 .03 .00 36000 3000

114 .19 .00 .00 .19 .08 .10 .00 .00 .00 .25 .01 .10 .00 .00 .01 .00 24000 2000

115 60000 5000

116 60000 5000

117 2.80 .00 .00 2.80 .20 2.00 .40 .25 .20 .00 .00 2.40 .00 .00 .20 .00 80000 5000

118 2.40 .00 .80 1.60 .14 .50 .80 .25 .16 .00 .00 .90 .40 .00 .16 .00 60000 4000

119 .30 .40 .00 .70 .20 .40 .10 .00 .00 .00 .00 .50 .00 .00 .00 .00 20000 2000

120 .20 .20 .00 .40 .20 .20 .00 .00 .00 .00 .00 .20 .00 .00 .00 .00 36000 3000

299

Page 305: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a, E

a,

a ° Cultivable Pond Kua C . +r

o u c 0

M c V land a>

m 0 o o c a , a O

> 0 t o O Ol "

M N

O-+

C c 0

O O p o M

x W O C O in a

m y C

c ii = w M

` L c ti o+

C U m . v o ... > M u.

o '- a)

" vs a O u E

O c a a L m y v o a c is a. B h y =' 0 7 F. C

= " c o = a 5 . 0 '0i o V f C3 = d CO A

Z Z V a z 3

U) M tea,

121 .19 .00 .00 .19 .19 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 72000 6000

122 .06 .00 .00 .06 .06 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 18000 1500

123 .07 .24 .00 .31 .04 .24 .00 .00 .00 .34 .03 .24 .00 .00 .03 .00 36000 3000

124 .14 .80 .00 .94 .08 .80 .00 .00 .00 .66 .06 .80 .00 .00 .06 .00 30000 2500

125 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 30000 2500

126 .08 .20 .00 .28 .08 .20 .00 .00 .00 .00 .00 .20 .00 .00 .00 .00 25000 2000

127 .50 .60 .00 1.10 .16 .86 .00 .00 .00 1.00 .08 .86 .00 .00 .08 .00 36000 3000

128 .88 .80 .00 1.68 .20 .92 .36 .25 .20 .00 .00 .92 .36 .00 .20 .00 60000 5000

129 .06 .36 .00 .42 .06 .36 .00 .00 .00 .00 .00 .36 .00 .00 .00 .00 36000 3000

130 2.20 .00 1.60 .60 .14 .00 .40 .33 .06 .00 .00 .40 .00 .00 .06 .00 24000 2000

131 1.10 .00 .30 .80 .14 .60 .00 .33 .06 .00 .00 .60 .00 .00 .06 .00 36000 3000

300

Page 306: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) E

o r , ; L Cultivable Pond Kua n ° C H

- c v v 3 rn ; c . land > a >

_= .. c . .. ° 1°

C > ,. 0 x s 13 n vn ' C

M N N O

c° = 0 3 _ p 0 M E

O 'n d Gl . CL

C +

M C 0 5 U

,2 J2 > to

LL.

= - M . O 7.. 3 T rr N O

y fl L `

Q t0 _ J

N Vl N i C

G 3 C C y ! 0 G. m O Qr z 7 a z M z Z o 3

M y to ,

132 1.08 .24 .00 1.32 .24 .74 .28 .34 .06 .00 .00 1.02 .00 .00 .06 .00 24000 2000

133 2.38 .00 .40 1.98 .26 1.40 .18 .13 .10 1.00 .04 1.58 .00 .00 .14 .00 80000 5000

134 2.28 .00 .80 1.48 .30 .00 .80 .13 .10 1.00 .28 .80 .00 .00 .38 .00 108000 10000

135 .60 .00 .36 .24 .11 .00 .05 .12 .08 .00 .00 .00 .05 .00 .08 .00 42000 3000

136 .- .00 .00 .- .11 .60 .20 .12 .08 .00 .00 .80 .00 .00 .08 .00 36000 3000

137 .95 .36 .56 .75 .11 .30 .26 .12 .08 .00 .00 .56 .00 .00 .08 .00 36000 3000

138 .62 .00 .00 .62 .08 .50 .00 .12 .04 .00 .00 .50 .00 .00 .04 .00 30000 2500

139 1.12 .00 .00 1.12 .32 .44 .12 .12 .04 1.00 .20 .56 .00 .00 .24 .00 65000 5300

140 .58 .00 .36 .22 .12 .00 .04 .12 .04 .50 .02 .04 .00 .00 .06 .00 60000 5000

141 .32 .60 .92 .08 .80 .00 .12 .04 .00 .00 .80 .00 .00 .04 .00 25000 2200

142 .58 .00 .36 .22 .12 .00 .04 .12 .04 .50 .02 .00 .04 .00 .06 .00 18000 1500

301

Page 307: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a,

E m

O o L , N L Cultivable Pond Kua ?+ .= c v

rn ; M v land L y ° 0r

O 0 v >. -0 O

C w w C

M fl N w v r" r- Z3

O C O C O p f'0 E x

W d M o H

d c ` ° N

'_° a

M ° i s vi V R a v .aw > O J GJ J V

r o .c O O , > C a L y O C i J W

- `= 7 4! y >, L C = i d H a. V M `= L a ° f0 J G H o3 c

°- a CO

spy Z

' Z M z 3`0 3 f

U) M

143 .56 1.60 1.60 .56 .12 .20 .20 .12 .04 .00 .00 .40 .00 .00 .04 .00 35000 2600

144 1.20 .00 .86 .34 .12 .10 .08 .12 .04 .00 .00 .18 .00 .00 .04 .00 36000 3000

145 2.08 .00 1.60 .48 ' .16 .14 .00 .00 -.00 1.00 .18 .14 .00 .00 .18 .00 65000 5000

146 .16 .80 .80 .16 .16 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 60000 5000

147 1.23 .00 .16 1.07 .08 .50 .16 .12 .08 1.25 .25 .66 .00 .00 .33 .00 60000 5000

148 4.83 .00 2.40 2.43

4 .10 1.60 .60 .12 .08 .25 .05 2.20 .00 .00 .13 .00 36000 3000

149 -.00 -.00 -.00 -.00 -.00 -.00 -.00 -.00 -.00 -.00 -.00 -.00 .00 .00 .00 .00

150 2.01 .00 1.20 .81 .10 .40 .10 .13 .08 1.25 .13 .50 .00 .00 .21 .00 50000 4000

151 .10 .00 .00 .10 .08 .00 .00 .00 -.00 .50 .02 .00 .00 .00 .02 .00 25000 2000

152 .14 .00 .00 .14 .08 .00 .04 .00 -.00 .50 .02 .00 .04 .00 .02 .00 36000 3000

153 .04 .00 .00 .04 .04 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 19000 1500

302

Page 308: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres)

o Cultivable Pond Kua a 2 C v 3 v land o ' 0 .

U) 41 3 c ° y = . .. E .. 3 .. v c - C 2 L .a N

C CL

cm M -0 aO+ C y M C 3 O

+ V + E W H 0 C G

#A f0 O O i .a C N N

> i 0 _ M U M ° O w U.

C M H 0 CL v E 0 - C M M O

0.O ' U. M H= 3 + 4j

f0 c v U L- =

M a t m s y L-

/0 - B Vl -W '°U - C

0 0 3

= y

v 0 p

z z`i z 3 0 3 U, r 9 ,

154 .04 .00 .00 .04 .04 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 20000 1500

155 5.30 .00 2.00 3.30 .40 2.10 .30 1.60 .40 1.00 .10 2.40 .00 .00 .50 .00 72000 6000

156 1.00 1.00 .00 2.00 .30 1.48 .10 .00 -.00 2.00 .12 1.58 .00 .00 .12 .00 40000 3000

157 .05 .00 .00 .05 .05 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 15000 1000

158 .05 .00 .00 .05 .05 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 22000 1800

159 2.19 .00 .00 2.19 .30 1.20 .45 .00 -.00 1.00 .24 1.65 .00 .00 .24 .00 45000 3500

160 .80 .00 .00 .80 .05 .44 .05 .37 .26 .00 -.00 .49 .00 .00 .26 .00 18000 1500

161 .55 .80 .00 1.35 .05 1.30 .00 .00 .00 .00 -.00 1.30 .00 .00 .00 .00 48000 4000

162 .05 .00 .00 .05 .05 .00 .00 .00 .00 .00 -.00 .00 .00 .00 .00 .00 22000 1800

163 .05 .80 .00 .85 .05 .80 .00 .00 .00 .00 -.00 .80 .00 .00 .00 .00 37000 3000

164 .32 .34 .00 .66 .06 .48 .08 .12 .04 .00 -.00 .56 .00 .00 .04 .00 48000 4000

303

Page 309: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) a, E

° a,

c Cultivable Pond Kua 'fl

C ; %-0 m

land .. W o

D.

2._ VI

C

C .0 y 41 d w Ol a+ ut O

C :0 O 3 `O a+ ++ O R

E W x

d C O p a Vl m 0 V

y C C O'

= N m + C G + G p

M .0 . T

C

U -i O i p p

p v O

=' - f0 t

O y w . C Ip . 0 . v O p + l a L m

O C_ t L Cf d O 7 y

L- _ N i /f a i U

z CL z 1. R z 3 f (, IT

> ,c 0 R

165 .08 .00 .00 .08 .06 .00 .00 .25 .02 .00 -.00 .00 .00 .00 .02 .00 35000 2670

166 .02 .00 .00 .02 .02 .00 .00 .00 .00 .00 -.00 .00 .00 .00 .00 .00 25000 2100

167 .04 .00 .00 .04 .04 .00 .00 .00 .00 .00 -.00 .00 .00 .00 .00 .00 30000 2500

168 .03 .00 .00 .03 .01 .00 .00 .25 .02 .00 -.00 .00 .00 .00 .02 .00 20000 1500

169 -.00 .00 .00 -.00 -.00 -.00 .00 -.00 -.00 .00 -.00 -.00 .00 .00 .00 .00

170 2.29 .00 .00 2.29 .03 2.00 .20 .50 .06 .00 -.00 2.00 .20 .00 .06 .00 25000 2200

171 .32 .80 .00 1.12 .03 .80 .23 .50 .06 .00 -.00 .80 .18 .05 .06 .00 40000 3600

172 .00 .00 .00 .00 .00 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 25000 2800

173 .36 .00 .00 .36 .16 .14 .00 .00 -.00 1.00 .06 .00 .14 .00 .06 .00 35000 2500

174 .02 .36 .00 .38 .02 .36 .00 .00 -.00 .00 -.00 .36 .00 .00 .00 .00 25000 2000

175 .02 .00 .00 .02 .02 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 6000 500

304

Page 310: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Land (in Acre) Nature of Land (in Acre) Use of Land (in Acres) w E

d

o L Cultivable Pond Kua -o -'

U C

v U v rn on V land -0

> °J > o

o C y

. c

3 .d C w Cn

C M y O n C.

