33
Bolted Connections A typical bolted joint (as shown) may contain a washer and gasket to improve the bond, a nut and a bolt besides the basic structure that it is connecting. The bolt assembly may be pretensioned or it may only resist shear. There are many options involved with a bolted connection. Each option has advantages and disadvantages, and none of the options will be right for every situation. To model the joint completely, the model would include the washer and/or gasket which is probably a hyperelastic material, the contact between the nut and the bolt, the nut and the washer, the washer and solid body and may also include friction, this could be done with a solid model, but would require a very detailed model, without including the threads in the bolts. When modeling a bolted connection, the first action should be to determine what information is needed. Some questions that should be considered are: Will the holes deform? Will the bolts deform? Do the bolts contribute to the overall deformations and stresses? Will the bolts fail first? Are the gasket/washer interfaces critical to the behavior of the structure? Will the bolt resist axial, shear, and/or bending? 1609 Elements 7341 Nodes 29 Contact Pairs Most analysts do not have the time or hardware to build this type of model. In addition, a detailed model would probably produce more information than is necessary. Bolt Washer Gasket Nut

Uniones atornilladas

  • Upload
    cmpsl

  • View
    53

  • Download
    1

Embed Size (px)

DESCRIPTION

Cálculo de uniones atornillada por EF

Citation preview

  • Bolted Connections

    A typical bolted joint (as shown) may contain a washer and gasket to improve the bond, a nut and a bolt besides the basic structure that it is connecting. The bolt assembly may be pretensioned or it may only resist shear. There are many options involved with a bolted connection. Each option has advantages and disadvantages, and none of the options will be right for every situation.

    To model the joint completely, the model would include the washer and/or gasket which is probably a hyperelastic material, the contact between the nut and the bolt, the nut and the washer, the washer and solid body and may also include friction, this could be done with a solid model, but would require a very detailed model, without including the threads in the bolts.

    When modeling a bolted connection, the first action should be to determine what information is needed. Some questions that should be considered are:

    Will the holes deform? Will the bolts deform? Do the bolts contribute to the overall deformations and stresses? Will the bolts fail first? Are the gasket/washer interfaces critical to the behavior of the structure? Will the bolt resist axial, shear, and/or bending?

    1609 Elements

    7341 Nodes

    29 Contact Pairs

    Most analysts do not have the time or hardware to build this type of model. In addition, a detailed model would probably produce more information than is necessary.

    Bolt

    Washer

    Gasket

    Nut

  • There are many modeling options. None of the options will produce exactly the behavior of the connection. The decision of which option to choose is dependent on required results and time available to produce results.

    Some of the modeling options include: Merge Nodes Rigid Connection Spring Element Beam Element Constraint Element Coupled DOF

    This paper will discuss some of the modeling options. It is intended as an introduction to the topic and is not the final answer to modeling beam connections. The results presented were calculated using I-DEAS as the post processor and Model Solution as the solver. The paper will present some of the advantages and disadvantages of using different modeling options. It will discuss merging nodes, rigid connections (using rigid elements), spring elements and beam elements. The constraint element and coupled DOF will be left to another paper.

    Determining the required information would then determine the type of model that could be used. For instance, if joint forces are needed, the bolt must be modeled with an element that can recover forces.. Different element types will result in different behavior of the bolt.

    There are local effects that could be modeled with a break out model or submodel. Some local effects are:

    Bolts can prevent the hole from changing shape. The interaction of the hole and the bolt is usually a local effect. A sub model would be needed to find bolt failure, if the failure mode is known. The gasket and washers generally contribute to only localized effects.

    Merge Nodes:

    Considerations: Connecting two bodies represented by

    solid elements. (Shells would not have coincident nodes)

    All forces are transferred. No localized behavior is considered.

    Concerns: It can be difficult to get the nodes to

    match. (Section meshing can help) No joint forces available. The contact between the surfaces would

    be very friction dependent.

  • There are two possible methods of merging nodes: 1. All nodes on the connecting surfaces could be merged

    - Behavior would be the same as one body 2. Only the nodes representing the bolts could be merged

    - Contact between the surfaces should be considered

    Merge Nodes Using I-DEAS 1. Pick Nodes

    Select nodes to be considered For all nodes, use MB3 All done

    2. Enter distance between nodes to be considered coincident (0.0003937008)

    Enter distance between nodes, the default is 1mm

    3. Enter method to select coincident node Lower Number is the default

    4. Ok to list element labels? (No) 5. Ok to merge coincident nodes? (No)

    Default is NO Select Yes to merge the nodes

    6. Ok to delete nodes that have been replaced (Yes)

  • One rigid element connecting all the nodes

    to one central node

    Two rigid elements connected with one

    rigid bar

    One rigid element connecting a node at the

    center of the hole

    Rigid Elements:

    Considerations: Selected DOFs can be transferred. No localized behavior calculated. The holes shape can be maintained.

    Concerns: Joint Forces can be recovered. May add numeric stiffness around the

    hole. If the nodes are not coincident, a

    moment will be induced.

    There are three possible methods using rigid elements to model the bolts.

    Rigid Elements Using I-DEAS Two types of rigid elements:

    RBARs - connect only 2 nodes RBEs connect multiple nodes The first node is the

    independent node. Rigid elements can be created:

    Manually using create element

    Geometry-based Elements using reference points or center points

    Section meshing will automatically suppress the hole.

  • Recovering Joint Forces using Rigid Elements:

    1. Constraint forces must be stored. They may be listed. It is recommended that element

    forces also be stored and listed. 2. Select constraint forces in display

    results. 3. Select arrow plots in display

    template.

    The forces may be listed using the report writer and similar to Arrow plot.

    Spring Elements:

    Considerations: Nodes should be coincident. Selected DOF can be transferred. Some calculations prior to the FE model would

    required to obtain the equivalent bolt stiffness. No localized behavior considered.

