UFE 2008 Analysis1

UFE 2008 ANALYSIS

Compiled by Load ProfilingEnergy Analysis & Aggregation

UFE 2008 Analysis2

UFE Basics

Sources of UFE include:■ Generation Measurement Errors■ Load - Missing/Erroneous Usage Data

- Model Error - Load Profile ID Assignment Error - Theft

■ Losses - Model Error - Loss Code Assignment Error

Negative UFE indicates load/losses are overestimated

UFE (unaccounted for energy) is computed as follows:UFE = Generation – (Load + Losses)

UFE 2008 Analysis3

UFE Basics

Net Generation for Settlement Interval

Interval Data Energy Usage

Profiled Energy Usage Non-Interval Data

Non-Metered Accounts

Losses:Transmission &

Distribution

UFEGAP - - - - - - >

Net GenerationCompared toLoad Buildup

UFE 2008 Analysis4

OVERVIEW OF THE SETTLEMENT PROCESS

UFE is computed for each 15-minute interval of a settlement run.

Initial

Final

Settlement

True-Up

Initial Settlement(posted on day 10 after the operating day)

Final Settlement(posted on day 60 after the operating day)

True-up Settlement (posted 6 months after operating day)

Resettlement statement (posted as needed)

UFE 2008 Analysis5

Load Weighted Calculation of MCPE

Market Clearing Price for Energy (MCPE) is the highest price by Congestion Zone for a Settlement Interval for Balancing Energy deployed during the Settlement Interval.

In 2008 there were 4 congestion zones – H08, N08, S08 and W08.

The load weighted MCPE is calculated for each 15 min. interval using the LCMZone cuts as follows:

MCPE_LWTD = ((LCMZone_H08_MWh * MCPEL_H08) + (LCMZone_N08_MWh * MCPEL_N08) + (LCMZone_S08_MWh * MCPEL_S08) + (LCMZone_W08_MWh * MCPEL_W08)) /

(LCMZone_H08_MWh + LCMZone_N08_MWh + LCMZone_S08_MWh + LCMZone_W08_MWh)

UFE 2008 Analysis6

Annual validation 2007 was completed. Hurricanes Dolly, Edouard and Ike struck

the Texas coast. Dolly made landfall at 1 p.m. CDT, July 23 on

South Padre Island as a Category 1 hurricane.

Edouard made landfall in Southeast Texas near Port Arthur on the morning of August 5 as a strong tropical storm.

Ike made landfall on Galveston Island on September 13 as a strong Category 2 hurricane. Its large size brought storm surge of over 12 feet from Galveston Island eastward into southern Louisiana. Power was disrupted in most of the Houston area. Coast Weather Zone profiles were adjusted.

Events that Influenced 2008 UFE

UFE 2008 Analysis7

Edouard conclusions: Ercot Load at model peak (8-4-08 16:45)

was reduced by about 1,682 MW as a result of Hurricane Edouard

IDR Coast: 529 MW IDR Non-Coast: 490 MW NIDR: 662 MW

Ercot Actual Load returned to predicted load levels on 8-6-08

IDR Coast actual load returned to predicted load levels on 8-8-08

Total Ercot energy reduction was about 23.1GWH as a result of Hurricane Edouard

Events that Influenced 2008 UFE

UFE 2008 Analysis8

Ike conclusions: Ercot Load was reduced across the 9-

10-08 to 9-28-08 time period by about 1,378 GWH as a result of Hurricane Ike

Largest 1-Day loss: 206 GWH on 9-13-08

Events that Influenced 2008 UFE

UFE 2008 Analysis9

LOAD AND UFE – ERCOT PEAK 2008

SR01

-4

-3

-2

-1

0

1

2

3

4

-2000

0

2000

4000

6000

8000

10000

12000

14000

16000

1 9 17 25 33 41 49 57 65 73 81 89

Per

cen

t

MW

H

Interval

ERCOT Load and UFE 2007 Peak Day - August 4, 2008Initial Settlement

ERCOT Load

Percent UFE

UFE

Daily avg percent UFE = 0.172

UFE 2008 Analysis10SR02

LOAD AND UFE – ERCOT PEAK 2008

-4

-3

-2

-1

0

1

2

3

4

-2000

0

2000

4000

6000

8000

10000

12000

14000

16000

1 9 17 25 33 41 49 57 65 73 81 89

Per

cen

t

MW

H

Interval

ERCOT Load and UFE 2007 Peak Day - August 4, 2008Final Settlement

ERCOT Load

Percent UFE

UFE

Daily avg percent UFE = 0.311

UFE 2008 Analysis11SR03

LOAD AND UFE – ERCOT PEAK 2008

-4

-3

-2

-1

0

1

2

3

4

-2000

0

2000

4000

6000

8000

10000

12000

14000

16000

1 9 17 25 33 41 49 57 65 73 81 89

Per

cen

t

MW

H

Interval

ERCOT Load and UFE 2007 Peak Day - August 4, 2008True Up Settlement

ERCOT Load

Percent UFE

UFE

Daily avg percent UFE = 0.331

UFE 2008 Analysis12

UFE MWh by Month in 2008Initial Settlement

SR04

-800,000

-600,000

-400,000

-200,000

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MW

h

UFE ABS UFE

ABS Annual UFE = 7,907,020 MWh

Annual UFE = 872,190 MWh

UFE 2008 Analysis13

UFE Cost by Month in 2008 Initial Settlement

SR05

-40,000,000

-20,000,000

0

20,000,000

40,000,000

60,000,000

80,000,000

100,000,000

120,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Do

lla

rs

UFE Cost ABS UFE CostUFE Cost = Σ(MCPE x UFE_Mwh)

ABS Annual UFE Cost = $545,602,999

Annual UFE Cost = $215,948,883

UFE 2008 Analysis14

UFE MWh by Month in 2008Final Settlement

SR06

-1,000,000

-800,000

-600,000

-400,000

-200,000

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MW

h

UFE ABS UFE

Annual UFE = 1,630,719 MWh

ABS Annual UFE = 5,801,568 MWh

UFE 2008 Analysis15

UFE Cost by Month in 2008 Final Settlement

SR07

-50,000,000

-40,000,000

-30,000,000

-20,000,000

-10,000,000

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

70,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Do

lla

rs

UFE Cost ABS UFE CostUFE Cost = Σ(MCPE x UFE_Mwh)

ABS Annual UFE Cost = $406,630,535

Annual UFE Cost = $139,617,087

UFE 2008 Analysis16

UFE MWh by Month in 2008 True-Up Settlement

SR08

-900,000

-700,000

-500,000

-300,000

-100,000

100,000

300,000

500,000

700,000

900,000

1,100,000

1,300,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MW

h

UFE ABS UFE

Annual UFE = 1,541,086 MWh

ABS Annual UFE = 5,887,262 MWh

UFE 2008 Analysis17

UFE Cost by Month in 2008 True-UP Settlement

SR09

-60,000,000

-50,000,000

-40,000,000

-30,000,000

-20,000,000

-10,000,000

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Do

llar

s

UFE Cost ABS UFE CostUFE Cost = Σ(MCPE x UFE_Mwh)

ABS Annual UFE Cost = $411,817,947

Annual UFE Cost = $134,692,211

UFE 2008 Analysis18

ABS UFE MWh by Month in 2008 Initial, Final and True Up Settlements

SR09a

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MW

h

Initial Final True Up

UFE 2008 Analysis19

ABS UFE Cost by Month in 2008 Initial, Final and True-Up Settlements

SR09b

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

70,000,000

80,000,000

90,000,000

100,000,000

110,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Do

lla

rs

Initial Final True UpUFE Cost = Σ(MCPE x UFE_Mwh)

UFE 2008 Analysis20

STATISTICAL SUMMARY - 2008

SR10

MEAN MEDIAN MIN MAX STD DEV

2002 31,980 30,107 19,209 55,703 7,437

2003 32,489 30,824 19,282 59,992 7,546

2004 32,909 31,162 20,231 58,528 7,448

2005 34,155 31,901 20,482 60,272 8,452

2006 34,884 32,707 21,223 62,430 8,508

2007 35,008 33,324 21,701 62,250 7,470

2008 35,304 33,423 19,574 62,266 8,091

2002 32,002 30,116 19,211 56,233 7,467

2003 32,517 30,850 19,292 59,996 7,562

2004 32,917 31,166 20,231 58,531 7,445

2005 34,161 31,911 20,486 60,270 8,454

2006 34,899 32,716 21,225 62,434 8,502

2007 35,016 33,332 21,715 62,265 7,471

2008 35,313 33,431 19,579 62,269 8,091

2002 32,052 30,142 19,266 56,248 7,479

2003 32,532 30,865 19,310 60,095 7,571

2004 32,917 31,166 20,231 58,531 7,445

2005 34,162 31,912 20,490 60,274 8,453

2006 34,902 32,722 21,225 62,434 8,502

2007 35,016 33,330 21,712 62,265 7,471

2008 35,314 33,433 19,579 62,269 8,091

INITIAL

FINAL

TRUE-UP

ERCOT LOAD (MW)

ERCOT LOAD (MW)

ERCOT LOAD (MW)

UFE 2008 Analysis21

STATISTICAL SUMMARY - 2008

SR11a

MEAN MEDIAN MIN MAX STD DEV

2002 -2,176 -2,228 -6,969 5,673 1,572

2003 -314 -400 -3,906 3,798 1,003

2004 67 -9 -4,558 4,559 792

2005 75 45 -5,537 3,538 881

2006 110 69 -2,957 4,543 877

2007 338 305 -4,000 6,666 900

2008 101 120 -10,954 4,511 1,375

2002 -1,624 -1,598 -5,954 3,427 1,147

2003 -6 -119 -3,172 3,728 891

2004 130 56 -3,929 4,302 721

2005 118 77 -4,199 3,163 750

2006 257 220 -2,288 3,351 707

2007 337 305 -3,068 3,972 644

2008 189 164 -4,593 4,479 901

2002 -456 -553 -3,371 3,803 898

2003 192 72 -2,886 4,065 857

2004 153 83 -3,879 4,299 719

2005 124 82 -4,155 3,190 750

2006 263 225 -2,296 3,332 706

2007 333 300 -3,076 3,975 643

2008 179 161 -4,853 4,513 919

INITIAL

FINAL

TRUE-UP

UFE (MW)

