134
Session ID: Prepared by: Upgrading PeopleSoft Grants v9.0 to v9.2 How Fred Hutchinson Cancer Research Center along with their implementation partner, SpearMC Consulting, managed its Grants upgrade from v9.0 to v9.2 102130 Cameron McClurg (FHCRC) Jessica Mann (SpearMC Consulting)

Upgrading PeopleSoft Grants v9.0 to v9 · 2016. 8. 3. · Session ID: Prepared by: Upgrading PeopleSoft Grants v9.0 to v9.2 How Fred Hutchinson Cancer Research Center along with their

  • Upload
    others

  • View
    5

  • Download
    1

Embed Size (px)

Citation preview

  • Session ID:

    Prepared by:

    Upgrading PeopleSoft Grants

    v9.0 to v9.2

    How Fred Hutchinson Cancer Research Center along with their implementation partner, SpearMC Consulting, managed its Grants upgrade from v9.0 to v9.2

    102130

    Cameron McClurg (FHCRC)

    Jessica Mann (SpearMC Consulting)

  • PeopleSoft Grants Upgrade to v9.2

    • Agenda

    – Organizational Overview, Presenters

    – Fred Hutch Environment and Upgrade Process

    • Project Objectives and Team

    • Project Recap/Lessons Learned

    – Changes to Grants Functionality (9.0 to 9.2)

    • Proposal

    • Award

    • Other module enhancements

    – Grants Lessons Learned

    2

  • Organization Overview,

    Presenters

    3

  • Your Presenters

    Fred Hutch Cancer

    Research Center

    Director - FMS

    [email protected]

    Jessica Mann

    SpearMC Consulting

    Practice Director – Grants

    Management

    [email protected]

    4

    Cameron McClurg

  • About FHCRC

    • Non-profit Cancer Research Organization opened

    in 1975

    • Home of three Nobel laureates

    • Birthplace of bone marrow transplantation

    • Annual Budget: $436 million

    • ~900 active awards

    • ~3500 active projects both sponsored and non-sponsored

    • ~1,300 proposals submitted in last year

    • ~2800 employees/staff (218 Faculty)

    • Close affiliation with University of Washington and

    Seattle Children’s

    5

  • About FHCRC

    PeopleSoft Financials 9.2.13

    • AM, AP, AR, BI, CA, GL, GM, KK, PC, PO

    PeopleSoft HRMS

    • 9.0 (Upgrading to 9.2)

    • Custom Effort/LCD

    PeopleTools

    PeopleTools 8.54.13

    SQL Server 2008

    6

    Applications

  • Technical Upgrade Refresher

    7

  • Upgrade Process

    8

  • FHCRC Environment and Upgrade

    Process

    9

  • View 2003 to Current

    10

    FMS PeopleSoft

    2003 - 2009

    Crystal Reporting

    Data Mart (March 2008)

    SciQuest/ePro (Oct 2010)

    Online Effort (Aug 2010)

    Hyperion Budgeting (Mar 2011)

    iLab integrations to iLab & FMS (Oct 2013)

    Onbase / AnyDoc (Mar 2013)

    Stabilization & Infrastructure

    Historical Trends in FMIS - Expanding use of technology in Finance

    - Growing list of software vendors, products Hyperion StepDown (Nov 2014)

    ACH Process (Sept 2014)

    International Phase 1 FMS (July 2013)

    CCSG Reporting (Oct 2013)

    2010 - 2016

    HARP - BTA (Mar 2015)

    HARP - LCD (~Jan 2016)

    PeopleSoft 9.2 (~Mar 2016)

    Future Trends in FMIS - Focus on Business Process

    - Integrated Systems

  • FMS Upgrade Project Objectives

    ©2014 Fred Hutchinson Cancer Research Center

    1. PeopleSoft 9.2. Move to supported Oracle release. Standard support expires July 2015.

    2. De-customize. Reduce and simplify custom development with stretch goal to eliminate 30% of custom objects.

    3. Strategic Enhancements. Implement strategic changes identified as included in the project, which add a high degree of enterprise wide benefits to the organization.

    • Simplify Commitment Control and reduce errors • Implement Combination Edits • Utilize Project status to control and manage transactions

    • Budgetary Controls for non-sponsored projects

    4. Increase Organization Knowledgebase. Develop new skillsets across Fred Hutch’s business and IT resources.

    5. Prepare System for International. Development objects will be reviewed and modified to mitigate impacts on international processing.