    Concerns: Joint Forces can be recovered. If nodes are not coincident a moment may be

    introduced. - For Ideas, it is suggested that the uniaxial flag be

    turned on. - For Nastran, the nodes should be coincident.

    To have no stiffness for a given DOF, set the stiffness to zero.

    - Ideas defaults to 3 DOF, either translational or rotational.

    - Nastran uses 1 DOF, multiple springs may be required to resist different forces.

  • There are two possible methods for modeling spring elements:

    1. Connecting nodes at the center of the hole.

    2. Model the hole using a rigid element and connecting the rigid elements with a spring.

    3. If midsurface data is used for shell models, the spring element may induce a moment.

    Recovering Joint Forces using Spring Elements:

    1. Create a group of the spring elements.

    2. Store Element Forces. 3. Select Arrow Display.

    In Visualizer, arrows can be set to show either 1 direction or 3 directions

    The forces may be listed using the report writer and similar to XY graph. An XY graph must first be created.

    Spring Elements Using I-DEAS Springs elements can be

    created: Manually using

    create element Geometry-based

    Elements using reference points or center points

    Set the solver mask before creating the physical property table entry.

  • Beam Elements:

    Considerations: Nodes should be coincident Stiffness in axial, shear and bending are

    included based on beam section Forces can be transferred in selected DOF Localized behavior can considered Preload may be included

    Concerns: Joint Forces can be recovered A beam or a rod element can be used...

    - Beams model all 6 DOF - Rods model translation only

    In short beams the shear deflection will control the overall deflection of the bolt.

    The beams are modeled connecting nodes at the center of the hole. The hole is not modeled, because the beam section models the bolt volume.

  • Beam Elements Using I-DEAS 1. Create a beam section that represents the

    bolt. 2. Create beams between the center nodes of

    the holes. 3. The holes may be suppressed (using

    section meshing) OR

    3. Use a rigid element to connect the edges of the hole with the beam.

    4. Store Element Forces

  • NX 3 Supports More Languages!! by Elango Ramanathan Programming tools Technical track chair

    Grrrrrrr! Yes! That is exactly how I felt when I heard UGS is adding more languages. Oh my God, GRIP, GRIP NC, C, C++, TCL, Intent! and now C#, VB.net. None of the existing language covers everything I need. We have been asking UGS to added more coverage in CAM area. What is wrong with these UGS people? Why are they wasting their resources in adding more languages? I was so curious when I attended beta testing at Cypress CA, I could not resist asking for a presentation on what was happening. But the more I found out about UGS strategy, the more impressed I became.

    Initially I thought UGS is just going to add a few more language to their list. But UGS has a well thought out strategy to help developers in the long run. UGS is providing a new recording tool called Journaling, and, by NX 3, will support VB.NET, C# and C++ for traditional automation. By NX 4 Java will be supported also. Any developer working with the NX Open for .NET API can use all the functionalities of the Microsoft .NET environment. NX 3 will support full object oriented programming concepts. Also, with the .NET API a developer can do remoting and distributed programming, as well as create Graphical User Interfaces (GUIs) using WinForms.

    Journaling is more like macro recording in Word or Excel. Journals will record VB.NET commands instead of menu clicks. They can also record in C++, but journal replay is limited to VB.NET only. Since journals are capturing functional code, and are not recording GUI or screen picks, they will work across multiple versions of NX. And journaling supported automation code provides the added benefit of recording actual automation commands. In the past, I used to make a lot of calls to GTAC to find out whether a function was available in Open C and how it worked. Now, with journals, it is so easy to find out. I can just record a journal and I get my sample program in no time. I can cut and paste directly into an automation program, then add only a few variables and logics to make the program work.

    My next worry was that I would have to learn yet another new language. I never had a need to fill my brain with one more language. But I saw it as opportunity to beat my son. Since he already knows C#, I borrowed his C# book and started to go through it. I was really surprised to know C# is more like C++ than what I had originally thought. A lot of the syntax is very similar to C++ except for arrays and the fact that there are no pointers. There are differences like delegates etc., but I felt comfortable with C# very fast. And, since I could add the NX .NET classes in the Visual Studio development environment, I got all the benefits of 'intellisense'. Wow!

    NX Open for .NET supports not only internal/external programs but now it supports remote programming as well. Remoting allows an NX user to execute an automation program from the same or a different machine from where the NX session is running. Via remoting, a user can connect to another system running NX within a network. This

  • addition is available through the .NET version of the NX Open API only. This mode is not available in the legacy Open C API.

    Okay! The future is very bright, but what about the past? I have about 150K lines of code to support. As usual UGS is committed to supporting their customers and has promised to continuing to support legacy Open C (User Function) libraries and GRIP. But no new functions will be added to Open C and GRIP. All the new functions will be added to the NX Open for .NET API and to the new NX Open C++ API. Both the .NET API and the new C++ API are derived from the same Common API kernel, so any new functionality will be provided equally for the new APIs. Customers with existing Open C licenses will automatically receive the new Open C++ API free of charge. As for my existing code, I recompiled and linked my code with the NX 3 Open C library. Everything worked fine except for few minor changes like the unit conversion function in expression is inch(....) instead of in(.).

    Not all NX functionality is available for automation through the native.NET API yet. To provide complete programming coverage in .NET, UGS is providing an additional library of .NET-wrapped Open C functions. This added library provides a .NET programmer with nearly the same automation access to NX functionality that the existing Open C and Open C++ libraries provide. Although UGS have plans to provide all existing and new functionality through the .NET API in future releases, the .NET-wrapped Open C library will not be removed.

    UGS is continuing to support C-based programming by releasing a new C++ library built from the same object and class structure of the new .NET library. Although this library is different than the existing Open C++ library, I can compile and link my existing C and C++ programs with this library. But if I want to use any of the Microsoft .NET classes I have to follow a book full of protocols and conventions. I tried and failed miserably. So I have decided to stick with C# because I want to program with .NET classes.