UFE (MW)

UFE (MW)

UFE 2008 Analysis22

STATISTICAL SUMMARY - 2008

SR11b

MEAN MEDIAN MIN MAX STD DEV

2002 2,321 2,257 0 6,969 1,348

2003 857 759 0 3,906 607

2004 606 472 0 4,559 515

2005 649 491 0 5,537 600

2006 673 528 0 4,543 574

2007 723 562 0 6,666 633

2008 918 644 0 10,954 1,029

2002 1,696 1,601 0 5,954 1,038

2003 707 599 0 3,728 542

2004 550 414 0 4,302 484

2005 567 426 0 4,199 505

2006 574 449 0 3,351 486

2007 560 445 0 3,972 463

2008 673 491 0 4,593 628

2002 838 771 0 3,803 559

2003 672 528 0 4,065 565

2004 551 413 0 4,299 487

2005 568 427 0 4,155 505

2006 574 450 0 3,332 488

2007 558 443 0 3,975 462

2008 683 497 0 4,853 640

|UFE| (MW)

INITIAL

|UFE| (MW)

|UFE| (MW)

TRUE-UP

FINAL

UFE 2008 Analysis23

STATISTICAL SUMMARY - 2008

SR12a

MEAN MEDIAN MIN MAX STD DEV

2002 -7.0 -7.1 -24.1 16.8 5.1

2003 -1.3 -1.3 -12.7 9.4 3.2

2004 0.1 0.0 -11.5 13.9 2.4

2005 0.2 0.1 -18.9 10.3 2.6

2006 0.2 0.2 -8.8 11.1 2.5

2007 0.9 0.9 -14.6 14.4 2.5

2008 0.1 0.3 -36.9 11.8 4.3

2002 -5.3 -5.2 -20.6 9.5 3.8

2003 -0.2 -0.4 -10.3 9.4 2.7

2004 0.3 0.2 -9.9 13.1 2.1

2005 0.3 0.2 -14.7 9.3 2.2

2006 0.7 0.7 -7.0 9.2 2.0

2007 0.9 0.9 -11.2 13.2 1.8

2008 0.5 0.5 -11.1 10.2 2.5

2002 -1.7 -1.8 -14.8 10.5 2.9

2003 0.4 0.2 -7.9 9.9 2.5

2004 0.4 0.3 -9.8 13.1 2.1

2005 0.3 0.3 -14.6 9.2 2.2

2006 0.7 0.7 -7.0 9.1 2.0

2007 0.9 0.9 -11.3 13.2 1.8

2008 0.4 0.5 -11.8 10.1 2.6

INITIAL

FINAL

TRUE-UP

UFE as PERCENT of LOAD

UFE as PERCENT of LOAD

UFE as PERCENT of LOAD

UFE 2008 Analysis24

STATISTICAL SUMMARY - 2008

SR12b

MEAN MEDIAN MIN MAX STD DEV

2002 7.5 7.2 0.0 24.1 4.4

2003 2.8 2.4 0.0 12.7 2.0

2004 1.8 1.5 0.0 13.9 1.5

2005 1.9 1.5 0.0 18.9 1.7

2006 1.9 1.6 0.0 11.1 1.6

2007 2.1 1.7 0.0 14.6 1.7

2008 2.7 1.9 0.0 36.9 3.4

2002 5.6 5.2 0.0 20.6 3.5

2003 2.2 1.9 0.0 10.3 1.6

2004 1.7 1.3 0.0 13.1 1.4

2005 1.7 1.3 0.0 14.7 1.4

2006 1.6 1.4 0.0 9.2 1.3

2007 1.6 1.3 0.0 13.2 1.3

2008 1.9 1.4 0.0 11.1 1.7

2002 2.7 2.5 0.0 14.8 1.9

2003 2.0 1.7 0.0 9.9 1.5

2004 1.7 1.3 0.0 13.1 1.4

2005 1.7 1.3 0.0 14.6 1.4

2006 1.6 1.4 0.0 9.1 1.3

2007 1.6 1.3 0.0 13.2 1.3

2008 2.0 1.4 0.0 11.8 1.8

INITIAL

FINAL

TRUE-UP

|UFE as PERCENT of Load|

|UFE as PERCENT of Load|

|UFE as PERCENT of Load|

UFE 2008 Analysis25

STATISTICAL SUMMARY - 2008

SR13a

MEAN MEDIAN MIN MAX STD DEV

2002

2003 356 -1,785 -88,773 511,652 17,737

2004 2,279 -57 -76,418 200,563 11,501

2005 4,224 386 -183,607 730,583 24,830

2006 4,131 596 -164,012 524,472 19,452

2007 6,522 3,033 -148,380 971,848 26,131

2008 6,266 1,120 -414,016 2,284,016 59,287

2002 -2,067 -1,841 -23,686 580,173 21,632

2003 2,663 -635 -132,426 824,621 22,931

2004 2,694 442 -92,510 164,969 10,532

2005 4,738 722 -220,201 596,968 21,409

2006 5,329 1,983 -118,425 452,539 16,076

2007 5,993 3,111 -115,711 649,964 20,154

2008 4,051 1,577 -1,624,294 1,687,088 40,720

2002 -1,777 -2,287 -121,635 933,143 13,866

2003 4,993 496 -86,677 904,970 24,964

2004 2,923 632 -92,408 168,849 10,577

2005 4,970 776 -212,732 603,737 21,679

2006 5,379 2,020 -116,067 455,747 16,094

2007 5,939 3,062 -115,201 645,980 20,101

2008 3,908 1,544 -1,748,888 1,692,783 42,155

INITIAL

FINAL

TRUE-UP

Note: UFE and |UFE| costs are not calculated for initial settlement in 2002 because LCMZONE cuts are not available to calculate the load weighted MCPE.

UFE Cost ($)

UFE Cost ($)

UFE Cost ($)

UFE 2008 Analysis26

STATISTICAL SUMMARY - 2008

SR13b

MEAN MEDIAN MIN MAX STD DEV

2002

2003 8,804 5,560 0 511,652 15,401

2004 6,887 4,055 0 200,563 9,489

2005 12,447 6,177 0 730,583 21,895

2006 9,886 5,543 0 524,472 17,254

2007 10,847 6,229 0 971,848 24,651

2008 15,831 7,876 0 2,284,016 57,477

2002 5,664 3,579 0 580,173 20,978

2003 8,596 4,699 0 824,621 21,425

2004 6,297 3,630 0 164,969 8,862

2005 10,923 5,345 0 596,968 19,012

2006 8,615 4,670 0 452,539 14,582

2007 8,517 4,977 0 649,964 19,224

2008 11,799 6,100 0 1,687,088 39,183

2002 5,251 3,780 0 933,143 12,955

2003 8,695 4,137 0 904,970 23,928

2004 6,329 3,605 0 168,849 8,964

2005 11,016 5,338 0 603,737 19,321

2006 8,620 4,688 0 455,747 14,617

2007 8,487 4,970 0 645,980 19,164

2008 11,949 6,160 0 1,748,888 40,615

TRUE-UP

Note: UFE and |UFE| costs are not calculated for initial settlement in 2002 because LCMZONE cuts are not available to calculate the load weighted MCPE.

INITIAL

FINAL

|UFE Cost| ($)

|UFE Cost| ($)

|UFE Cost| ($)

UFE 2008 Analysis27

STATISTICAL SUMMARY - 2008

SR14a

MEAN MEDIAN MIN MAX STD DEV

2002

2003 -1.0 -1.0 -11.4 9.4 3.1

2004 0.1 0.0 -11.5 13.9 2.4

2005 0.2 0.1 -18.9 10.3 2.6

2006 0.2 0.2 -8.8 11.1 2.5

2007 0.9 0.9 -14.6 14.4 2.5

2008 0.2 0.3 -36.1 11.8 4.2

2002 -2.2 -2.1 -9.4 3.0 2.6

2003 -0.1 -0.3 -8.7 9.4 2.6

2004 0.3 0.2 -9.9 13.1 2.1

2005 0.3 0.2 -14.7 9.3 2.2

2006 0.7 0.7 -7.0 9.2 2.0

2007 0.9 0.9 -11.2 13.2 1.8

2008 0.5 0.5 -11.1 10.2 2.5

2002 -1.6 -1.8 -14.8 10.5 2.9

2003 0.4 0.2 -7.9 9.5 2.5

2004 0.4 0.3 -9.8 13.1 2.1

2005 0.3 0.3 -14.6 9.2 2.2

2006 0.7 0.7 -7.0 9.1 2.0

2007 0.9 0.9 -11.3 13.2 1.8

2008 0.4 0.5 -11.8 10.1 2.6

UFE Cost as % of Total Cost

INITIAL

FINAL

UFE Cost as % of Total Cost

UFE Cost as % of Total Cost

TRUE-UP

Note: UFE and |UFE| costs are not calculated for initial settlement in 2002 because LCMZONE cuts are not available to calculate the load weighted MCPE.

