IT-Hub Sargodha Version: 1.0
Accounts Management System Date: July 10 2017
IT-Hub 1
Department of Computer Science &
Information Technology
University of Sargodha
Accounts Management System
version 1.0
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 2
Table of Contents
CHAPTER 1: FINAL PROJECT PROPOSAL ......................................................................... 5
1.1. PROJECT TITLE: ..................................................................................................................... 5 1.2 INTRODUCTION ...................................................................................................................... 5 1.3. PROJECT OVERVIEW STATEMENT: ......................................................................................... 5 1.4. PROJECT GOALS & OBJECTIVES: ........................................................................................... 6
1.5. HIGH-LEVEL SYSTEM COMPONENTS: ..................................................................................... 6 1.7. EXCLUSIONS: ........................................................................................................................ 7 1.8. APPLICATION ARCHITECTURE: .............................................................................................. 7
1.10.1. Hardware and Software Requirements:...................................................................... 7
1.11. TOOLS AND TECHNOLOGIES USED WITH REASONING: .......................................................... 7 1.11.1 Front-End /Back-End technologies.............................................................................. 7
1.11.2. Tools ............................................................................................................................ 8
CHAPTER 2: FIRST DELIVERABLE ...................................................................................... 9
2.1. PROJECT/PRODUCT FEASIBILITY REPORT .............................................................................. 9 2.1.1. Technical Feasibility ..................................................................................................... 9 2.1.2. Operational Feasibility ................................................................................................. 9
2.1.3. Economic Feasibility .................................................................................................... 9 2.1.4. Schedule Feasibility ...................................................................................................... 9
2.1.5. Specification Feasibility................................................................................................ 9 2.1.6. Information Feasibility ................................................................................................. 9
2.1.7. Motivational Feasibility ................................................................................................ 9 2.1.8. Legal & Ethical Feasibility ........................................................................................... 9
2.2. PROJECT/PRODUCT SCOPE .................................................................................................... 9 2.3. PROJECT/PRODUCT COSTING .............................................................................................. 10
2.3.1. Project Cost Estimation by Function Point Analysis .................................................. 10
2.3.2. Project Cost Estimation by using COCOMO’81 (Constructive Cost Model) ............ 11 2.3.3. Activity Based Costing ................................................................................................ 12
2.4. TASK DEPENDENCY TABLE ................................................................................................. 12 2.5. CPM - CRITICAL PATH METHOD ......................................................................................... 13
2.6. GANTT CHART ..................................................................................................................... 15 2.7. INTRODUCTION TO TEAM MEMBER AND THEIR SKILL SET .................................................... 15 2.8. TASK AND MEMBER ASSIGNMENT TABLE ........................................................................... 15
2.10. TOOLS AND TECHNOLOGY WITH REASONING .................................................................... 16 2.11. VISION DOCUMENT ........................................................................................................... 17
Introduction: ......................................................................................................................... 17 Scope and vision: .................................................................................................................. 17
2.12. RISK LIST .......................................................................................................................... 17 2.13. PRODUCT FEATURES/ PRODUCT DECOMPOSITION ............................................................. 17
CHAPTER 3: SECOND DELIVERABLE FOR OBJECT ORIENTED APPROACH ...... 18
3.1. INTRODUCTION: .................................................................................................................. 18 3.2. EXISTING SYSTEM: .............................................................................................................. 18
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 3
3.3 SCOPE OF THE SYSTEM: ........................................................................................................ 18 3.4 SUMMARY OF REQUIREMENTS: (INITIAL REQUIREMENTS): .................................................. 18
3.5 EXTERNAL ENTITIES ............................................................................................................ 19 3.10 HIGH LEVEL USE CASE DIAGRAM: ..................................................................................... 22 3.11 ANALYSIS LEVEL USE CASE DIAGRAM: ............................................................................. 23 3.12USECASE DESCRIPTION ....................................................................................................... 24
CHAPTER 4: THIRD DELIVERABLE FOR OBJECT ORIENTED APPROACH .......... 29
4.1. DOMAIN MODEL ................................................................................................................. 29 4.2. SYSTEM SEQUENCE DIAGRAM ............................................................................................ 30 4.3. SALESMAN SEQUENCE DIAGRAM: ....................................................................................... 31 4.4. ADMIN SEQUENCE DIAGRAM .............................................................................................. 32
4.5. DESIGN CLASS DIAGRAM .................................................................................................... 33 4.6. STATE CHART DIAGRAM ...................................................................................................... 34 4.7. ACTIVITY DIAGRAM ............................................................................................................ 35
CHAPTER6: 4TH DELIVERABLE (USER INTERFACE DESIGN) ................................... 39
6.1. SITE MAPS .......................................................................................................................... 39
