of 4 /4
º p p Graves Graves Tank Tank Fuel Tank Fuel Tank Fuel Tank Fuel Tank Works in progress Works in progress Works in progress Works in progress Works in progress ˇ• U¿˘ U¿˘ x x U¿˘ ß ß U¿˘ ß U¿˘ U¿˘ I‹u I‹u I‹u I‹u I‹u Tollgate ‹ƒO TSING YI INTERCHANGE C«ƒ Podium ›¥ »›·M–~• ]¡C«ƒ ' N^› ›¥ ˆƒ B‡z ˇ–@ 8 6 9 1 1 1 2 9 1 8 1 5 9 2 2 7 6 8 3 NAM WAN KOK HA KO TAN SHEUNG KO TAN CHUN FA LOK SAI SHAN k Lam Tin Resite Village Tsing Yi Garden Grand Horizon Uk te Village ate Ching Shing Court Cheung Ching Estate Greenfield Garden Cheung Hong Estate Mayfair Gardens Cheung Ching Estate Rambler Crest n«W U/“ W/“ ² K‹Æ ¯´— üfiY“ l“d C«– l“C A»' l“d ü‹”· l“C s• ¯´Æ G YI Power Station Chemical Works Container Terminal 9 Tien Chu Industries Centre Sewage Treatment Plant Open Storage Open Storage Sinopec Hong Kong Oil Terminal 312.4 261.6 81.7 21.4 41.4 5.9 32.5 23.7 41.4 26.3 10.2 5.1 25.6 4.3 26.2 57.1 39.2 52.3 68.0 10.0 7.0 5.5 5.5 4.8 37.2 55.3 81.0 46.6 27.4 21.8 5.5 5.2 31.0 26.6 4.8 5.7 5.8 5.6 5.7 44.4 4.5 14.9 11.8 6.0 6.1 6.6 5.8 5.5 5.5 26.2 61.5 67.0 4.4 16.0 8.7 8.8 18.2 5.1 5.2 5.3 7.5 52.9 57.1 18.1 29.1 6.0 36.9 73.1 26.3 26.2 113.4 9.0 7.5 8.3 22.8 6.1 5.6 12.2 25.2 7.8 4.6 57.7 53.8 26.7 16.7 4.9 57.1 5.3 6.0 6.0 4.9 39.8 47.3 6.3 5.1 56.1 5.2 4.8 X‰ X‰ X‰ X‰ X‰ Pier Pier Pier Pier Pier Fuel Tank Fuel Tank U¿˘ U¿˘ Pump House Pump House ' ' Sinopec Hong Kong Oil Terminal 4.7 4.7 p p Tank fiØ ß A1 A3 A2 B C1 D F G C2 C Tollgate ‹ƒO KWAI CHUNG INTERCHANGE j/” “‚Ffl e » Pumping Station Podium ATL Logistics Centre Podium Podium Podium Hutchison Logistics Centre ' ›¥ ›¥ ' ' ' ¨¤w‹f‡d´ ›¥ ' üfi ¯f ›¥ ' ›¥ u/¨ ›¥ ' ' üfi ' ' ' ›¥ ›¥ ›¥ ' M'¶«“ »›· f‡d´X‰Y {²N¥f‡ ‡ƒ›› 2 8 2 8 9 1 6 1 1 6 1 9 6 5 4 2 5 8 1 HA KWAI CHUNG LAI CHI KOK Highland Park Yin Lai Court Kau Wa Keng Wah Lai Estate Lai King Terrace Happy Villa Regency Park Ching Lai Court Shek Lei Tau Lai Yan Court Cho Yiu Chuen Chung Shan Terrace flK A»‰ ß E/| ü‹•§ Efl” ‰R fl” E/ fifiR ˜²@ ˜²G üfipfi M²R fl” fl” flY “fl Ø`s E/| Open Storage Container Terminal 5 Container Terminal 8 Lai King Training Centre Container Storage Break Pressure Tank Container Terminal 7 Container Terminal 6 Container Terminal 4 Container Terminal 2 Container Terminal 1 Container Storage Container Terminal 3 50.6 106.7 222.9 210.3 192.1 4.9 4.1 10.8 5.2 4.5 4.5 5.8 5.7 18.9 5.1 3.8 4.8 12.0 14.9 5.4 4.1 9.4 4.8 4.9 4.8 5.1 5.6 10.5 7.6 4.4 4.8 4.1 4.7 27.8 29.6 13.1 4.6 5.1 5.1 33.4 34.9 5.1 45.7 22.6 9.8 13.2 5.3 5.5 44.7 5.4 4.7 26.1 10.8 21.1 166.3 69.1 34.0 18.1 78.0 40.1 5.2 21.3 14.0 18.1 13.2 38.5 60.9 56.5 60.9 56.5 62.9 64.5 163.4 152.8 4.6 4.2 3.9 4.1 3.6 4.3 4.5 4.4 36.7 5.2 9.6 13.5 13.6 31.9 23.0 60.8 73.3 6.1 5.9 6.7 5.9 48.3 5.9 130.0 143.1 118.2 26.5 90.8 103.4 123.9 98.7 229.3 85.6 107.4 115.1 65.2 100.6 102.5 119.9 106.7 113.6 229.2 208.1 4.8 6.6 5.0 153.4 28.2 98.5 4.3 29.4 26.8 4.9 4.4 12.9 7.6 38.9 23.6 9.2 28.9 14.2 5.4 4.9 6.0 20.2 216.2 72.2 4.7 56.3 23.8 113.0 29.8 53.9 89.0 101.1 127.7 91.2 26.4 53.7 21.6 3.8 34.5 10.3 4.3 25.2 4.0 5.1 4.2 4.7 4.1 3.5 4.2 6.1 5.0 4.4 4.7 5.2 21.4 4.1 4.4 4.8 4.9 5.8 16.1 156.3 40.0 24.0 5.0 59.1 6.0 4.3 184.9 3.6 4.5 4.9 5.5 38.9 4.8 101.5 4.6 ß ß Pumping Station ' üfiW/ STONECUTTERS ISLAND ø' Sewage Treatment Works Container Terminal RAMBLER CHANNEL ¯´/˙ 44.5 4.9 4.5 3.7 4.9 4.7 4.7 4.4 11.2 4.7 PW PW JC JC AFK 1:6000 PRE P2 LANDSCAPE IMPACT ASSESSMENT MING (SHEET 1 OF 3) LEGEND: 500m ASSESSMENT AREA PROPOSED DREDGING AREA 822000 N 821000 N 823000 N FOR CONTINUATION SEE DWG MATCH LINE FIGURE 8.3b 0 100 200 300m 1 : 6 000 SCALE BAR - LANDSCAPE CHARACTER AREAS LCA2 LCA3 LCA4 LCA1 BOUNDARY OF LANDSCAPE CHARACTER AREA FIGURE 8.3a KWAI TSING INDUSTRIAL LANDSCAPE TSING YI MIXED URBAN LANDSCAPE KWAI CHUNG URBAN FRINGE LANDSCAPE KWAI TSING WATER CHANNEL App¡ƒd Ch¡ƒk¡ƒd Description Drawn Date Rev Rev Status Drawing Number Scale at A1 Eng check Approved Coordination Dwg check Drawn Designed Title Client J:\259053-AA01\REPORT\ENV\EIA\100312\FIGURE 8.3a.dgn DATE: 22/04/2010 TIME: 12:30:54 USER: yim42169 Project CIVIL ENGINEERING SPECIAL ADMINISTRATIVE REGION THE GOVERNMENT OF THE HONG KONG AND DEVELOPMENT DEPARTMENT PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER BASIN AND ITS APPROACH CHANNEL LCA1 LCA2 LCA3 LCA3 LCA1 LCA1 LCA1 LCA4