UFE 2008 Analysis28

STATISTICAL SUMMARY - 2008

SR14b

MEAN MEDIAN MIN MAX STD DEV

2002

2003 2.6 2.3 0.0 11.4 1.9

2004 1.8 1.5 0.0 13.9 1.5

2005 1.9 1.5 0.0 18.9 1.7

2006 1.9 1.6 0.0 11.1 1.6

2007 2.1 1.7 0.0 14.6 1.7

2008 2.7 1.8 0.0 36.1 3.2

2002 2.7 2.2 0.0 9.4 2.1

2003 2.1 1.9 0.0 9.4 1.5

2004 1.7 1.3 0.0 13.1 1.4

2005 1.7 1.3 0.0 14.7 1.4

2006 1.6 1.4 0.0 9.2 1.3

2007 1.6 1.3 0.0 13.2 1.3

2008 1.9 1.4 0.0 11.1 1.7

2002 2.7 2.5 0.0 14.8 1.9

2003 2.0 1.7 0.0 9.5 1.5

2004 1.7 1.3 0.0 13.1 1.4

2005 1.7 1.3 0.0 14.6 1.4

2006 1.6 1.4 0.0 9.1 1.3

2007 1.6 1.3 0.0 13.2 1.3

2008 2.0 1.4 0.0 11.8 1.7

|UFE Cost| as % of Total Cost

|UFE Cost| as % of Total Cost

|UFE Cost| as % of Total Cost

TRUE-UP

Note: UFE and |UFE| costs are not calculated for initial settlement in 2002 because LCMZONE cuts are not available to calculate the load weighted MCPE.

INITIAL

FINAL

UFE 2008 Analysis29

STATISTICAL SUMMARY – MONTHLY for 2008

SR15

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

ERCOT Total Load (MW) 34,237 33,679 23,123 46,255 4,920 ERCOT Total Load (MW) 31,218 31,545 23,315 46,085 3,589

FINAL FINALERCOT Total Load (MW) 34,244 33,685 23,125 46,262 4,920 ERCOT Total Load (MW) 31,226 31,553 23,325 46,092 3,589

TRUE_UP TRUE_UPERCOT Total Load (MW) 34,247 33,689 23,125 46,262 4,919 ERCOT Total Load (MW) 31,226 31,553 23,325 46,092 3,589

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

ERCOT Total Load (MW) 30,641 31,241 22,403 42,886 4,065 ERCOT Total Load (MW) 31,190 31,215 22,142 46,120 5,022

FINAL FINALERCOT Total Load (MW) 30,649 31,247 22,411 42,894 4,065 ERCOT Total Load (MW) 31,201 31,224 22,151 46,418 5,030

TRUE_UP TRUE_UPERCOT Total Load (MW) 30,649 31,247 22,411 42,894 4,065 ERCOT Total Load (MW) 31,201 31,224 22,151 46,418 5,030

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

ERCOT Total Load (MW) 37,613 36,091 23,076 56,379 7,816 ERCOT Total Load (MW) 44,034 44,561 27,806 59,699 8,173

FINAL FINALERCOT Total Load (MW) 37,622 36,126 23,087 56,386 7,815 ERCOT Total Load (MW) 44,041 44,569 27,811 59,705 8,173

TRUE_UP TRUE_UPERCOT Total Load (MW) 37,626 36,126 23,087 56,386 7,818 ERCOT Total Load (MW) 44,041 44,569 27,811 59,706 8,173

JANUARY

MARCH

FEBRUARY

APRIL

MAY JUNE

UFE 2008 Analysis30SR16

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

ERCOT Total Load (MW) 43,458 43,845 28,802 60,497 8,356 ERCOT Total Load (MW) 43,165 42,294 28,619 62,266 8,377

FINAL FINALERCOT Total Load (MW) 43,464 43,851 28,806 60,503 8,355 ERCOT Total Load (MW) 43,169 42,297 28,621 62,269 8,378

TRUE_UP TRUE_UPERCOT Total Load (MW) 43,464 43,851 28,806 60,503 8,356 ERCOT Total Load (MW) 43,169 42,297 28,621 62,269 8,378

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

ERCOT Total Load (MW) 35,789 34,595 19,574 56,434 8,342 ERCOT Total Load (MW) 32,157 31,797 22,467 46,748 5,599

FINAL FINALERCOT Total Load (MW) 35,792 34,597 19,579 56,439 8,342 ERCOT Total Load (MW) 32,165 31,800 22,473 46,752 5,597

TRUE_UP TRUE_UPERCOT Total Load (MW) 35,793 34,597 19,579 56,439 8,343 ERCOT Total Load (MW) 32,167 31,805 22,473 46,757 5,599

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

ERCOT Total Load (MW) 29,553 30,015 22,134 38,968 3,686 ERCOT Total Load (MW) 32,740 32,004 22,073 48,008 5,354

FINAL FINALERCOT Total Load (MW) 29,575 30,032 22,138 38,974 3,687 ERCOT Total Load (MW) 32,753 32,010 22,078 48,047 5,367

TRUE_UP TRUE_UPERCOT Total Load (MW) 29,575 30,032 22,138 38,974 3,687 ERCOT Total Load (MW) 32,754 32,011 22,078 48,048 5,367

SEPTEMBER OCTOBER

NOVEMBER DECEMBER

JULY AUGUST

UFE 2008 Analysis31SR17

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE (MW) 673 628 -2,021 3,904 846 UFE (MW) -118 -228 -1,914 2,121 735

FINAL FINALUFE (MW) 327 337 -2,382 3,105 762 UFE (MW) 110 20 -1,667 1,997 660

TRUE_UP TRUE_UPUFE (MW) 335 340 -2,382 3,102 759 UFE (MW) 118 29 -1,687 2,003 660

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE (MW) -242 -295 -3,699 3,909 1,089 UFE (MW) -7 -23 -2,074 1,909 562

FINAL FINALUFE (MW) 100 112 -2,646 3,494 842 UFE (MW) 54 52 -1,673 1,782 522

TRUE_UP TRUE_UPUFE (MW) 99 112 -2,650 3,505 844 UFE (MW) 57 56 -1,664 1,775 522

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE (MW) 735 675 -1,289 3,414 807 UFE (MW) -15 -16 -2,295 1,544 698

FINAL FINALUFE (MW) 216 226 -1,773 2,435 589 UFE (MW) 130 151 -1,642 1,669 529

TRUE_UP TRUE_UPUFE (MW) 202 218 -1,791 2,416 589 UFE (MW) 131 150 -1,642 1,686 527

MAY

JANUARY

MARCH

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis32SR18

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE (MW) 100 158 -2,236 1,709 635 UFE (MW) 197 207 -2,995 2,227 767

FINAL FINALUFE (MW) 242 268 -1,892 1,550 504 UFE (MW) 449 483 -2,222 2,598 735

TRUE_UP TRUE_UPUFE (MW) 257 283 -1,879 1,572 504 UFE (MW) 482 512 -2,125 2,636 733

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE (MW) -930 210 -10,954 3,481 3,052 UFE (MW) 1,390 1,522 -1,741 4,511 1,329

FINAL FINALUFE (MW) 1,538 1,383 -702 4,479 965 UFE (MW) -1,065 1,534 3 4,511 1,035

TRUE_UP TRUE_UPUFE (MW) 1,531 1,374 -661 4,513 968 UFE (MW) -1,183 -1,103 -4,593 1,509 877

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE (MW) -977 -994 -2,931 1,037 687 UFE (MW) 314 308 -3,298 3,769 1,049

FINAL FINALUFE (MW) -75 -123 -1,985 1,655 534 UFE (MW) 293 216 -1,960 3,265 778

TRUE_UP TRUE_UPUFE (MW) -108 -150 -2,051 1,639 541 UFE (MW) 282 206 -1,973 3,252 778

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis33SR19

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE| (MW) 858 720 1 3,904 657 |UFE| (MW) 605 518 0 2,121 434

FINAL FINAL|UFE| (MW) 654 525 0 3,105 510 |UFE| (MW) 520 407 0 1,997 421

TRUE_UP TRUE_UP|UFE| (MW) 654 529 0 3,102 510 |UFE| (MW) 519 408 1 2,003 424

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE| (MW) 812 561 1 3,909 766 |UFE| (MW) 434 350 1 2,074 357

FINAL FINAL|UFE| (MW) 611 446 0 3,494 588 |UFE| (MW) 402 321 0 1,782 337

TRUE_UP TRUE_UP|UFE| (MW) 612 448 1 3,505 589 |UFE| (MW) 402 321 0 1,775 337

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE| (MW) 860 734 0 3,414 673 |UFE| (MW) 557 471 0 2,295 420

FINAL FINAL|UFE| (MW) 496 408 0 2,435 384 |UFE| (MW) 433 358 0 1,669 330

TRUE_UP TRUE_UP|UFE| (MW) 493 408 0 2,416 380 |UFE| (MW) 432 357 0 1,686 329

JANUARY

MARCH

MAY

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis34SR20

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE| (MW) 518 445 0 2,236 381 |UFE| (MW) 617 486 0 2,995 496

FINAL FINAL|UFE| (MW) 448 383 0 1,892 333 |UFE| (MW) 696 617 0 2,598 506

TRUE_UP TRUE_UP|UFE| (MW) 455 390 0 1,879 337 |UFE| (MW) 712 637 0 2,636 513

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE| (MW) 2,127 1,173 1 10,954 2,378 |UFE| (MW) 1,621 1,534 3 4,511 1,035

FINAL FINAL|UFE| (MW) 1,553 1,383 1 4,479 942 |UFE| (MW) 1,164 1,110 1 4,593 741

TRUE_UP TRUE_UP|UFE| (MW) 1,547 1,374 2 4,513 942 |UFE| (MW) 1,258 1,216 0 4,853 789

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE| (MW) 1,035 994 0 2,931 598 |UFE| (MW) 857 688 0 3,769 681

FINAL FINAL|UFE| (MW) 419 328 0 1,985 339 |UFE| (MW) 629 493 0 3,265 544

TRUE_UP TRUE_UP|UFE| (MW) 432 344 3 2,051 344 |UFE| (MW) 626 489 0 3,252 541

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis35SR21

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE as % of Load 1.88 1.88 -5.65 11.09 2.38 UFE as % of Load -0.38 -0.72 -5.91 6.15 2.37