    NX Open for .NET comes with a new set of documents that are presented in a standard Microsoft help file format. The documents are user friendly and more like Visual Studio docs. And details about the NX Open for .NET classes and methods show up automatically in the Visual Studio Object Browser. It should be noted, though, that a user needs to be running Visual Studio .NET 2003 (Version 7.1) if they want to work with the .NET API. They also need to have the Microsoft .NET Framework 1.1 loaded on their workstation

    I need to buy a new NX Open for .NET authoring license if I want to program in C# or VB.net, but no additional execution license is required. No new licenses are required if I program in C++ and link with the new library.

    Over all I am quite impressed with UGS strategy to support more object oriented programming languages. In the long run, I believe this new direction will help developers a lot.

  • NX Manager I-DEAS via Team Center Engineering

    One of the main areas that I-DEAS users need to focus on is the transition from I-DEAS to NX. This process

    involves two distinct phases, migrating TDM to NX Manager I-DEAS (via TC Eng) and then migrating I-DEAS NX CAD data to NX3 (or beyond) CAD. I am very happy to be able to provide news about the process relating to the TDM to NX Manager I-DEAS migration.

    We under went our "early adopter" I-DEAS to NX initial audit by UGS in August 2004. UGS came out to our

    company and spent two days with us, analyzing our CAD data and showing us the new products. My overall

    anxiety has pretty much disappeared now that I have seen the products as they relate to our CAD data. The

    products - both CAD NX and TDM to TC Eng NX Manager I-DEAS look solid. I also found great benefit from

    attending the recent Denver Colorado Team Center of Tour and NX3 event hosted by UGS.

    In order to migrate your TDM to NX Manager I-DEAS, there is a great tool to help. The MiAdmin tool is a

    gem! This tool analyzes your TDM. It lists everything you ever wanted to know and more (but were afraid to ask) about the items in your TDM. Also, it provides wonderful automated tools for you to fix your data! The I-DEAS user needs to understand that in order to utilize NX Manager I-DEAS, they must also work within the

    Team Center Engineering environment. While this might seem like a daunting task, it is possible to start out

    with basic TDM like functionality first and then add on modules of TC Eng if one so desires. The interface for

    accessing I-DEAS thru TC Eng has an easy to use windows feel to it and users should quickly adapt to this new

    structure.

    The added benefits of working within the TeamCenter Engineering environment are fantastic. These include the

    potential for Global CAD data sharing, being able to link other types of file (MS and such) to your CAD object, markup and viewing of both 2D and 3D CAD data. The NX Manager I-DEAS product looks like a go now. I

    would say that the I-DEAS NX CAD product is still evolving. Each new release will ensure a greater success

    rate with migrating part features and drawings. NX3 has some great features and its ease of use is a definite

    welcome to this next generation CAD tool.

    Follow the user discussions relating to I-DEAS to NX on the I-deas to NX Transition Digest bulletin board.

    https://citizen.plmworld.org/login.php?ru=/access/conferencing.php

    You must be a registered PLM World Citizen!

  • Rick Rueger PLM World Article Submit Date: October 15, 2004 Word Count: 856

    1

    First of Two Simple Applications of Using Part Equations in I-DEAS

    Part 1 of 2

    Have you ever needed to model a spring specified by the pitch and number of turns? Have you ever needed to balance a number of slots or other features and position them uniformly along a face? Did it cause you to struggle when you tried to do this within I-DEAS and struggle even more when you had to go back and change them? If so, read on because these articles were written to give you a couple of examples of using the Part Equations form to create dimension-driven parts that can be easily and controllably modified.

    Part 1 (this article) will look at driving a spring design by specifying the pitch and number of turns.

    Part 2 (next issue) will examine how to uniformly space and balance an array of slots (or other features) on a given face.

    Driving a Spring by Pitch and Number of Turns

    It is relatively easy to create a spring within I-DEAS. This can be done by sketching a profile, picking the Revolve command, selecting the profile, then selecting the axis to revolve about and completing the rest of the form. What might be a little more cryptic is the way that you need to fill out the rest of the form to accomplish the helix. You next need to calculate (or put in an expression for) the Revolve Angle to specify how many revolutions are in the spring. An example of this is shown in Figure 1.

  • Rick Rueger PLM World Article Submit Date: October 15, 2004 Word Count: 856

    2

    Figure 1: Initial Input of Revolve Angle

    Next click on the options button to enter the Translation along Axis. This is the total translation distance from the beginning of the spring to the end. For an example of this see Figure 2.

    Figure 2: Initial Input of Total Translation

    A more intuitive way of defining a spring might be to specify the number of turns and the pitch (distance between turns). This can be done by going into the Part Equations command (Icon row 4, column 1) after you have created the initial spring. In the equations section type:

    NUMBER_OF_TURNS = 5 PITCH = 50|mm|

    Note: There cannot be spaces in your variable names. Use underscores to accomplish readability. Also, when entering constant values in this form make sure to specify units. This is done in the example above by typing the vertical bar or pipe symbol (found as the shift of the backslash on your keyboard) both before and after the actual units. Anything between these two pipes is evaluated as a unit. If no units are specified,

  • Rick Rueger PLM World Article Submit Date: October 15, 2004 Word Count: 856

    3

    everything is solved in SI (System International) which means that it will be interpreted as meters, not millimeters.

    Next, in the dimension section, highlight and enter values for the following two dimensions:

    RevolveAngle = NUMBER_OF_TURNS * 360 AxialTrans = PITCH * NUMBER_OF_TURNS

    See Figure 3 for an example of the equations form and the resulting spring. You now have a spring that can easily be modified by changing these two parameters at the top of the Part Equations form.

