Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning and Approvals Act 1993 notice is hereby given that the urgent amendments known as Urgent Amendment KIN UA1-2018 and KIN UA2-2018 to the Kingborough Interim Planning Scheme 2015 have received approval by the Tasmanian Planning Commission. The urgent amendments may be viewed during normal office hours at the public office of Kingborough Council, 15 Channel Highway, Kingston and Council’s website www.kingborough.tas.gov.au from Wednesday, 27 February 2019 to Wednesday, 13 March 2019. A copy of the amended Kingborough Interim Planning Scheme 2015 can also be viewed at www.iplan.tas.gov.au. The urgent amendments became effective as of 21 February 2019 as follows: insert an overlay map for the E8.0 Electricity Transmission Protection Code in the text of F1.0 Kingston Green Specific Area Plan, replace Figure F1.1 Kingston Green Specific Area Plan. Kingborough Interim Planning Scheme 2015

Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Urgent Amendments KIN UA1-2018 & KIN UA2-2018

In accordance with section 30IA(6) of the former provisions of the Land Use Planning and Approvals Act 1993 notice is hereby given that the urgent amendments known as Urgent Amendment KIN UA1-2018 and KIN UA2-2018 to the Kingborough Interim Planning Scheme 2015 have received approval by the Tasmanian Planning Commission. The urgent amendments may be viewed during normal office hours at the public office of Kingborough Council, 15 Channel Highway, Kingston and Council’s website www.kingborough.tas.gov.au from Wednesday, 27 February 2019 to Wednesday, 13 March 2019. A copy of the amended Kingborough Interim Planning Scheme 2015 can also be viewed at www.iplan.tas.gov.au. The urgent amendments became effective as of 21 February 2019 as follows:

• insert an overlay map for the E8.0 Electricity Transmission Protection Code

• in the text of F1.0 Kingston Green Specific Area Plan, replace Figure F1.1 Kingston Green Specific Area Plan.

Kingborough Interim Planning Scheme 2015

Page 2: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Urgent Amendment KIN UA1-2018 Kingborough Interim Planning Scheme 2015

Insert an overlay map for the E8.0 Electricity Transmission Infrastructure Protection Code, as shown below:

Page 3: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Hobart City Council

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5247

000

5247

000

5248

000

5248

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 1 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 4: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Hobart City Council

524000

524000

525000

525000

526000

526000

527000

527000

528000

528000

5247

000

5247

000

5248

000

5248

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 2 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 5: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Hobart City Council

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5245

000

5245

000

5246

000

5246

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 3 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 6: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

516000

516000

517000

517000

518000

518000

519000

519000

520000

520000

5243

000

5243

000

5244

000

5244

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 4 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 7: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5243

000

5243

000

5244

000

5244

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 5 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 8: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

512000

512000

513000

513000

514000

514000

515000

515000

516000

516000

5241

000

5241

000

5242

000

5242

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 6 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 9: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

516000

516000

517000

517000

518000

518000

519000

519000

520000

520000

5241

000

5241

000

5242

000

5242

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 7 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 10: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5241

000

5241

000

5242

000

5242

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 8 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 11: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Huon Valley Council

508000

508000

509000

509000

510000

510000

511000

511000

512000

512000

5239

000

5239

000

5240

000

5240

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 9 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 12: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5239

000

5239

000

5240

000

5240

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 10 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 13: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5237

000

5237

000

5238

000

5238

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 11 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 14: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5235

000

5235

000

5236

000

5236

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 12 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 15: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Huon Valley Council

516000

516000

517000

517000

518000

518000

519000

519000

520000

520000

5233

000

5233

000

5234

000

5234

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 13 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 16: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

520000

520000

521000

521000

522000

522000

523000

523000

524000

524000

5233

000

5233

000

5234

000

5234

000

KINGBOROUGH INTERIM PLANNING SCHEME 2015 - ELECTRICITY TRANSMISSION INFRASTRUCTURE PROTECTION OVERLAY

Disclaimer: Before taking any action based on the data inthis map, it should be verified with a council planner. For online maps go to www.iplan.tas.gov.au or www.thelist.tas.gov.au

¹0 0.2 0.4 0.6 0.8 1

Kilometres

Coordinate System: GDA 94 MGA Zone 55Overlay data from TasNetworks

Topographic data from the LIST © State of Tasmania

Map 14 764

8

2

5

9

31

11

13 1412

10

LOCATION MAPMap key

Communications station buffer areaSubstation facility buffer areaInner protection areaSubstation facilityElectricity transmission corridor

Page 17: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Peter Fischer Acting Executive Commissioner Tasmanian Planning Commission

This amendment comes into effect on 21 February 2019

Page 18: Urgent Amendments KIN UA1-2018 & KIN UA2-2018 · Urgent Amendments KIN UA1-2018 & KIN UA2-2018 In accordance with section 30IA(6) of the former provisions of the Land Use Planning

Urgent Amendment KIN UA2-2018 Kingborough Interim Planning Scheme 2015

In the text of F1.0 Kingston Green Specific Area Plan, replace Figure F1.1 Kingston Green Specific Area Plan with that shown below:

Peter Fischer Acting Executive Commissioner Tasmanian Planning Commission This amendment comes into effect on 21 February 2019