FINAL FINALUFE as % of Load 0.91 1.02 -5.62 8.82 2.20 UFE as % of Load 0.36 0.06 -4.90 6.05 2.12

TRUE_UP TRUE_UPUFE as % of Load 0.93 1.05 -5.45 8.81 2.19 UFE as % of Load 0.39 0.09 -4.96 6.07 2.12

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE as % of Load -0.86 -1.00 -14.10 11.70 3.34 UFE as % of Load -0.02 -0.08 -5.87 6.57 1.80

FINAL FINALUFE as % of Load 0.31 0.38 -10.08 9.99 2.59 UFE as % of Load 0.22 0.17 -4.46 6.13 1.66

TRUE_UP TRUE_UPUFE as % of Load 0.31 0.37 -10.10 10.01 2.59 UFE as % of Load 0.23 0.19 -4.47 6.11 1.66

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE as % of Load 1.87 1.85 -3.73 9.03 1.98 UFE as % of Load -0.02 -0.04 -4.77 3.83 1.59

FINAL FINALUFE as % of Load 0.56 0.62 -4.47 6.98 1.54 UFE as % of Load 0.29 0.35 -3.33 3.65 1.19

TRUE_UP TRUE_UPUFE as % of Load 0.53 0.61 -4.51 6.93 1.54 UFE as % of Load 0.29 0.35 -3.33 3.63 1.19

JANUARY

MARCH

MAY

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis36SR22

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE as % of Load 0.21 0.36 -5.50 3.87 1.53 UFE as % of Load 0.40 0.47 -7.12 4.82 1.76

FINAL FINALUFE as % of Load 0.56 0.60 -4.32 3.75 1.17 UFE as % of Load 1.03 1.15 -5.28 5.66 1.64

TRUE_UP TRUE_UPUFE as % of Load 0.59 0.63 -4.26 3.79 1.17 UFE as % of Load 1.11 1.21 -5.05 5.75 1.63

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE as % of Load -3.58 0.57 -36.95 8.16 10.20 UFE as % of Load 4.10 4.92 -5.57 11.76 3.81

FINAL FINALUFE as % of Load 4.17 4.16 -3.14 10.21 2.30 UFE as % of Load -3.29 -3.65 -11.13 4.58 2.48

TRUE_UP TRUE_UPUFE as % of Load 4.15 4.15 -2.96 10.13 2.30 UFE as % of Load -3.65 -4.02 -11.75 4.25 2.52

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE as % of Load -3.27 -3.51 -10.32 3.18 2.23 UFE as % of Load 0.78 1.02 -10.64 10.21 3.16

FINAL FINALUFE as % of Load -0.22 -0.43 -6.18 5.77 1.78 UFE as % of Load 0.81 0.67 -6.48 8.77 2.32

TRUE_UP TRUE_UPUFE as % of Load -0.34 -0.55 -6.22 5.76 1.80 UFE as % of Load 0.77 0.64 -6.52 8.73 2.32

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis37SR23

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE as % of Load| 2.45 2.17 0.00 11.09 1.79 |UFE as % of Load| 1.95 1.66 0.00 6.15 1.39

FINAL FINAL|UFE as % of Load| 1.89 1.57 0.00 8.82 1.44 |UFE as % of Load| 1.68 1.33 0.00 6.05 1.35

TRUE_UP TRUE_UP|UFE as % of Load| 1.89 1.57 0.00 8.81 1.44 |UFE as % of Load| 1.68 1.32 0.00 6.07 1.36

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE as % of Load| 2.57 1.86 0.00 14.10 2.30 |UFE as % of Load| 1.40 1.15 0.00 6.57 1.13

FINAL FINAL|UFE as % of Load| 1.94 1.47 0.00 10.08 1.74 |UFE as % of Load| 1.29 1.04 0.00 6.13 1.07

TRUE_UP TRUE_UP|UFE as % of Load| 1.94 1.48 0.00 10.10 1.74 |UFE as % of Load| 1.29 1.03 0.00 6.11 1.07

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE as % of Load| 2.21 1.95 0.00 9.03 1.59 |UFE as % of Load| 1.28 1.10 0.00 4.77 0.94

FINAL FINAL|UFE as % of Load| 1.31 1.12 0.00 6.98 0.98 |UFE as % of Load| 0.99 0.81 0.00 3.65 0.73

TRUE_UP TRUE_UP|UFE as % of Load| 1.30 1.11 0.00 6.93 0.98 |UFE as % of Load| 0.98 0.82 0.00 3.63 0.72

JANUARY

MARCH

MAY

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis38SR24

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE as % of Load| 1.23 1.03 0.00 5.50 0.93 |UFE as % of Load| 1.42 1.15 0.00 7.12 1.12

FINAL FINAL|UFE as % of Load| 1.04 0.87 0.00 4.32 0.77 |UFE as % of Load| 1.60 1.44 0.00 5.66 1.10

TRUE_UP TRUE_UP|UFE as % of Load| 1.06 0.89 0.00 4.26 0.78 |UFE as % of Load| 1.63 1.47 0.00 5.75 1.11

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE as % of Load| 6.72 3.18 0.00 36.95 8.47 |UFE as % of Load| 4.86 4.94 0.01 11.76 2.78

FINAL FINAL|UFE as % of Load| 4.23 4.16 0.00 10.21 2.19 |UFE as % of Load| 3.59 3.68 0.00 11.13 2.03

TRUE_UP TRUE_UP|UFE as % of Load| 4.21 4.15 0.01 10.13 2.19 |UFE as % of Load| 3.88 4.03 0.00 11.75 2.15

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE as % of Load| 3.47 3.51 0.00 10.32 1.91 |UFE as % of Load| 2.58 2.09 0.00 10.64 1.98

FINAL FINAL|UFE as % of Load| 1.41 1.11 0.00 6.18 1.11 |UFE as % of Load| 1.89 1.51 0.00 8.77 1.56

TRUE_UP TRUE_UP|UFE as % of Load| 1.45 1.17 0.01 6.22 1.12 |UFE as % of Load| 1.88 1.50 0.00 8.73 1.55

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis39SR25

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost ($) 11,253 7,540 -110,818 403,038 25,021 UFE Cost ($) -976 -2,632 -112,450 370,857 15,601

FINAL FINALUFE Cost ($) 5,779 4,007 -237,422 296,405 18,508 UFE Cost ($) 2,413 203 -62,707 388,874 15,214

TRUE_UP TRUE_UPUFE Cost ($) 5,891 4,048 -234,612 297,493 18,508 UFE Cost ($) 2,540 282 -59,103 392,840 15,313

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost ($) -1,154 -2,829 -78,842 1,777,492 56,182 UFE Cost ($) -187 -266 -303,010 272,258 18,726

FINAL FINALUFE Cost ($) 3,520 1,029 -73,250 1,687,088 52,761 UFE Cost ($) -74 509 -567,727 214,704 21,142

TRUE_UP TRUE_UPUFE Cost ($) 3,515 1,033 -74,031 1,692,783 52,941 UFE Cost ($) -15 570 -566,467 214,968 21,134

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost ($) 31,037 10,491 -127,473 2,284,016 128,329 UFE Cost ($) 56 -273 -414,016 548,220 30,505

FINAL FINALUFE Cost ($) 9,062 2,583 -212,826 1,102,409 54,630 UFE Cost ($) 4,063 3,214 -285,345 485,293 22,762

TRUE_UP TRUE_UPUFE Cost ($) 8,571 2,435 -219,325 1,080,972 53,525 UFE Cost ($) 4,060 3,240 -287,033 477,895 22,753

JANUARY

MARCH

MAY

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis40SR26

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost ($) 3,489 3,028 -43,039 310,093 18,089 UFE Cost ($) 7,840 3,012 -55,225 1,005,249 44,278

FINAL FINALUFE Cost ($) 6,699 5,160 -37,797 287,008 15,660 UFE Cost ($) 10,575 6,838 -37,215 1,090,849 36,679

TRUE_UP TRUE_UPUFE Cost ($) 7,078 5,448 -37,533 292,039 15,887 UFE Cost ($) 11,169 7,175 -35,461 1,102,545 37,382

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost ($) 1,135 1,741 -228,063 1,966,378 60,906 UFE Cost ($) 23,350 9,588 -18,113 1,753,159 101,603

FINAL FINALUFE Cost ($) 19,338 13,382 -588,062 305,862 25,943 UFE Cost ($) -16,071 -7,155 -1,624,294 161,996 90,812

TRUE_UP TRUE_UPUFE Cost ($) 19,231 13,240 -597,644 302,968 26,168 UFE Cost ($) -17,800 -8,058 -1,748,888 140,579 97,921

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost ($) -9,490 -6,741 -405,840 298,064 16,006 UFE Cost ($) 6,074 2,039 -47,481 726,576 25,705

FINAL FINALUFE Cost ($) -470 -541 -196,983 522,237 12,991 UFE Cost ($) 4,643 1,392 -17,880 742,296 21,742

TRUE_UP TRUE_UPUFE Cost ($) -811 -711 -232,869 515,350 13,153 UFE Cost ($) 4,521 1,317 -17,996 733,788 21,519

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis41SR27

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE COST| ($) 13,826 9,179 9.0 403,038 23,696 |UFE COST| ($) 8,859 6,160 11.7 370,857 12,877

FINAL FINAL|UFE COST| ($) 10,323 6,465 1.0 296,405 16,412 |UFE COST| ($) 7,946 4,973 7.9 388,874 13,196

TRUE_UP TRUE_UP|UFE COST| ($) 10,326 6,461 0.4 297,493 16,450 |UFE COST| ($) 7,958 4,925 5.9 392,840 13,326

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE COST| ($) 14,623 7,558 4.0 1,777,492 54,257 |UFE COST| ($) 8,717 4,913 10.8 303,010 16,573