C p- O 3 p ±+ "0 ,+ f0 O E f0

W G1 W,

O (U ,a

L v1 fC O L

IV O 2 } d f0 i i C Qt p U R

o p p + Q y

. V J C R C

. E O _ a L i 0 C L r0 J L u. L r d vl

.' a+ y 3 i yam,,

C p r= V m

3: 0 w . U) m z a z L '° 3 0 3 f a - a,

z

176 .03 .00 .00 .03 .03 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 19000 1500

177 .03 .00 .00 .03 .03 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 12000 1000

178 .03 .00 .00 .03 .03 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 12000 1000

179 .02 .00 .00 .02 .02 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 24000 1500

180 .17 .20 .00 .37 .12 .20 .05 .00 -.00 .00 -.00 .20 .05 .00 .00 .00 45000 3500

181 .17 .20 .00 .37 .12 .20 .05 .00 -.00 .00 -.00 .20 .05 .00 .00 .00 36000 3000

182 .13 .00 .00 .13 .04 .00 .09 .00 -.00 .00 -.00 .00 .09 .00 .00 .00 24000 2000

183 .00 .00 .00 .00 .00 .00 .00 .00 -.00 .00 -.00 .00 .00 .00 .00 .00 19000 1500

184 .60 .00 .00 .60 .20 .36 .00 .00 -.00 1.00 .04 .36 .00 00 .04 .00 48000 4000

185 48000 4000

305

Page 311: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ANIMAL AND FOREST RESOURCES, SOURCE OF WATER

AND NATURE OF LATRINE

Page 312: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Bogair Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of

in Number) of Family Latrine Pou ltry C ow Go at Trees Egg Pou ltry M ilk Fis h

U Wood it 0 &a a Ch Cn

CL n - n. _ a a+ +' E

= a c

LL Z O C Z O 0 Z N G .o a)

.0 E (A E E 0 E

(A O

E i L R .C

E E C C C in O Q U D

Z Z 3 U U U U

1 22 2 5 1 - - 39 18 205 180 130 - 2120 5110 225 - 11 no Tubewell Tubewell Ringslub

2 11 4 4 1 - - 24 11 200 150 150 - 1000 3000 200 - 12 yes Both Tubewell Ringslub

3 22 5 3 - - - 50 17 130 200 90 220 800 2500 175 - 12 yes Both Tubewell Ringslub

4 23 2 5 1 - - 45 13 100 250 70 430 1500 3500 125 - 12 yes Both Tubewell Ringslub

5 10 2 4 1 - - 85 19 150 - 48 - 1300 2250 108 - 12 yes Both Tubewell Watersealed

6 12 3 6 1 - - 25 11 200 360 110 330 1000 2500 3500 - 12 yes Both Tubewell Ringslub

7 17 2 4 - - - 27 15 275 310 450 250 1100 1310 2500 3000 12 yes Both Tubewell Ringslub

8 11 4 3 - - - 20 9 175 185 105 300 1000 2600 4000 2100 12 yes Both Tubewell Ringslub

9 7 - 3 - - - 250 75 150 50 220 - 1000 1223 1500 1000 12 yes Both Tubewell Watersealed

10 12 2 3 - - - 300 120 170 130 420 300 1130 1100 1500 1100 12 yes Tubewell Tubewell Ringslub

11 8 - 2 - - - 200 50 400 - 300 100 - - 700 1200 12 yes Tubewell Tubewell Ringslub

307

Page 313: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources in Number)

Production last Year (in Taka) Crop Production of Family

Sources of Water Nature of Latrine

Pou ltry C ow G oat Trees Egg Pou ltry M ilk Fis h

U Z.

Wood Fruit 0 0 0 0 " a a = c

E o

Z

"a !

c 0

Z

V aa'

G o

Z

"a !

c a`J

>=

Z

a`l

E

Z

n E

C

U

U n E

c U

a a E

c U

n E

c U

a E a°'i o

p V

d 3 c c of °i ai U

12 87 17 3 - - - 150 37 - 400 500 2800 - 4000 900 1300 12 yes Tubewell Tubewell Ringslub

13 17 - - - - - 10 6 150 200 340 350 - - 1100 - 12 no Tubewell Tubewell Ringslub

14 21 5 2 - - - 25 10 85 250 425 550 - - 1000 - 12 no Both Tubewell Ringslub

15 82 13 3 - - - 7 3 750 1200 300 1100 - 9000 800 - 12 yes Pond Tubewell Ringslub

16 - - 2 - - - 11 7 - - - - - 800 400 - - no Tubewell Tubewell Ringslub

17 3 - 3 1 16 4 55 100 150 100 - 1400 500 - 8 no Tubewell Tubewell Ringslub

18 - - - - - - 9 4 35 - - - - - 200 - 9 no Pond Tubewell Ringslub

19 27 7 3 1 25 13 350 240 600 1400 750 700 450 - 12 yes Tubewell Tubewell Ringslub

20 31 6 5 1 12 8 460 300 340 500 880 3600 1000 - 12 no Pond Tubewell Ringslub

21 - - 8 1 320 80 - - - - 7000 6000 4000 70000 12 yes Tubewell Tubewell Watersealed

22 30 4 4 - 70 22 400 300 900 1200 230 1100 500 - 12 yes Tubewell Tubewell Ringslub

23 9 - 2 - 11 6 100 125 200 300 100 600 150 - 4 no Tubewell Tubewell Ringslub

308

Page 314: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Famil Latrine

Pou ltry C ow Go at Trees Egg Pou ltry M ilk Fis h

o Wood Fruit 0 0 0

° N O1 '4' °1 Z. Z vt 7 d C C

L A, CL _ 41

G. - A., a _ d _ a+ C a C C Y LL

° Z

C7

0 O

Z _v

0 Z 47 O ai E

N E N

Z N

E N

Z E U1

O y 0 E

L L-

f0 y u

C

a Z z 0 U U U U

24 14 3 3 - - - 28 5 120 175 180 220 200 700 200 - 12 no Tubewell Tubewell Ringslub

25 6 - 4 - - - 30 4 - - - 300 150 1000 150 - 6 no Tubewell Tubewell Ringslub

26 - - 2 - - - - - - - - - - - - - - no Tubewell Tubewell Ringslub

27 - - 2 - - - 70 11 - - - - - - - - 7 no Tubewell Tubewell Ringslub

28 30 4 4 - - - 80 25 200 300 300 400 325 1200 200 - 12 no Tubewell Tubewell Ringslub

29 50 5 5 1 - - 120 18 350 400 900 200 700 1000 1500 - 12 yes Tubewell Tubewell Ringslub

30 80 15 4 - - - 55 35 300 400 1100 700 300 1100 600 - 12 yes Tubewell Tubewell Ringslub

31 - - - - - - 15 10 - - - - - - - - 12 no Tubewell Tubewell Ringslub

32 25 10 5 - - - 200 50 250 - 1000 - 500 1000 1500 - 12 yes Both Tubewell Ringslub

33 40 5 4 - - - 250 35 1000 - 500 300 - 1000 2000 - 12 yes Both Tubewell Ringslub

34 25 6 2 - - - 400 35 2000 1000 240 3600 1000 500 4000 - 12 yes Both Tubewell Ringslub

35 17 4 1 - - - - - 1000 1575 110 230 850 - - - - no Both Tubewell Ringslub

309

Page 315: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

Pou ltry Cow G oat Trees Egg Pou ltry M ilk Fis h

U . Wood Fruit C O

G O

C O

C O i H Oi y C Qf

C

. Z Z7 2 0 Z

b 2 0 z O 'G T

Q L. a

z

L. 4J

Z

O. E h

U

_- GJ {A

4 E h

U

_- 4-1 a E Vf

U

0J

Z Q E Vf

V

_-

Vl

++ C p

V

y n i. {n

C= 10

U +J

Y C

36 19 8 2 - - - - 2 800 1600 240 3000 500 750 700 - 9 no Both Tubewelf Open

37 26 7 1 - - - 35 15 1110 1200 130 330 - - 1000 - 12 yes Both Tubewell Ringslub

38 40 4 4 1 - - 10 11 1010 1330 600 4000 800 982 1500 - 12 yes Both Tubewelf Ringslub

39 39 2 4 - - - 15 5 1213 1314 300 400 - - 2300 - 12 yes Both Tubewelf Ringslub

40 14 3 2 - - - 7 5 630 900 200 100 - - 300 - 7 no Both Tubewell Ringslub

41 - - 3 - - - 30 15 - - - - 800 1200 - - 5 no Tubewell Tubewelf Ringslub

42 12 4 4 - - - 10 5 100 - 200 - 300 4000 1500 1000 11 no Pond Tubewell Ringslub

43 15 - 4 2 - - 11 8 200 50 150 200 500 - - - 9 no Tubewell Tubewell Watersealed

44 6 - 2 1 - - 50 20 150 75 400 100 300 700 - - 10 no Tubewell Tubewelf Ringslub

45 - - - - - - 47 22 - - - - - - - - 10 no Pond Tubewell Ringslub

46 9 2 6 1 - - 32 15 80 100 300 500 700 2000 - - - no Tubewell Tubewell Ringslub

47 15 4 6 3 - - 60 25 250 150 200 700 - 1000 2400 2000 11 no Pond Tubewelf Ringslub

310

Page 316: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Family Latrine

Pou ltry Co w Go at Trees Egg Pou ltry M ilk Fis h C

U Wood Fruit 0 +i C L N Ol U)

O O O O t N C C v Q a _ n _ a a _ E; c a m c

U_ O D D (A 0 FA

E N (> > D E E C C C C a

Z Z U U U U U

48 34 4 6 - - - 40 15 300 500 300 - - 500 700 - 12 yes Tubewell Tubewell Ringslub

49 20 2 4 1 - - 10 7 500 400 600 700 200 300 500 700 12 yes Tubewell Tubewell Ringslub