TSING YI - EPD

  • Author
    others

  • View
    2

  • Download
    0

Embed Size (px)

Text of TSING YI - EPD

Lam Tin Resite Village
312.4
261.6
81.7
21.4
41.4
5.9
32.5
23.7
41.4
26.3
10.2
5.1
25.6
4.3
26.2
57.1
39.2
52.3
68.0
10.0
7.0
5.5
5.5
4.8
37.2
55.3
81.0
46.6
27.4
21.8
5.5
5.2
31.0
26.6
4.8
5.7
5.8
5.6
5.7
44.4
4.5
14.9
11.8
6.0
6.1
6.6
5.8
5.5
5.5
26.2
61.5
67.0
4.4
16.0
8.7
8.8
18.2
5.1
5.2
5.3
7.5
52.9
4.7
4.7
p
p
Tank
ðfiØ
ß
A1
A3
A2
B
C1D
F
G
C2
C
{†N¥f‡ ‡ƒ››
- LANDSCAPE CHARACTER AREAS
FIGURE 8.3a
KWAI TSING WATER CHANNEL
App¡ƒdCh¡ƒk¡ƒdDescriptionDrawnDateRev
J:\259053-AA01\REPORT\ENV\EIA\100312\FIGURE 8.3a.dgn DATE:22/04/2010 TIME: 12:30:54 USER: yim42169
Project
AND DEVELOPMENT DEPARTMENT
AND ITS APPROACH CHANNEL
178.1
136.1
60.7
5.4
4.1
81.7
21.4
5.9
4.8
5.75.4
44.4
8.2
53.0
4.4
16.0
4.6
8.7
8.8
18.2
5.2
5.3
177.2
25.7
6.0
6.0
73.7
5.1
4.8
X‰
7.4
4.7
4.7
5.8
4.6
PW
PW
JC
JC
AFK
FIGURE 8.3b
J:\259053-AA01\REPORT\ENV\EIA\100312\FIGURE 8.3b.dgn DATE:22/04/2010 TIME: 12:31:42 USER: yim42169
Project
AND DEVELOPMENT DEPARTMENT
AND ITS APPROACH CHANNEL
Reception Centre
t°ô Ser Res
t°ô Ser Res
Ser Res
sÀŒ
m‚I·
500m400300200100
1:10000
FIGURE 8.3c
App¡ƒdCh¡ƒk¡ƒdDescriptionDrawnDateRev
J:\259053-AA01\REPORT\ENV\EIA\100312\FIGURE 8.3c.dgn DATE:22/04/2010 TIME: 12:32:23 USER: yim42169
Project
AND DEVELOPMENT DEPARTMENT
AND ITS APPROACH CHANNEL
LCA5 -- Offshore Waters outside Green IslandLCA4 -- Kwai Tsing Water Channel