FINAL FINAL|UFE COST| ($) 11,560 5,374 1.9 1,687,088 51,598 |UFE COST| ($) 8,404 4,472 0.6 567,727 19,400

TRUE_UP TRUE_UP|UFE COST| ($) 11,594 5,376 4.0 1,692,783 51,775 |UFE COST| ($) 8,401 4,461 0.2 566,467 19,392

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE COST| ($) 33,376 12,023 4.8 2,284,016 127,740 |UFE COST| ($) 16,423 11,136 7.3 548,220 25,705

FINAL FINAL|UFE COST| ($) 15,330 6,945 1.5 1,102,409 53,212 |UFE COST| ($) 12,777 8,435 0.4 485,293 19,270

TRUE_UP TRUE_UP|UFE COST| ($) 15,161 6,982 0.6 1,080,972 52,043 |UFE COST| ($) 12,779 8,446 3.9 477,895 19,257

JANUARY

MARCH

MAY

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis42SR28

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE COST| ($) 11,882 8,761 9.7 310,093 14,077 |UFE COST| ($) 14,043 7,368 0.1 1,005,249 42,717

FINAL FINAL|UFE COST| ($) 10,922 7,949 0.4 287,008 13,069 |UFE COST| ($) 14,569 9,514 0.2 1,090,849 35,283

TRUE_UP TRUE_UP|UFE COST| ($) 11,121 8,075 1.2 292,039 13,371 |UFE COST| ($) 14,899 9,714 0.4 1,102,545 36,058

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE COST| ($) 20,707 11,513 3.6 1,966,378 57,288 |UFE COST| ($) 25,002 10,136 0.1 1,753,159 101,209

FINAL FINAL|UFE COST| ($) 19,936 13,411 0.0 588,062 25,486 |UFE COST| ($) 17,756 7,800 2.4 1,624,294 90,498

TRUE_UP TRUE_UP|UFE COST| ($) 19,864 13,260 0.1 597,644 25,691 |UFE COST| ($) 19,148 8,469 2.6 1,748,888 97,666

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE COST| ($) 10,436 7,031 1.7 405,840 15,406 |UFE COST| ($) 9,805 4,950 0.4 726,576 24,525

FINAL FINAL|UFE COST| ($) 4,439 2,266 0.0 522,237 12,217 |UFE COST| ($) 7,087 3,477 0.0 742,296 21,072

TRUE_UP TRUE_UP|UFE COST| ($) 4,574 2,304 0.0 515,350 12,358 |UFE COST| ($) 7,039 3,436 0.0 733,788 20,832

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis43SR29

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost as % of Total Cost 1.9 1.9 -5.7 11.1 2.4 UFE Cost as % of Total Cost -0.4 -0.7 -5.9 6.1 2.4

FINAL FINALUFE Cost as % of Total Cost 0.9 1.0 -5.6 8.8 2.2 UFE Cost as % of Total Cost 0.4 0.1 -4.9 6.1 2.1

TRUE_UP TRUE_UPUFE Cost as % of Total Cost 0.9 1.0 -5.4 8.8 2.2 UFE Cost as % of Total Cost 0.4 0.1 -5.0 6.1 2.1

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost as % of Total Cost -0.9 -1.0 -14.1 11.7 3.3 UFE Cost as % of Total Cost 0.0 -0.1 -5.9 6.6 1.8

FINAL FINALUFE Cost as % of Total Cost 0.3 0.4 -10.1 10.0 2.6 UFE Cost as % of Total Cost 0.2 0.2 -4.5 6.1 1.7

TRUE_UP TRUE_UPUFE Cost as % of Total Cost 0.3 0.4 -10.1 10.0 2.6 UFE Cost as % of Total Cost 0.2 0.2 -4.5 6.1 1.7

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost as % of Total Cost 1.9 1.9 -3.7 9.0 2.0 UFE Cost as % of Total Cost 0.0 0.0 -4.8 3.8 1.6

FINAL FINALUFE Cost as % of Total Cost 0.6 0.6 -4.5 7.0 1.5 UFE Cost as % of Total Cost 0.3 0.4 -3.3 3.7 1.2

TRUE_UP TRUE_UPUFE Cost as % of Total Cost 0.5 0.6 -4.5 6.9 1.5 UFE Cost as % of Total Cost 0.3 0.3 -3.3 3.6 1.2

JANUARY

MARCH

MAY

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis44SR30

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost as % of Total Cost 0.2 0.4 -5.5 3.9 1.5 UFE Cost as % of Total Cost 0.4 0.5 -7.1 4.8 1.8

FINAL FINALUFE Cost as % of Total Cost 0.6 0.6 -4.3 3.8 1.2 UFE Cost as % of Total Cost 1.0 1.1 -5.3 5.7 1.6

TRUE_UP TRUE_UPUFE Cost as % of Total Cost 0.6 0.6 -4.3 3.8 1.2 UFE Cost as % of Total Cost 1.1 1.2 -5.1 5.7 1.6

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost as % of Total Cost -3.2 0.7 -36.1 8.2 9.7 UFE Cost as % of Total Cost 4.1 5.0 -5.6 11.8 3.8

FINAL FINALUFE Cost as % of Total Cost 4.2 4.2 -2.9 10.2 2.3 UFE Cost as % of Total Cost -3.3 -3.6 -11.1 4.6 2.5

TRUE_UP TRUE_UPUFE Cost as % of Total Cost 4.2 4.2 -2.7 10.1 2.3 UFE Cost as % of Total Cost -3.6 -4.0 -11.8 4.3 2.5

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

UFE Cost as % of Total Cost -3.3 -3.5 -10.3 3.2 2.2 UFE Cost as % of Total Cost 0.8 1.0 -10.6 10.2 3.2

FINAL FINALUFE Cost as % of Total Cost -0.2 -0.4 -6.2 5.8 1.8 UFE Cost as % of Total Cost 0.8 0.7 -6.5 8.8 2.3

TRUE_UP TRUE_UPUFE Cost as % of Total Cost -0.3 -0.6 -6.2 5.8 1.8 UFE Cost as % of Total Cost 0.8 0.6 -6.5 8.7 2.3

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis45SR31

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE Cost| as % of Total Cost 2.4 2.2 0.0 11.1 1.8 |UFE Cost| as % of Total Cost 2.0 1.7 0.0 6.1 1.4

FINAL FINAL|UFE Cost| as % of Total Cost 1.9 1.6 0.0 8.8 1.4 |UFE Cost| as % of Total Cost 1.7 1.3 0.0 6.1 1.3

TRUE_UP TRUE_UP|UFE Cost| as % of Total Cost 1.9 1.6 0.0 8.8 1.4 |UFE Cost| as % of Total Cost 1.7 1.3 0.0 6.1 1.4

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE Cost| as % of Total Cost 2.6 1.9 0.0 14.1 2.3 |UFE Cost| as % of Total Cost 1.4 1.1 0.0 6.6 1.1

FINAL FINAL|UFE Cost| as % of Total Cost 1.9 1.5 0.0 10.1 1.7 |UFE Cost| as % of Total Cost 1.3 1.0 0.0 6.1 1.1

TRUE_UP TRUE_UP|UFE Cost| as % of Total Cost 1.9 1.5 0.0 10.1 1.7 |UFE Cost| as % of Total Cost 1.3 1.0 0.0 6.1 1.1

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE Cost| as % of Total Cost 2.2 1.9 0.0 9.0 1.6 |UFE Cost| as % of Total Cost 1.3 1.1 0.0 4.8 0.9

FINAL FINAL|UFE Cost| as % of Total Cost 1.3 1.1 0.0 7.0 1.0 |UFE Cost| as % of Total Cost 1.0 0.8 0.0 3.7 0.7

TRUE_UP TRUE_UP|UFE Cost| as % of Total Cost 1.3 1.1 0.0 6.9 1.0 |UFE Cost| as % of Total Cost 1.0 0.8 0.0 3.6 0.7

JANUARY

MARCH

MAY

FEBRUARY

APRIL

JUNE

UFE 2008 Analysis46SR32

STATISTICAL SUMMARY – MONTHLY for 2008

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE Cost| as % of Total Cost 1.2 1.0 0.0 5.5 0.9 |UFE Cost| as % of Total Cost 1.4 1.2 0.0 7.1 1.1

FINAL FINAL|UFE Cost| as % of Total Cost 1.0 0.9 0.0 4.3 0.8 |UFE Cost| as % of Total Cost 1.6 1.4 0.0 5.7 1.1

TRUE_UP TRUE_UP|UFE Cost| as % of Total Cost 1.1 0.9 0.0 4.3 0.8 |UFE Cost| as % of Total Cost 1.6 1.5 0.0 5.7 1.1

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE Cost| as % of Total Cost 6.4 3.1 0.0 36.1 8.0 |UFE Cost| as % of Total Cost 4.9 5.0 0.0 11.8 2.8

FINAL FINAL|UFE Cost| as % of Total Cost 4.3 4.2 0.0 10.2 2.2 |UFE Cost| as % of Total Cost 3.6 3.7 0.0 11.1 2.0

TRUE_UP TRUE_UP|UFE Cost| as % of Total Cost 4.2 4.2 0.0 10.1 2.2 |UFE Cost| as % of Total Cost 3.9 4.0 0.0 11.8 2.2

INITIAL INITIALMEAN MEDIAN MIN MAX STD DEV MEAN MEDIAN MIN MAX STD DEV

|UFE Cost| as % of Total Cost 3.5 3.5 0.0 10.3 1.9 |UFE Cost| as % of Total Cost 2.6 2.1 0.0 10.6 2.0

FINAL FINAL|UFE Cost| as % of Total Cost 1.4 1.1 0.0 6.2 1.1 |UFE Cost| as % of Total Cost 1.9 1.5 0.0 8.8 1.6