50 10 1 - - - - 30 12 50 - 100 300 - - - - 4 no Pond Tubewell Ringslub

51 20 5 2 - - - 10 5 150 200 200 500 500 - - - 6 no Tubewell Tubewell Ringslub

52 17 3 - - - - 40 15 200 300 100 450 - - 400 - 4 no Tubewell Tubewell Ringslub

53 25 7 2 - - - 10 7 100 400 300 700 300 - - - 3 no Pond Tubewell Watersealed

54 18 5 - - - - 10 8 250 500 250 400 - - - - - no Pond Tubewell Ringslub

55 15 6 3 - - - 30 14 100 300 80 500 400 900 700 - 3 no Tubewell Tubewell Ringslub

56 10 2 - - - - 7 10 50 350 100 300 - - - - - no Tubewell Tubewell Watersealed

57 16 4 - - - - 17 15 150 400 200 500 - - - - - no Tubewell Tubewell Ringslub

58 25 7 3 - - - 40 15 100 300 250 800 500 1000 900 - 8 no Tubewell Tubewell Ringslub

59 30 4 3 - - - 50 20 300 500 400 900 400 700 1000 - 12 yes Pond Tubewell Ringslub

311

Page 317: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number) of Family Latrine

a Pou ltry C ow G oat Trees Egg Pou ltry M ilk Fis h

c ° Wood Fruit C C C C ++ G i H 1A .2 O O u .C

Q al 3 C C

E 0 a, O d 0 2 a`i a E a E a G E a

G, E a

+' ' > o

C C N Y

U- z Z z o .0 a f/) Ur) Nf (9 v> > i9 V) to E a v C `

z z U V U U V

60 15 3 1 - 28 15 100 300 200 500 500 - 1100 - 11 no Tubewell Tubewell Watersealed

61 20 2 3 - - - 70 15 300 - 250 800 100 2500 300 - 10 no Tubewell Tubewell Ringslub

62 15 - 2 - - - 10 6 - 100 400 700 1000 1500 400 - 6 no Pond Tubewell Ringslub

63 18 4 3 - - - 65 17 100 - 200 300 - 1200 900 - 5 no Tubewell Tubewell Watersealed

64 35 - 4 - - - 150 30 400 200 400 - 1500 1000 2000 - 12 yes Tubewell Tubewell Ringslub

65 5 2 2 - - - 4 4 300 - 200 - - - 700 - - no Pond Tubewell Ringslub

66 10 4 3 - - - 40 13 700 - 600 - 1000 - 3000 - 4 no Pond Tubewell Watersealed

67 10 - 2 - - - 100 60 250 - 800 - 1000 3000 2000 3000 12 yes Pond Tubewell Ringslub

68 5 2 2 - - - - - - - - - - - - - no Tubewell Tubewell Ringslub

r 69 3 - 1 - - - - - - - - - - - - - - no Tubewell Tubewell Ringslub

70 6 - - - - - - - - - - - - - - - no Tubewell Tubewell Ringslub

71 15 - 2 40 13 100 150 100 300 - - - 1 no Tubewell Tubewell Ringslub

312

Page 318: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

Pou ltry C ow Go at Trees Egg Pou ltry M ilk Fis h

o Wood Fruit C C C C ° ++ C i N H C

L ° Z v 0 Z _ 0 Z w w E M E Z

C E z

E :3 YI

U

E N C

U

Gl E Yf C

U

4) CIL

E {/1 C

U

C1 !O

O G L U

' L

Q 1C y (J

C

72 14 2 2 - - - 30 18 100 200 100 250 - - - - - no Tubewell Tubewell Ringslub

73 - - - - - - 11 4 - - - - no Tubewell Tubewell Ringslub

74 35 4 - - - - 100 40 250 - 700 - - - 5000 - 12 yes Both Tubewell Ringslub

75 12 - 2 - - - 15 13 2000 - 800 1000 - - 4000 - 12 no Both Tubewell Watersealed

76 28 - - - - - 30 8 1000 - 1200 - - - 3000 - 11 no Both Tubewell Watersealed

77 23 2 3 - - - 35 7 900 - 1000 - - 5000 2000 - 12 yes Both Tubewell Watersealed

78 - - 1 - - - 32 5 - - - - - - 1000 - 12 yes Tubewell Tubewell Watersealed

79 - - - - - - 18 7 - - - - - - 200 - 12 yes Tubewell Tubewell Watersealed

80 - - - - - - 15 2 - - - - - - 250 - 12 yes Tubewell Tubewell Watersealed

81 20 5 2 - - - 20 10 150 400 300 500 - - 150 - 8 no Tubewell Tubewell Ringslub

82 17 7 1 - - - 30 12 100 300 200 600 - - 300 - 9 no Tubewell Tubewell Ringslub

83 25 6 1 - - - 40 15 200 600 306 800 - - 400 - 7 no Pond Tubewell Ringslub

313

Page 319: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Family Latrine

Pou ltry C ow G oat Trees Egg Pou ltry M ilk Fis h

U Wood Fruit C C C

1 I _ t u 1 1 c

U. Z Z Z D .Q {/1 N N C a V C C C O Z Z U V U V

84 10 3 2 - - - 20 7 100 200 100 200 300 500 500 - 12 yes Pond Tubewell Ringslub

85 8 2 2 - - - 30 12 80 150 300 - 200 500 300 - 12 no Tubewell Tubewell Ringslub

86 15 4 4 - - - 17 7 200 400 300 - 300 600 200 100 12 yes Tubewell Tubewell Ringslub

87 17 6 1 - - - 17 8 500 200 200 300 - - 400 600 6 no Tubewell Tubewell Ringslub

88 16 4 2 - - - 25 4 200 400 100 400 - - 300 - 5 no Tubewell Tubewell Watersealed

89 7 2 1 - - - 50 17 90 100 200 - - - 200 - - no Tubewell Tubewell Ringslub

90 20 5 1 - - - 13 7 200 400 300 500 - - 300 - 12 yes Both Tubewell Ringslub

91 55 13 - - - - 105 19 300 398 300 1500 - - 3500 - - no Both Tubewell Ringslub

92 35 15 3 1 - - 81 10 250 310 250 340 1000 2000 2500 - 6 no Tubewell Tubewell Watersealed

93 37 11 1 - - - 30 7 400 200 150 400 - - - - - no Both Tubewell Ringslub

94 13 2 2 - - - 87 19 190190 350 450 650 - - 1150 3460 10 no Tubewell Tubewell Ringslub

95 80 20 2 - - - 15 20 720 - 2000 - 4000 - 3300 - 12 no Pond Tubewell Ringslub

314

Page 320: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Famil Latrine

Pou ltry C ow Go at Trees Egg Pou ltry M ilk Fis h

U Wood Fruit C 0

4M

6 CL CL 0. 6

M 0 Z N

0 0 Z N 0 Z N

0 Gl .0 N .0 E

7 y (/ E

3 Q7 (/ E Q1 0 E

7 N (A

3 d 0 = d 7 N d

YI c N c YI c c Q V Z Z U U U U

U

96 88 38 2 - - - 18 14 790 - 1225 - 4800 - 3300 - 12 yes Pond Tubewell Ringslub

97 44 24 - - - - 13 18 480 - 500 - - - 3300 - - no Tubewell Tubewell Ringslub

98 11 7 - - - - - 4 380 420 280 300 - - - - 4 no Pond Tubewell Ringslub

- 65 - 3 - - - 20 50 390 420 2000 - 3000 5000 5000 - 12 yes Pond Tubewell Ringslub

100 47 15 - - - - 22 45 344 498 1896 - - - 5000 - - no Pond Tubewell Ringslub

101 15 - 1 - - - - 5 128 470 390 - - - - - 4 no Tubewell Tubewell Ringslub

102 15 5 - - - - - 6 280 255 330 200 - - - - - no Pond Tubewell Open

103 18 7 - - - - - 5 180 210 280 190 - - - - - no Pond Tubewell Open

104 25 5 - - - - - 10 280 315 120 290 - - 700 - - no Pond Tubewell Ringslub

105 13 10 2 - - - - 4 120 220 - - - - 500 - 6 no Pond Tubewell Ringslub

106 10 15 1 - - - - 6 100 130 210 - - - 400 - 3 no Pond Tubewell Ringslub

107 6 10 3 - - - - 1 116 138 150 - 1240 - 300 - 8 no Pond Tubewell Ringslub

315

Page 321: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Family

Sources of Water Nature of Latrine

Pou ltry C ow G oat Trees Egg Pou ltry M ilk Fis h

U . Wood Fruit C O

C O

C O

C O

0 C

a i N Q1 H C. G1

C

L O z c z d c z -0 a a

z

a so

z

C E

U

= i C. E

U

d v C

U

>

C E >

U

= ' ++ ' E o E

O U

CL +'

a

-C ray u *'

Y c o

108 23 16 - - - - - 5 122 128 250 - - - 200 - 1 no Pond Tubewell Ringslub

109 11 21 - - - - - 4 75 - 100 - - - 100 - - no Pond Tubewell Open

110 12 30 - - - - 20 6 40 200 256 - - - 100 - - no Pond 3.00 Open

111 14 8 - - - - 2 4 122 128 150 - - - 50 - - no Pond Tubewell Open

112 21 10 - - - - 3 5 112 220 180 250 - - 120 - - no Pond Tubewell Open

1113 38 12 2 - - - 10 25 480 690 980 480 - - 590 - 12 yes Pond Tubewell Ringslub

114 31 9 - - - - 5 5 370 480 600 300 - - 360 - 2 no Pond Tubewell Ringslub

115 . .

116 . .

117 72 30 2 1 - - 157 35 480 398 2500 - 2160 - 5360 7000 12 yes Pond Tubewell Ringslub

118 56 30 2 2 - - 20 30 480 - 1800 - 2300 - 5000 - 8 no Tubewell Tubewell Watersealed

119 19 18 1 - - - - 3 120 - - - - - - - 5 no Pond Tubewell Ringslub

316

Page 322: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

Pou ltry C ow Go at Trees Egg Pou ltry M ilk Fis h

U . Wood Fruit C O

C O

C O

C O

'jOj C y (v 3

01 N .

Cn

E U-

O z O Z

O Z 4) 0

Z Z

CL E

0 U

a 0. E 3

0 U

a E a a cn

E

0 U

a> cn

CL

> 0 E f

O U

t ' fl

a

C o U

c D

120 26 11 - - - - 150 300 12 900 - - - - 4 no Tubewell Tubewell Ringslub

121 42 14 - - - - 21 10 200 - 1200 - - - - - - no Pond Tubewell Ringslub

122 3 2 - - - - - - - - - - - - - - - - Pond Tubewell Open

123 4 - - - - - - 3 - - 50 - - - 880 - 9 no Pond Tubewell Ringslub

124 42 25 - - 9 6 480 550 1000 660 - - 1700 - 12 yes Pond Tubewell Ringslub

125 15 5 1 - - - - 4 - 360 250 - - - - - - no Tubewell Tubewell Ringslub

126 58 - 1 - - - 7 15 380 420 580 540 - 4 no Tubewell Tubewell Ringslub

127 35 11 3 - 21 11 90 300 12 250 600 1200 1500 - 6 no Pond Tubewell Ringslub

128 30 20 2 - 10 6 100 - 400 100 1200 - 1000 - 12 no Pond Tubewell Ringslub

129 12 10 - - - - - 5 400 - 200 50 - - - - 8 no Tubewell Tubewell Ringslub

130 19 21 2 30 20 300 400 6 - 1200 - - - 12 no Tubewell Tubewell Ringslub

131 14 11 2 11 7 - - 1500 - 300 2500 800 - 8 no Pond Tubewell Ringslub

317

Page 323: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

Pou ltry C ow G oat Trees Egg Pou ltry M ilk Fis h

U . Wood Fruit C O O

c O

c O

0 6 L y

al 7 rn C v+ C

E U.

