i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II ( Design of Steell Structure Krasak’s River II Bridge) Diajukan untuk memenuhi salah satu syarat akademis dalam menyelesaikan Pendidikan Tingkat Sarjana (Strata-1) Program Reguler II Jurusan Teknik Sipil Fakultas Teknik Universitas Diponegoro Disusun Oleh : ANDIKA ARIE A L2A605006 MARTHEN MAHENDRA M L2A605041 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS DIPONEGORO SEMARANG 2009

TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

Embed Size (px)

Citation preview

Page 1: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

i

TUGAS AKHIR

PERENCANAAN STRUKTUR JEMBATAN

RANGKA BAJA KALI KRASAK II ( Design of Steell Structure Krasak’s River II Bridge)

Diajukan untuk memenuhi salah satu syarat akademis

dalam menyelesaikan Pendidikan Tingkat Sarjana (Strata-1)

Program Reguler II Jurusan Teknik Sipil Fakultas Teknik

Universitas Diponegoro

Disusun Oleh :

ANDIKA ARIE A L2A605006

MARTHEN MAHENDRA M L2A605041

 

JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS DIPONEGORO

SEMARANG

2009

Page 2: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

ii

LEMBAR PENGESAHAN

TUGAS AKHIR

PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

( Design of Steell Structure Krasak’s River II Bridge )

Diajukan untuk memenuhi salah satu syarat akademis dalam menyelesaikan Pendidikan Tingkat Sarjana Strata-1 Jurusan Teknik Sipil Program S1 Reguler II Fakultas Teknik

Universitas Diponegoro Semarang

Disusun oleh :

ANDIKA ARIE A L2A605006

MARTHEN MAHENDRA M L2A605041

Semarang, Agustus 2009

Disetujui :

Dosen Pembimbing I

Ir. Hariwarsianto, MS NIP. 130 936 138

Dosen Pembimbing II

Yulita Arni Priastiwi, ST.MT NIP. 132 205 687

Mengetahui, Ketua Program Reguler II

Jurusan Teknik Sipil Fakultas Teknik Universitas Diponegoro

Ir. Moga Narayudha, SP1. NIP. 130 810 731

Page 3: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

iii

KATA PENGANTAR

Puji syukur penyusun panjatkan kehadirat Tuhan Yang Maha Esa yang telah

melimpahkan rahmat dan hidayah-Nya, sehingga penyusun dapat menyelesaikan Tugas

Akhir yang berjudul “Perencanaan Struktur Jembatan Rangka Baja Kali Krasak II” ini

dengan sebaik-baiknya. Tugas akhir ini merupakan satu mata kuliah wajib dan merupakan syarat akademis

dalam menyelesaikan pendidikan Strata I (S1) di Jurusan Sipil Fakultas Teknik Universitas

Diponegoro.

Dalam pembuatan tugas akhir ini data-data yang kami peroleh dari lapangan,

wawancara, pengamatan serta data dari instansi terkait menjadi acuan disamping buku-buku

literatur dan pengetahuan yang telah kami dapatkan di perkuliahan. Melalui tugas akhir ini

kami dapat mempelajari serta memperoleh pengalaman secara langsung mengenai masalah -

masalah yang ada dalam bidang perencanaan struktur jembatan.

Atas terselesaikannya tugas akhir ini, penulis mengucapkan terima kasih kepada :

1. Ir. Sri Sangkawati, MS., selaku Ketua Jurusan Teknik

Sipil Universitas Diponegoro

2. Ir. Moga Narayudha, SP1., selaku Ketua Program Reguler II.

3. Hardi Wibowo,ST., MEng., selaku Sekretaris Program Sipil Reguler II.

4. Ir. Slamet Hargono, Dipl.Ing., selaku dosen wali.

5. Ir. Salamun, MS., selaku dosen wali.

6. Ir. Hariwarsianto, MS., selaku dosen pembimbing I.

7. Yulita Arni Priastiwi, ST.,MT., selaku dosen pembimbing II.

8. Staf pengajar Jurusan Sipil Fakultas Teknik Universitas Diponegoro-Semarang.

9. Ayah, ibunda,dan semua keluarga tercinta

10. Rekan-rekan mahasiswa pada Jurusan Sipil Reguler II Fakultas Teknik

Universitas Diponegoro angkatan 2005, yang telah memberikan dukungan dan

saran-sarannya.

11. Semua pihak yang telah mendukung hingga terselesaikannya Tugas Akhir ini.

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 4: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

iv

Penulis menyadari bahwa laporan tugas akhir ini masih penuh dengan kekurangan.

