WELCOME
Filling out an att endee profi le form
Viewing the story boards about the study
Sharing informati on at our three map stati ons
Providing feedback on a survey about this event
Asking questi ons and talking with the Engineers, Landscape Architects & City of Winnipeg staff
4.
2.
1.
3.
5.
Please parti cipate today by:Welcome to the KICK-OFF EVENT for the Chief Peguis Trail Extension West from Main Street to Brookside Boulevard.
The City of Winnipeg is initi ati ng a study to gain insight into the use of and expectati ons for the Chief Peguis Trail Extension.
CHIEF PEGUIS TRAIL EXTENSIONCORRIDOR AREA
MAIN ST.M
cGRE
GO
R ST
.
McP
HILL
IPS
ST.
PIPE
LIN
E R
D.
LEILA AVE.
KIN
G E
DW
AR
D S
T.
DR
. JO
SE R
IZA
L W
AY
N
JEFFERSON AVE.
FERR
IER
ST.
BR
OO
KSI
DE
BLV
D.
We want your input in our study!
Do you live, work or play nearby?•
Do you anti cipate using this route for cycling, walking, • commuti ng or recreati on?
Do you want to be involved in future workshops as • we plan the route, greenway and features?
CHIEF PEGUISTR AIL1
STUDY BACKGROUND
The Chief Peguis Trail (CPT) extension between Main Street and Brookside Boulevard is identi fi ed as a short term project in the Winnipeg Transportati on Master Plan.1
The Transportati on Master Plan identi fi es CPT as part of the Strategic Road Network.
“The completi on of the strategic road network is required to maintain the integrity of Winnipeg’s transportati on system for goods movement, and does not undermine the goals of sustainable transportati on.”2
1 April 25, 2012 City of Winnipeg Council amendment to Winnipeg Transportati on Master Plan2 Winnipeg Transportati on Master Plan, page 25
Road Network Implementati on Map
Kilometers
0 2 4 6 8 10
MA
P 7
R
oad
Net
wo
rk Im
ple
men
tati
on
PORTAGEPORTAGE
PORTAGEPORTAGE
SASKATCHEWANSASKATCHEWAN
CORYDON
CORYDON
KEN
AST
ON
KEN
AST
ON
BISHOP GRANDIN BOULEVARD
BISHOP GRANDIN BOULEVARD
WARDEWARDE
PERIMETER HIGHWAY
PERIMETER HIGHWAY
PER
IMET
ER H
IGH
WA
YPE
RIM
ETER
HIG
HW
AYPL
ESSI
SPL
ESSI
S
EDW
AR
D S
CH
REY
ER
PAR
KW
AY
EDW
AR
D S
CH
REY
ER
PAR
KW
AY
PER
IMET
ER H
IGH
WA
YPE
RIM
ETER
HIG
HW
AY
PERIMETER HIGHWAYPERIMETER HIGHWAY
MARIONMARION
FERMORFERMOR
CONCORDIA
CONCORDIA
NAIRNNAIRN
REGENTREGENT
RALEIG
H/GATEW
AY
RALEIG
H/GATEW
AY
HEN
DER
SON
HW
Y
HEN
DER
SON
HW
Y
LAG
IMO
DIE
RE
LAG
IMO
DIE
RE
TAYLORTAYLOR
GRANTGRANT
MCGILLIVRAY
MCGILLIVRAY
WA
VER
LEY
WA
VER
LEY
PEM
BIN
APE
MB
INA
PEMBIN
A
PEMBIN
A
WILKESWILKES
ACADEMYACADEMY
NESSNESS
SILVERSILVER
James Armstrong Richardson Int’l
Airport
James Armstrong Richardson Int’l
AirportELLICEELLICE
LOGANLOGAN
NOTRE DAME
NOTRE DAME
OAK POINT
OAK POINT
PTH 6 EXTENSION
PTH 6 EXTENSIONCEN
TR
EPO
RT
CA
NA
DA
WAY
KIN
G E
DW
AR
DK
ING
ED
WA
RD
INKSTERINKSTER
INKSTERINKSTER
FUTURE PR221FUTURE PR221