C Z 2 0

Z w 0

Z w w

7 Z

a

3 Z

C E y O U

= m

C E N

U

_= a

C E i7/f

O U

_ ar N

C E

O U

a

6

E o y Ei L

C U

a d *' `-

Q

= c M

U IV 4.,

Y

0

132 40 21 2 2 - - 6 10 250 300 12 - 1500 2000 2000 - 12 no Tubewell Tubewell Ringslub

133 42 70 5 - - - 60 30 - - 600 - 1080 1860 3000 - 12 yes Pond Tubewell Ringslub

134 60 40 1 - - - 120 15 280 - 1000 - - - 2500 - 12 no Pond Tubewell Ringslub

135 35 35 4 - - - - 10 280 - 1000 - - 1800 1000 - - no Pond Tubewell Open

136 49 30 2 - - - 15 10 120 360 1200 - 1080 - 1000 - 12 no Pond Tubewell Ringslub

137 60 20 3 - - - 30 15 280 360 1750 - 980 1000 1000 - 9 no Pond Tubewell Ringslub

138 21 19 1 - - - 8 12 150 80 1200 - - - 1500 - 12 no Pond Tubewell Ringslub

139 20 40 3 - - - 25 30 228 - 228 - 480 - 2560 - 12 no Tubewell Tubewell Ringslub

140 35 33 - - - - 10 10 280 - 500 - - - 800 - - no Tubewell Tubewell Ringslub

141 40 35 - - - - 11 15 400 - 1100 500 - - 1200 - 12 no Pond Tubewell Ringslub

142 20 10 - - - - 6 5 150 180 500 - - - 800 - - no Tubewell Tubewell Ringslub

143 39 21 - - - - 19 9 500 250 300 150 - - - - 9 no Pond Tubewell Open

318

Page 324: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources (in Number)

Production last Year (in Taka) Crop Production of Family

Sources of Water Nature of Latrine

Pou ltry C ow Go at Trees Egg Pou ltry M ilk Fis h

0 o 2.

Wood Fruit C O

C O

C O

C O

0 i+ C vZ i Vl 7

O1 H G - O1

E U.

O Z

v d O z v N O Z

v T G

N

z

. w .0

z

n E

U

- N

a E

C

U

- Vf

G. E H C

U

- Vf

0. E h C

U

- N (A

E _ N O

C U

a+ a Q Vf

m C

V 3 c L

144 - 20 2 - - - 40 15 340 280 390 - 800 1000 800 - 2 no Pond Tubewell Ringslub

145 30 20 - - - - 40 30 120 280 480 - - - 3000 - 2 no Pond Tubewell Ringslub

146 29 21 - - - - 11 9 200 - - - - - - - 12 no Pond Tubewell Ringslub

147 40 30 1 - - - 125 50 170 190 500 - 900 2000 3000 - 12 no Pond Tubewell Ringslub

148 45 10 1 - - - 40 25 170 190 560 - 800 1080 2500 - 12 yes Pond Tubewell Ringslub

149 - - - - - - - - - - - - - - - -.00 -.00 -.00

150 25 30 2 - - - 55 26 150 220 750 650 780 2250 4000 - 10 no Pond Tubewell Ringslub

151 15 15 1 - - - - 6 36 120 200 - - - 500 - - - Pond Tubewell Ringslub

152 30 20 1 - - - - 10 180 220 500 - - - 500 - - - Pond Tubewell Ringslub

153 10 5 - - - - - - 70 120 150 - - - - - - - Pond Tubewell Open

154 10 5 - - - - 5 6 180 210 380 - - - - - - - Pond Tubewell Ringslub

155 45 35 6 - 7 - 700 350 2000 2500 3000 1500 3000 3500 7000 - 12 yes Tubewell Tubewell Watersealed

319

Page 325: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of (in Number of Family Latrine

a Pou ltry C ow G oat Trees Egg Pou ltry M ilk Fis h

c ° Wood Fruit 0 L 45 7 =

v v M L a = n = n = a = E y C 5 a C

Y. 0 Z

a D Z

0 aJ

0 0 z

w N w E N

w to E N to

E H

a N E w 3 w o C E Q N c

l= H V 93

Z Z U U U V

156 40 20 3 - - - 70 20 700 300 1200 1000 1000 2000 300 - 11 yes Tubewell Tubewell Ringslub

157 12 3 1 - - - 20 8 50 200 100 300 - - - - - - Pond Tubewell Ringslub

158 4 - - - - - 2 1 100 - - - - - - - Pond Tubewell Ringslub

159 100 50 - - - - 100 100 200 250 2500 2500 - - 1000 - 12 yes Pond Tubewell Ringslub

160 - - - - - - - 10 - - - - - - 3000 2000 9 no Pond Tubewell Ringslub

161 55 35 1 - - 32 9 250 350 1200 900 - - - - 12 yes Pond Tubewell Ringslub

162 48 32 - - - - - 4 120 400 500 1200 - - - - - - Pond Tubewell Ringslub

163 50 30 2 - - - 10 8 300 450 850 1200 1200 1500 - - 12 yes Pond Tubewell Ringslub

164 55 35 2 - 10 280 390 1150 950 - - 1000 - 5 no Pond Tubewell Ringslub

165 - 9 - - - - 4 6 - - - - - - 850 - - - Tubewell Tubewell Ringslub

166 25 12 1 1 7 5 - - 295 360 - - - - 2 no Pond Tubewell Open

167 28 12 - - 30 25 460 680 1210 480 - - - - 12 no Tubewell Tubewell Ringslub

320

Page 326: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources in Number

Production last Year (in Taka) Crop Production of Famil

Sources of Water Nature of Latrine

- Pou ltry Co w Go at Trees Egg Pou ltry M ilk Fis h

0 u >.

Wood Fruit C O

C O

C O

C O

° *P C 1 V L a

L O1 y Cn C

E O 2 O "0 O 0 E

Z

a

E

Z

n E

C

U

n E

C

U

a E

C

U

a a E

C

U

a> +, *'

> a°i o 'A E O V

C a a

= c af0i :

168 14 16 - - - - 5 10 - - 680 - - - 400 - 11 no Pond Tubewell Ringslub

169 - - - - 00 Tubewell -.00

170 16 26 4 - 16 18 360 425 1260 - 3225 5208 1800 - 12 no Pond Tubewell Ringslub

171 12 36 4 - - - 27 19 325 - 12 - 496 985 1180 - - - Tubewell Tubewell Ringslub

172 8 25 2 - - - - 2 60 - 4 5 1800 - - - - - Pond Tubewell Open

173 30 30 2 1 - - 12 206 320 560 - - - 1000 - 4 no Pond Tubewell Ringslub

174 10 18 2 - - - 10 360 226 9 - 1800 - - - 2 no Pond Tubewell Ringslub

175 32 15 - - - - - - - 250 - - - - - - Pond Tubewell Open

176 23 12 - - - 2 8 - 250 220 350 - - - - - - Pond Tubewell Ringslub

177 22 11 - - 1 - 3 4 40 90 85 100 - - - - - - Pond Tubewell Ringslub

178 30 12 1 - - - - 3 80 120 250 300 - - - - - - Pond Tubewell Ringslub

179 26 12 - - - - 1 2 120 60 90 280 - - - - - - Pond Tubewell Ringslub

321

Page 327: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Animal & forest Resources Production last Year (in Taka) Crop Production Sources of Water Nature of in Number) of Famil Latrine

Pou ltry Co w Go at Trees Egg Pou ltry M ilk Fis h

c o Wood Fruit C C C L or C L V! IA G1 O O 0 0 C ,y C v n . c c _ a n E c .+ a c c Z 2 C Z 2

G O Z v

0 w a n E E

cn E to

E >

y cn

o g N ai

N Vl H YI

O a V

7 Z 7 z 0 V O V 0 0 0 U

180 60 21 2 - - - 17 11 900 400 1100 250 - - - - 4 no Tubewell Tubewell Ringslub

181 50 11 - - - - 11 15 600 580 750 - - - - - 5 no Tubewell Tubewell Ringslub

182 55 21 - - - - 9 11 280 470 540 870 - - - - - - Tubewell Tubewell Open

183 31 11 - - - - - - - 180 250 500 - - - - - - Tubewell Tubewell Open

184 59 31 2 - - - 15 70 150 1500 2000 - - 2000 1000 - 10 no Tubewell Tubewell Ringslub

185 . . . . .