    Figure 3: Finished Spring and Example Equations Form

    Also, notice that the name of the other dimensions have been changed to be more meaningful than the default D11 and D12. The names wire_diameter and spring_radius are far more apparent as to what they will control. Highlight on the dimension in this form and then type in the new name in the lower left-hand box instead of the right-hand box where you enter the value. Again, no spaces in dimension names (same rule as for user-defined variables). This dimension name change can be done in the Modify command as well.

    If you go back into the feature parameters form of the revolve you will notice that both the Angle and the Translation along Axis are greyed out and not available to change here. This is because the values for these two dimensions are now controlled at the part level through the Part Equations form and are no longer able to be (accidentally) changed at the feature level.

  • Rick Rueger PLM World Article Submit Date: October 15, 2004 Word Count: 856

    4

    Summary

    The Part Equations command allows you to build design intent into your model. You can quickly build a series of parts by changing the values of the constants in the desired set of equations. The more intuitively-named dimensions and variables that you put into your part, the greater the likelihood that someone will be able to change your part predictably. The hardest part about using the Part Equations command is usually writing out the mathematical relationships. Entering them in the form is easy. Hopefully, this simple example has given you some exposure to this and will encourage you to try to build more of these relationships into the next part that you create. Check back next issue for a more involved example of equation writing and using some of the available functions such as truncate and round.

    Bio: Rick Rueger is the District Training Manager for UGS in Chicago. He has worked for SDRC/EDS/UGS for the last 14 years and still occasionally teaches a few classes there. Rick Rueger UGS Inc. [email protected]

  • As another year quickly closes, PLM World keeps the momentum going. 2004 was a fabulous year, at our annual conference in May over 1600 attendees experienced a weeks worth of technical and UGS Executive presentations, Teamcenter, Ideas, and Unigraphics training opportunities, witnessed numerous capabilities to improve your bottom line provided by the PLM World Partners who participated in our Vendor Fair.

    In addition to our US meeting, the momentum is Global. Our friend Paul Averte, the Australian PLM Expo Chairperson held their User Meeting in Melbourne in September. Attendance doubled from earlier years. Great Job, Mate! Karla Kluth, organizer for PLM Europe, held a very successful conference in Stuttgart, Germany in mid-October. Nette Aufgabe Karla! Asia (Korea, Japan, India, Malaysia, and Singapore) has scheduled several user events in late October and early November, Im sure they will be just as successful. .So, no matter where you in the world, theres opportunity to experience a world class User event. Give one a Try!

    Looking into the future, the planning for our 2005 conference in Dallas Texas, May 2 6 is well underway. The Call for Papers has been posted on our website, www.plmworld.org. Were looking forward to many top notch technical presentations our users and UGS folks will be presenting. Scott Adams, the creator of Dilbert, will be our keynote speaker on Tuesday Morning, Im sure everyone can relate a little bit of Dilbert in their daily lives. Thursday night youll be invited to a little piece of Texas hospitality at our Texas Barbeque. And yes, youll still have opportunities to attend UGS Training Sessions headed up by UGS Education Services and experience the many new innovative products the Vendor Fair provides. All in all, PLM World provides the opportunity to learn and network with UGS experts and peers enabling users to apply the technology at their workplace. Its 4 Days of non-stop action, dont worry, as you can see well sprinkle in a little bit of fun too! We cant wait.

    See you in Dallas, Jim Wilson PLM World Chairperson

  • 1

    PLM World - User News:

    News from the Drafting and Dimensional Management Technical Committee

    By Kristy Timbimboo, Drafting and Dimensional Management Committee Chairperson

    Although there has been strong representation of drafting issues in past years, for

    a number of reasons, involvement appears to have diminished somewhat. It is difficult to

    believe that 2-D, and the many drafting issues associated with it, has suddenly

    disappeared (perhaps abducted by aliens). The decline is more likely attributable to the

    fact that users have a multitude of other CAD-related issues vying for their attention.

    Those issues are numerous and valid: elevated interest in 3-D and the move to solid

    model-controlled paperless systems, focus on Teamcenter activities and related data

    management issues, apprehensiveness about future products and migration issues, and

    even reorganization of the structure within PLM World combining UG and I-DEAS

    Drafting into one committee. The way we do business is changing for many users, myself

    included.

    2-D Drafting is still a big part of many peoples lives and will be for quite some

    time. UGS and PLM World both recognize this and are committed to continued support

    of this sector. We are in the early stages of forming the combined Drafting and

    Dimensional Management Technical Committee and, in addition to myself, four other

    people have volunteered their services to help focus on drafting issues (there is always

    room for more!). We have recently been active in defining the purpose and function of the

    committee, and outlining future challenges of the drafting user community as a whole.

    This will allow us to move forward with purposeful vision and direct the attention to the

  • 2

    greatest needs of the user community. The following sentences outline some of the items

    compiled by the committee. As always, user input is welcome please let us know the

    things that are important to you. Contact information for committee members is listed at

    the end of this article.

    Committee purpose:

    To represent the interests and the needs of the users in this sector. Our goal is to assist in

    the development of the user community through communication and cooperation between

    the users and UGS. Our primary objectives are to help the user optimize use of the

    product and to help UGS provide the most efficient and effective tool.