Segala saran dan kritik sangat penulis harapkan agar bermanfaat bagi kita semua dalam

memperluas pengetahuan dibidang Teknik Sipil.

  Semarang, Agustus 2009 Penulis

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 5: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

v

DAFTAR ISI

HALAMAN JUDUL ......................................................................................... i

HALAMAN PENGESAHAN ........................................................................... ii

KATA PENGANTAR ....................................................................................... iii

DAFTAR ISI ...................................................................................................... v

DAFTAR GAMBAR ......................................................................................... xi

DAFTAR TABEL ............................................................................................. xiv

BAB I PENDAHULUAN .............................................................................. I-1

I. 1. Tinjauan Umum .......................................................................... I-1

I. 2. Latar Belakang ........................................................................... I-1

I. 3. Maksud Dan Tujuan ................................................................... I-2

I. 4. Lokasi Pembangunan Jembatan .................................................. I-2

I. 5. Ruang Lingkup ............................................................................ I-2

I. 6. Sistematika Penulisan ................................................................. I-6

BAB II STUDI PUSTAKA ............................................................................. II-1

II. 1 Tinjauan Umum ......................................................................... II-1

II. 2 Aspek Topografi ......................................................................... II-1

II. 3 Aspek Lalu Lintas ....................................................................... II-2

II.3.1 Volume Lalu Lintas (Q) ............................................... II-2

II.3.2 Pertumbuhan Lalu Lintas ............................................. II-4

II.3.3 Kapasitas Jalan ............................................................. II-5

II.3.4 Kinerja Lalu Lintas ...................................................... II-7

II. 4 Aspek Hidrologi .......................................................................... II-8

II.4.1 Curah Hujan ................................................................. II-8

II.4.2 Debit Banjir Rencana ................................................... II-9

II.4.3 Kedalaman Penggerusan .............................................. II-10

II. 5 Aspek Geoteknik ......................................................................... II-11

II.5.1 Kapasitas Daya Dukung Ultimate ................................ II-12

II.5.2 Penurunan .................................................................... II-13

II. 6 Aspek Pemilihan Tipe Jembatan ................................................. II-13

II.6.1 Dasar Pemilihan ........................................................... II-14

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 6: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

vi

II.6.2 Faktor Penentu Lokasi ................................................. II-14

II. 7 Aspek Struktural ......................................................................... II-15

II.7.1 Pembebanan Struktur Pada Desain LRFD ................... II-16

II.7.1.1 Beban Permanen ............................................ II-16

II.7.1.2 Beban Lalu Lintas ......................................... II-16

II.7.1.3 Beban Lingkungan ........................................ II-23

II.7.2 Kombinasi Beban ......................................................... II-27

II.7.3 Faktor Beban ................................................................ II-29

II.7.4 Faktor Reduksi ............................................................. II-31

II.7.5 Kekuatan Penampang ................................................... II-31

II.7.5.1 Penampang Non Komposit ............................ II-33

II.7.5.2 Penampang Komposit ................................... II-36

II.7.6 Hubungan ..................................................................... II-45

II.7.6.1 Hubungan dalam Unsur Utama ..................... II-45

II.7.6.2 Luas Lubang .................................................. II-45

II.7.6.3 Perencanaan Baut .......................................... II-46

II. 8 Perencanaan Bangunan Atas ....................................................... II-48

II.8.1 Pemilihan Bangunan Atas/Utama Jembatan ................ II-48

II.8.2 Perencanaan Sandaran ................................................. II-49

II.8.3 Perencanaan Pelat Lantai ............................................. II-50

II.8.4 Perencanaan Trotoar .................................................... II-51

II.8.5 Perencanaan Gelagar Memanjang (Non Komposit) .... II-51

II.8.6 Perencanaan Gelagar Melintang .................................. II-52

II.8.7 Perencanaan Ikatan Angin ........................................... II-52

II.8.8 Perencanaan Rangka Baja ............................................ II-53

II.8.9 Andas Jembatan ........................................................... II-53

II.8.10 Oprit ............................................................................. II-54

II.8.11 Perkerasan Jalan ........................................................... II-54

II. 9 Perencanaan Bangunan Bawah ................................................... II-55

II.9.1 Pilar/ Peir ..................................................................... II-55

II.9.2 Pangkal/ Abutment ....................................................... II-58

II.9.3 Pondasi ......................................................................... II-60