TRUE_UP TRUE_UP|UFE Cost| as % of Total Cost 1.5 1.2 0.0 6.2 1.1 |UFE Cost| as % of Total Cost 1.9 1.5 0.0 8.7 1.6

NOVEMBER DECEMBER

JULY AUGUST

SEPTEMBER OCTOBER

UFE 2008 Analysis47UFD01

Distribution of UFE MW Initial, Final, and True Up - 2008

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

Per

cen

t o

f In

terv

als

wit

h U

FE

Val

ues

UFE (MW)

Initial Final True Up

UFE 2008 Analysis48

Distribution of UFE as Percent of ERCOT Load - 2008

UFD03

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

22.0

-7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

Dis

trib

uti

on

of

UF

E P

erce

nt

of

Lo

ad

UFE Percent of ERCOT Load

Initial Final True-Up

UFE 2008 Analysis49

Distribution of UFE MW 2007 vs. 2008 - Initial Settlement

UFD04

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

Pe

rce

nt o

f In

terv

als

wit

h U

FE

Va

lue

s

UFE (MW)

UFE 2007 UFE 2008Initial Settlement

UFE 2008 Analysis

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

Pe

rce

nt o

f In

terv

als

wit

h U

FE

Va

lue

s

UFE (MW)

UFE 2007 UFE 2008Final Settlement

50

Distribution of UFE MW 2007 vs. 2008 - Final Settlement

UFD05

UFE 2008 Analysis

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

8.0

Pe

rce

nt o

f In

terv

als

wit

h U

FE

Va

lue

s

UFE (MW)

UFE 2007 UFE 2008True Up Settlement

51

Distribution of UFE MW 2007 vs. 2008 – True Up Settlement

UFD06

UFE 2008 Analysis52

Distribution of UFE Percent of ERCOT Load2007 vs 2008 – Initial Settlement

UFD07

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

-8.0 -7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

Dis

trib

uti

on

of

UF

E P

erc

en

t o

f L

oa

d

UFE Percent of ERCOT Load

UFE 2007 UFE 2008Initial Settlement

UFE 2008 Analysis

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0

Dis

trib

uti

on

of

UF

E P

erc

en

t o

f L

oa

d

UFE Percent of ERCOT Load

UFE 2007 UFE 2008Final Settlement

53

Distribution of UFE Percent of ERCOT Load2007 vs 2008 – Final Settlement

UFD08

UFE 2008 Analysis

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0

Dis

trib

uti

on

of

UF

E P

erc

en

t o

f L

oa

d

UFE Percent of ERCOT Load

UFE 2007 UFE 2008True Up Settlement

54

Distribution of UFE Percent of ERCOT Load2007 vs 2008 – True Up Settlement

UFD09

UFE 2008 Analysis55

UFE Distribution

Initial

UFE 2008 Analysis

Settlement=1 Initial Month=1

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 09 0

40 1105 4172 6273 9525 18

1020 341554 522104 712450 822731 922853 962914 982954 992964 1002969 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

56

UFE Distribution 2008Initial - January

UFD10

UFE 2008 Analysis

Settlement=1 Initial Month=2

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 0

30 1113 4316 11707 25

1241 451744 632091 752334 842475 892605 942718 982781 1002784 1002784 1002784 1002784 1002784 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

57

UFE Distribution 2008Initial - February

UFD11

UFE 2008 Analysis58

UFE Distribution 2008Initial - March

UFD12

Settlement=1 Initial Month=3

CUM.FREQ.

CUM.PCT.

18 0.6122 0.7442 1.4175 2.52

153 5.15257 8.65421 14.17673 22.64

1021 34.351493 50.241938 65.212321 78.102573 86.572689 90.482733 91.962797 94.112842 95.632870 96.572914 98.052934 98.722946 99.132972 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500

UFE 2008 Analysis

Settlement=1 Initial Month=4

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 0

11 046 2

128 4330 11832 29

1508 522103 732533 882731 952820 982860 992875 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700

59

UFE Distribution 2008Initial - April

UFD13

UFE 2008 Analysis

Settlement=1 Initial Month=5

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 00 04 0

59 2229 8566 19

1075 361631 552169 732590 872793 942927 982951 992966 1002975 1002976 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

60

UFE Distribution 2008Initial - May

UFD14

UFE 2008 Analysis

Settlement=1 Initial Month=6

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 0

29 1142 5298 10733 25

1463 512040 712582 902849 992880 1002880 1002880 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

61

UFE Distribution 2008Initial - June

UFD15

UFE 2008 Analysis

Settlement=1 Initial Month=7

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 03 0

21 163 3

177 8439 21873 41

1451 691871 892042 972112 1002112 1002112 1002112 1002112 1002112 1002112 1002112 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

62

UFE Distribution 2008Initial - July

UFD16

UFE 2008 Analysis

Settlement=1 Initial Month=8

CUM.FREQ.

CUM.PCT.

0 00 00 02 0

10 025 143 1

122 4255 9511 18

1122 391788 622356 822725 952861 992880 1002880 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700

63

UFE Distribution 2008Initial - August

UFD17

UFE 2008 Analysis

Settlement=1 Initial Month=9

CUM.FREQ.

CUM.PCT.

596 20.69639 22.19653 22.67665 23.09677 23.51718 24.93764 26.53811 28.16930 32.29

1129 39.201308 45.421560 54.171872 65.002186 75.902466 85.632673 92.812804 97.362847 98.852874 99.792880 100.002880 100.002880 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

64

UFE Distribution 2008Initial - September

UFD18

UFE 2008 Analysis

Settlement=1 Initial Month=10

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 05 0

30 1104 3264 9435 15602 20748 25866 29987 33

1229 411519 511822 612187 732560 862816 952901 972976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400

65

UFE Distribution 2008Initial - October

UFD19

UFE 2008 Analysis

Settlement=1 Initial Month=11

CUM.FREQ.

CUM.PCT.

5 0.1713 0.4540 1.39

112 3.88266 9.22588 20.39

1136 39.391735 60.162096 72.682452 85.022627 91.092780 96.392824 97.922879 99.832884 100.002884 100.002884 100.002884 100.002884 100.002884 100.002884 100.002884 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

66

UFE Distribution 2008Initial - November

UFD20

UFE 2008 Analysis

Settlement=1 Initial Month=12

CUM.FREQ.

CUM.PCT.

14 0.4719 0.6441 1.3855 1.8585 2.86

130 4.37207 6.96342 11.49498 16.73752 25.27

1095 36.791478 49.661918 64.452270 76.282549 85.652732 91.802870 96.442943 98.892958 99.402969 99.762973 99.902976 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500

67

UFE Distribution 2008Initial - December

UFD21

UFE 2008 Analysis68

UFE Distribution

Final

UFE 2008 Analysis

Settlement=4 Final Month=1

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 0

11 055 2

132 4274 9530 18978 33

1476 502049 692557 862771 932887 972924 982948 992970 1002976 1002976 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

69

UFE Distribution 2008Final - January

UFD22

UFE 2008 Analysis

Settlement=4 Final Month=2

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 0

19 198 4

311 11775 28

1350 481859 672194 792396 862570 922723 982783 1002784 1002784 1002784 1002784 1002784 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

70

UFE Distribution 2008Final - February

UFD23

UFE 2008 Analysis

Settlement=4 Final Month=3

CUM.FREQ.

CUM.PCT.

1 0.035 0.179 0.30

14 0.4728 0.9467 2.25

140 4.71284 9.56509 17.13813 27.36

1278 43.001868 62.852379 80.052664 89.642756 92.732839 95.522911 97.952926 98.452934 98.722952 99.332972 100.002972 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

71

UFE Distribution 2008Final - March

UFD24

UFE 2008 Analysis

Settlement=4 Final Month=4

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 0

13 072 3

242 8634 22

1296 452029 702507 872718 942809 982858 992879 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

72

UFE Distribution 2008Final - April

UFD25

UFE 2008 Analysis

Settlement=4 Final Month=5

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 0

14 043 1

148 5451 15

1057 361810 612480 832835 952946 992966 1002971 1002976 1002976 1002976 1002976 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

73

UFE Distribution 2008Final - May

UFD26

UFE 2008 Analysis

Settlement=4 Final Month=6

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 00 0

19 1126 4360 13

1124 392065 722678 932867 1002880 1002880 1002880 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800 900 1000

74

UFE Distribution 2008Final - June

UFD27

UFE 2008 Analysis

Settlement=4 Final Month=7

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 04 0

18 150 2

176 8608 29

1354 641926 912066 982112 1002112 1002112 1002112 1002112 1002112 1002112 1002112 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

75

UFE Distribution 2008Final - July

UFD28

UFE 2008 Analysis

Settlement=4 Final Month=8

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 04 0

19 152 2

130 5303 11710 25

1342 472030 702588 902834 982874 1002880 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700

76

UFE Distribution 2008Final - August

UFD29

UFE 2008 Analysis

Settlement=4 Final Month=9

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 00 01 0

11 034 188 3

207 7524 18898 31

1355 471874 652309 802532 882717 942807 972868 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

77

UFE Distribution 2008Final - September

UFD30

UFE 2008 Analysis

Settlement=4 Final Month=10

CUM.FREQ.

CUM.PCT.

12 0.4029 0.9766 2.22

119 4.00307 10.32703 23.62

1306 43.881797 60.382151 72.282413 81.082634 88.512801 94.122887 97.012957 99.362969 99.762976 100.002976 100.002976 100.002976 100.002976 100.002976 100.002976 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700

78

UFE Distribution 2008Final - October

UFD31

UFE 2008 Analysis

Settlement=4 Final Month=11

CUM.FREQ.

CUM.PCT.

0 00 00 00 02 0

15 146 2

135 5376 13948 33

1722 602256 782539 882763 962824 982871 1002884 1002884 1002884 1002884 1002884 1002884 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

79

UFE Distribution 2008Final - November

UFD32

UFE 2008 Analysis

Settlement=4 Final Month=12

CUM.FREQ.