    6. Update Integration Tools. Standardize integration tools and technology that supports interfaces between PeopleSoft Financials and external applications.

    11

  • Business & Application Scope

    ©2014 Fred Hutchinson Cancer Research Center

    12

    Business / Technical Domains Application Scope

    Finance and Accounting General Ledger (GL)

    Commitment Control (KK)

    Accounts Receivable (AR)

    Billing (BI)

    Asset Management (AM)

    Grants Management Grants (GM)

    Contracts (CA)

    Project Costing (PC)

    Procure-to-Pay eProcurement (ePro)

    Purchasing (PO)

    Accounts Payable (AP)

    Information Technology PeopleTools 8.54

    BI Publisher

    PeopleSoft Update Manager (PUM)

    Secure Enterprise Search (SES) – Removed from Scope

    PeopleSoft Test Framework (PTF) Evaluation

    Delivered WorkCenters and Dashboards

    Potentially Impacted Systems

    and Interfaces

    SciQuest

    ONBASE

    Hyperion

    iLab

    Web Focus Data Warehouse (BI reporting)

    PeopleSoft HCM Labor Cost Distribution (LCD)

  • Upgrade Improvement Scope Criteria

    ©2014 Fred Hutchinson Cancer Research Center

    13

    # Project Objective Decision Criteria

    1. Leverage out of the box PeopleSoft Financials v9.2 Is change a new delivered feature and can it be supported easily within

    the current set of system functionality?

    2. Reduce and simplify custom development

    • Does change require net-new (expansion) custom development?

    • Can we eliminate a customization with new features and

    functionality?

    3. Implement strategic changes that add a high degree

    of enterprise wide benefits to the organization

    Does change represent a broad based, global benefit to the

    organization?

    Note: Pure departmental changes were not included in scope.

    4. Develop new skillsets and support capabilities to

    reduce risk to operations

    • Can we improve Fred Hutch’s support capabilities within the

    business and IT?

    • Are support risks reduced?

    5. Retrofit custom development that impacts delivered

    PeopleSoft international processing functionality.

    Does existing custom development or configuration block or hinder

    future international processing in multiple global business units?

    6. Improve the flow of information between

    PeopleSoft Financials and external applications Can we standardize or improve existing interfaces between systems?

  • Sample: Improvement Opportunities

    ©2014 Fred Hutchinson Cancer Research Center

    14

    PS Financials 9.2 Upgrade - Potential Improvements (Assessment + 9.2 Enhancements) Scoring and Work Effort

    # Module Track Improvement Description Change Type Notes PriorityEffort

    (Hrs)In Scope?

    Decision

    Criteria

    12 GL,KK FIN

    Monthly Pro-Card Reconci l iation duration should be

    shortened. Very Manual . Poss ible opportunity to

    improve Pro-Card Journal upload process .

    - Excess ive KK errors occur after journal uploadFunctional

    Improvement

    KK and Combo Edit changes will drive

    some benefit during upgrade. Ful l

    scope of Process & Tech changes are

    post upgrade effort. High level of

    labor effort. Delays month end by a

    min two days . More than 200 hours

    per month. High Low

  • Project Team

    15

    • Functional

    • 6-7 Full time Business Analysts

    • 1 Part time Business Analyst

    • 3 Full Time SpearMC resources

    • Technical

    • Upgrade Architect (SpearMC)

    • System Admin (SpearMC)

    • 2 Full time Developers

    • 1 Part time Developer (SpearMC)

    • Project Management (SpearMC)

  • Project Recap

    16

    • Go Live 3/21 (two month extension on original timeline)

    • Some decustomization. Some new customizations.

    • Successfully executed on Strategic Enhancements

    • Combo Edits stop bad transactions at the source

    • Almost no KK errors in ePro due to simplified KK and modification

    end user process.

    • Project Status sending only good projects to feeder systems

    • KK setup for Budgetary Controls

    • Successfully transitioned to BI Publisher and Integration

    Broker.

    • Did not implement WorkCenters or Alerts/Notifications

  • Project Management Lessons Learned

    17

    • Timeline – Scope – Resources

    • Beware swapping out tires on a moving car!

    • “Reduction” of Customizations

  • Project Management Lessons Learned

    (Cont.)