322

Page 328: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

EMPLOYMENT, FAMILY PLANNING METHOD,

NEW BORN BABY AND DISEASE

Page 329: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Bociair Information about Employment (V Last one Year , c 3 Information about Disease (without considering cold, cough, and fever)

w c

c v Number of Nature of Disease Nature of Treatment

v L d +- o ° a o M

patient > 0 `

'0

aEi D ° ° -0

4) V 0 >. 0) .D

U CL E E E E o T 41 U. E M

LL y 41 it, a

E

v

E

a

E ,, n

or

c u y

E

a '0 Male Female Children Male Female Children

4) CO E E U u. u. LL. LL U a ~

1 3 3 - - 1 - 1 - 3 - 3 3 - 1 1 - gastric pressure - private doctor private doctor -

2 2 1 2 1 - - - - 1 - 1 - - 1 1 - mental gastric - private clinic private clinic -

3 1 1 - - - - - - 1 - 1 - - 1 - - pate pathar .00 - rural doctor .00 -

4 3 1 1 - - - - - - - 2 - - malaria/ .00 - private clinic .00 -

Diarrhoea

5 1 1 - - - - - 1 1 - 1 1 apendix apendix - private clinic private clinic -

6 1 2 1 - - - - 1 1 1 - presure .00 - private doctor .00 -

7 4 2 - - - - 1 - 2 1 1 1 1 jandice presure - kabiraj private doctor -

8 2 2 1 1 1 1 - - .00 .00 - .00 .00 -

9 2 1 - - - - - 1 1 - 1 .00 presure - .00 private doctor -

10 3 1 1 - 1 1 diabetis .00 - private clinic .00 -

324

Page 330: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year _ c 3 Information about Disease (without considering cold, cough, and fever)

w g, c c a Number of Nature of Disease Nature of Treatment v o °a o patient 13 > o L E C

CU o 0 o dv o d o a

c°i ¢''a =a =° E

tea J ° E

aE Eo O) 7 Z u. Z

U. 4l N G) C) M a) U - 4)

E E E o c -S E :2 Male Female Children Male Female Children CO

E v 1L u_ a i u. v o_ F-

11 1 2 1 1 1 1 gastric .00 .00 private doctor .00

12 1 2 1 - - 1 1 1 1 1 1 mental khichuni .00 private clinic private clinic .00

13 1 1 - - - - - - - - - - 1 - gestric .00 .00 private clinic private clinic .00

14 1 1 - - - 1 1 1 .00 .00 .00 .00 .00 .00

15 1 3 - - - - 1 1 pate pathar hapanee ruraldoctor rural doctor

16 2 1 - - 1 - 1 1 00 .00 .00 .00 .00 .00

17 1 1 - - - - 1 1 - - - - - .00 .00 .00 .00 .00 .00

18 1 1 - - - - 1 1 - - - - - .00 .00 .00 .00 .00 .00

19 1 1 1 - - - 1 1 - - - 1 .00 presure .00 .00 private doctor .00

20 1 1 1 1 .00 .00 .00 .00 .00 .00

21 1 1 1 1 1 .00 - - .00 -

325

Page 331: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment c, Last one Year c 3 Information about Disease (without considering cold, cough, and fever)

w a c c Number of Nature of Disease Nature of Treatment

> 3 E a n

o .2 0 a s d

a 0 patient

0 o j u

O T C

Cu -0 0 a 0 .0 d V '0- f v ate`.- E O J E a E o r a, Z LL. Z

. E M

LL

d m a, a) a, d _u a! C

E E E m

E CL 0 E E Male Female Children Male Female Children E x V 1L u. LL LL V a ~

22 1 1 1 1 1 .00 - - .00 -

23 2 1 1 1 1 jandice - kobiraj -

24 3 1 - - - 1 2 1 - - - - - - .00 - .00 -

25 1 1 1 1 1 1 - pate pathar - - private clinic -

26 1 1 i 1 1 1 - pate pathar - - hospital -

27 1 1 1 - I 1 1 1 - .00 - - .00 -

28 1 1 - - - 1 1 .00 - - .00 -

29 3 1 1 1 1 1 presure - - private doctor -

30 1 1 1 1 1 .00 - .00 -

31 1 - - - - - - - - - - - - - 1 - - - - - - -

32 1 1 - - 1 1 1 1 1

326

Page 332: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment d Last one Year c Information about Disease without considerin cold, cough, and fever

;+, d E

c v 0 U1

d Number of Nature of Disease Nature of Treatment

N L u -0 L d t c 3 .!2 12 0 Y a y 0 1 patient

C W

:0. V ° ° d U 0 CL

O > d

4!

a M E i;M E Q

f E a . a Z

u 3 a 2

ro U.

d d d W R V d d

E E d m E n c E v Male Female Children Male Female Children (D W 2: E U w :E U. U U d u- o a

33 1 1 1 - - - 1 1 1 1 - - - - - -

34 1 1 1 - - 1 - 2 1 1 - - - - - -

35 1 1 - - - 1

36 - 2 - - - - - - - - - - - - - - - - - - -

37 1 1 - - - 1 - 1 - 1 1 - 1 - - - - - - - -

38 1 1 - - - - - - - - - -

39 3 1 - 1 - - 1 - 1 - - 1 - - - - - -

40 2 1 - - 1 1 - - 2 1 1 1 - - - - - - - - - -

41 2 - - - - - - - - - - 1 - gestric -.00 -.00 private doctor -.00 -.00

42 3 1 - - - - 1 1 2 1 skin bat -.00 private doctor private doctor -.00

43 1 1 - - - - 1 - 1 - 1 operation -.00 numunia private clinic -.00 private clinic

327

Page 333: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment v Last one Year

1

, c 3 Information about Disease (without considering cold, cough, and fever) .2 w 2 c r- v c d Number of Nature of Disease Nature of Treatment o :° a o patient

W > o ` 0) E CL;

v o o'o

' c W

U Q J w d ° E

U 1° a E Q E ° :3 z Li- z E

M LL-

N A a, al al

m al u a)

1 a

E E E E m n c E Male Female Children Male Female Children i E = V u. u. 1 ai y U.

a I-

44 1 1 1 - - - - - - - .00 -.00 -.00 -.00 -.00 -.00

45 3 1 - 1 - - - - 2 - - - - - - - -.00 -.00 -.00 -.00 -.00 -.00

46 2 - - - - 1 - - 1 1 1 presure bat -.00 rural doctor rural doctor -.00

47 3 2 - - - - - - 1 1 1 urinery gastric -.00 rural doctor rural doctor -.00

48 2 1 - - - - 2 - 1 5 1 - gestric gastric -.00 rural doctor rural doctor -.00

49 1 1 - - - - - - 1 1 3 1 1 gestric -.00 numunia pharmachiest -.00 pharmachiest

50 1 1 1 1 1 - - gestric -.00 -.00 pharmachiest -.00 -.00

S1 1 1 1 - - - -.00 -.00 -.00 -.00 -.00 -.00

52 1 1 - - - - 1 - 1 - - - - - - - -.00 -.00 -.00 -.00 -.00 -.00

53 1 1 - - - - - - 1 - - 1 - - - - -.00 -.00 -.00 -.00 -.00 -.00

54 1 1 - - - - - - 1 - - 1 - - - 1 -.00 -.00 numunia -.00 -.00 private clinic

328

Page 334: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment d Last one Year ,- c 3 Information about Disease (without considerin cold, cough, and fever)

u, c r c a Number of Nature of Disease Nature of Treatment

3 , d d a ° o D. a. L a patient >

.a L E W V C

CL t .a V @)

C U J °

Z) a M E

V o Q E A N U- Z

M E M

LL

N

E

d

E m

Gl

E

v

E

f0

a G1

c

V v N d ° Male Female Children Male Female Children

u. u. CO

y E z V U- v

55 1 1 1 1 1 -.00 gastric -.00 -.00 pharmachiest -.00

56 1 1 i 1 - gestric -.00 -.00 Pharmachiest -.00 -.00

57 1 1 1 1 1 - -.00 -.00 -.00 -.00 -.00 -.00

58 3 1 - - - - - - 1 1 1 presure -.00 -.00 private doctor -.00 -.00

59 1 1 - - - - - - 1 - - - - - - - -.00 -.00 -.00 -.00 -.00 -.00

60 3 1 1 -.00 -.00 -.00 -.00 -.00 -.00

61 2 2 1 1 1 hapanee -.00 -.00 private clinic -.00 -.00

62 1 1 1 1 gestric -.00 -.00 pharmachiest -.00 -.00

63 2 1 1 1 1 urinery -.00 -.00 private clinic -.00 -.00

64 2 2 1 1 presure -.00 -.00 private doctor -.00 -.00

65 2 2 - - 1 - - - 2 1 1 2 1 mental gastric numunia private clinic private clinic private clinic

329

Page 335: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year 70 , c 3 Information about Disease (without considerin cold, cough, and fever) rn u, a c v c a Number of Nature of Disease Nature of Treatment

oM patient Gl > V E Q s n

L Q

a v Q. >. 6)

Q a U J' a ?

Q. j a

E U J E E Q

Z M

Z

d d d N M y V 4) 47

° E

v v m E n c E d

Male Female Children Male Female Children U-

o'

E v 2 U u_ L U a -

66 2 1 1 -.00 bat -.00 -.00 rural doctor -.00

67 2 2 - - - - - - 2 1 - - - - - -.00 -.00 -.00 -.00 -.00 -.00

68 1 2 1 - 1 - - - 2 - - - - - - - gestric -.00 -.00 -.00 -.00 -.00

69 1 1 - - - - - - 1 1 -.00 -.00 -.00 pharmachiest -.00 -.00

70 - 1 - - 1 - - - 1 - 1 - - - - -.00 -.00 -.00 -.00 -.00 -.00

71 1 1 1 1 gestric -.00 -.00 pharmachiest -.00 -.00

72 1 1 1 -.00 -.00 -.00 -.00 -.00 -.00

73 1 1 - - - - - - 1 1 - - - - -.00 -.00 -.00 -.00 -.00 -.00

74 3 2 - - - - - - 2 2 1 2 - Omrigi bat/ Gastric -.00 private clinic kobiraj -.00

75 2 1 - - - - - - 1 1 - 1 1 -.00 presure turner -.00 rural doctor private clinic

76 1 1 - - - - - - 1 - - - - - 1 - -.00 presure -.00 -.00 pharmachiest -.00

330

Page 336: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment W Last one Year

rn , c 3 Information about Disease (without considering cold, cough, and fever) w d c C

W Number of Nature of Disease Nature of Treatment LV o0 °a oM patient

ou M

Ed wo o .0 Lo ad

C) M

0 E 0 U Q J ' d = o.

E o M -j

.

E Q E .