CUM.PCT.

0 00 00 00 09 0

20 159 2

160 5333 11565 19

1029 351672 562095 702474 832741 922859 962928 982956 992970 1002976 1002976 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700

80

UFE Distribution 2008Final - December

UFD33

UFE 2008 Analysis81

UFE Distribution

True Up

UFE 2008 Analysis

Settlement=5 True Up Month=1

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 09 0

51 2123 4272 9525 18975 33

1457 492040 692547 862771 932884 972923 982948 992970 1002976 1002976 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

82

UFE Distribution 2008True Up - January

UFD34

UFE 2008 Analysis

Settlement=5 True Up Month=2

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 0

18 198 4

306 11752 27

1338 481853 672190 792392 862556 922720 982783 1002784 1002784 1002784 1002784 1002784 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

83

UFE Distribution 2008True Up - February

UFD35

UFE 2008 Analysis

Settlement=5 True Up Month=3

CUM.FREQ.

CUM.PCT.

1 0.035 0.179 0.30

14 0.4728 0.9467 2.25

140 4.71285 9.59509 17.13813 27.36

1281 43.101871 62.952378 80.012664 89.642757 92.772840 95.562910 97.912926 98.452933 98.692952 99.332971 99.972972 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

84

UFE Distribution 2008True Up - March

UFD36

UFE 2008 Analysis

Settlement=5 True Up Month=4

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 0

12 072 3

247 9624 22

1291 452023 702510 872720 942810 982858 992879 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

85

UFE Distribution 2008True Up - April

UFD37

UFE 2008 Analysis

Settlement=5 True Up Month=5

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 0

15 148 2

154 5473 16

1094 371832 622503 842844 962946 992967 1002971 1002976 1002976 1002976 1002976 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

86

UFE Distribution 2008True Up - May

UFD38

UFE 2008 Analysis

Settlement=5 True Up Month=6

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 00 0

13 0124 4361 13

1126 392068 722679 932867 1002880 1002880 1002880 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800 900 1000

87

UFE Distribution 2008True Up - June

UFD39

UFE 2008 Analysis

Settlement=5 True Up Month=7

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 03 0

18 147 2

170 8583 28

1333 631911 902064 982112 1002112 1002112 1002112 1002112 1002112 1002112 1002112 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

88

UFE Distribution 2008True Up - July

UFD40

UFE 2008 Analysis

Settlement=5 True Up Month=8

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 01 0

13 046 2

117 4290 10674 23

1282 451986 692565 892813 982873 1002880 1002880 1002880 1002880 1002880 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

89

UFE Distribution 2008True Up - August

UFD41

UFE 2008 Analysis

Settlement=5 True Up Month=9

CUM.FREQ.

CUM.PCT.

0 00 00 00 00 00 00 00 06 0

36 191 3

219 8526 18908 32

1360 471878 652315 802540 882721 942810 982868 1002880 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

90

UFE Distribution 2008True Up - September

UFD42

UFE 2008 Analysis

Settlement=5 True Up Month=10

CUM.FREQ.

CUM.PCT.

22 0.7448 1.6185 2.86

184 6.18430 14.45928 31.18

1497 50.301931 64.892261 75.972483 83.432692 90.462834 95.232925 98.292961 99.502971 99.832976 100.002976 100.002976 100.002976 100.002976 100.002976 100.002976 100.00

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600

91

UFE Distribution 2008True Up - October

UFD43

UFE 2008 Analysis

Settlement=5 True Up Month=11

CUM.FREQ.

CUM.PCT.

0 00 00 00 02 0

16 152 2

159 6427 15

1068 371784 622292 792546 882773 962825 982872 1002884 1002884 1002884 1002884 1002884 1002884 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700 800

92

UFE Distribution 2008True Up - November

UFD44

UFE 2008 Analysis

Settlement=5 True Up Month=12

CUM.FREQ.

CUM.PCT.

0 00 00 00 0

10 020 162 2

165 6338 11578 19

1056 351697 572104 712490 842747 922862 962928 982956 992970 1002976 1002976 1002976 100

ufe

_p

erc

en

t M

IDP

OIN

T

10.5 9.5 8.5 7.5 6.5 5.5 4.5 3.5 2.5 1.5 0.5 -0.5 -1.5 -2.5 -3.5 -4.5 -5.5 -6.5 -7.5 -8.5 -9.5

-10.5

FREQUENCY

0 100 200 300 400 500 600 700

93

UFE Distribution 2008True Up - December

UFD45

UFE 2008 Analysis94

UFE Percent of ERCOT Load 2008Initial Settlement plus95% Confidence Interval

CIP01

-10.0

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

10.0

UF

E P

erce

nt

of

ER

CO

T L

oad

Day of the Week 2008Median 5th Percentile 95th Percentile

Sun TueMon Wed Thur Fri Sat

UFE 2008 Analysis95CIP02

UFE Percent of ERCOT Load 2008Final Settlement plus95% Confidence Interval

-10.0

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

10.0

UF

E P

erce

nt

of

ER

CO

T L

oad

Day of the Week 2008

Median 5th Percentile 95th Percentile

Sun TueMon Wed Thur Fri Sat

UFE 2008 Analysis96CIP03

UFE Percent of ERCOT Load 2008True-Up Settlement plus95% Confidence Interval

-10.0

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

10.0

UF

E P

erce

nt

of

ER

CO

T L

oad

Day of the Week 2008

Median 5th Percentile 95th Percentile

Sun TueMon Wed Thur Fri Sat

UFE 2008 Analysis97CIP04

UFE Percent of ERCOT Load 2008Comparison of Medians for Initial & Final

-3.0

-2.5

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

UF

E P

erce

nt o

f E

RC

OT

Lo

ad

Day of the Week 2008

Initial Final

Sun Mon Tue Wed Thu Fri Sat

Note: True Up is omitted since the results for Final and True Up are similar.

UFE 2008 Analysis98

Seasonal Comparison - Spring 2008UFE Percent of ERCOT Load and ERCOT Load

SEA01

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

55000

-4.5

-4.0

-3.5

-3.0

-2.5

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

ER

CO

T L

oad

(M

W)

UF

E P

erc

en

t o

f E

RC

OT

Lo

ad

Day of the Week

Initial Final Total ERCOT Aggregated Load Adjusted for Losses

Sun Mon Tue Wed Thu Fri Sat

Note: True Up is omitted since the results for Final and True Up are similar.

UFE 2008 Analysis99

Seasonal Comparison - Summer 2008UFE Percent of ERCOT Load and ERCOT Load

SEA02

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

55000

60000

-4.5

-4.0

-3.5

-3.0

-2.5

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

ER

CO

T L

oad

(M

W)

UF

E P

erce

nt o

f E

RC

OT

Lo

ad

Day of the Week

Initial Final Total ERCOT Aggregated Load Adjusted for Losses

Sun Mon Tue Wed Thu Fri Sat

Note: True Up is omitted since the results for Final and True Up are similar.

UFE 2008 Analysis100

Seasonal Comparison - Fall 2008UFE Percent of ERCOT Load and ERCOT Load

SEA03

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

-4.5

-4.0

-3.5

-3.0

-2.5

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

ER

CO

T L

oad

(M

W)

UF

E P

erce

nt o

f E

RC

OT

Lo

ad

Day of the Week

Initial Final Total ERCOT Aggregated Load Adjusted for Losses

Sun Mon Tue Wed Thu Fri Sat

Note: True Up is omitted since the results for Final and True Up are similar.

UFE 2008 Analysis101

Seasonal Comparison - Winter 2008UFE Percent of ERCOT Load and ERCOT Load

SEA04

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

55000

-4.5

-4.0

-3.5

-3.0

-2.5

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

ER

CO

T L

oad

(M

W)

UF

E P

erc

en

t o

f E

RC

OT

Lo

ad

Day of the Week

Initial Final Total ERCOT Aggregated Load Adjusted for Losses

Sun Mon Tue Wed Thu Fri Sat

Note: True Up is omitted since the results for Final and True Up are similar.

UFE 2008 Analysis102SEA05

Seasonal Comparison of Medians – Initial SettlementUFE Percent of ERCOT Load - 2008

-5

-4

-3

-2

-1

0

1

2

3

4

5

UF

E P

erce

nt

of

Lo

ad

Day of the Week

Spring Summer Fall Winter

Sun Mon Tue Wed Thu Fri Sat

UFE 2008 Analysis103SEA06

Seasonal Comparison of Medians – Final SettlementUFE Percent of ERCOT Load - 2008

-5

-4

-3

-2

-1

0

1

2

3

4

5

UF

E P

erce

nt

of

Lo

ad

Day of the Week

Spring Summer Fall Winter

Sun Mon Tue Wed Thu Fri Sat

UFE 2008 Analysis104SEA07

Seasonal Comparison of Medians – True UpUFE Percent of ERCOT Load - 2008

-5

-4

-3

-2

-1

0

1

2

3

4

5

UF

E P

erce

nt

of

Lo

ad

Day of the Week

Spring Summer Fall Winter

Sun Mon Tue Wed Thu Fri Sat

UFE 2008 Analysis105

Percent UFE vs ERCOT LoadInitial Settlement - 2008

MPL01

-9.0

-8.0

-7.0

-6.0

-5.0

-4.0

-3.0

-2.0

-1.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

20000 25000 30000 35000 40000 45000 50000 55000

Pe

rce

nt

UF

E

ERCOT Load (MW)

Median 5th Percentile 95th Percentile Regression on Total Aggregated Load

UFE 2008 Analysis106

Percent UFE vs ERCOT LoadFinal Settlement - 2008

MPL02

-9.0

-8.0

-7.0

-6.0

-5.0

-4.0

-3.0

-2.0

-1.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

20000 25000 30000 35000 40000 45000 50000 55000

Pe

rce

nt

UF

E

ERCOT Load (MW)