6.29 TRACE-ABILITY MATRIX .................................................................................................... 54
CHAPTER 7: 5TH DELIVERABLE (SOFTWARE TESTING) ............................................ 55
7.1 TEST PLAN ............................................................................................................................ 55
7.2.1....................................................................................................................................... 55
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 4
List of Figures
Figure 1 Gantt Chart ...................................................................................................................... 7
Figure 2 Draw the Network Diagram .......................................................................................... 13
Figure 3 Newtwork diagram ........................................................................................................ 14
Figure 4 Gantt Chart .................................................................................................................... 15
Figure 5 High Level Use Case Diagram ...................................................................................... 22
Figure 6 Analysis Level Use Case Diagram ................................................................................ 23
Figure 7 Domain Model ............................................................................................................... 29
Figure 8 System Sequence Diagram ............................................................................................ 30
Figure 9 Salesman Sequence Diagram ........................................................................................ 31
Figure 10 Admin Sequence Diagram ........................................................................................... 32
Figure 11 Design Class Diagram ................................................................................................. 33
Figure 12 State Chart diagram ..................................................................................................... 34
Figure 13 Activity Diagram ......................................................................................................... 35
Figure 14 Activity Diagram 2 ...................................................................................................... 36
Figure 15 Activity Diagram 3 ...................................................................................................... 37
Figure 16 Entity Relationship Diagram ....................................................................................... 38
Figure 17 Site Maps ..................................................................................................................... 39
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 5
Chapter 1: Final Project Proposal
1.1. Project Title:
Account Simple
1.2 Introduction
Account Simple is designed to facilitate the business to manage its accounts in an efficient way.
It could be any type of business who wants to manage its account.
This project can manage accounts, expenses, income, employee payrolls, bank accounts and can
generate profit and loss reports on annually, monthly and daily basis. It is an online account
management solution and any businessman can Sign up there and he will be able to manage its
accounts. After Sign up and he will get username and password and after logging in he can add
employee data, suppliers data, customer data, banks data and afterwards can manage all the
business transactions throughout the business
1.3. Project Overview statement:
Project Title: Departmental store management system Project Manager: Muhammad Muntazir Mehdi Bukhari
Project Members: WaqarAdil, Hassan Ali Shah, Usama
Name Registration # Email Address Signature
WaqarAdil [email protected]
Hassan Ali Shah [email protected]
Usama [email protected]
Project Goal:
The goal of this system is to develop Account management system. It will handle all the
accounts related operations of the business Objectives:
Sr.#
1 The system will manage accounts of many businesses at the same time
2 Any businessman can sign up online and he will be able to manage the accounts online
3 Manage expense and check profit and loss.
4 Generate annual report, customer report and project reports.
5 Generate invoices
6 Manage bank accounts
7 Manage Employess payrolls.
8 Add delete or update expenses
9 Add delete or update income
Project Success criteria:
The project’s success is based on following criteria:
• Adaptability: The system should be able to adjust to new conditions.
• Availability: The system ensures 24/7 availability.
• Reliability: The system functions according to the stated conditions.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 6
• Response time: The system must have a fast response time.
• Usability: The system provides ease of use, effectiveness, efficiency, learn ability and an overall
users’ satisfaction in addition to these all system will perform all the task mentioned above.
Assumptions, Risks and Obstacles:
• It is assumed that the team members will cooperate and work seriously on this project.
• It is assumed that the system would be accessible across all global locations through the Internet.
Non availability of the Internet would be one of the major obstacles.
• It is assumed that the user is familiar with Internet and World Wide Web navigational tools. The
users who are not familiar with these tools would face difficulty to use the system.
Users will require special training how to use the functionalities of the system. The level of training
depends on the role of the users.
Organization Address (if any):
IT-hub, 113/3, Stadium road, Sargodha
Type of project: Research Development
Target End users:
• Managers and administrator of company/organization
Development Technology: Object Oriented Structured
Platform: Web based Distributed
Desktop based Setup Configurations
Other_____________________
Approved By:
Date:
1.4. Project Goals & Objectives:
1.4.1. Goals: Main goal of this system is to provide an online account management solution to any business.
Business owner doesn't need to install any software or buy expensive systems he can manage his
account with any system having internet and web browser any time any where.
1.4.2. Objectives: To develop an effective and transparent departmental store management system for achieving
following objectives:
i. To manage and maintain Accounts of business
ii. To maintain bank accounts details
iii. To manage customer’s transactions
iv. To manage and maintain suppliers transactions
v. To maintain annual, customer and expense reports
vi. To generate profit and loss reports
1.5. High-level system components:
i. Manage and maintain bank accounts
ii. Manage and maintain expenses
iii. Generate customer receipts
iv. Manage accounts
v. Generate and maintain reports
vi. Manage employee payrolls, customers and suppliers transactions
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 7
1.6. List of optional functional units: Purchasing management
1.7. Exclusions:
It is only an account management system. Which can only maintain and manage accounts related
tasks of any business.