    Committee function:

    We collectively:

    Represent a cross-section of UG and I-DEAS users

    Provide focus on 2-D to 3-D Drafting issues:

    a) Dimensional Management (3-D Annotation/ASME Y14.41, GD&T Associativity, Dimensioning Between Views, etc.)

    b) Develop and mature correlation between 2-D and 3-D (Promote Master Model concept)

    Help determine Best Practices to share with others

    Use what we learn and know as a basis for future conference presentations

    Be positive role models to encourage other users to get the most out of the product

    Future Challenges:

    Migration issues as we move toward one common product

    Maintaining support of two separate software applications

  • 3

    Encouraging strong user presence in newsletter articles and conference presentations

    Strengthen the committee as we focus on future products and drafting-related issues

    ****

    The users of 2-D Drafting are instrumental in helping shape the future of the

    product and are a large network of support for other users. Individual user participation is

    important to other users in the learning process. I especially encourage those who are

    migrating into the world of NX from UG and I-DEAS to contribute to the newsletter or

    make a presentation at the upcoming conference in May 2005. Migration will be a big

    topic over the next few years and for those of you beginning that transition, let the rest of

    us know some of the challenges you are facing and the solutions you have found. ASME

    Y14.41 is another topic that users would like to know more about. Let us know some of

    the things you are doing to incorporate the ASME Y14.41 standard for 3-D annotation in

    your work.

    Finally, if you are interested in being involved as part of this committee, please let

    me or someone else on the committee know there is always room for more. As much as

    we all like to be involved in this, we all have other jobs to do and the time we can

    contribute is limited, many hands make the work light. It is much more beneficial for

    the users to have a broad range of representation.

    Kristy Timbimboo Chairperson, Drafting and Dimensional Management Technical Committee Design Drafter ATK Thiokol Inc. P.O. Box 707, M/S 251

  • 4

    Brigham City, Utah 84302 (435) 863-5882 [email protected]

    Committee Members:

    First Name Last Name

    Background Company E-mail

    Paul Howard I-DEAS Goodrich Aircraft Wheels & Brakes [email protected]

    Paula Lambertz I-DEAS Accelerator Cryogenic Systems,

    Fermi National Accelerator Laboratory

    [email protected]

    Jim Melton I-DEAS/UG USA [email protected] Jim Rawlinson UG Goodrich Hoist and Winch Power Systems [email protected]

  • Teamcenter

    Repeatable Digital Validation:Teamcenter's integrated solution fordigital product validation

    Teamcenter repeatable digital validation (RDV) provides an integrated solution that enables

    your enterprise to rapidly validate product configurations as they continuously change across

    your product lifecycle.

    w h i t e p a p e r :

    Te a m c e n t e r R e p e a t a b l e

    D i g i t a l Va l i d a t i o n

    www.ugs.com

  • Table of contents

    Executive Summary 1

    Business challenges 2

    Business challenge complications 3

    Teamcenters RDV solution 4

    Benefits 5-7

    Why RDV excels 8-9

    Teamcenter Community

  • 1Todays mainstream product development processes are inherently

    inefficient when it comes to handling product change. Design teams,

    suppliers and manufacturing stakeholders often encounter inaccuracies

    as they exchange and share change-related data. Errors are introduced

    as data is modified or when data is re-entered but not validated across

    multiple disciplines and systems.Additionally, quality decision-making is

    hampered by the failure to integrate data and core business rules

    between multiple systems. Significant reduction in new product

    introduction time and total cost and increased product quality is

    possible with a new paradigm for engineering review and validation.

    Product development requires that support systems focus on the entire

    range of products and processes of the enterprise. As the complexity of

    the products and processes grow, the product development community

    needs tools that are integrated into efficient, process-oriented

    applications. Critical product decisions require the continuous availability

    of the latest digital product and process information. Finally, the

    tremendous amount of data contributing to the definition of a product

    and its manufacturing processes must be navigated efficiently and

    reduced to the minimum set of data that will accurately represent the

    full decision context.

    A solution that enables a continuous and accurate decision context based

    on the latest product and process information must be able to:

    Integrate information from a variety of tools, including multiple CAD

    authoring tools, validation and analysis tools and business systems

    Configure and apply business rules to product and process

    configurations for rapid what-if analysis and knowledge reuse

    Quickly navigate large amounts of product and process information

    and work with only relevant data while retaining the context of

    total product

    Interrogate and validate the configurations for form, fit and function,

    and comply with requirements such as cost, weight and investment

    Integrate into your product development process with minimal training

    and support while sustaining your organizations ability to develop

    innovative new products

    Today, there are software tools available that attempt to solve each

    problem separately. For example, digital mockup (DMU) software

    addresses digital prototyping but is time consuming, static and invariably

    prone to errors. Similarly, PDM solutions address problems related to

    configuration and business rules but lack tight integration with CAD tools

    or DMU solutions.

    Teamcenters Repeatable Digital Validation (RDV) solution facilitates a

    true paradigm shift for companies that perform complex product

    development and want to integrate a suite of core systems, such as

    design tools, visualization, product configuration, and change

    management into a single integrated web environment. Never before has

    such a ground breaking technology been able to dramatically reduce

    time to market in product development while delivering decision making

    knowledge directly to stakeholders responsible for getting the right

    product to the right market.

    RDV removes product development latency while providing an always

    on digital mockup of the complete product and all of its variations. RDV

    enables companies to make optimal product decisions quicker resulting

    in faster and better products to market. Product changes and alternative

    ideas can be done real time in a controlled process while assessing the

    impact of change across the finished product and the impact on its

    performance characteristics. No other product development suite in the

    market can support this level of integration. In addition, RDV reduces a

    companys ownership costs by supporting multiple product development

    processes on a single integrated solution.

    Executive Summary

  • 2Exhibit 1: Embedded costs per phase of product lifecycle

    Business challenges

    Lifecycle cost determination

    100%

    90%

    80%

    70%

    60%

    50%

    40%

    30%

    20%

    10%

    0%Concept Validation Deployment Production Operation

    Cost reduction opportunities Source: US Defense Advanced Research Project Agency.

    66%

    34%35%

    22%

    12%

    70%

    85%

    95%99%

    3%

    The discrete manufacturing industry is rapidly shifting from mass

    production to mass customization which demands that companies

    build a larger number of products according to geographic and cultural

    style preferences and bring them to market on average 5 to 10

    percent faster every year. Product innovation and time compression are

    primary drivers across marketplaces.The sooner a product can be

    brought to a customer, the greater its lifecycle profitability potential.