Median 5th Percentile 95th Percentile Regression on Total Aggregated Load

UFE 2008 Analysis107

Percent UFE vs ERCOT LoadTrue-Up Settlement – 2008

MPL03

-9.0

-8.0

-7.0

-6.0

-5.0

-4.0

-3.0

-2.0

-1.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

20000 25000 30000 35000 40000 45000 50000 55000

Pe

rce

nt

UF

E

ERCOT Load (MW)

Median 5th Percentile 95th Percentile Regression on Total Aggregated Load

UFE 2008 Analysis108

Comparison of Median Percent UFEInitial, Final and True-Up Settlements - 2008

MPL04

-4.5

-4.0

-3.5

-3.0

-2.5

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

20000 25000 30000 35000 40000 45000 50000 55000

Pe

rce

nt

UF

E

ERCOT Load (MW)

Initial Final True Up Regression on Total Aggregated Load

UFE 2008 Analysis109

Load Weighted Average MCPE vs LoadInitial Settlement - 2008

MPL05

-100.0

-50.0

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

20000 25000 30000 35000 40000 45000 50000 55000 60000

Lo

ad

We

igh

ted

Av

era

ge

MC

PE

($

/MW

H)

ERCOT Load (MW)

Median 5th Percentile 95th Percentile Regression on MCPE vs Load

Load Wt'd Avg MCPE 95th percentile max value = $1017 per mWh

UFE 2008 Analysis110

Load Weighted Average MCPE vs Load Final Settlement - 2008

MPL06

-100.0

-50.0

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

20000 25000 30000 35000 40000 45000 50000 55000 60000

Lo

ad

We

igh

ted

Av

era

ge

MC

PE

($

/MW

H)

ERCOT Load (MW)

Median 5th Percentile 95th Percentile Regression on MCPE vs Load

Load Wt'd Avg MCPE 95th percentile max value = $1021 per mWh

UFE 2008 Analysis111

Load Weighted Average MCPE vs Load True Up Settlement - 2008

MPL07

-100.0

-50.0

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

20000 25000 30000 35000 40000 45000 50000 55000 60000

Lo

ad

We

igh

ted

Av

era

ge

MC

PE

($

/MW

H)

ERCOT Load (MW)

Median 5th Percentile 95th Percentile Regression on MCPE vs Load

Load Wt'd Avg MCPE 95th percentile max value = $1021 per mWh

UFE 2008 Analysis112

Comparison of Median Load Weighted Average MCPE vs Load for Initial, Final and True-Up Settlements - 2008

MPL08

-20.0

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

20000 25000 30000 35000 40000 45000 50000 55000 60000

Lo

ad

We

igh

ted

Av

era

ge

MC

PE

($

/MW

H)

ERCOT Load (MW)

Initial Final True Up Reg on MCPE vs Load

UFE 2008 Analysis113

Load Weighted Average MCPE vs Percent UFE Initial Settlement - 2008

MPL09

-80.0

-60.0

-40.0

-20.0

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

-37.0 -33.0 -29.0 -25.0 -21.0 -17.0 -13.0 -9.0 -5.0 -1.0 3.0 7.0 11.0

Lo

ad

We

igh

ted

Av

era

ge

MC

PE

($

/MW

H)

Percent UFE of Load

Median 5th Percentile 95th Percentile Regression on MCPE vs Percent UFE

Load Wt'd Avg MCPE 5th percentile min value = -999 $ per mWh

UFE 2008 Analysis114MPL10

Load Weighted Average MCPE vs Percent UFE Final Settlement - 2008

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

-11.0 -9.0 -7.0 -5.0 -3.0 -1.0 1.0 3.0 5.0 7.0 9.0

Lo

ad

We

igh

ted

Av

era

ge

MC

PE

($

/MW

H)

Percent UFE of Load

Median 5th Percentile 95th Percentile Regression on MCPE vs Percent UFE

Load Wt'd Avg MCPE 95th percentile max value = 1999 $ per mWh

UFE 2008 Analysis115MPL11

Load Weighted Average MCPE vs Percent UFE True-Up Settlement - 2008

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

-12.0 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0

Lo

ad

We

igh

ted

Av

era

ge

MC

PE

($

/MW

H)

Percent UFE of Load

Median 5th Percentile 95th Percentile Regression on MCPE vs Percent UFE

Load Wt'd Avg MCPE 95th percentile max value = 1999 $ per mWh

UFE 2008 Analysis116

Comparison of Median Load Weighted Average MCPE vs Percent UFE forInitial, Final and True-Up Settlements - 2008

MPL12

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

-12.0 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0

Lo

ad W

eig

hte

d A

vera

ge

MC

PE

($/M

WH

)

Percent UFE of Load

Initial Final True UP Regression on MCPE vs Percent UFE

UFE 2008 Analysis117

Sum of Dollars from Positive UFEacross the Week 2008

UCT02

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

Do

llars

Day of the Week

Sun Mon Tue Wed Thu Fri Sat

UFE 2008 Analysis118

Sum of Dollars from Negative UFEacross the Week 2008

UCT03

-2,500,000

-2,000,000

-1,500,000

-1,000,000

-500,000

0

Do

lla

rs

Day of the Week

Sun Mon Tue Wed Thu Fri Sat

UFE 2008 Analysis119UCT04

Sum of Dollars from Absolute Value of UFE across the Week 2008

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

Do

llar

s

Day of the Week

Sun Mon Tue Wed Thu Fri Sat

UFE 2008 Analysis120

Sum of Dollars from Net UFE across the Week 2008

UCT05

-2,500,000

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

Do

lla

rs

Day of the Week

Sun Mon Tue Wed Thu Fri Sat

UFE 2008 Analysis121UCT06

SUM of UFE DollarsCompare All Seasons in 2008Positive and Negative UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - September 30

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: October 1 - November 30

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: December 1 - February 28

UFE 2008 Analysis122

SUM of UFE Dollars – Spring 2008Positive and Negative UFE

UCT07

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

UFE 2008 Analysis123UCT08

SUM of UFE Dollars – Summer 2008Positive and Negative UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - September 30

UFE 2008 Analysis124UCT09

SUM of UFE Dollars – Fall 2008Positive and Negative UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: October 1 - November 30

UFE 2008 Analysis125UCT10

SUM of UFE Dollars – Winter 2008Positive and Negative UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

SUM(+UFE) SUM(-UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: December 1 - February 28

UFE 2008 Analysis126UCT11

SUM of UFE DollarsCompare All Seasons in 2008Absolute Value and Net UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

llar

s

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - Sept 30

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: Oct 1 - Nov 30

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: Dec 1 - Feb 28

UFE 2008 Analysis127

SUM of UFE Dollars – Spring 2008Absolute Value and Net UFE

UCT12

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

UFE 2008 Analysis128UCT13

SUM of UFE Dollars – Summer 2008Absolute Value and Net UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

llar

s

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - Sept 30

UFE 2008 Analysis129UCT14

SUM of UFE Dollars – Fall 2008Absolute Value and Net UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: Oct 1 - Nov 30

UFE 2008 Analysis130UCT15

SUM of UFE Dollars – Winter 2008 Absolute Value and Net UFE

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1,000,000

1,500,000

2,000,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: Dec 1 - Feb 28

UFE 2008 Analysis131

Mean of UFE DollarsCompare All Seasons in 2008Positive and Negative UFE

UCT16

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - Sept 30

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: Oct 1 - Nov 30

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: Dec 1 - Feb 28

UFE 2008 Analysis132UCT17

Mean of UFE Dollars – Spring 2008Positive and Negative UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

UFE 2008 Analysis133UCT18

Mean of UFE Dollars – Summer 2008Positive and Negative UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - Sept 30

UFE 2008 Analysis134UCT19

Mean of UFE Dollars – Fall 2008Positive and Negative UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: Oct 1 - Nov 30

UFE 2008 Analysis135UCT20

Mean of UFE Dollars – Winter 2008Positive and Negative UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

Do

lla

rs

Day of the Week

Mean (+UFE) Mean (-UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: Dec 1 - Feb 28

UFE 2008 Analysis136

Mean of UFE DollarsCompare All Seasons in 2008 Absolute Value and Net UFE

UCT21

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

llar

s

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - Sept 30

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: Oct 1 - Nov 30

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: Dec 1 - Feb 28

UFE 2008 Analysis137UCT22

Mean of UFE Dollars – Spring 2008Absolute Value and Net UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

llar

s

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Spring: March 1 - April 30

UFE 2008 Analysis138UCT23

Mean of UFE Dollars – Summer 2008Absolute Value and Net UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Summer: May 1 - Sept 30

UFE 2008 Analysis139UCT24

Mean of UFE Dollars – Fall 2008 Absolute Value and Net UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Fall: Oct 1 - Nov 30

UFE 2008 Analysis140UCT25

Mean of UFE Dollars – Winter 2008Absolute Value and Net UFE

-250,000

-200,000

-150,000

-100,000

-50,000

0

50,000

100,000

150,000

200,000

250,000

Do

lla

rs

Day of the Week

ABS (UFE) Net (UFE)

Sun Mon Tue Wed Thu Fri Sat

Winter: Dec 1 - Feb 28

UFE 2008 Analysis141

Hurricanes Edouard and Ike were the largest single event contributors to UFE in 2008.

Mean and median UFE (MW) and UFE as Percent of Load declined from 2007 values. Min and std dev values increased due to the hurricane effects.

Mean and median UFE Cost ($) and UFE Cost as Percent of Total Cost declined from 2007 values. Min and std dev values increased due to the hurricane effects.

UFE 2008 Analysis Observations

UFE 2008 Analysis142

Develop new profile models using Round 2 load research data.

Perform settlements using 15 minute interval data from AMI meters.

Evaluate algorithms for replacing missing AMI, IDR and NIDR data estimation.

Improve distribution loss estimates.

Steps to Reduce UFE