    18

    • Change Management

    • Finance Departments

    - Core module users

    - Design Meetings covered customization rationalization, new 9.2

    feature evaluation and scope decisions

    - UAT

    - Communication – Many new features and controls

    • End Users

    - Mostly ePro and Reporting

    - “Champs” team – ePro evaluation and UAT

    - Communication – “Reduced ePro errors” and “Enhanced error

    handling”

  • About SpearMC

    19

    Founded in 2004, SpearMC is a technology and professional services firm specializing in

    PeopleSoft Financials and Supply Chain Management

    PeopleSoft Human Capital Management and Payroll

    Maximo Enterprise Asset Management

    Oracle Business Intelligence

    ERP Architecture and Application Development

    Project and Program Management (PMO)

    Change Management

    ERP Training

    Mobile Technology

  • 20

    About SpearMC

    Offices in Chicago, Denver, Houston, Phoenix, Seattle and San Francisco

    We focus on local market delivery and capability

    development in line with industry focus areas unique to the regions we serve.

    Our local and well-connected network of top-tier

    business analysts, technical leads, developers and project managers keep travel cost to a minimum.

  • 21

    About SpearMC

    Each member of our Leadership Team leverages over 20 years of experience in Technology, Financial and Business Transformation.

  • About SpearMC

    22

    Oracle Gold Partner since 2008: PeopleSoft Specialization

    Applications Reseller

    Hardware Reseller

    IBM Advanced Partner:

  • Changes to Grants Functionality

    (9.0 to 9.2)

    23

  • Proposal

    24

  • Creating the Proposal

    25

    • Functionality

    similar to 9.0

    • Some new

    features

  • Creating the Proposal

    26

    • Allow multiple

    PIs (9.1)

    Already in place

    at FHCRC in 9.0

  • Creating the Proposal

    27

    New fields available

    • Reference Award #

    • FAIN

    Values copy to award upon generation

    FHCRC conversion created for FAIN value (from Attribute on Award)

  • Creating the Proposal

    28

    Long Description

    • No longer a hyperlink – has become a text box

    • Shows how many additional characters can be entered

  • Creating the Proposal

    29

    Sponsor ID

    • In v9.0 FHCRC had a customization to allow any grants sponsor, even if not set

    up for billing

    • Allowed use of NIH (1002) and Pending Sponsor Assignment (1003)

    • Generate Award failed if sponsor not changed to value set up with billing

    information

    • Prevented generation of award with bad sponsor – could not change on award

  • Creating the Proposal - Projects

    30

    Sponsor ID

    • New functionality exists which allows a Sold To Sponsor to be changed after

    award generation as long as the contract has not been activated

    • FHCRC removed 9.0 customization

    • Continued current audit of Sponsor ID before award generation

    • Additional audit added by Accounting before activation to validate Sponsor

  • Creating the Proposal - Projects

    31

    Long Description

    • Similar to Proposal general page

    • No longer a hyperlink – has become a text box

    • Shows how many additional characters can be entered

  • Creating the Proposal - Projects

    32

    Dept Contact

    • As delivered, individual has to be set up as department contact to be listed as contact

    • In 9.0 FHCRC had a customization that allowed all employees to be selected

    • Removed customization and will use delivered

    • Created an Excel to CI to create/update Dept Contacts

  • Dept Contact Setup

    • User must be setup as a department contact to be added to Project as contact

    • As a part of cutover, needed to make sure each current project admin had a department contact record

    33

  • Proposal Budgets

    34

    • No significant changes

    • 9.0 Customizations for Proposal budget brought forward to 9.2

  • Proposal Budgets

    35

    • No significant changes

    • 9.0 Customizations for Proposal budget brought forward to 9.2

  • Proposal Budgets

    36

    • Customized page used to track high level budget info for proposal and

    waived FNA

  • Proposal Additional Information

    37

    • 9.0 Customized page brought forward which tracks info needed for the Office of Sponsored Research (OSR) to track incoming proposals

    • Includes ability to generate emails

  • Proposal Conflict of Interest

    38

    • 9.0 Customized page brought forward which allows OSR to track status

    of conflict of interest reporting at time of proposal

  • F&A Setup

    • No change in functionality

    39

  • F&A Setup

    40

    • Pricing Method and Product – determines which contract line a Project and

    Budget ID/Activity ID is assigned to

    • In 9.0 FHCRC used just two Products • GRANTS_REIMBURSABLE: Project is billed through the Billing System

    • FIXED_PRICE: Project is not billed through the Billing System

    • In 9.2 created additional reimbursable Products

    • Using new Products to assign years of an incoming subaward to separate lines on the contract