II.9.4 Dinding Penahan Tanah/ Retaining Wall ..................... II-65

II.9.5 Drainase ....................................................................... II-65

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 7: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

vii

II.10 Aspek Pendukung ....................................................................... II-65

BAB III METODOLOGI ................................................................................. III-1

III.1 Persiapan ..................................................................................... III-1

III.2 Tahap Perencanaan ..................................................................... III-1

III.3 Pengumpulan Data ...................................................................... III-3

II.3.1 Jenis- jenis Data ........................................................... III-4

II.3.1.1 Data Primer ................................................... III-4

II.3.1.1 Data Sekunder ............................................... III-4

III.4 Analisa Dan Pengolahan Data .................................................... III-5

III.5 Pemecahan Masalah .................................................................... III-5

III.6 Gambar Desain ............................................................................ III-6

III.7 Rencana Anggaran Biaya (RAB) ................................................ III-6

III.8 Time Schedule dan Network Planning ........................................ III-6

BAB IV PENGUMPULAN DAN ANALISA DATA ..................................... IV-1

IV.1 Analisa Geoteknik ....................................................................... IV-1

IV.I.1 Hasil Penyelidikan Tanah ............................................ IV-1

IV.I.2 Kesimpulan Hasil Penyelidikan Tanah ........................ IV-4

IV.I.3 Pemilihan Struktur Bawah Jembatan ........................... IV-4

IV.2 Analisa Data Hidrologi ............................................................... IV-5

IV.2.1 Analisa Data Curah Hujan ........................................... IV-6

IV.2.2 Analisa Debit Banjir .................................................... IV-8

IV.2.3 Analisa Terhadap Penggerusan Dasar Sungai ............. IV-13

IV.3 Analisa Jaringan Jalan ................................................................. IV-14

IV.3.1 Analisa Terhadap Penggerusan Dasar Sungai ............. IV-15

IV.3.2 Angka Pertumbuhan Lalu-Lintas ................................. IV-15

IV.3.3 Penentuan LHR Rencana ............................................. IV-18

IV.3.4 Penentuan Kelas Jalan .................................................. IV-18

IV.3.5 Penentuan Jumlah Lajur ............................................... IV-19

IV.3.6 Penentuan Geometri Jalan ............................................ IV-19

BAB V ANALISA PEMILIHAN ALTERNATIF dan STRUKTUR JEMBATAN

.................................................................................................... V-1

V.1 Analisa Pemilihan Struktur Jembatan ......................................... V-1

V.1.1 Alternatif Konstruksi Atas Jembatan ........................... V-1

V.1.2 Alternatif Konstruksi Bawah Jembatan ....................... V-5

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 8: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

viii

V.1.3 Alternatif Pondasi ........................................................ V-5

V.2 Penetapan Tipe Jembatan ............................................................ V-6

BAB VI PERHITUNGAN STRUKTUR ........................................................ VI-1

VI.1 Data Teknis Perencanaan ............................................................ VI-1

VI.2 Gambar Rencana Struktur ........................................................... VI-2

VI.3 Perhitungan Struktur Atas ........................................................... VI-3

VI.3.1 Sandaran ....................................................................... VI-3

VI.3.1.1 Pembebanan ................................................. VI-3

VI.3.1.2 Data-data Teknis .......................................... VI-4

VI.3.1.3 Analisa Struktur ........................................... VI-4

VI.3.1.4 Cek Kekuatan dan Kekakuan ....................... VI-5

VI.3.2 Perhitungan Lantai Trotoir ........................................... VI-6

VI.3.2.1 Pembebanan ................................................. VI-6

VI.3.2.2 Perencanaan Struktur ................................... VI-7

VI.3.3 Perencanaan Plat Lantai Kendaraan ............................. VI-8

VI.3.3.1 Pembebanan ................................................. VI-8

VI.3.3.2 Perencanaan Struktur ................................... VI-14

VI.3.4 Gelagar Memanjang ..................................................... VI-19

VI.3.4.1 Pembebanan ................................................. VI-19

VI.3.4.2 Perencanaan Struktur ................................... VI-20

VI.3.4.3 Kontrol Kekuatan Bahan ............................ VI-20

VI.3.5 Gelagar Melintang ....................................................... VI-22