SELKIRKSELKIRK
MCG
REG
OR
MCG
REG
OR
SALT
ERSA
LTER
ARL
ING
TON
ARL
ING
TON
MO
RA
YM
OR
AY
WIL
LIA
M R
. CLE
MEN
T P
AR
KW
AY
WIL
LIA
M R
. CLE
MEN
T P
AR
KW
AY
OSBO
RNE
OSBO
RNE
ARCH
IBALD
ARCH
IBALD
LAG
IMO
DIE
RE
LAG
IMO
DIE
REST. M
AR
YST. M
AR
Y
ST. M
AR
YST
. MA
RY
ST. AN
NE’S
ST. AN
NE’S
DA
KOTA
DA
KOTA
CHANCELLOR
MATHESONCHANCELLOR
MATHESON
GRANTGRANT
CORYDONCORYDON
ROBLINROBLIN
MA
INM
AIN
MCP
HIL
LIPS
MCP
HIL
LIPS
KEE
WA
TIN
KEE
WA
TIN
CHIEF PEGUIS TRAIL
CHIEF PEGUIS TRAIL
LEILALEILA
PANDORAPANDORA
DUGALDDUGALD
ST. J
AM
ESST
. JA
MES
BR
OO
KSI
DE
BR
OO
KSI
DE
STU
RG
EON
ST
UR
GEO
N
Route180
M AN I TO BA
MA N ITO BA
MAN I TO B A
MA NI T OBA
M AN ITO B A
MA N I T OB A
100
MAN IT OB A
100
MAN I TO BA
100
Route
20
Route
20
Route
20Route
90
Route
90
Route
90
Route
165
Route
165
Route
80
Route
42
Route42
Route
80
Route
155
Route
150
Route
52
Route
135
Route
115
Route
37 Route
37
Route
115
Route42
Route52
Route23Route17
Route85
Route
85
Route
95
Route
95
Route
70
Route
145
Route
105
Route105
Route
62
Route
52
Route
25
Route
96
MA N ITO BA
Route
90Route
125
Route
30
Route
57
Route57
Route47Route62
101��������
15��������
101��������
59��������
101��������
9��������
8��������
101��������
7��������
6��������
101��������
2��������
3��������
100��������
3��������
100��������
75��������
59��������
427
241
425
204
200
LEGENDCity RouteStrategic Road Network
Route
80
CHIEF PEGUIS TRAIL EXTENSION WEST
CHIEF PEGUISTR AIL2
SCOPE OF STUDY
FUNCTIONAL DESIGN involves the development of the basic roadway alignment and cross-secti on. It includes enough detail to generally locate the roadway and defi ne the amount of right-of-way needed to accommodate the future constructi on.
PRELIMINARY DESIGN further refi nes the functi onal design, determining more details and confi rming with greater accuracy such things as drainage details, turning lanes and geometry at intersecti ons. Some detail is developed on the roadway profi le for improved accuracy in quanti ti es and cost esti mates for major items.
* Final Report will include:
Segment 1:
Functi onal Engineering Drawings•
Preliminary Engineering Drawings•
Cost Esti mate•
Segment 2:
Functi onal Engineering Drawings•
Recommended Opti mal Alignments•
Cost Esti mate•
Defi niti ons for Project Phases:
SEGMENT 1
FUNCTIONAL DESIGN
SEGMENT 1
PRELIMINARY DESIGN
SEGMENT 2
FUNCTIONAL DESIGN
* THIS STUDY *NOW UNTIL SPRING 2015
FINAL REPORT *
TransportationMaster Plan
Winnipeg
PLAN
CONCEPT
completed
DETAILED DESIGN
future
SEGMENT 2
PRELIMINARY DESIGN
Project Phases: from ideas to completed roadway
CONSTRUCTION
CHIEF PEGUISTR AIL3
CORRIDOR AREACORRIDOR AREA
MAIN ST.
McP
HILL
IPS
ST.
PIPIPIPEPEPE
LI LI LIN
EN
EN
E RRR
D.
D.
D.
LELELEILILILA A A AVAVAVE.E.E.
KI
KI
KIN
GN
GN
G E E E
WD
WD
WA
RA
RA
RD
D
D
STSTST.