    • Allows FHCRC to keep the same award/project id for incoming subawards with multiple budget years and send

    separate invoices for each year

    • Plan to review Products and additional Contracts functionality post go-live

  • Proposal Resources

    • No significant change

    • 9.0 Customization for Conflict of Interest brought forward to 9.2

    • PI, Co PI, or Other Key Person show up on COI tab

    41

  • Negotiate Award

    42

    • Notes can be

    started on

    Draft Proposal

  • Negotiate Award

    43

    • FHCRC was

    previously storing

    notes in several

    places: • Award Profile – Attributes

    • Award Profile – Additional

    Information

    • Award Profile – Award Modification

    Comments

    • Contract Notes

    • Shifted to consolidate

    notes on the Negotiate

    Award page

    • FHCRC Conversion

    created to move

    existing notes to

    Negotiate Award

    Delivered values

  • Negotiate Award

    44

    • Updated Negotiation Type Translate Values

  • Submit the Proposal

    45

    • No change

  • Generate Award

    • No significant change

    46

  • Award

    47

  • Award

    48

    • Functionality similar

    • Some changes

  • Award

    49

    • Reference Award

    Number and FAIN come

    over from proposal

  • Award – Long Title

    50

    • Long description no longer a drill

    • Shows # characters left for entry

    • User can display text in ‘Mobile Window’

  • Award – Reporting Role

    52

    • Format of subpage is different – no longer in a grid format

    • Continuing to use this page to indicate MPI and MPI from outside institutions

    • FHCRC added a customization to indicated Institution if not from FHCRC

    Customized

  • Award – Post Award Admin

    53

    • Delivered field now available to display Post Award Administrator (OSR Admin)

    • FHCRC eliminated custom OSR Specialist field

    • FHCRC conversion created to move OSR Specialist value to new field

  • Who is a Post Award Admin?

    • Drop down based on employees identified

    as Post Award Admin on Professional Data

    setup

    54

  • Who is a Post Award Admin?

    55

    • Similar to Eligible PI setup

    • FHCRC conversion created to check Post Award Administrator for those currently used in custom field

    • New business process created for going forward when staff are added to OSR

  • Award Administrator

    • Same functionality as Proposal Department Contact

    • Grant Administrator must be a department contact for the

    department listed

    56

  • Accessing the Project from the Award

    • Project hyperlinked

    • When clicked user is transferred to Project General Page

    57

  • Transfer to Project From Award

    • Contract Number displays on Project General

    • Click on Contract Number to transfer to Contract pages

    58

  • Project Manager

    59

    • Project Manager

    automatically

    assigned during

    award generation

  • Award Resources

    60

    • PO Link added which links to Purchase Order

    • Not used by FHCRC

  • Award Modification

    • Period Detail Hyperlink allows entry of multiple awards

    for each period

    61

  • Award Modification

    • Can enter multiple Award IDs and Issue Dates

    • Select a project to which a modification on the Award Modifications for a Period page can be associated

    • Amounts entered on Award Mods for Period sum to total on Award Modifications page

    62

  • Award Funding

    • Delete a budget funding period from the Award Funding page (as long as no budget period details exist)

    • Capability to have project with some but not all budget years

    • Example of project funded in last 3 years of award

    63

  • Award Funding

    • Example of project funded in first 2 years of award

    64

  • Award Funding

    • Example of project with one year of funding

    65

  • Award Funding

    • FHCRC Customized page

    • Allows budget to be entered at a high level (direct vs indirect)

    • Provides the ability to capture Cancer Center Support Grant specific reporting requirements

    • CA Ln Activity added in 9.2 for customized Grants Invoice

    66

  • Award Terms

    • Ability to Copy Terms from Prime Project to other Projects

    • E.g. UGALL Entered at Primary Project

    67

  • Award Terms

    • Check ‘Copy terms to all projects on save’

    • Save change

    • Second project now has term UGALL

    68

  • Milestones

    • Milestones now allow entry of Completion Date and Completed

    By Fields (allowed FHCRC to remove a customization)

    • FHCRC also removed a customization to enter Budget Ref on

    this page

    69

  • Supplemental Data

    • Functionality that allows customers to “create” new fields as needed

    • Limited number of fields available in different formats

    • Text

    • Date/Time

    • Numeric/Signed Number

    • Yes/No

    • Codes (with drop down list)