1.8. Application Architecture:
3 Tier Architecture is being used in our system.
1.9. Gantt chart:
Figure 1 Gantt Chart
1.10. Hardware and Software Specification:
1.10.1. Hardware and Software Requirements:
• Operating System: Windows 10, 7, Vista
• Web browser with internet connections
1.10.2. Hardware Specification:
• Processor: x86 compatible processor
• RAM: 512 MB or greater
• Hard Disk: 20 GB or greater
• Monitor: VGA/SVGA
• Keyboard: 104 keys standard
• Mouse: 2/3 button. Optical/ Mechanical.
1.11. Tools and technologies used with reasoning:
1.11.1 Front-End /Back-End technologies
1.11.1.1. Front-End:
i. HTML
a. It is used to generate web pages. HTML, an initialism of Hypertext Markup
Language, is the predominant markup language for web pages. It provides the
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 8
means to describe the structure of text based information in a document by
denoting certain text as headings, paragraphs, list and so on.
ii. JAVASCRIPT
a. It is a scripting language most often used for client side web development. It is a
dynamic, weakly typed, prototype based language with a lot of functions.
iii. CSS
a. CSS is used to design for front end designing. With the help of CSS we can make
our webpages more attractive and eye catching.
1.11.1.2Back-End:
• My SQL
My SQL is used to access the database. SQL stands for structured query language and is
used to perform different operations on the data stored in database.
• PHP
PHP is a technology that lets you mix regular, static HTML with dynamic generated
HTML. PHP receive any process request from HTML and give the result to HTML after
processing to show the result.
1.11.2. Tools
• PHP Storm
• XAMPP
• Google chrome
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 9
Chapter 2: First Deliverable
2.1. Project/Product Feasibility Report
There are many types of feasibilities:
2.1.1. Technical Feasibility Our project is technically feasible because it is an account management system which can
manage accounts of any business. We have all technical skills needed to design this system. We
have the ability to design an attractive front end for the end user and a proper back end to make
the system efficient.
2.1.2. Operational Feasibility
The system we are going to design is operationally feasible.
2.1.3. Economic Feasibility
Economic feasibility can be divided into two parts; cost estimates and benefit estimates. Cost
estimates can further be alienated into development or acquisition costs (one time) and
maintenance and operation costs (ongoing). Benefit estimates enclose tangible benefits and
intangible benefits. Tangible benefits would include reduced costs and increased revenues.
However, information quality, job satisfaction, and external standing are examples of intangible
benefits. According to the skill cost of team members and cost estimation our project is
economically feasible.
2.1.4. Schedule Feasibility
We have much time to develop this project. To efficiently utilize our time we have assigned a
limited time to each task/phase to complete out project on time.
2.1.5. Specification Feasibility
All requirements are clear. All features and components are well known.
2.1.6. Information Feasibility
System is very reliable. It can properly manage departmental store and generate accurate reports
of each transaction.
2.1.7. Motivational Feasibility
All information about the system is available. We can motivate the team members to develop an
acceptable and efficient management system.
2.1.8. Legal & Ethical Feasibility
It is a management system that is designed to manage departmental stores. This will be a useful
system. So there are no legal or ethical issues.
2.2. Project/Product Scope
Scope of this system can be defined by mentioning the system requirements. This system is
beneficial for maintaining and managing accounts of any business. The system will keep record
of all transactions. It will manage income ,expenses, bank accounts and customer transaction.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 10
End user of the system will be an admin who has to register himself and then login to work with
the system.
The admin will be given privileges to view accounts, add new customer and supplier, add bank
accounts details and manage income and expense of the business. The system will generate
customer receipts and profit and loss reports.