VI.3.5.1 Pembebanan ................................................. VI-22

VI.3.5.2 Perencanaan Struktur ................................... VI-22

VI.3.5.3 Perhitungan Kapasitas Penampang ............... VI-25

VI.3.6 Sambungan Gelagar Memanjang Dan Melintang ........ VI-27

VI.3.6.1 Pembebanan ................................................. VI-27

VI.3.6.2 Perencanaan Struktur ................................... VI-27

VI.3.7 Cek Badan Terhadap Aksi Tekanan Tumpuan ............ VI-27

VI.3.8 Penghubung Geser (Shear Connector) ........................ VI-32

VI.3.8.1 Pembebanan ................................................. VI-32

VI.3.8.2 Perencanaan Struktur ................................... VI-33

VI.3.9 Pertambatan Angin ....................................................... VI-35

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 9: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

ix

VI.3.9.1 Pembebanan ................................................. VI-35

VI.3.9.2 Perhitungan struktur ..................................... VI-36

VI.3.9.3 Perhitungan Sambungan .............................. VI-39

VI.3.10 Rangka Utama .............................................................. VI-44

VI.3.10.1 Pembebanan ............................................... VI-44

VI.3.10.2 Perencanaan Struktur ................................. VI-75

VI.3.10.3 Perhitungan Sambungan ............................. VI-78

VI.3.11 Perhitungan Chamber .................................................. VI-88

VI.4 Perhitungan Struktur Atas ........................................................... VI-3

VI.4.1 Landasan ...................................................................... VI-90

VI.4.1.1 Pembebanan .................................................. VI-90

VI.4.1.2 Spesifikasi Elastomer .................................... VI-91

VI.4.1.3 Pemilihan elastomer ...................................... VI-91

VI.4.1.4 Angkur .......................................................... VI-93

VI.4.2 Pelat Injak .................................................................... VI-95

VI.4.2.1 Data-data ....................................................... VI-95

VI.4.2.2 Pembebanan .................................................. VI-95

VI.4.2.3 Perhitungan Momen ...................................... VI-95

VI.4.2.4 Perhitungan Tulangan ................................... VI-95

VI.4.3 Abutment ...................................................................... VI-96

VI.4.3.1 Pembebanan .................................................. VI-96

VI.4.3.2 Kombinasi Beban .......................................... VI-105

VI.4.3.3 Tinjauan stabilitas abutmen .......................... VI-115

VI.4.3.4 Pondasi Sumuran ........................................ VI-116

VI.4.3.5 Penulangan Abutment ................................... VI-125

VI.4.4 Pilar .............................................................................. VI-144

VI.4.4.1 Pembebanan .................................................. VI-144

VI.4.4.2 Perencanaan Struktur .................................... VI-156

VI.4.4.3 Penulangan Pilar ........................................... VI-163

VI.4.5 Perencanaan Jalan Pendekat (Oprit) ............................ VI-170

VI.4.5.1 Perencanaan Perkersan Jalan ........................ VI-170

BAB VII RENCANA KERJA DAN SYARAT-SYARAT ............................. VII-1

VII.1 Syarat – Syarat Umum Dan Administrasi .................................. VII-1

VII.1.1 Ketentuan Dan Persyaratan Umum .............................. VII-1

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 10: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

x

VII.1.2 Ketentuan Dan Persyaratan Administrasi .................... VII-10

VII.2 Syarat – Syarat Umum Teknis .................................................... VII-26

BAB VIII RENCANA KERJA DAN SYARAT-SYARAT ........................... VIII-1

VIII.1 Perhitungan Volume Pekerjaan ............................................... VIII-1

VIII.2 Analisa Harga Satuan Pekerjaan ............................................. VIII-21

VIII.3 Rencana Anggaran Biaya ........................................................ VIII-40

VIII.4 Network Planning ................................................................... VIII-43

VIII.5 Man Power .............................................................................. VIII-46

BAB IX PENUTUP ........................................................................................ IX-1

IX.1 Kesimpulan ............................................................................. IX-1

DAFTAR PUSTAKA ........................................................................................ xvii

LEMBAR ASISTENSI .....................................................................................

LAMPIRAN .......................................................................................................