DR
DR
DR
. . .JOJOJO
SESESE R R R
IZIZIZA
LA
LA
L W WW
AYAYA
N
JEJEFFFFERERERSOSOSON N N AVAVAVE.E.E.F
BR
OO
KSI
DE
BLV
D.
SEGMENT 1SEGMENT 1
SEGMENT 2SEGMENT 2
CORRIDOR AREACORRIDOR AREA
MMc
Mc
McG
RG
RG
REGEGEG
OR
OR
OR
S S ST.T.T.
Mc
Mc
Mc
Mc
FEFEFERRRRRR
IEIEIER R R
STSTST...
STUDY OBJECTIVES
The study will develop the recommended alignment between Main Street and Brookside Boulevard so that the City of Winnipeg has a plan in place and can move ahead with detailed design and constructi on when funding becomes available.
The scope of the study includes Main Street and Brookside Boulevard, but also considers what may happen west of Brookside Boulevard to connect to CentrePort Canada Way in the future.
Realignment of roads• Intersecti on design • Pedestrian & cycling connecti ons (sidewalks, trails & roads)• Traffi c fl ow• Land drainage study• Universal Design principles• Environmental considerati ons• Sound reducti on•
Character of the roadway corridor• Greenspace features• Experience• Gateways• View corridors• Pedestrian & cycling faciliti es•
The study will look at:
Project opportuniti es:
Special considerati ons for this study include:
Neighbours: residents, businesses & industry• Existi ng natural habitat (forest and wetland areas)• Litt le Mountain Park • New residenti al developments• Property limitati ons• Connecti ons to and between neighbourhoods• What else are we missing? (Please tell us on our exit survey)•
Site features and ameniti es - images of existi ng Chief Peguis Trail, Main Street, and surrounding neighbourhoods
CHIEF PEGUISTR AIL4
SEGMENT 2
PUBLIC PARTICIPATION TIMELINE
EARLY SPRING 2015
FINAL REPORT
McPhillips to Brookside
FUNCTIONAL DESIGN
COMMUNITY WORKSHOPS
ALL ARE WELCOMESIGN UP TODAY!
ENTIRE ROUTE
PUBLIC OPEN HOUSE
ALL ARE WELCOME!
Please provide your contact information so we may
keep you informed
SEGMENT 1
FUNCTIONAL & PRELIMINARY D
ESIG
N
COMMUNITY WORKSHOPS
ALL ARE WELCOMESIGN UP TODAY!
1. 2. 3. 4.
PUBLIC INFORMATION & KICK-OFF EVENT
ForRoute Neighbours,
Route Users,& the Public at Large
ENTIRE ROUTE
5.
EARLY 2015TODAY’S EVENT LATE SPRING 2015
+
*INTERNAL & EXTERNAL STAKEHOLDER DISCUSSIONS ARE ONGOING THROUGHOUT PROCESS*
Main St. to McPhillips
CHIEF PEGUISTR AIL5
PEDESTRIAN & CYCLING FACILITIES
Walking and cycling are important modes of transportati on that • encourage healthy lifestyles while being good for the environment.The City of Winnipeg has made the commitment to developing AT • faciliti es and promoti ng cycling and walking.
The study will take into account the needs of and opportuniti es for • both neighbourhood and citywide residents. Our goal is to create a pedestrian and cyclist friendly environment • that enhances the surrounding communiti es. This includes faciliti es which are safe, convenient and aestheti cally pleasing.We are looking at both the possible locati ons of routes and • appropriate types of faciliti es.
City of Winnipeg Cycling Map
PLACE HOLDER
Why are pedestrian & cycling faciliti es important to the City?
What is being considered?
N
Proposed Cycling Faciliti es from Pedestrian and Cycling Strategies Map (subject to Council approval)
CHIEF PEGUISTR AIL
NEXT STEPS
How You Can Get Involved!Fill out an att endee profi le form•
Sign-up for workshops•
Next Steps:
First workshop for Segment 1 will be in early 2015 - we will contact the • people that have signed up
Look for updates at www.winnipeg.ca/ChiefPeguisTrail and on the • City of Winnipeg Facebook page
Reach us at • CPT@scatliff .ca or
THANK YOU FOR COMING TODAY!
Please fi ll out an exit survey before you leave