2.3. Project/Product Costing
2.3.1. Project Cost Estimation by Function Point Analysis
Information domain values are defined in the following manner:
To compute function points (FP), the following relationship is used:
FP est. = 91 * [0.65 + 0.01 * (28)]
FP est. = 91 * [0.65 + 0.01 * 28]
FP est. =84.63
Type of
component
Low Average High Total
External Input 0*4=0 5*0=0 5*6=30 30
Internal Output 6*0=0 0*3=0 6*3=18 18
External Inquire 2*5=10 0*5=0 4*0=0 10
Internal logical
Files
0*6=0 1*17=17 0*14=0 17
External
Interface
File
0*2=0 2*8=16 0*12=0 16
Total 91
Serial # Complex Technology Term Scale
1 Data Communication 0
2 Distributed data processing 0
3 Performance 4
4 Heavily used configuration 2
5 Transact rate 1
6 Online data entry 0
7 End-user Efficiency 4
8 Online update 0
9 Complex Processing 3
10 Reusability 3
11 Installation ease 4
12 Operational ease 4
13 Multiple Sites 0
14 Facilitate change 3
Sum(Fi) 28
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 11
2.3.2. Project Cost Estimation by using COCOMO’81 (Constructive Cost Model)
Basic COCOMO
Type Effort Schedule
Organic PM= 2.4 (KLOC)1.05 TD= 2.5(PM)0.38
Semi-Detached PM= 3.0 (KLOC)1.12 TD= 2.5(PM)0.35
Embedded PM= 2.4 (KLOC)1.20=2.4(6)1.05=15.12
TD= 2.5(PM)0.32=2.5(15.12)0.38=14.364 PM= person-month (effort)
KLOC= lines of code, in thousands
TD= number of months estimated for software development (duration)
Intermediate COCOMO
Type Effort Organic PM= 2.4 (KLOC)1.05 x M
Semi-Detached PM= 3.0 (KLOC)1.12 x M
Embedded PM= 2.4 (KLOC)1.20 x M
PM= person-month
KLOC= lines of code, in thousands
M.- reflects 15 predictor variables, called cost drivers
The schedule is determined using the Basic COCOMO schedule equations.
People Required = Effort / Duration
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 12
2.3.3. Activity Based Costing
Activity Cost
Feasibility Report
1000
Cost Estimation by Function Point Analysis 2000
Cost Estimation by COCOMO Model 2000
Activity based Costing 2000
Critical Path Method
3000
Task Dependency and Duration
2000
Vision Document
1000
Risk List
500
Allocate Requirement
500
Design Interface
10000
Modeling
15000
Test and Evaluate
5000
Improve Test
3000
Show Result
4000
Total Cost 49000
2.4. Task Dependency Table
Task# Task Dependencies
T1 Proposal None
T2 Feasibility Report T1
T3 Cost Estimation T2
T4 System Specification and
Analysis
T2
T5 Domain Model T1,T2
T6 Allocate Requirements None
T7 Application Development T4.T5
T8 User T7
T9 Processing T7,T8
T10 Testing T9
T11 Showing T7,T8,T9,T10
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 13
2.5. CPM - Critical Path Method
2.5.1. Specify the Individual Activities
Individual activities are as follow:
2.5.1.1. Planning
2.5.1.2. Analysis
2.5.1.3. Logical design
2.5.1.4. Physical design
2.5.1.5. Testing
2.5.1.6. Implementation
2.5.1.7. Deployment
2.5.2. Determine the Sequence of the Activities
All activities are dependent on each other like, first planning and then go to second activity
which is named as Analysis. And then logical designing after it physical designing, then testing it
all and then deployment.
2.5.3. Draw the Network Diagram
4. Estimate Activity Completion Time
Activity Duration ES EF LS LF TS FS
Planning
(A) 5 0 5 0 5 0 0
Analysis
(B) 4 0 4 4 8 4 3
Logical
designing
(C)
8 5 13 5 13 0 0
Physical
designing
(D)
7 5 12 6 13 1 1
Testing
(E) 7 0 7 6 13 6 6
Deploy-
ment (F) 4 13 17 13 17 0 0
B C D E F A
Figure 2 Draw the Network Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 14
2.5.4 Identify the Critical Path
The critical path is the longest-duration path through the network. The significance of the critical
path is that the activities that lie on it cannot be delayed without delaying the project. Because of
its
impact on the entire project, critical path analysis is an important aspect of project planning.
Critical path is: (A,B,C,D,E,F)
6. Update CPM Diagram
Activity Immediate Predecessor Duration (Weeks)
A None 1
B None 1
C A 3
D A, B 4
E None 4
F C, D, E 5
G F 3
The critical path is:
A, C, F, G
D
E
B
A C
F G End Start
Figure 3 Newtwork diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 15
2.6. Gantt chart
Figure 4 Gantt Chart
2.7. Introduction to Team member and their skill set
Name Roll No Skill
WaqarAdil MITF15M99 • HTML,
CSS,PHP,java script
Hassan Ali Shah MITF15M05 • HTML,
CSS,PHP,Java script
Usama MITF14M27 • HTML
• CSS,PHP,Java script
2.8. Task and Member Assignment Table
Task# Task Dependencies
T1 Proposal None
T2 Feasibility Report T1
T3 Cost Estimation T2
T4 System Specification and
Analysis
T2
T5 Domain Model T1,T2
T6 Allocate Requirements None
T7 Application Development T4.T5
T8 User T7
T9 Processing T7,T8
T10 Testing T9
T11 Showing T7,T8,T9,T10
Consider the set of activities shown in figure. This table shows activities, their duration, and
activity interdependencies. From figure, you can see that Task T3 is dependent on Task T2. This
means that T2 must be completed before T3 starts. For example, T1 might be the preparation of a
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 16
component design and T3, the implementation of that design. Before implementation starts, the
design should be complete.