    • Do not need technical support to create

    • Available at the Award and the Project (also Contract Header/Line)

    • Can indicate if the field is required

    • Logic can be built to display fields on the Supplemental Data page only when appropriate (e.g. when Award Type is CON)

    70

  • Supplemental Data for an Award

    71

    • FFATA Reporting: Subject to FFATA and Rationale

    • FH Origin Date – replaces NIH Start Dt

    • Type of Follow-up

    • FHCRC Conversion created to move these values stored on the Attribute to Supplemental Data tables

  • Supplemental Data

    • Steps to set up:

    • Register Record

    • Register Component

    • Define Record

    - Record

    - Fields Summary

    - Fields Detail

    • Define Display Group

    • Assign Display Group

    72

  • Supplemental Data

    • Register Record

    73

    • Already delivered

  • Supplemental Data

    • Register Component

    74

    • Already delivered

  • Supplemental Data

    • Define Record

    75

    • Status needs to be “In Design” to make changes

    • Change status to “Activated” before saving and existing component

  • Supplemental Data

    • Define Record

    76

    • Map fields to data storage fields

  • Supplemental Data

    • Define Record

    77

    • Enter name, description, and other field details like drop down values

  • Supplemental Data

    • Define Record

    78

  • Supplemental Data

    • Define Record

    79

  • Supplemental Data

    • Define Record

    80

  • Supplemental Data

    • Define Display Group

    81

    Define a

    display

    group and

    associate

    any records

    and fields,

    including the

    order in

    which the

    fields appear

    on the page

  • Supplemental Data

    • Define Display Group

    82

  • Supplemental Data

    • Assign Display Group

    83

    • Assign one or more display groups to a supplemental data-

    enable component and page

    • Add Criteria (optional) when the supplemental data should be

    displayed (e.g. Award Type = Specific Value)

  • Supplemental Data

    84

  • Other Module Enhancements

    85

  • Letter of Credit

    86

    • Several changes around Letter of Credit functionality

    • Increased Letter of Credit Doc ID (LOC_DOC_ID)

    field length to 30 characters, added new letter of

    credit fields

  • Letter of Credit

    87

    • Enhanced Letter of Credit processing on the

    Sponsor component to help track multiple LOC

    numbers, associate the LOC with its associated

    draw type, and populate the Contract - Billing

    Options (Billing Plan General) page with the

    correct LOC ID during award generation.

    Primary LOC

    will be

    defaulted to

    Billing Options

    FHCRC

    Conversion

    created to

    update Type

    and Primary

  • Letter of Credit

    88

    • Other LOC changes (not being used by FHCRC)

    • Subaccount ID field introduced to the LOC Summary page and

    the BI Publisher version of the LOC Summary report.

    • Added capability to reprint draw reports to minimize manual

    data entry into sponsor systems and reduce the risk of error

    due to manual manipulation.

    • Added new fields in extract tables to include additional grants-

    related data elements.

    • Application engine created to generate both pro forma and final

    LOC Draw Reports in BI Publisher report format. Supports

    generation of the pro forma and invoiced draw listings by

    Business Unit (mass draw capabilities), Sponsor, and LOC ID.

    • Allows the user to access a finalized listing of draws through

    new delivered queries. Organizations can then manipulate the

    output of the queries to upload the data into sponsor payment

    request systems and support payment matching analysis.

  • Amendment Processing

    89

    • Process to change contract limit slightly different

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    90

    Page with sections

    minimized

    • The Contracts Workbench enables you to view all the information related to PeopleSoft Contracts, Grants, and Project Costing through a single workspace (or interface). You can view the current status or the required update to any major, related entity such as a contract line, a project, or an activity.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    91

    Default View when page

    opens.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center 92

    The records that are available for CONTRACTS are:

    • CA_DETAIL – Contract Line*

    • CA_MS_COND - Milestone Condition Table

    • CA_PREPAID_TBL - Contracts Prepaid Balance Tbl

    • CA_CONS_RATE_VW – Contract Rates

    • CA_LMT_FEE_DTL - Contract Line Limit/Fee Detail

    The records that are available for GRANTS are:

    • GM_AWARD - Award Parent Record*

    • GM_AWD_FUND_PD - Award Funding by Period*

    • GM_AWD_MILE - Award Milestones*

    • GM_AWD_MOD_VW - Award Modification* (This is a view on

    GM_AWD_MOD and GM_AWD_MOD_LINE table)

    For each Table you can select which fields should be displayed.