E o 21 w Z

R U- z

eo LL

a,

N a, 2 G7

o R

° y E

V d

E E E f E ° ' ° ° Male Female Children Male Female Children LA. U. EE

= iv :E a

77 2 1 - - - - 1 1 1 presure presure -.00 private clinic pharmachiest -.00

78 1 1 1 1 1 -.00 presure -.00 -.00 private doctor -.00

79 1 1 1 1 - diabetis -.00 -.00 private clinic -.00 -.00

80 1 1 - - - - 1 1 -.00 -.00 -.00 -.00 -.00 -.00

81 2 2 - - - - - - - - - - - 1 -.00 eye -.00 private doctor

82 2 2 - - - - - - 2 1 18.00 -.00 pharmachiest -.00

83 2 1 1 - - - - - - - -.00 -.00 .00 -.00

84 4 1 - - - - - - 1 1 gestric -.00 pharmachiest -.00

85 2 2 - - - - - - 1 - - - - - -.00 -.00 -.00 -.00

86 2 1 - - - - - - 1 - - - - - - - -.00 -.00 -.00 -.00

87 1 1 - - - - - - 1 - - - - 1 - - gestric -.00 rural doctor -.00

331

Page 337: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment a Last one Year

o , c 3 Information about Disease (without considering cold, cough, and fever) = c v = v Number of Nature of Disease Nature of Treatment °a o R patient

U U Q '- n. D U ra E Q

E m

L E o

O 7 Z LL_ 7 Z M

v ro C N d v d E

V Ol Q I

M E E E m M a E E v_ Male Female Children Male Female Children

U. LL. LL. E LL-

U f-

88 1 1 1 00 -.00 -.00 -.00

89 2 1 1 00 -.00 -.00 -.00

90 1 1 1 1 gestric -.00 rural doctor -.00

91 2 00 -.00 -.00

92 1 1 1 1 cancer private doctor -.00

93 1 1 - 1 1 - - 2 - - - - 1 gestric rural doctor -.00

94 1 1 - - - - - 1 1 -.00 -.00 -.00

95 2 4 - - - 2 - - 1 1 1 private clinic

96 1 1 - - - 1 - - 1 --.00 -.00 -.00

97 1 3 - 1 - 1 2 - 1 gestric private clinic .00

98 1 1 1 1 -.00 -.00 -.00

332

Page 338: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment d Last one Year

rn %- c 3 Information about Disease (without considering cold, cough, and fever) ;, a, c c

r- -

W a Number of Nature of Disease Nature of Treatment

> ai aI a L o say c Patient

y v 2° L W - -o t o . v v ° d -0 E

Z U. ZM

M LL

N N Ql d E y

E V Ql y

E f E E E m E a E v Male Female Children Male Female Children a U. a a) E = V u U

99 2 - - 1 1 - - 2 2 2 1 bat pharmachiest .00 -

100 1 1 - - - 1 - - 1 - 1 1 -.00 gastric -.00 rural doctor

101 2 2 - 1 1 1 - - - - - - - -.00 -.00 -.00 -.00 -.00 -.00

102 1 1 - - - - - - 1 1 - - - - - - .00 .00 .00 .00 .00 .00

103 1 1 - - - - - - 1 1 - - 1 - - bat -.00 -.00 kabiraj -.00 -.00

104 2 2 - 1 - - - - 2 - 1 - - - - - -.00 -.00 -.00 -.00 -.00 -.00

105 1 1 - 1 - - - - 1 1 1 -.00 gastric -.00 -.00 private clinic -.00

106 1 1 - 1 - - - - 1 1 1 -.00 skin -.00 -.00 private clinic -.00

107 1 1 - - - 1 - - 1 1 1 bat -.00 -.00 private clinic -.00 -.00

108 1 1 - - 1 - - - 1 1 1 1 -.00 -.00 turner -.00 -.00 private clinic

109 1 1 - 1 1 1 1 -.00 -.00 -.00 -.00 -.00 -.00

333

Page 339: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year , c 3 Information about Disease (without considering cold, cough, and fever) u, c c a Number of Nature of Disease Nature of Treatment

yL -o w L L o a °y 0M patient d > V E a Gl G fl 7 0- L O U CL c N ` L

(U

U Q J G. = a V G L 4) z L1

M .0 z E

R LL

N Gl d N M C/ U_ 41 d

r= E E m

M c

c E E v_ Male Female Children Male Female Children

` LL U- U. a l E u_ U

110 1 1 - - - - - - 1 - 1 - - - - - -.00 -.00 -.00 -.00 -.00 -.00

111 1 1 - - - - - - 1 - 1 .00 -.00 -.00 -.00

112 1 1 - - - - - - 1 - 1 - - - 1 bat -.00 pharmachiest -.00

113 3 2 - - - - - - 2 - 1 - - - -.00 -.00 -.00 -.00

114 1 1 - - - - - - 1 - 1 -.00 -.00 -.00 -.00

115

116

117 1 1 1 1 1 gastric -.00 rural doctor -.00

118 2 1 1 - - - - - 1 1 - 1 1 gastric Bronchitis private clinic private clinic

119 1 1 - - - - - - 1 - 1 -.00 -.00 -.00 -.00

120 1 1 1 1 00 -.00 -.00 -.00

334

Page 340: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment d Last one Year

a+ Information about Disease (without considering cold, cough, and fever)

u, 2 c c v c v Number of Nature of Disease Nature of Treatment

d L L V

L o °as o Patient d > o$ E, v o ° c a° o .w a

U Q CL E J E Q E E `o

o Z U- = .a

ro LA-

a) a, fa N

a) ID N

v f0 >,

aa)

C y E 'C

a f0 w L

E E m a v_ Male Female Children Male Female Children E w

U- U- LL. a, U - 1-

121 1 1 - - - - 1 1 1 gastric -.00 -.00 rural doctor -.00 -.00

122 1 - - - .00 .00 -.00 -.00 -.00 -.00

123 1 1 1 - - - - - - 1 -.00 -.00 TB -.00 -.00 private clinic

124 1 1 - - - - 1 1 1 1 - - - - .00 -.00 -.00 -.00 -.00 -.00

125 1 - 1 1 - - - - - - -.00 00 -.00 -.00 -.00 -.00

126 2 1 1 - - - 1 1 gastric -.00 -.00 pharmacist -.00 -.00

127 1 1 - - - - I 1 1 jaundice -.00 -.00 kabiraj -.00 -.00

128 3 3 - - - - 3 3 1 hapanee -.00 -.00 pharmacist -.00 -.00

129 1 1 1 - - - 1 1 1 -.00 means iregular -.00 -.00 rural doctor .00

130 1 1 - - - - 1 - 1 - -.00 -.00 -.00 -.00 -.00 -.00

131 1 2 1 1 -.00 -.00 -.00 -.00

335

Page 341: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment w Last one Year , c 3 Information about Disease (without considering cold, cough, and fever) w c c d Number of Nature of Disease Nature of Treatment

v o ° arcs o m patient (U a) c O o r d

- ' d o

c O 0 o a .! c o a a D E U J a

E 0 E A E o

T N 3 U- Z D E

LL c c ° a i

° d u_

a, i a

1O E E E C a c E Male Female Children Male Female Children . w CO 7

E = u o U U v t U

132 2 2 1 1 - - - -.00 -.00 -.00 -.00

133 3 2 - - - - - - 2 2 1 -.00 -.00 Private clinic -.00

134 5 2 - - - - - - 2 - - - - - 1 harvanga Skin -.00 pharmacist

135 2 1 - - - - - - 1 1 - - - 1 -.00 gastric -.00 rural doctor

136 1 1 - - - - - - 1 - 1 - - - 1 -.00 bat -.00 private clinic

137 1 1 - - - - - - 1 - 1 - - - 1 -.00 bat -.00 private clinic

138 3 2 - - - - - - 2 - 2 1 -.00 -.00 -.00 -.00

139 2 1 - - - - - - 1 - 1 1 gastric -.00 private clinic -.00

140 1 1 1 1 -.00 -.00 -.00 -.00

141 1 1 - - - - - - 1 1 -.00 -.00 -.00 -.00

142 1 - - - - 1 - - 1 - -.00 -.00 -.00 -.00

336

Page 342: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment a Last one Year T ,- c 3 Information about Disease (without considering cold cou h, and fever) w d c v c a Number of Nature of Disease Nature of Treatment

E d w 3 4- CL

L. o .2 = a o

a Patient

Z7 >> m

° i 47 > -°

n L a i °' V

W 0 T ,

0 C ' a J aE Eo

+ a! 7 Z LL 7 .a Z

LL v C a

E

a

E

d E c = c

y c E

ai v_ Male Female Children Male Female Children E g w Li v

.

w =

U u

143 2 1 1 1 - - - - -.00 -.00 -.00 -.00

144 1 1 1 1 1 -.00 turner -.00 private clinic

145 3 2 - - - 2 1 1 1 .00 heart -.00 private clinic

146 1 1 - - - 1 1 - - - - - .00 .00 -.00 -.00

147 3 1 - - - 1 - 1 1 gestric heart private clinic private clinic

148 1 1 - - - 1 - 1 - paralisis .00 kabiraj -.00

149 - - - - - - -.00 .00 -.00 -.00

150 3 2 - - - 2 2 1 .00 gastric -.00 private clinic

151 1 1 1 1 presure .00 .00 pharmachiest

152 1 1 1 1 1 .00 .00 toncel -.00

153 1 1 1 1 .00 .00 .00 -.00

337

Page 343: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment Last one Year _, c 3 Information about Disease (without considering cold, cough, and fever)

w a c r- 'n c a Number of Nature of Disease Nature of Treatment

a) .. v o n ° °

a c' 0 patient

o M ` t 4)

c .4 to Z. 0 a v CL cu °-f .0

c v ° i ° Z a c a

E c J E E o . a) > z L1 3 z E M U.

C) () C) C) R C) U_ C)

C)

E m c .E E Male Female Children Male Female Children CO (D V lL U. lL

41

d U- U

154 1 1 - - - - - - 1 - 1 - - 1 - - heart .00 .00 private clinic

disease

155 3 2 - 2 1 1 1 1 presure bat numunia private clinic

156 2 1 - 1 - - - - - 2 1 -.00 depresion diareheoa -.00

157 2 1 1 - 1 1 1 turner -.00 -.00 rural doctor

158 1 1 - - 1 -.00 -.00 -.00 -.00

159 1 1 - 1 bat gastric -.00 private clinic

160 - - - 1 1 bat presure -.00 pharmachiest

161 3 2 - - 2 1 1 turner -.00 private clinic -.00

162 1 1 2 - 1 - - - - - -.00 -.00 -.00 -.00

163 1 1 - - 1 - - - - - - - -.00 -.00 -.00 -.00

164 3 2 - - - - - - 1 - - - - 1 - - pate pathar -.00 horneo -.00

338

Page 344: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment a Last one Year

S 3 Information about Disease (without considering cold, cough, and fever) U2 m C c .v

c v Number of Nature of Disease Nature of Treatment L L. a°i o= CL .2

° a t .0 o M

Patient W >

t7 E W W

v 2-0 v Gu CL o .0

V a o Q ° o

- d z L = M z T

= R d a i a

E (U

d y E E f E E a E :2 Male Female Children Male Female Children

CO

C E I LL a i LL U

165 2 1 1 1 1 1 -.00 malaria -.00 private clinic

166 1 1 1 1 1 1 bat -.00 rural doctor -.00

167 1 1 - 1 - 1 1 - - - - -.00 -.00 -.00 -.00

168 1 1 1 - - 1 - - - - - 1 -.00 gastric -.00 rural doctor

169 - - - - - - - - - - - - - -.00 -.00 -.00 -.00

170 2 1 2 - 2 1 1 1 1 gestric gastric rural doctor rural doctor

171 2 2 1 - 3 - 1 1 numunia rural doctor

172 1 1 - - - 1 - 1 1 - 1 - - - - - -.00

173 1 1 - - 1 - 1 - 1 - 1 - - - - - -.00

174 2 1 - - - 1 - - 1 - 1 -.00

175 - 1 - - - - - - - - - - - -.00

339

Page 345: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Information about Employment a, Last one Year , c 3 Information about Disease without considering cold, cough, and fever) C c - c Q) Number of Nature of Disease Nature of Treatment

a, - v o 0 0

-W a y o patient

> o - U(u 0 0Ei T -0 o °

E ' d U O > W - I_ ..

o U ¢ ? Q C C.