Activity bar Chart
Allocation of People to Activities:
T1 Hassan
T2 Waqar
T3 Hassan
T4 Usama
T5 Waqar
T6 Waqar
T7 Usama
T8 Hassan
T9 Hassan
T10 Usama
T11 Waqar
2.10. Tools and Technology with reasoning There are following tools and technologies that are used in our system:
Tools:
• MS Visio Professional:
We used Visio for ERD and Sequence diagram.
• MS Project Professional;
We used MS Project for Gantt chart.
• MS word
For project documentation
• Not pad++/Bracket( for coding)
• Web Server - Apache web server or other who concern with PHP codes or scripts. It is
basically used to run the PHP code or file on browser.
• Web-browsing software-Mozilla Firefox, Internet Explorer or other
• XAMPP- WIN-32-1.6.3a
Technologies:
PHP – It is used for back end tools for the system.
MYSQL - Used to maintain the database. So, you can call it to back-end of system.
HTML & CSS &Bootstrap-These are used for font end because they sport to produce good
front end .Bootstrap used for responsiveness.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 17
2.11. Vision Document
Introduction:
This account management system is designed to facilitate the business to manage its accounts in
an efficient way. It could be any kind of business who wants to manage his accounts.
Scope and vision:
The system will be utilized by any business owner. End user of the system is an admin who will
have the access to the system after logging in. The admin will be able to add new bank accounts
details, add new customer, supplier and employee . He can add delete or update income , and
expenses. He can add delete or update his interbank transactions and trace them. He can create
customers invoices and can generate reports of expense, profit and loss report. These reports will
contain all information in detail about each entity.
The system will minimize the problems of record keeping, reports generation and business
progress checking.
2.12. Risk List
We may encounter following risks:
• Short time
• Editing Cost
2.13. Product Features/ Product Decomposition
Our product features are as follows:
Accounts management system
• Easy to use
• Generate fine and accurate result
• Manages profit and loss reports
• Create customer invoices
• Manage bank transactions
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 18
Chapter 3: Second Deliverable for Object Oriented Approach
3.1. Introduction:
Account Simple is designed to facilitate the business to manage its accounts in an efficient way.
It could be any type of business who wants to manage its account.
This project can manage accounts, expenses, income, employee payrolls, bank accounts and can
generate profit and loss reports on annually, monthly and daily basis. It is an online account
management solution and any businessman can Sign up there and he will be able to manage its
accounts. After Sign up and he will get username and password and after logging in he can add
employee data, suppliers data, customer data, banks data and afterwards can manage all the
business transactions throughout the business
3.2. Existing System:
On existing system all the accounts details are on records books and done manually including
invoices ,sales ,orders and etc.
3.3 Scope of the System:
Scope of the System
The system will be utilized by any business owner. End user of the system is an admin who will
have the access to the system after logging in. The admin will be able to add new bank accounts
details, add new customer, supplier and employee . He can add delete or update income , and
expenses. He can add delete or update his interbank transactions and trace them. He can create
customers invoices and can generate reports of expense, profit and loss report. These reports will
contain all information in detail about each entity.
The system will minimize the problems of record keeping, reports generation and business
progress checking.
3.4 Summary of Requirements: (Initial requirements):
The System will be operated by an admin or accountant. He will manage all activities performed
by the system.
3.4.1 Registration:
In order to perform further action admin or accountant will need to first register. Admin will
enter his credentials to register him.
3.4.2 Login: After registration admin or accountant will enter his user name and password to log in.
3.4.3 Admin Interface:
From admin interface, there will be a dashboard having information about sales, expenses,
banks accounts and profit and loss to perform. There will be buttons for creating new invoice,
new expense, new payment, new receipt and payrolls. He can check daily weekly and monthly
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 19
sales reports of business. He can generate profit and loss reports and other reports for other
financial activities.
3.4.4 Company:
After clicking on Company on admin interface admin will be redirected here. It will be a form
through which admin can add all the details of the company Like business details, accounting
and tax details, Bank details and business owner details
3.4.5 Customer:
After clicking on Customer on admin interface admin will be redirected here. It will be a page on
which admin can see customer information like name, reference, Telephone etc. Admin can also
Add, delete or Update client from here.
3.4.6 Supplier:
After clicking on Supplier on admin interface admin will be redirected here. It will be a page on
which admin can see Supplier information like name, reference, Telephone etc. Admin can also
Add, delete or Update Supplier information from here
3.4.7 Bank:
After clicking on Bank on admin interface admin will be redirected here. It will be a page on
which admin can see Bank accounts information like Bank name, reference, Account Number,
SORT Code etc. Admin can also Add, delete or Update Bank information from here
3.4.8 Analysis List:
After clicking on Customer on admin interface admin will be redirected here. It will be a page on
which admin can see the types of expenses here. Admin can also Add, delete or Update expenses
from here.