    *Tables selected by FCHRC based on data most commonly used.

    There is a list of 13 Records

    available to be used in the

    Workbench.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center 93

    The records that are available for PROJECTS are:

    • PROJECT_CA_VW – Projects* (This is a view on PROJECT table)

    • PROJ_ACT_CA_VW - Project Activities (This is a view on

    PROJECT_ACTIVITY table)

    • PROJ_TM_SCH_VW - Project Team Member (This is a view on

    PROJ_TEAM_SCHED table)

    • PROJ_STA_CA_VW - Project Status (This is a view on

    PROJECT_STATUS table)

    For each Table you can select which fields should be displayed.

    *Tables selected by FCHRC based on data most commonly used.

  • Contracts Workbench

    94

    Easy to change setup

    Simply check/uncheck fields that you want to include

  • Workbenches

    ©2014 Fred Hutchinson Cancer Research Center 95

    Three pre-defined templates are delivered:

    • CONTRACTS

    • GRANTS

    • PROJECTS

  • Workbenches

    ©2014 Fred Hutchinson Cancer Research Center 96

    Template ID associated to the Business Unit

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    97

    Hyperlink to Additional Amounts is

    a delivered feature in the header of

    the Workbench.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    98

    The Additional Amounts Hyperlink

    opens a zoom window with high-

    level summary information from the

    Award and Contract.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    99

    • The first section, Summary of

    Amounts, is also a delivered

    section of the Workbench.

    • Displays the Billing Limit

    (Spending Limit) on the Contract.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    100

    Award displays data fields from the

    Award Profile page.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    101

    • Award Type

    • PI Name

    • Prime

    Sponsor (if

    Flowthrough)

    • Reference

    Award (if

    Flowthrough)

    • Previous

    Award

    • Long Title

    • Short Title

    • CFDA

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    102

    Hyperlink to directly

    to Award Profile

    • Grant Administrator and Post

    Award Administrator were not

    included, as they were displayed

    as Employee ID numbers.

    • Clicking on the Award Number

    hyperlink will take you to the

    Award Profile page where that

    information can be accessed.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    103

    Award Funding Periods displays

    information from the Funding tab of

    the Award.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    104

    • Only shows primary

    project of multi-

    project award

    • You can access the

    full Funding page by

    clicking the

    hyperlink

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    105

    Award Milestones displays the

    information from the Milestones tab

    of the Award Profile.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    106

    • Completion

    Date

    • Due Date • Comments

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    107

    Award Modifications displays the

    information from the Award

    Modifications tab of the Award

    Profile.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    108

    • Rows are

    from the

    Period

    Detail

    pages

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    109

    • Contract Lines displays the

    information from the Contract.

    • At FHCRC contract information

    is primarily used by Accounting.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    110

    • Projects displays all projects associated with the award, and their titles.

  • Contracts Workbench

    ©2014 Fred Hutchinson Cancer Research Center

    111

    • Export

    to

    Excel

    Additional Features:

    • Zoom

    • Show all

    columns

  • Contracts Workbench

    • Current limitations

    • Currently only works for Active Award Status.

    • Displays the value for fields instead of the text

    description (e.g. EmplID instead of name).

    • Order of fields and records cannot be changed on a

    global basis, but users can personalize.

    112

  • Modify Sponsor after Generation (Sold To

    Customer)

    ©2014 Fred Hutchinson Cancer Research Center 113

    • New page in Customer Contracts allows user to

    change Sold To customer

    • Can also change Ship To and Bill To customer as

    well

  • Modify Sponsor after Generation (Sold To

    Customer)

    ©2014 Fred Hutchinson Cancer Research Center 114

    • Contract now reflects Correct

    Sold to Customer

  • Modify Sponsor after Generation (Sold To

    Customer)

    ©2014 Fred Hutchinson Cancer Research Center 115

  • Modify Sponsor after Generation (Sold To

    Customer)

    ©2014 Fred Hutchinson Cancer Research Center 116

    • Sponsor on Proposal pages is now correct as well!!

  • F&A Adjustments

    ©2014 Fred Hutchinson Cancer Research Center 117

    • New F&A adjustment feature that enables users to process F&A adjustments based on new or updated F&A bases and F&A rates, generate F&A adjustment transactions, and review, approve, and delete adjustment transactions prior to posting.