    This is complicated by the need to increasingly deliver variations of

    each product according to sub markets and respond to ever-changing

    customer hot buttons.

    Globalization has helped manufacturers find suppliers in far away places

    at very competitive prices, but has added complexity to the product

    development process. For example, the new global reach concept

    requires communications and collaboration across a distributed supply

    chain in order to avoid long delays and costly errors as information

    propagates across all tiers of suppliers.

    Since approximately 70 percent of a products costs are committed

    during the product development phase, the biggest cost savings

    opportunity is during the upfront product design phase.These large

    savings opportunities are not going to come from ERP, SCM and CRM.

    The biggest challenges to increasing productivity and eliminating errors

    and cost overruns are:

    Efficiency of the change process as demonstrated by a companys

    ability to immediately evaluate and analyze changes in the context of

    other changes and their impact on the complete product.

    Ability to configure and visualize each part in all its usages in all

    products to fully understand change impact

    Ability to provide the right individuals the right data, rapidly and

    easily, and in the right context at the right time.To meet this

    challenge and facilitate a totally effective product decision, companies

    need to deliver tightly focused product information to their

    designers. In essence, all of the participants in your value chain need

    to access virtual product content on a consistent and repeatable

    basis.To illustrate the value of delivering the most relevant

    information to your product team, your value chain needs to be able

    to answer the following kinds of questions:find all parts within 5

    mm of the engine so I can do packaging study, or get me the solid

    models for all parts released this week so I can assess the impact on

    product weight.

    Ability to design and validate products with complex variability.This

    functionality allows companies to correct error in early design

    phases rather than during the manufacturing phase. For example,

    designers need to be able to ask their digital solution to evaluate

    behind dashboard clearance for wire harness with both left and right

    side drive, with and without air conditioning, with and without a GPS

    system. I need to know that I can assemble the product for all

    variants, not just the one in the current configuration.

    Reducing risk by institutionalizing the reuse of existing designs, which

    already embed corporate best practices and lessons learned from

    previous products.

    Ability to configure and visualize a part in all its current usages in all

    products to determine if it can be reused in a new product

  • 3Take the example of a new car design.A typical car has over 10,000

    parts. On average, 2500 parts change during any given week.Trying to

    pull all these changes can take 2-3 weeks. Once a change is initiated, it

    must be validated and its impact on overall weight, cost and supplier

    schedule must be analyzed.This is a time consuming, resource intensive

    task.While knowledge workers are pulling the changes together, more

    design changes will invariably need to be initiated.This cycle is repeated

    every 2-3 weeks during the product development process, which lasts

    12 to 18 months.The second problem faced by the design team is that

    even when it brings up the whole product containing 10,000 parts, it

    can take hours to zero-in on the part and surrounding area that needs

    to be analyzed. Because of this complexity, many engineers try to only

    work with a few parts at a time.This creates a risk of not envisioning the

    change in the context of the entire product, or the entire surrounding

    environment impacted by the change.

    Technologys promised added value versus the reality of adding

    more complexity. Todays software tools attempt to solve each of the

    previously enumerated problems. For example, digital mockup software

    address one set of problems while PDM solutions address another set.

    However, productivity gain will only be significant when a solution is able

    to address all of these problems simultaneously.

    Consider the following excerpt on configured digital mockup from the

    recent paper titled Fundamentals of Shared Product Structure by

    Wayne Collier, DH Brown.

    A design component may represent, for example, right and left tires

    as two instances of the same CAD model. But digital mockups

    create a visualization of a total product in three dimensions and

    require separate entities to visualize the right and left sides.

    Similarly, representations based on part records may use a single

    part number for an entire end-item assembly actually consisting of

    dozen parts, while digital mockups require unique identification of

    each entity included in a configuration to resolve interference,

    packaging and other design integration issues. Digital mockups

    come into use during design reviews at early phases of product

    development, before part records have been released, as conceptual

    designers explore alternatives across multiple configurations. All of

    these characteristics of digital mockup make it difficult and time

    consuming to generate them automatically for multiple

    configurations if those configurations are based on traditional, parts-

    based bills of materials or traditional CAD assembly model.

    In response to these limitations most companies today resort to

    brute force manual reconciliation to assemble as-ordered product

    configurations generated by order configuration representations

    from families of design components managed in CAD data

    managers.This reconciliation is tedious and error proneTraditional

    approaches and automated versions of them simply do not serve

    the need to rapidly validate designs across hundreds of product

    configurations generated on the fly.

  • 4Teamcenter Repeatable Digital Validation (RDV) combines industry leading CAD integration, product modeling

    technology, high performance visualization, spatial search engine technology and a design in context application that provides

    a powerful innovative, and integrated digital product validation solution.

    Teamcenters RDV solution

    Rapidly configure

    Re-use alternativesDesign evaluation

    Validation

    Design changes

    DesignerSupplier 1

    Supplier 2

    RDV reflects a wide variety of robust capabilities:

    RDV is continuously repeatable with a new configuration or with an

    alternative design configuration. It allows the same validation process

    to be repeated at different sites or by different individuals including

    suppliers.This insures consistency of result and eliminates human

    errors during configuration.

    RDV provides a powerful tool for abstraction and relevance in a

    extremely complex product development process so that the entire

    value chain can use a consistent way of accessing virtual product content

    RDV enables engineers to design and validate products with complex

    variability. Change is validated against one product, as well as against

    all possible variations.

    RDV always keeps product configurations up to date with the

    latest changes.

    RDV allows a user to visualize the whole product as well the specific

    area of interest.The search engine database is specifically optimized

    for quick search.

    RDV synchronizes CAD, visual and product structure data based on

    business rules and best practice processes captured in a company-

    specific workflow.