3.4.9 Payroll:
After clicking on Payroll on admin interface admin will be redirected here. It will be a page on
which admin can see Employees information like name, reference, start date and leaving date
Admin can also Add, delete or Update Employees information from here.
3.4.10 Income:
After clicking on Income on admin interface admin will be redirected here. It will be a page on
which admin can see all the business transactions with supplier and customers. He will create
invoices for clients. There will be buttons to add new transaction and Generate reports
3.4.11 Expense:
After clicking on Customer on admin interface admin will be redirected here. It will be a page on
which admin can see expense report. Admin can also Add, delete or Update expenses from here
3.4.11 Generate report:
System will generate some reports from where admin can check the status of the company
account, expense, accounts and profit or loss.
• System will generate weekly monthly and annual sales report.
• System will generate reports of debt and credit of business
• System will generate annual report showing profit and loss year and month vise.
• System will generate expense report to show expense of business
3.5 External Entities
Main external entities is only one in this system:
• Admin
3.6 Capture “shall” Statement:
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 20
Para# Initial Requirements
1.0 Shall system give user interface and log in option too.
1.0 Shall system Manage expense and check profit and loss.
1.0 Shall System Generate annual report, Monthly reports, Daily reports
1.0 Shall System Manage Bank Accounts
1.0 Shall System manage Income record
1.0 Shall system manage expense record
1.0 Shall system generate profit and loss reports
3.7 Allocate Requirements:
Para# Initial Requirements Use case name
1.0 Admin Shall register himself UC_Registration
1.0 Admin shall login UC_Login_Admin
1.0 He shall add company details UC_Company
1.0 He shall add, update and delete customer UC_Customer
1.0 He shall add, update and delete Supplier UC_Supplier
1.0 He shall add, update and delete Bank details UC_Bank
1.0 He shall add, update and delete expense Type UC_Analysis_list
1.0 System shall generate annual report showing profit and loss
year and month.
UC_ Generate_
Report
1.0 He shall create payroll and add, update and delete employee UC_Payroll.
1.0 He shall add, update and delete income details UC_Income
1.0 He shall add and update expense details UC_Expense
3.8 Priorities Requirements:
Para# Rank Initial Requirements Use case
ID
Use case Name
1.0 Highest Admin will register
himself
Uc.1 UC_Admin_Register
1.0 Highest Admin will login. Uc.2 UC_Admin_Login
1.0 Highest He will add Company
details
Uc.3 UC_Add_Company_Details
1.0 Highest He will update
Company details
Uc.3 UC_Update_Company_Details
1.0 Highest He will add customer
details
Uc.4 UC_Add_Customer_Details
1.0 Highest He will update
customer details
Uc.4 UC_Update_Customer_Details
1.0 Medium He will delete
customer details.
Uc.4 UC_Delete_Customer_Details
1.0 Highest He will add supplier
details.
Uc.5 UC_Add_Supplier_Details
1.0 Highest He will update supplier Uc.5 UC_Update_Supplier_Details
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 21
details.
1.0 Medium He will delete supplier
details.
Uc.5 UC_Delete_Supplier_Details
1.0 Highest He will add bank
details.
Uc.6 UC_Add_Bank_Details
1.0 Highest He will update bank
details.
Uc.6 UC_Update_Bank_Details
1.0 Medium He will delete bank
details.
Uc.6 UC_Delete_Bank_Details
1.0 Highest He will add expense
type.
Uc.7 UC_Add_Expense_Type
1.0 Highest He will update expense
type
Uc.7 UC_Update_ Expense_Type
1.0 Medium He will delete expense
type
Uc.7 UC_Delete_ Expense_Type
1.0 Highest He will add Income
details
Uc.8 UC_Add_Income_Details
1.0 Highest He will update Income
details
Uc.8 UC_Update_ Income_Details
1.0 Medium He will delete Income
details
Uc.8 UC_Delete_ Income_Details
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 22
3.10 High Level Use case Diagram:
Figure 5 High Level Use Case Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 23
3.11 Analysis Level Use case Diagram:
Figure 6 Analysis Level Use Case Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 24
3.12Usecase Description
1: Admin Registration:
2: Admin Login:
3: Add Company details:
4: Update Company details:
Use case name: UC_Admin_Login Use case ID: 2
Pre-Conditions: System is on.
Basic flow: Enter admin email and Password.
Alternative flow : Enter again Email and Password.
Post -Conditions: Login Successfully.
Use case name: UC_Admin_Register Use case ID: 1
Pre-Conditions: System is on.
Basic flow: Enter admin detail.
Alternative flow : Not done.
Post -Conditions: Registered.
Use case name: UC_Add_Company_Details Use case ID: 3
Pre-Conditions: Login admin
Basic flow: Enter company details.