  • F&A Adjustments

    ©2014 Fred Hutchinson Cancer Research Center 118

    F&A Adjustment example. Base is MTDC1

  • F&A Adjustments

    ©2014 Fred Hutchinson Cancer Research Center 119

    Project incurred direct expenses

  • F&A Adjustments

    ©2014 Fred Hutchinson Cancer Research Center 120

    F&A process is run for MTDC1 base

  • F&A Adjustments

    ©2014 Fred Hutchinson Cancer Research Center 121

    F&A base is updated to S&W

  • F&A Adjustments

    ©2014 Fred Hutchinson Cancer Research Center 122

    F&A Adjustment process is run

  • F&A Adjustments

    ©2014 Fred Hutchinson Cancer Research Center 123

    SFA Adjustments are created

  • AR & BI to PC

    124

    • PeopleSoft Receivables 9.2 extends the AR to PC

    integration by interfacing AR direct journals to Project

    Costing. The interface process was modified to pick up

    direct journals from Receivables. Users are able to

    specify an analysis type while entering the direct

    journal which makes AR direct journal integration to

    PC consistent with other subsystems.

  • AR to PC

    125

  • AR to PC

    126

    • Direct Journal rows

    from AR come over

    to PC with BI

    Distrib Status of “I”

    and are not priced

    • Therefore, FHCRC,

    decided to keep

    existing

    customization to

    send ARD journals

    from GL to PC

  • PC Distrib Status

    127

    • PC_DISTRIB_STATUS move from JRNL_HEADER to

    JRNL_LN

    • Minimal impact for

    FHCRC

    • Needed to update

    a small number of

    queries

    • Needed to retro

    fix AR to PC

    customization

  • Billing Speadsheet Import

    128

    • Spreadsheet Import to Billing interface allows the user

    to enter invoice data into an Excel spreadsheet and

    post it to the Billing Interface tables via Integration

    Broker.

    • Rolled out at FHCRC for fixed priced bills (previously

    entered through AR Pending Items

  • Commitment Control (KK) Changes

    129

    • Overall functionality pretty similar

    • Some new, nice features

    • Auto-override option on Source Transaction (automatically override those errors that can be overridden)

    • Account Ranges on Budget Definition

    • Copy the entire Budget Definition setup, including the creation of Commitment Control Ledgers, Ledger Groups, and Budget Definitions.

    • Check Only (what-if scenario) - not being at FHCRC

  • FHCRC KK Changes

    130

    • Eliminated GL ChartFields from Budget Checking (with the exception of Account and Budget Ref)

    • Added Rulesets to allow managing Fiscal Year (FY) projects differently than Life to Date (LTD) projects (adding Budget Period)

    • Added a Rollup/Summary Level to have the ability to control or turn off spending at an Expense Grouping level

    • Added Revenue Ledgers to all spending authority to be increased by Revenue for certain Projects

    • Turned on KK for AR and BI

    • Created a new Detail ledger so that encumbrance detail can be tracked and PO Roll over functionality can be used (and still have RSA – Remaining Spending Authority – calculated at the Grandchild, Child, and Parent Level). Previously detail ledger was check on the Child Expense Ledger Group

    • Began using PO Rollover Functionality

  • New Features not using

    131

    • Grants WorkCenter (will be rolled out post go-live)

    • Federal Financial Report (FFR) (may roll out post

    go-live)

    • Grants Portal

    • Separately identify rates and prices for revenue and

    billing

  • Lessons Learned

    132

  • Lessons Learned

    133

    • If you need to make changes to Commitment Control • Don’t be afraid to change… but it does take work

    • Do: Give yourself time for the conversion

    • Updating Budget Definition – Performance/Timeout issues

    • Recalculating Budget Date default not checked (Copy Journal, Create Standard Journals, PO Close)

    • PO Rollover does not carry forward Req information

    • If using PO Rollover, be sure to have inbound AP interfaces not charge to close/cancelled PO Distrib lines

    • AR Items created through on-line pending items needed SQL insert since it was not budget checked pre-go live

    • Drilling URL bug

  • Thank You.

    134

  • 135

    Quest is the home for PeopleSoft and JD Edwards Users

    Visit the Quest International Users Group

    Booth #323

    ■ Let us show you how to leverage the Quest community to maximize your ERP investment

    ■ Receive your personalized Quest Activation Plan & learn how to make the most of your membership

    ■ Plus, find out more about our upcoming events PeopleSoft RECONNECT (July 19-21) and JD Edwards INFOCUS (August 8-10)