Uli Schäfer 1
JEM1: Status and plans
• Hardware status• Firmware status• Plans
Uli Schäfer 2
JEM1
16 x 6-channel de-serialisers : SCAN921260on 4 Input daughter modules w. XC2V1500.
G-link / Opto daughter module
Jet and Sum Processors XC2V2000 (BF package).
Configuration : SystemACE
88 pair
VME
each 165 pins FIO60 bit @ 80Mb/s
TTCdec
CAN
SystemACE
3 x 40 bit @ 40 Mb/s
DES
DES
DES
DESInput2 B1 A0 V
60
60
40
Input5 E4 D3 C
Input8 H7 G6 F
Input--
10 X9 W
DAQ/Timing/VME
To JMM
G
G
Jet
R
S
T
USum
DAQ
To SMM
ROI
Opto
clock mirror
Uli Schäfer 3
JEM1 H/W Status
Input daughters:• 4 modules available• 2 fully working (PCB ageing problems)Main board:• 1 module available • Fully working. Few bug fixes required (2 tracks missing, 1
pull-up).• CAN under test. Compatibility ?• Flash configurator not yet successfully operated (cfg read
error)G-link daughters:• 1 (electrical) module available, in-house assembled, re-
worked after RAL test.• fully (?) working
Uli Schäfer 4
JEM1 firmware status (energy sum / control)
• Previous JEM0 functionality fully implemented • Latency reduction (energy path) ~3 ticks• TTCdec :
• I2C control added• TTCrx ID via GeoAdd• short broadcast support
• CPM-style spy memory control (continuous spy, wrap at 255)• Playback / spy VME-controlled, use broadcast to reset pointers • Flash configurator (ACE) mapped into VME• VME control (including configuration) faster and more reliable
To be done:• Support for CAN (?)
Uli Schäfer 5
Plans : JEM1 Prototype production
Make a total of 4 JEMs for slice test & beam test
Main board:• 3 PCBs available • Components available • Assembly at Rohde & Schwarz starting next week (?)
Input daughter modules (+16):• Active components (LVDS/Xilinx) available• Slot for PCB production & assembly at Rohde & Schwarz: ?
G-link daughter modules:• Components available • Slot for PCB production & assembly at Rohde & Schwarz: ?
Total of four JEMs available for tests early August