Alternative flow : Again enter company details.
Post -Conditions: Enter company details Successfully.
Use case name:
UC_Delete_Customer_Details
Use case ID: 4
Pre-Conditions: Login admin
Basic flow: delete Customer details.
Alternative flow : Not done.
Post -Conditions: delete Customer Details Successfully.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 25
5: Add Customer Details:
6: Update Customer Details
7: Delete Customer Details
8: Add Supplier Details
Use case name:
UC_Update_Supplier_Details
Use case ID: 5
Pre-Conditions: Login admin
Basic flow: Update Supplier details.
Alternative flow : Not done.
Post -Conditions: Update Supplier Details Successfully.
Use case name: UC_Add_Bank_Details Use case ID: 6
Pre-Conditions: Login admin
Basic flow: Add Bank details.
Alternative flow : Not done.
Post -Conditions: Add Bank Details Successfully.
Use case name: UC_Add_Expense_Type Use case ID: 7
Pre-Conditions: Login admin
Basic flow: Add Expense Type.
Alternative flow : Not done.
Post -Conditions: Add Expense Type Successfully.
Use case name: UC_Update_
Income_Details
Use case ID: 8
Pre-Conditions: Login admin
Basic flow: Update Income Details.
Alternative flow : Not done.
Post -Conditions: Update Income Details Successfully.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 26
9: Update Supplier Details
10: Delete Supplier Details
11: Add Bank Details
12: Update Bank Details
13: Delete Bank Details
Use case name: UC_Add_Expense_Type Use case ID: 9
Pre-Conditions: Login admin
Basic flow: Add Expense Type.
Alternative flow : Not done.
Post -Conditions: Add Expense Type Successfully.
Use case name: UC_Update_ Expense_Type Use case ID: 10
Pre-Conditions: Login admin
Basic flow: Update Expense Type.
Alternative flow : Not done.
Post -Conditions: Update Expense Type Successfully.
Use case name: UC_Add_Bank_Details Use case ID:11
Pre-Conditions: Login admin
Basic flow: Add Bank details.
Alternative flow : Not done.
Post -Conditions: Add Bank Details Successfully.
Use case name: UC_Update_Bank_Details Use case ID: 12
Pre-Conditions: Login admin
Basic flow: Update Bank details.
Alternative flow : Not done.
Post -Conditions: Update Bank Details Successfully.
Use case name: UC_Add_Income_Details Use case ID: 13
Pre-Conditions: Login admin
Basic flow: Add Income Details.
Alternative flow : Not done.
Post -Conditions: Add Income Details Successfully.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 27
14: Add Expense Type
15: Update Expense Type
16: Delete Expense Type
Use case name: UC_Update_
Income_Details
Use case ID: 14
Pre-Conditions: Login admin
Basic flow: Update Income Details.
Alternative flow : Not done.
Post -Conditions: Update Income Details Successfully.
Use case name: UC_Delete_
Income_Details
Use case ID: 15
Pre-Conditions: Login admin
Basic flow: Delete Income Details.
Alternative flow : Not done.
Post -Conditions: Delete Income Details Successfully.
Use case name: UC_Delete_ Expense_Type Use case ID: 16
Pre-Conditions: Login admin
Basic flow: Delete Expense Type.
Alternative flow : Not done.
Post -Conditions: Delete Expense Type Successfully.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 28
17: Add Income Details
18: Update Income Details
19: Delete Income Details
Use case name: UC_Add_Income_Details Use case ID: 17
Pre-Conditions: Login admin
Basic flow: Add Income Details.
Alternative flow : Not done.
Post -Conditions: Add Income Details Successfully.
Use case name: UC_Update_
Income_Details
Use case ID: 18
Pre-Conditions: Login admin
Basic flow: Update Income Details.
Alternative flow : Not done.
Post -Conditions: Update Income Details Successfully.
Use case name: UC_Delete_
Income_Details
Use case ID: 19
Pre-Conditions: Login admin
Basic flow: Delete Income Details.
Alternative flow : Not done.
Post -Conditions: Delete Income Details Successfully.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 29
Chapter 4: Third Deliverable For Object Oriented Approach
4.1. Domain Model
Figure 7 Domain Model
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 30
4.2. System Sequence Diagram
Figure 8 System Sequence Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 31
4.3. Salesman Sequence Diagram:
Figure 9 Salesman Sequence Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 32
4.4. Admin Sequence Diagram
Figure 10 Admin Sequence Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 33
4.5. Design Class Diagram
Figure 11 Design Class Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 34
4.6. State chart diagram
Figure 12 State Chart diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 35
4.7. Activity diagram
Figure 13 Activity Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 36
4.8 Activity diagram2
Figure 14 Activity Diagram 2
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 37
4.9 Activity diagram3
Figure 15 Activity Diagram 3
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 38
4.9 Entity Relationship Diagram
Figure 16 Entity Relationship Diagram
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 39
Chapter6: 4th Deliverable (User Interface Design)