E 2 .C E ¢ a

d E E o

a 3 3 z z E M

LL

c m R

al ' al - m

w 75- c

a t

C a v U a cu

E E E ' °

c 5 E Male Female Children Male Female Children y f (U f (U co c7

E x U

a i E U.

a 1-

176 1 1 - - - - - 1 - 2 - - - -.00

177 1 1 - - - - - 1 - - - - - - - -.00

178 1 - - 1 - - - - - - - - - - - -.00

179 1 1 - - - - - 1 1 - - - - - -.00

180 1 1 1 - - - - 1 1 - - - - - -.00

181 1 1 - 1 - - - - - - - -

182 2 1 1 - - - - - - -

183 1 1

184 2 1 - - - - - 2 1 1 - - - - - - -

185

340

Page 346: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

ELECTRICITY, TUBEWELL, TRANSPORT OWNERSHIP,

PRODUCTION EQUIPMENT, HOUSING, ACCESS TO

COMMUNICATION EQUIPMENT, INVOLVEMENT IN DEVELOPMENT

ORGANISATION AND CREDIT

Page 347: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Bocgair

Having facilities? a

o r E a 121

o, o s person involved person taken o

. _

. 0) 3 M

in Organisation Nature of loan U ?-

c U c = L } ,-

0 aU

c - development Sources of ;

loan w c 0 o a o o organisation

N E (U D U.

z o :t: z ` Male Female Male Female a o

M z a Co z - 1 Yes Yes - - CI sheet Black & White - - 1 Bank

Television

2 Yes Yes Cycle - CI sheet Colour Television - - - - -

3 Yes Yes Cycle CI sheet - - - - - -

4 Yes No Cycle - CI sheet - - - - - -

Black & White 5 Yes Yes Cycle - CI sheet

Television

6 Yes Yes Cycle - CI sheet - - - - - -

7 Yes Yes Cycle - CI sheet Colour Television - - - - -

Black & White 8 Yes Yes Cycle STW CI sheet

Television

Black & White 9 Yes Yes Cycle - CI sheet

Television

10 Yes Yes Cycle - CI sheet - - - - - -

11 Yes Yes Cycle - CI sheet - - - - - -

342

Page 348: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having °Q 0 0 3 °a Number of Number of

. facilities? CL h o E

12 2- o = o

U person involved person taken

o . t cC AR

, aU c - in Organisation Nature of loan

12 o 0

2,

develo ment Sources of

p l 0 ° o g -0 o o organisation oan

U (U L E L .

t; z o z Male Female Male Female zi ~

to z - a z W

12 Yes Yes Cycle - CI sheet - - - - - -

13 Yes No - - CI sheet - - - - -

14 Yes Yes Cycle - CI sheet Television black - - - - -

15 Yes No Cycle - CI sheet - - - - - -

16 ves No Cycle - CI sheet - - - - - -

17 Yes No - - CI sheet - - - - - -

18 No No - - CI sheet - - - - - -

19 Yes No Cycle Thresher CI sheet Television & Two in - - - - -

One

20 Yes No - - CI sheet - - - - - -

21 Yes Yes micro bus STW building Colour Television - - - - -

22 Yes No Cycle - CI sheet - - - 1 moneylender

23 Yes No - - CI sheet - - - - -

343

Page 349: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having g 0 n° 0 0 3 a C Number of Number of

- facilities? a

CL t

E L o, o s o y person involved person taken

o . L r ._ c a in Organisation Nature of loan

2. 12

W r c a development Sources of ;

n l a°,

C c 0 c c o organisation oa

E U 7 m

L o

L CU z Male Female Male Female

m z z a a z w

24 Yes No Cycle - CI sheet Two in One - - - - -

25 Yes Yes Cycle - CI sheet - - - 1 - moneylender

26 Yes No Cycle - CI sheet - - - - - -

27 Yes No - - CI sheet - - - - - -

28 Yes Yes - Thresher - - - - - - -

29 Yes Yes Cycle Thresher CI sheet Black & White - - - - -

Television

30 No Yes Cycle - CI sheet - - - - - -

31 Yes No - - CI sheet - .

32 Yes Yes Cycle Thresher Semi Building Television & Two in .

One

33 Yes Yes - - CI sheet - .

34 Yes Yes Cycle Thresher CI sheet Black & White .

Television

344

Page 350: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having 0 Q

0 0 Number of Number of

facilities? a s E In ° o t o

In y person involved person taken i t c 3 g in Organisation Nature of loan

= 3: a develo ment Sources of

c p

l

c 0 ;d c c organisation oan

E LL U

z L

o L

z L

Male Female Male Female m z a a z W

35 Yes No - - CI sheet -

36 Yes No - - CI sheet - .

37 Yes Yes Cycle Thresher CI sheet Black & White .

Television

38 Yes No - Thresher CI sheet Two in One .

39 Yes Yes Cycle Thresher CI sheet Two in One .

40 Yes Yes Cycle Thresher CI sheet Two in One .

41 Yes Yes Cycle Thresher Semi Building Two in One - - - -

42 Yes Yes - Weedier and CI sheet - - - - -

Thresher

43 Yes No Cycle Weedier CI sheet Black & White - - - -

Television

44 Yes No - - CI sheet Two in One - - - -

45 Yes Yes Cycle - building Television & Two in - - - -

One

345

Page 351: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having 9 0 a. a ° 3 n r of Number of

facilities? CL Q. N n

E a o, c ??

o y person involved person taken o U

. s = C Cr

c , Ui a 3 a, 5; c in Organisation Nature of loan

1211

c :5 t w o

W

development Sources of

o c =

c loan i s o o a 0 0 organisation u N

z i 3

o L E

z ` n - Male Female Male Female

z a f0 d z W I

46 Yes No - Weedier CI sheet - - - - - -

47 Yes Yes Cycle Weedier and CI sheet Two in One - - 1 - bankmoneyle

Thresher

48 Yes Yes Cycle Weedier and

CI sheet Two in One - - 1 - bankmoneyle Thresher

49 Yes No Cycle Weedier CI sheet - - - 1 - bankmoneyle

50 No No - - Chan - - - 1 - moneylender

51 No No Rickshaw - Chan - - - - - -

52 No No - - CI sheet Two in One - - - - -

53 Yes No Cycle - CI sheet Two in One - - - - -

54 No No - - Chan - - - - - -

55 No No Cycle Weedier CI sheet - - - - - -

56 Yes No Cycle - CI sheet Black & White - - - - -

Television

346

Page 352: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

aving t: C °n ag

° 0 3 0 r Number of Number of

facilities? a CL

s a 12

0 : o person involved person taken o 0 i s c= 3

w in Organisation Nature of loan

'' a o o ° c ; develo ment Sources of c ; p

l aoi 3 0 ° o n o o g or g

oan

z e 0 E z Male Female Male Female

a, za a z

57 Yes Yes Cycle Weedier and CI sheet Two in One - - - - -

Thresher

58 Yes Yes Cycle Weedier and CI sheet Two in One - - - - -

Thresher

59 No Yes Cycle Weedier and CI sheet - - - - - -

Thresher

60 No Yes Rickshaw Weedier and CI sheet Two in One - - - - -

Thresher

61 Yes Yes Cycle - CI sheet Two in One - - 1 - moneylender

62 No No Cycle Weedier and CI sheet - - - - - -

Thresher

63 Yes Yes Cycle Weedier and CI sheet radio - - 1 - moneylender

Thresher

64 Yes Yes Cycle Weedier and Semi Building Two in One - - - - -

Thresher

65 Yes No - - CI sheet - - - - - -

66 Yes Yes - - Cl sheet Two in One - - 1 - moneylender

67 Yes Yes Weedier and

Semi Building Television & Two in Thresher

One

347

Page 353: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having a C 0 3 °a Number of Number of

facilities? - a t E T n c

o ° o person involved person taken o

= s 4V 9 , H .a 3 d 5 in Organisation Nature of loan ' T C m

o 3 s w- a)

o develo ment Sources of

o c c ° p loan

E 0 °- o o o organisation - ' a E U- v 3: &J

z o z i ` Male Female Male Female

z a a z W

68 Yes No - - CI sheet - - - - -

69 Yes No Cycle - CI sheet Two in One - - - - -

70 Yes No - - CI sheet - - - - - -

71 Yes No - - CI sheet - - - - - -

72 Yes No Cycle - CI sheet - - - - - -

73 Yes No - - Chan - - - - - -

74 Yes Yes Motor STW CI sheet Two in One - 1 - bank Cycle and

micro

75 Yes Yes Cycle - CI sheet Television & Two in - - 1 - Cooperative One

76 Yes Yes - - CI sheet Two in One - - 1 - Cooperative

Black & White 77 Yes Yes - - CI sheet

Television

78 Yes No - - CI sheet Television & Two in

One

348

Page 354: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having CL ) 0 Number of Number of

-a facilities? D. c a

t E In c r 0

°- o person involved person taken

o L C rr ._

3 3 = a in Organisation Nature of loan Z, a 3 3 development Sources of

O C .C l d o 0 o a 0 0 organisation oan

.