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 11: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

xi

DAFTAR GAMBAR

Gambar I.1 Denah Lokasi Jembatan Krasak II ............................................. I - 1

Gambar I.2 Peta Lokasi Jembatan Krasak II ................................................ I - 3

Gambar I.3 Jalan Akses Menuju Jembatan Krasak dari Jogjakarta .............. I - 4

Gambar I.4 Jalan Akses Menuju Jembatan Krasak dari Magelang .............. I - 4

Gambar I.5 Jembatan Krasak I Dari arah Magelang .................................... I - 4

Gambar I.6 Jembatan Krasak II Dari arah Magelang ................................... I - 4

Gambar I.7 Jembatan Krasak II dan I ........................................................... I - 4

Gambar I.8 Jembatan Krasak I Dari arah Magelang .................................... I - 4

Gambar II.1 Skema Penyebaran Muatan “D” ................................................ II - 19

Gambar II.2 Penyebaran Beban ..................................................................... II - 20

Gambar II.3 Penyebaran Beban Roda Dalam Lantai Baja............................. II - 20

Gambar II.4 Syarat Penampang Lantai Komposit dengan Metal deck .......... II - 38

Gambar II.5 Penampang Pelat Lantai Per Segmen Metal Deck .................... II - 39

Gambar II.6 Diagram Regangan-Tegangan Pelat Lantai ............................... II - 39

Gambar II.7 Distribusi Teg Plastis utk M Positif pd Penampang Komposit . II - 42

Gambar II.8 Modifikasi Distribusi Tegangan Plastis .................................... II - 43

Gambar II.9 Lubang Selang-seling ................................................................ II - 46

Gambar II.10 Penyaluran Beban pada Gelagar ................................................ II - 51

Gambar II.11 Penampang Pelat Lantai Per Segmen Metal Deck .................... II - 53

Gambar IV.1 Denah Lokasi Pengujian Bor Mesin .......................................... IV - 1

Gambar IV.2 Penampang Melintang Sungai Krasak....................................... IV - 9

Gambar VI.1 Potongan Memanjang Jembatan ................................................ VI - 2

Gambar VI.2 Ikatan Angin Atas ...................................................................... VI - 2

Gambar VI.3 Potongan Melintang Jembatan .................................................. VI - 3

Gambar VI.4 Model Struktur sandaran ........................................................... VI - 4

Gambar VI.5 Penampang Pipa Sandaran ........................................................ VI - 4

Gambar VI.6 Pemasangan Pipa ....................................................................... VI - 5

Gambar VI.7 Pola Pembebanan pada Trotoar ................................................. VI - 6

Gambar VI.8 Penampang Komposit ................................................................ VI - 8

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 12: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

xii

Gambar VI.9 Penyebaran Beban 1 .................................................................. VI - 9

Gambar VI.10 Penyebaran Beban 2 ................................................................. VI - 10

Gambar VI.11 Potongan Memanjang Jembatan .............................................. VI - 11

Gambar VI.12 Beban Sementara (Beban Angin) ............................................. VI - 13

Gambar VI.13 Penampang Metal deck Per Segmen ........................................ VI - 14

Gambar VI.14 Diagram Regangan-Tegangan Pelat ........................................ VI - 15

Gambar VI.15 Penulangan Plat Lantai Kendaraan .......................................... VI - 18

Gambar VI.16 Beban lajur D ........................................................................... VI - 19

Gambar VI.17 Pemodelan Beban Dalam SAP ................................................. VI - 20

Gambar VI.18 Penampang Profil Gelagar Memanjang ................................... VI - 20

Gambar VI.19 Penampang Profil Gelagar melintang ...................................... VI - 22

Gambar VI.20 Pemodelan Beban Dalam SAP ................................................. VI - 23

Gambar VI.21 Modifikasi Distribusi Tegangan Plastis ................................... VI - 24

Gambar VI.22 Letak Garis Netral dan Regangan Saat .................................... VI - 26

Gambar VI.23 Sambungan Gelagar Memanjang Baut Geser .......................... VI - 27

Gambar VI.24 Sambungan Gelagar Memanjang Baut Geser dan Tarik .......... VI - 29

Gambar VI.25 Penyebaran Gaya Melalui Flens dan Badan ............................ VI - 30

Gambar VI.26 Pembebanan pada Perhitungan Shear Connector .................... VI - 32

Gambar VI.27 Gaya lintang pada perhitungan sehar connector ..................... VI - 33

Gambar VI.28 Shear Connector ...................................................................... VI - 33

Gambar VI.29 Bidang Sisi Rangka Utama dan Beban Hidup ......................... VI - 35

Gambar VI.30 Pengaruh Angin dan Beban hidup Terhadap Rangka .............. VI - 35

Gambar VI.31 Pemodelan Struktur Akibat Pengaruh Angin ........................... VI - 36

Gambar VI.32 Model Struktur Ikatan Angin Atas ........................................... VI - 36

Gambar VI.33 Hubungan Batang Diagonal dengan Buhul .............................. VI - 42

Gambar VI.34 Hubungan Batang Vertikal dengan Rangka Utama ................. VI - 43