6.1. Site Maps
Figure 17 Site Maps
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 40
6.2 Front page
6.3 Enter email and password
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 41
6.4 Wrong email or password entered:
6.5 Login successful. Owner panel shown.
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 42
6.5 Scroll down to view next graph.
6.6 First Tab Is Dashbord Expand (Add New Invoice)
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 43
6.7 Click on New Invoice to Add invoice
6.8 Add Data and click on Save Button
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 44
6.9 Click on Expenses to Add expenses
6.10 Click on Expenses A page appear
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 45
6.11 Click on second tab INCOME
6.12 All sales invoices are credits shown
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 46
6.13 Click on Reports to generate reports
6.14 Click on reports and enter data and click on generate to generate report
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 47
6.15 Third tab is Expenses all expenses are shown.
6.16 To generate report click on reports
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 48
6.17 Add data and click on generate to generate reports
6.18 Click on Enter Button to enter expenses
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 49
6.19 Add detail and click on add button for submission
6.20 Fourth tab is Bank click on bank to show bank page
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 50
6.21 Click on add reports to generate reports
6.22 Add detail and generate reports
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 51
6.23 Click on enter to enter reports
6.24 Enter data and click on Add button
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 52
6.25 Next Sub tab is Transfer to transfer funds
6.26 Enter info and click on transfer to transfer Amount
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 53
6.27 Next tab is payroll
6.28 Next tab is Settings
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 54
6.29 Trace-ability Matrix
Features UC
ID
UI
ID
Priority DB
ID
Dependent classes
Authentication 1 1 High 10 Connection.php
authorization 1 1 High 10 Authentication
Signup 1 1 High 10 Authentication
login 2 2 High 10 Signup
Add new project
6 4 High 5 Login
Update project
information
6 5 low 5 Project added
View projects
6 6 low 5 Project added
Project approval
process
12 4 High 7 Added project
Project Assignment to
managers
7 4 High 7 Added project
Add new tasks
8 4 High 8 Added project
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 55
Chapter 7: 5th Deliverable (Software Testing)
7.1 Test plan
7.2.1.
Test plane identifier: 1
Introduction: Sign Up system is used for authenticate users.
Test item: Registration and login
Feature: Authentication & authorization
Approach: Enter user name, password, email, phone,
address.
Result: Pass
Test plane identifier: 2
Introduction: Add or Update information of company
Test item: Add and update information
Feature: Insertion & Updation
Approach: Enter company detail by fill form.
Result: Pass. Test plane identifier: 3
Introduction: Add, Delete, Update Customer information
Test item: Add, Delete and update information
Feature: Addition, Deletion and Updation Customer
record
Approach: Add customer Delete Customer and Update
customer using form and delete button
Result: Pass.
Test plane identifier: 4
Introduction: Add, Delete, Update Supplier information
Test item: Add, Delete and update information
Feature: Addition, Deletion and Updation Supplier
information
Approach: Add Supplier Delete Supplier and Update
Supplier using form and delete button
Result: Pass.
Test plane identifier: 5
Introduction: Add, Delete, Update Bank information
Test item: Add, Delete and update information
Feature: Addition, Deletion and Updation Bank record
Approach: Add Bank Delete Bank and Update Bank using
form and delete button
Result: Pass. Test plane identifier: 6
Introduction: Add, Delete, Update Analysis list
IT Hub Sargodha Version: 1.0
Accounts Management System Date: march 10.3.2017
IT-HUB 56
Test item: Add, Delete and update information
Feature: Addition, Deletion and Updation of expense
type
Approach: Add, Delete and Update expense type using
form and delete button
Result: Pass. Test plane identifier: 7
Introduction: Add, Delete, Update payroll
Test item: Add, Delete and update information
Feature: Addition, Deletion and Updation of employee
info
Approach: Add, Delete and Update employee using form
and delete button
Result: Pass.
Test plane identifier: 8
Introduction: Add, Delete, Update income details
Test item: Add, Delete and update income details
Feature: Addition, Deletion and Updation of income
Approach: Add, Delete and Update income using form and
delete button
Result: Pass.
Test plane identifier: 9
Introduction: Add, Delete, Update Generate reports
Test item: Generate Annual, Monthly and weekly reports
Feature: Generating Annual, Monthly and weekly
reports
Approach: Generating reports by clicking on Reports
button and filling the form
Result: Pass.
Test plane identifier: 10
Introduction: Add expense and Update expense
Test item: Addition and updation of expense details
Feature: Add and update of expense details
Approach: Adding and updating expense details by
clicking on Edit and add button and filling the
form
Result: Pass.