    RDV provides a powerful classification application enabling

    both product and process reuse, while reducing risk and direct

    material costs.

    Collision detection and interference analysis is the first of many

    potential product validation applications based on the RDV platform.

    These common digital validation applications require easy and efficient

    access to all CAD files of a specific product variation or product family.

    The CAD data is converted to the standards-based JT format, an

    optimal and accurate CAD geometry format for visualization and

    collision detection. For collision detection and spatial searches, UGS

    harvester approach replaces time-consuming queries on the entire

    database with an efficient filter that carefully selects only the parts that

    are changed, and for the selected or appropriate configurations.

    Configure Validate against all

    Validate variant/ options for reuse

    Productstructure Central designrepository

    Repeatable Team reviews the

    same configuration to

    analyze issues

    Visualize

    Analyse

    Track andpublish Issues Progress

    Figure 2.Typical RDV process flow Figure 3. Key RDV capabilities

  • Physical and static

    Months

    Weeks

    Days

    Hours

    Physical Digital Repeatablemockup mockup digital validation

    Complete digital and dynamic

    Huge productivity breakthrough forthe product validation process

    From weeks to minutes

    From static to dynamic From concurrent to collaborative

    Pro

    du

    ct

    valid

    ati

    on

    cycle

    Technology and process

    5

    Figure 4. RDV productivity improvement

    1. Substantial enterprise productivity gains are realized by

    enabling continuous product validation. Digital validation in the

    traditional form (DMU) is unable to address all the challenges and

    offers disappointing payback.This is due to the lack of a repeatable and

    continuous process available to everyone stakeholder in your

    organization.With traditional DMU, you get some exciting discrete

    events but you cannot count on them reflecting the latest product

    intent. Benefits accelerate and allow you to achieve your vision only

    when the process becomes repeatable and continuous.

    In the past to stage a digital vehicle took 6 weekspulling 14,000 parts,

    right version, right locationand now with this new technology (RDV) we are

    able to do the same in 2 hours

    CIMdata Conference 2001, Keynote Speech, Kirk Gutmann, Global

    Product Development Information Officer, GM

    2. RDV enables designers and suppliers to spend more time on

    innovation and creativity. RDV removes non-value added tasks from

    your product development process, such as searching for components

    and creating the right context or environment for validation. RDV also

    eliminates human error and ensures the right version and right

    configurations are always selected. RDV presents only the relevant

    information for decision-making and validation, instead of requiring

    users to navigate through plethora of data to find what they need to

    complete their job.

    Benefits

  • 120 min.

    60 min.

    0 min.

    100 1,000 10,000

    Task:Visual navigation(Spatial search)

    Tim

    e

    Assembly size/number of components process

    Traditional digitalmock-up or DMU

    RDV enabled design process

    Figure 6. Second example of potential time savings

    Examples of potential time savings

    6

    120 min.

    60 min.

    0 min.

    100 1,000 10,000

    Task:Product variation validation

    Tim

    e

    Assembly size/number of components process

    Traditionaldesign process

    RDV enabled design process

    Figure 5. First example of potential time savings

  • Figure 7. Comparing RDV and non-RDV digital validation solutions

    If designers spent 75 minutes a day searching and navigating to find

    the right components and its context for validating their design then:

    Time savings per day = 75 minutes

    Time saving per year = 200 * 75 = 15000 minutes = 31 days

    RDVs ability to present only relevant data also benefits your

    infrastructure. If you have 200 users searching a 5000-part assembly

    once per day, your network will be burdened with

    200 * 5000 * 1 MB/part = 1 Terabyte/day just for visualization

    Using more intelligent searches, you could decrease your amount of

    actual loaded relevant data by ~80 percent or more depending on

    your users working habits.

    200 users * 100 parts * 1MB/part = 20 Gigabytes/day.

    This saves you money on network hardware and enables you to

    maintain good performance and happy productive users on your

    existing infrastructure.

    3. RDV reduces errors during your production and/or assembly

    phases by enabling early problem detection. RDV allows designers,

    suppliers and manufacturing planners to evaluate product changes

    continuously against specifications and business constraints, enabling

    them to reduce errors and make optimal total product decisions.

    4. RDV accelerates your time to market cycle. Companies are able

    to quickly evaluate more alternatives early in the design phase, allowing

    them to deliver right product faster to market.

    5. RDV enables design reuse. RDV enables designers to easily and

    quickly evaluate many alternatives early in the design phases.

    7

    Without RDV

    Perform w

    ork order

    Perfor

    m

    wor

    k or

    der

    T i m e

    With RDV

    If desired, include

    WIPrevisions

    If de

    sire

    d, in

    clud

    e

    W

    IP rev

    isions

    Remove unw

    anted

    parts by attribute

    Add parts in

    proximity

    of the work

    parts

    Select options

    Select cached

    revisionrule

    Enter work order

    Spend less time searching, waiting, clicking, with less errors

    Look

    up

    wor

    k or

    der

    Sear

    ch for

    wor

    kpart

    s

    Find

    where

    wor

    k

    part

    s ar

    e us

    ed

    Load

    con

    text

    ass

    embl

    ies

    Set th

    e

    revisionru

    le

    Set th

    e op

    tions

    Turn

    off part

    s

    not inpr

    oxim

    ity

    Turn

    off

    other

    unw

    ante

    dpart

    s

  • A variety of factors cause conventional digital validation products to

    fail. The following comparison explains why Teamcenters RDV solution

    succeeds while other approaches falter.

    Problem: Single product focus.Typically, conventional solutions revolve

    around a single CAD visualization or PDM product.This cannot work.

    CAD and visualization products do not provide change controls,

    configuration management or advanced searching techniques. CAD and

    PDM do not have sufficiently rich and fast visualization capabilities.

    PDM and visualization do not have sufficient validation capabilities that

    complete solid models and high end CAD and CAE applications

    provide.