Gambar VI.36 Rangka Utama .......................................................................... VI - 44

Gambar VI.37 Denah Batang ........................................................................... VI - 50

Gambar VI.38 Pertemuan Simpul .................................................................... VI - 87

Gambar VI.39 Elastomer Bearing,Seismic Buffer,Lateral Stop dan Angkur .. VI - 94

Gambar VI.40 Konstruksi Pelat Injak .............................................................. VI - 95

Gambar VI.41 penulangan Pelat Injak ............................................................. VI - 96

Gambar VI.42 Pembebanan Akibat Berat sendiri Pada Abutment .................. VI - 97

Gambar VI.43 Pembebanan Abutment Akibat bangunan Atas ....................... VI - 98

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 13: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

xiii

Gambar VI.44 Pembebanan Abutment Akibat Gaya Vertikal Tanah .............. VI - 99

Gambar VI.45 Pembebanan Abutment Akibat Gaya Rem .............................. VI - 100

Gambar VI.46 Pembebanan Abutment Akibat Gaya Gesek ............................ VI - 100

Gambar VI.47 Pembebanan Abutment Akibat Tekanan Tanah lateral ........... VI - 101

Gambar VI.48 Pembebanan Abutment Akibat Gaya Gempa .......................... VI - 103

Gambar VI.49 Pondasi Sumuran ..................................................................... VI - 117

Gambar VI.50 Denah Pondasi Sumuran .......................................................... VI - 119

Gambar VI.51 Daya dukung ijin tanah (tanah dengan φ dan c seragam) ........ VI - 120

Gambar VI.52 Lay Out Pondasi Sumuran ....................................................... VI - 122

Gambar VI.53 Pembebanan pada dinding sumuran (beton cincin) ................. VI - 123

Gambar VI.54 Pembebanan Abutment Akibat Gaya Gesek ............................ VI - 124

Gambar VI.55 Pembebanan Pada Plat Pemisah Akibat Berat Sendiri ............ VI - 125

Gambar VI.56 Denah Tulangan Pelat Pemisah ............................................... VI - 129

Gambar VI.57 Penulangan Pada Plat Pemisah ................................................ VI - 130

Gambar VI.58 Penampang Badan Abutmen .................................................... VI - 130

Gambar VI.59 Denah Tulangan Konsol dan Badan ........................................ VI - 136

Gambar VI.60 Pembebanan Poer ..................................................................... VI - 137

Gambar VI.61 Denah Tulangan Poer Abutmen ............................................... VI - 139

Gambar VI.62 Denah Pembebanan akibat berat sendiri wingwall .................. VI - 140

Gambar VI.63 Sketsa penulangan Wingwall ................................................... VI - 143

Gambar VI.64 Pembebanan Berat Sendiri Pada Pilar ...................................... VI - 144

Gambar VI.65 Pembebanan Akibat Berat Tanah Pada Pilar ........................... VI - 145

Gambar VI.66 Pembebanan Pada Pilar ............................................................ VI - 156

Gambar VI.67 Daya dukung ijin tanah (tanah dengan φ dan c seragam) ........ VI - 159

Gambar VI.68 Pondasi Sumuran ..................................................................... VI - 159

Gambar VI.69 Pembebanan Pada Dinding Sumuran (beton Cincin) ............... VI - 161

Gambar VI.70 Pembebanan yang Terjadi pada Pilar ....................................... VI - 163

Gambar VI.71 Penulangan Pada Badan Pilar .................................................. VI - 165

Gambar VI.72 Pembebanan pada Kepala Pilar ................................................ VI - 166

Gambar VI.73 Penulangan Pada Kepala Pilar ................................................. VI - 167

Gambar VI.74 Pembebanan Pada Pile Cap pilar ............................................. VI - 168

Gambar VI.75 Penulangan Pada Pile Cap Pilar ............................................... VI - 169

Gambar VI.76 Tebal Perkerasan ...................................................................... VI – 176

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 14: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

xiv

DAFTAR TABEL

Tabel II.1 Klasifikasi Medan .................................................................. II - 2

Tabel II.2 Penentuan Faktor K ................................................................ II - 4

Tabel II.3 Kapasitas Dasar Jalan Luar Kota ( 2/2 UD )......................... II - 6