E LL V 07 r f° z

L O '0 o

i (U

V z

L- ` Male Female Male Female

` Z o. a z w

79 Yes No - - CI sheet - - - - - -

80 Yes No - - CI sheet - - - 1 - Ngo

81 Yes Yes - Weedier and CI sheet Two in One - - - - -

Thresher

82 Yes Yes - - CI sheet - - - - - -

83 Yes No Cycle Weedier and CI sheet - - - - - -

Thresher

84 Yes Yes Cycle Weedier and CI sheet Two in One - - - - -

Thresher

85 Yes Yes - Weedier and CI sheet Two in One - - 1 - moneylender

Thresher

86 Yes Yes Cycle Weedier and CI sheet Two in One 1 - moneylender

Thresher

87 Yes No - Weedier and CI sheet - - - 1 - bankmoneyle

Thresher

88 Yes No - Weedier CI sheet Two in One - - - - -

89 No No - - CI sheet - - - - - -

349

Page 355: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having c a a r of Number of

facilities a CL U1 C L

= E CL 12 IM r 13 ,N person involved person taken

c .

_ - -

r0 3 in Organisation Nature of loan

T 12 0 c develo ment

Sources of p

l n E

c o o 0 0 organisation oa

LL.

z o z Male Female Male Female a za a z w I-

90 Yes No - - CI sheet Colour Television - - - - -

91 Yes Yes - - CI sheet Television & Two in - - - - -

One

92 Yes Yes - Weedier and CI sheet - - - - - -

Thresher

93

94 No No Rickshaw - CI sheet - - - - - -

Weedier and 95 Yes Yes - CI sheet - - - - -

Thresher

Weedier and Black & White 96 Yes No Cycle CI sheet

Thresher Television

97 Yes No - CI sheet - 1 - 1 - moneylender

98 Yes No - CI sheet - - - - - -

- Yes Yes - Weedier and CI sheet

Black & White 1 - 1 - bank

Thresher Television

100 Yes No - - CI sheet - - - - - -

350

Page 356: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having oo

oa a 0 0. r Number of Number of

facilities? CL CL

s E rn o

° :E - involved person taken

o rv .3 .

r0 3 1 > in Organisation Nature of loan

o c s o develo ment Sources of ° p l c - c .0 a c organisation oan

rd E u'

z ' o i

Male Female Male Female z a a

M z W

101 Yes Yes - - CI sheet Black & White - - - - -

Television

102 Yes No Rickshaw - Chan - - - 1 - -

103 Yes No Rickshaw - Cl sheet - - - - - -

104 No No - - CI sheet - - - - - -

105 No No - - CI sheet - - - - -

106 No No - - CI sheet - - - - - -

107 No No - Weedier CI sheet - - 1 - 1 -

108 No Yes - Weedier and CI sheet - - - - -

Thresher

109 No No Rickshaw - Chan - - 1 - 1 -

110 No No Rickshaw - CI sheet - - 1 - 1 -

111 No No Rickshaw - Chan - 1 - 1 Ngo

351

Page 357: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having 9 c CL s 0 0 Number of Number of

facilities? Q. FA a - a o,

c °a s o

V person involved person taken

c o . o , in Organisation Nature of loan U Z.

12 c Cr M a develo ment

Sources of c c c °

o p

loan 0 a) o-f o 0 organisation

M 211 c E LL.

t z m 0 z `- 41 Male Female Male Female

C' L

-0 - z a z U

112 No No Rickshaw - CI sheet - - 1 - 1 Ngo

113 Yes Yes Cycle Weedier and CI sheet - - - - - -

Thresher

114 Yes No - - CI sheet Black & White - - - - -

Television

115 Yes Yes micro bus Thresher building Black & White

Television

Black & White 116 Yes Yes - - Semi Building

Television

117 Yes Yes Cycle STW CI sheet Black & White

Television

118 Yes Yes Cycle - building Colour Television - - - - -

119 No Yes - - CI sheet - - - 1 - bank

120 No Yes - - CI sheet - - - 1 - moneylender

121 No Yes Rickshaw - CI sheet - - - - - -

122 No Yes - - CI sheet - - - - - -

352

Page 358: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having o CL d fl Number of Number of

facilities? rs H a

t E ° - LI

o v z o In

person involved person taken

= ° - .

ca' v w W in Organisation Nature of loan

U .

: . w o

= ° W

c a c develo ment Sources of

Z o ; p l o rd o n o 0 organisation oan

z U z 3 L Male Female Male Female

Z CL M

1-

123 No No - - CI sheet - - - - 1 moneylender

124 No Yes - - CI sheet - - - - - -

125 No Yes - Weedier and CI sheet Two in One - - - - -

Thresher

126 Yes Yes Rickshaw - Chan Two in One 1 - I - Ngo

127 Yes Yes Cycle Weedier and CI sheet - - 1 - 1 Ngo

Thresher

128 Yes Yes Cycle Weedier and Semi Building Colour Television - - - - -

Thresher

129 Yes Yes - - CI sheet Two in One - - - - -

130 Yes Yes - Thresher building Two in One - - 1 - bank

131 No No - - CI sheet - - - 1 - bank

132 Yes Yes Cycle - CI sheet - 1 bank

353

Page 359: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having 9 c a s 0 0 Number of Number of

W facilities? a H a a 12 ._

o, t o person involved person taken 0 L c c> in Organisation Nature of loan

1 W 3 N o a`, 0 3 (U develo ment Sources of

c 0C 4 ' L- o p loan

M 27 _ o

3 W 0 0 c 4- 0 organisation

U. V U 0

z ` - o

i :V

E

z Male Female Male Female a, z I

a M z w I-

133 Yes Yes Cycle Weedier and CI sheet - - - - - -

Thresher

134 Yes Yes Cycle Weedier and Semi Building Two in One - - 1 - moneylender Thresher

135 Yes Yes Cycle Weedier and CI sheet - - - 1 - moneylender Thresher

136 Yes Yes Cycle Weedier and CI sheet Black & White - - 1 - moneylender

Thresher Television

137 Yes Yes - Weedier and CI sheet Two in One - 1 - - -

Thresher

138 Yes Yes - Weedier and CI sheet Two in One - - - - -

Thresher

139 Yes Yes Cycle Weedier and CI sheet

Television & Two in

Thresher One

140 Yes Yes Cycle - Semi Building - - - 1 - moneylender

141 Yes Yes - - CI sheet Television & Two in

One

142 Yes No - - Chan Two in One - - - - -

354

Page 360: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having f 0

4- 11

Q IV

4- 0

o

4- o Number of Number of

facilities? U1 o. t = In .2-

Ch t o person involved person taken 0 L r rr 3 c > in Organisation Nature of loan

ZI w _

e = a 0 develo ment Sources of ; p l

M a 3 0 ° 0 n 0_ organisation oan , E C U. v

z L 7 . o

i z

i Male Female Male Female

0 0 Z C- a z 1-

143 Yes Yes - Weedier and Semi Building - - 1 - 1 Mohila Somitee

Thresher

144 Yes Yes Cycle Weedier and

CI sheet Black & White

1 1 Mohila Somitee

Thresher Television

145 Yes Yes Cycle Thresher Semi Building Two in One - - - - -

146 Yes No - - CI sheet - - - - - -

147 Yes Yes Cycle Thresher Cl sheet Two in One - - 1 - moneylender

148 Yes Yes Cycle Thresher building Two in One - - - - -

149 Yes Yes - - building - - - - -

150 Yes Yes Cycle Thresher building Two in One 1 - - Mohila Somitee

151 Yes No - - Chan - - - 1 - moneylender

152 Yes No - - CI sheet - - 1 - - -

153 Yes No - - CI sheet - - - 1 - moneylender

154 Yes No Cycle - CI sheet Two in One 1 - - - -

355

Page 361: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having 9 o c. a ° c. Number of Number of

facilities? a H a - o. E ._

CM c .

° s o 1 y person involved person taken

U , ., AR

in Organisation Nature of loan 12

s o develo ment Sources of

o c c p

n l

M _ m o o o f o o organisation oa

U-

z o E z Male Female Male Female

a zC a z

155 Yes Yes Cycle Thresher Semi Building Colour Television - - 1 - bank

156 Yes Yes Cycle Thresher CI sheet Two in One - - 1 - moneylender

157 Yes No - - CI sheet - - - 1 - moneylender

158 Yes No - - Chan - - - - - -

159 Yes Yes Cycle Thresher CI sheet - - - 1 - moneylender

160 Yes No - - CI sheet - - - - -

161 Yes Yes Cycle - CI sheet Two in One - - - - -

162 Yes No - - CI sheet - - - 1 - moneylender

163 Yes Yes - - CI sheet Television & - - - - -

Two in One

164 Yes Yes - - CI sheet - - - 1 - moneylender

165 No No - - Chan - - - 1 - moneylender

356

Page 362: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having o '

C CL w 0 Q 3

o Number of Number of

. facilities? 0 t a 12 ._ v0 12 N person involved person taken

= a ;a

= c 3 in Organisation Nature of loan 121

o c ° 0 o development Sources of l

d o o o f . 0_ organisation oan

tL V N r rr i i Z7

z 0 z Male Female Male Female d z L.

a z

166 No No - - Chan - - 1 1 - moneylender

167 No Yes - - CI sheet - - 1 - - Ngo

168 Yes No - - CI sheet Two in One - - 1 - bank

169 No No Cycle - Chan - - - - - -

170 Yes Yes Cycle - CI sheet Colour Television - - - - -

171 Yes Yes - - building Colour Television - 1 1 - bank

172 No No - - Chan - - 1 1 - moneylender

173 No No - - CI sheet - - 1 - 1 Ngo

174 Yes Yes - - CI sheet - - 1 - 1 Ngo

175 No No - - Chan - - - - - -

176 No No - - Chan - - - 1 - moneylender

177 No No - - Chan - - - - - -

357

Page 363: Village Information Book · 1CRC .. Lfb. MIMAP-Bangladesh Micro Impacts of Macroeconomic and Adjustment Policies in Bangladesh Focus Study No. 06 Data Base for Local Level Planning:

Having o 0 ° °

0 v 3 a c Number of Number of

facilities? a y n t o In _ 0 t 0

121 Joi person involved person taken

c c ,, M a

in Organisation Nature of loan 12

a 3: W r c develo ment

Sources of

o c p

loa M

° 3 0° o o_ organisation n

U. E z

LP 'C

t; a z o Male Female Male Female u °

t" z a a M z W

178 No No - - Chan - - - - - -

179 Yes No - - CI sheet - - 1 - 1 Ngo

180 Yes No Cycle - CI sheet - - 1 - 1 Ngo

181 Yes Yes Cycle - CI sheet - - 1 - 1 Ngo

182 No No Rickshaw - Chan - - 1 - 1 Ngo

183 No No - - CI sheet - - - - - -

184 No Yes - - CI sheet - - 1 - 1 Mohila Somitee

185 No No - - CI sheet - - 1 - 1 Ngo

358