    RDV solution: RDV contains tightly integrated CAD visualization and

    PDM modules. RDV combines PDMs control and searching capabilities

    with high-speed lighweight visualization and high-end CAD validation/

    modeling.These integrated capabiliteis work in concert to enable you

    to achieve multiple validation goals in a single solution.

    Problem: Too many tools, not enough application. Perhaps through

    super human effort or a talented project champion, you can get enough

    custom programming and procedures together to get through a

    conventional validation pilot. However, many solutions are too shaky

    and dependent on key individuals to keep running them on a long term

    basis. Frequently, companies discover that nobody can remember the

    right buttons to push to maintain and use their pilot system or

    they learn that their customized code no longer complies with new

    product versions. In addition, companies often find it difficult to justify

    the budgeting requests needed to sustain a customized solution (e.g.,

    when management no longer sees a financial payback).

    RDV solution: UGS delivers a complete RDV solution. It is integrated

    and tested for exactly your purpose before shipping. Out-of-the-box

    processes and documentation are provided for exactly your purposes,

    instead of a collection of independent, unrelated tools that you use to

    build your own solution.

    Problem: Unavailable digital environment when you need it. Many

    design engineers face pressing deadlines on a regular basis deadlines

    that result in the following mindset. My deadline is today. I need to give a

    go/no-go answer on an engineering change today. I cannot wait a week for

    other people to assemble a digital mockup for me. I cannot trust such a

    decision to digital data that is 2 weeks old. I need all of the latest data now.

    RDV solution: RDV is a process not an event.All necessary indexing

    and caching is built continuously as data is released so that you can

    perform searches whenever you want.Visualization and CAD can be

    launched directly with the search results; there is no need to export

    data into special environments or perform special translations.You get

    what you need when you need it.

    Problem: Too much data and manual filtering:Additional approaches

    based on visualization packages require the user to load huge products

    then filter down to what he or she really needs.This is often preceded

    by a lengthy export and translation activity.The amount of data can be

    so large that performance is unacceptable.Typically, the graphics scene

    is too big and cluttered to be of immediate use until after considerable

    manual filtering is complete.

    RDV solution: With RDV, the filter is specified up front, indicating: what

    project, what configuration and what spatial area you need.Then, the

    system finds and loads only the data you require. Subsequent searches

    quickly expand your data set if you need more. Good performance is

    maintained on this smaller set and you always have a manageable

    graphics environment.

    RDV is a powerful platform for the digital product validation process,

    providing a foundation for an all encompassing rapid decision system.

    This rapid decision system for product development aggregates

    results from multiple validation processes and presents them to

    decision makers in easy-to-understand web based portal. RDV enables

    optimal product and process decisions and allows more time for

    creativity and innovation by eliminating mundane non-value added tasks.

    Collision detection and interference checking (initial appications

    released with the RDV platform) instantly obsolete traditional digital

    mockup while eliminating many of the issues and drawbacks associated

    with this current best practice technology. Although DMU applications

    visually represent the product concept and facilitate complete product

    validation, they encounter many problems when implemented on highly

    engineered products. Examples of such issues are validating multiple

    configurations, keeping configurations up to date with changes and

    allowing anyone in the organization access to the latest information.

    RDV provides immediate value by solving the issues associated with

    these traditional techniques, while providing a solid foundation for the

    addition of many future digital product validation applications that will

    support a rapid decision system. UGS envisions a suite of digital

    product validation applications, including:

    Simulation analysis

    CAE validation

    Manufacturing validation

    Cost validation

    Function specification validation

    Test analysis

    8

    Why RDV excels

  • RDV allows designers to make design changes, validate the complete

    product for packaging, CAE, process simulation, manufacturability, test,

    serviceability, cost and function, and compare the validation result to

    other alternative designs. It enables designers to rapidly configure,

    visualize, analyze and compare the new part design in all its usages in all

    products to fully understand change impact. Design engineers can

    configure and visualize a part in all its current usages in all products to

    determine if it can be reused in a new product.

    RDV enables designers to make optimal product decisions taking into

    account all variability and constraints.

    By delivering ROI long expected from digital product definition,

    Teamcenters RDV solution provides the foundation for facilitating the

    digital transformation of todays product-driven companies.

    Repeatable Digital Validation platform

    Rapid decision system

    Applications: CAD, CAE, costing, requirements...

    Knowledgelibrary

    Designchanges

    Decision

    Accept

    Reject

    Man

    ufa

    cturing

    valid

    ati

    on

    Figure 8. RDV-enabled rapid decision system

  • Corporate Headquarters

    United StatesGranite Park One

    5800 Granite Parkway

    Suite 600

    Plano,TX 75024

    972 987 3000

    Asia-PacificSuites 3601-2, Citibank Tower

    Citibank Plaza, 3 Garden Road

    Hong Kong

    852 2230 3333

    Fax 852 2230 3200

    EuropeNorwich House Knoll Road

    Camberley, Surrey

    GU15 3SY

    United Kingdom

    44 1276 705170

    Fax 44 1276 705150

    Americas13690 Riverport Drive

    Maryland Heights, MO 63043

    United States

    800 498 5351

    Fax 314 264 8900

    Regions

    Teamcenter, Parasolid, Solid Edge, Femap and I-deas are registered trademarks; and Imageware is a trademark of UGS Corp.

    All other logos, trademarks or service marks used herein are the property of their respective owners. Copyright 2004 UGS Corp. All rights reserved.

    9/04

    About UGS

    UGS is a leading global provider of product lifecycle management (PLM) software and services

    with more than 3.1 million licensed seats and 42,000 clients worldwide.The company promotes

    openness and standardization and works collaboratively with its clients in creating enterprise

    solutions enabling them to transform their process of innovation and thus begin to capture the

    value of PLM. For more information on UGS products and services, visit www.ugs.com.