Tabel II.4. Penyesuaian Kapasitas Untuk Pengaruh Lebar Jalur Lalu -

Lintas Untuk Jalan Luar Kota (FCW).................................... II - 6

Tabel II.5. Faktor Penyesuaian Kapasitas untuk Pemisah Arah (FCSP ... II - 7

Tabel II.6. Faktor Penyesuaian Kapasitas Akibat Hambatan Samping

Berdasarkan Lebar Bahu untuk Jalan Luar Kota (FCSF)......... II - 7

Tabel II.7. Koefisien Limpasan Berdasarkan Kondisi Daerah Pengaliran

dan Sungai ............................................................................... II - 9

Tabel II.8. Faktor Lempung Lacey Berdasar Tanah ............................... II - 10

Tabel II.9. Kedalaman Penggerusan ....................................................... II - 11

Tabel II.10. Berat Isi untuk Berat Sendiri ............................................... II - 17

Tabel II.11. Faktor Distribusi untuk Pembebanan Truk “T”.................... II - 21

Tabel II.12. Nilai Faktor Beban Dinamik ................................................ II - 22

Tabel II.13. Gaya Rem ............................................................................ II - 22

Tabel II.14. Intensitas Beban Pejalan Kaki untuk Trotoar

Jembatan Jalan Raya ............................................................ II - 23

Tabel II.15. Koefisien Seret (CW) ............................................................ II - 24

Tabel II.16. Kecepatan Angin Rencana (VW) .......................................... II - 24

Tabel II.17. Faktor Kepentingan (I) ......................................................... II - 26

Tabel II.18. Faktor Tipe Struktur Jembatan (S) ....................................... II - 27

Tabel II.19. Kombinasi Beban Umum untuk Keadaan Ultimate ............ II - 27

Tabel II.20. Faktor Beban Keadaan Batas Ultimate................................. II - 29

Tabel II.21. Faktor Reduksi Kekuatan U.L.S. untuk Baja....................... II - 31

Tabel II.22. Faktor Reduksi untuk Beton ............................................... II - 31

Tabel II.23. Nilai Batas Kelangsingan Elemen Pelat ............................... II - 32

Tabel II.24 Mutu Baut.............................................................................. II - 46

Tabel II.25 Luas Penampang Baut ......................................................... II - 46

Tabel II.26. Faktor Reduksi Panjang Yang Dibaut (kr)............................ II - 48

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 15: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

xv

Tabel II.27. Alternatif Bangunan Atas Jembatan di Indonesia................. II - 48

Tabel II.28. Jenis Pilar Tipikal ................................................................ II - 48

Tabel II.29. Jenis Pangkal Tipikal............................................................. II - 58

Tabel II.30. Dimensi Pondasi Tipikal dan Beban Rencana

Keadaan Batas Ultimit.......................................................... II - 64

Tabel IV.1. Hasil Pekerjaan Pengeboran Mesin BH-1 ........................... IV - 2

Tabel IV.2. Hasil Pekerjaan Pengeboran Mesin BH-2 ........................... IV - 3

Tabel IV.3. Data Curah Hujan Maksimum Sta. Tempel ........................ IV - 6

Tabel IV.4. Perhitungan Curah Hujan Rencana ...................................... IV - 7

Tabel IV.5. Hasil Perhitungan Debit ....................................................... IV - 13

Tabel IV.6 LHR tiap golongan kendaraan pada Ruas Jalan

Sleman-Tempel ................................................................... IV - 15

Tabel IV.7 Angka Pertumbuhan Lalu lintas Metode Eksponensial ....... IV - 16

Tabel IV.8 Angka Pertumbuhan Lalu-Lintas Metode Regresi Linier ... IV - 16

Tabel IV.9 Perhitungan Angka Pertumbuhan Lalu-Lintas ................... IV - 17

Tabel IV.10 Klasifikasi Fungsi Jalan dan Kelas Jalan ............................. IV - 18

Tabel IV.11 Penentuan Kecepatan Rencana ............................................ IV - 19

Tabel IV.12 Penentuan lebar jalur dan bahu jalan.................................... IV - 20

Tabel IV.13 Perhitungan DS.................................................................... IV - 20

Tabel V.1. Keuntungan dan Kerugian masing-masing alternatif

Konstruksi Atas .................................................................. V - 2

Tabel V.2. Analisa masing-masing alternatif Konstruksi Atas ............ V - 3

Tabel V.3. Analisis kuantitatif alternatif sistem struktur jembatan ...... V - 4

Tabel VI.1 Joint Reaktions Hasil Analisa SAP ...................................... VI - 22

Tabel VI.2 Joint Reaktions Hasil Analisa SAP ...................................... VI - 44

Tabel VI.3 Pembebanan Beban Mati Pada Tiap Titik Buhul

dan Batang ........................................................................... VI - 46

Tabel VI.4 Kombinasi Pembebanan Pada Rangka Induk ...................... VI - 72

Tabel VI.5 Perhitungan Jumlah Baut Pada Rangka Induk ..................... VI - 81

Tabel VI.6 Lendutan Maksimum Pada Tiap Buhul................................ VI - 89

Tabel VI.7 Lendutan Yang Terjadi Pada Titik Buhul............................. VI - 89

Tabel VI.8 Pembebanan akibat berat sendiri abutment........................... VI - 97

Tabel VI.9 Pembebanan abutment akibat tanah vertikal

( γ tanah urug = 26 kN/m3) ................................ ................. VI - 99

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id ) 

Page 16: TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA …eprints.undip.ac.id/34402/3/2015_preliminary.pdf · i TUGAS AKHIR PERENCANAAN STRUKTUR JEMBATAN RANGKA BAJA KALI KRASAK II

xvi

Tabel VI.10 Kombinasi Pembebanan....................................................... VI - 105

Tabel VI.11 Kombinasi Beban 1.............................................................. VI - 106

Tabel VI.12 Kombinasi Beban 2 (a) ....................................................... VI - 107

Tabel VI.13 Kombinasi Beban 2 (b) ....................................................... VI - 108

Tabel VI.14 Kombinasi Beban 3 (a) ....................................................... VI - 109

Tabel VI.15 Kombinasi Beban 3 (b) ....................................................... VI - 110

Tabel VI.16 Kombinasi Beban 4 (a) ........................................................ VI - 111

Tabel VI.17 Kombinasi Beban 4 (b) ........................................................ VI - 112

Tabel VI.18 Kombinasi Beban 5 .............................................................. VI - 113

Tabel VI.19 Kombinasi Beban 6 ............................................................. VI - 114

Tabel VI.20 Titik Berat Pelat Pemisah .................................................... VI - 125

Tabel VI.21 Berat Sendiri Badan Abutment ............................................ VI - 131

Tabel VI.23 Denah Tulangan Pelat Pemisah ........................................... VI - 134

Tabel VI.24 Pembebanan akibat berat sendiri wingwall ........................ VI - 140

Tabel VI.26 Perhitungan Berat Sendiri ................................................... VI - 144

Tabel VI.27 Perhitungan Akibat Berat Tanah ....................................... VI - 145

TabelVI.28 Kombinasi Beban 1 ............................................................... VI - 149

Tabel VI.29 Kombinasi Beban 2 ............................................................. VI - 150

Tabel VI.30 Kombinasi Beban 3 .............................................................. VI - 150

Tabel VI.31 Kombinasi Beban 4 ............................................................. VI – 151

Tabel VI.32 Kombinasi Beban 5 ............................................................. VI – 151

Tabel VI.33 Kombinasi Beban 6 ............................................................. VI – 152

Tabel VI.34 Kombinasi Beban 1 .............................................................. VI – 153

Tabel VI.35 Kombinasi Beban 2 .............................................................. VI – 153

Tabel VI.36 Kombinasi Beban 3 ............................................................. VI – 154

Tabel VI.37 Kombinasi Beban 4 ............................................................. VI – 154

Tabel VI.38 Kombinasi Beban 5 ............................................................. VI – 155

Tabel VI.39 Kombinasi Beban 6 ............................................................ VI – 155

Tabel VI.40 Nilai-nilai daya dukung Terzaghi ....................................... VI – 158

Tabel VI.41 Data LHR Pada Awal dan Akhir Umur Rencana ............... VI – 171

Tabel VI.42 Angka Ekivalen (Ej) Beban Sumbu Kendaraan ................. VI – 171

Tabel VI.43 Nilai Lintas Ekivalen Permulaan LEP ................................ VI – 173

Tabel VI.44 Niali Lintas Ekivalen Permulaan LEA ............................... VI – 173

Tabel VI.45 Faktor Regional ................................................................... VI – 174

This  document‐  is  Undip  Institutional  Repository  Collection.  The  author(s)  or  copyright  owner(s)  agree  that  UNDIP‐IR  may,  without changing  the  content,  translate  the  submission  to  any medium  or  format  for  the  purpose  of  preservation.  The  author(s)  or  copyright owner(s) also agree that UNDIP‐IR may keep more than one copy of this submission for purpose of security, back‐up and preservation: 

( http://eprints.undip.ac.id )