Doble Testing
Potential Transformers ( PT’s )
Bob Sarni
Doble Engineering Company
Doble Engineering Company 85 Walnut Street, Watertown, MA 02472
Doble Testing Potential Transformers 2
Potential Transformers (PTs)
H1
H0
Isurface
Secondary Windings
Not Shown
Cascade Type
Doble Testing Potential Transformers 3
Potential Transformers (PTs)
H1
CH
CHX
CHY
X1
X2
X3
Y1
Y2
Y3
H0 Line To Ground PT
Doble Testing Potential Transformers 4
X1X2
X3
Y1
Y2Y3
CH1 CH2
CHY
CHX
Potential Transformers (PTs)
H1 H2
Line To Line PT
Doble Testing Potential Transformers 5
Recommended Test Voltage
Liquid-Filled Line-to-Line PTs Rated Below 15 kV Insulation Class
PT Voltage Rating Test Voltage (kV)
7.2 to 8.7 5.0
4.2 to 5.0 2.5
2.4 2.0
*For Units Rated 15 kV and Above, Perform Tests at 10 kV
Doble Testing Potential Transformers 6
Liquid-Filled Line-to-Ground PTs
a) Perform Test At the Rated Voltage of the Neutral Bushing
b) Cross-Check Tests are Performed at 10 kV or at Rated Line-to-
Ground Voltage, Whichever is Lower
Recommended Test Voltage
Doble Testing Potential Transformers 7
Dry-Type Line-to-Line PTs Rated Below 15 kV Insulation ClassPT Voltage Rating Test Voltage (kV)
Overall a. 2 kV
b. Line-to-Ground Voltage*
c. 10% to 25% Above Line-to-Ground
operating Voltage
Cross-Check a. 2 kV
b. Line-to-Ground Operating Voltage
Exciting Current a. Line-to-Ground Operating Voltage
Recommended Test Voltage
*Note: Power Factor Tip Up Test
Doble Testing Potential Transformers 8
Recommended Test Voltage
Dry-Type Line-to-Ground PTs Rated Below 15 kV Insulation Class
•Perform Test at a Voltage Not to Exceed the Neutral Bushing
Rating as Outlined in Previous Section
•Cross-Checks are Performed at 10 kV or Rated Line-to-Ground
Voltage, Whichever is Lower
•For Units Rated Above 15 kV, Perform Tests at 2 and 10 kV to
Determine Tip-Up Value
Doble Testing Potential Transformers 9
Test Procedure - Single Phase - P T
Test
No.
Test
Mode Energize Ground Guard UST Test Description
1 GST H1, H2 X1,Y1 - - Overall
2 GST H1 X1Y1 H2 - H1 Cross Check
3 GST H2 X1Y1 H1 - H2 Cross-Check
4 UST H1 X1Y1 - H2 Excitation H1 to H2
5 UST H2 X1Y1 - H1 Excitation H2 to H1
6 Supplementary Hot-Collar tests on the primary line-terminalbushings
Doble Testing Potential Transformers 10
Test Procedure - Single Phase - P T
X1X2X3
Y1Y2Y3
CH1 CH2
CHY
CHX
Test #1 : GST Ground - No LV Lead Required
Measure: CH1+CHX+CHY+CH2
H1 H0HV Lead
Doble Testing Potential Transformers 11
Test Procedure - Single Phase - P T
Test #2: GST-Guard (Cross-Check Test #1)
•Measure: CH1+ 1/2CHX + 1/2CHY
X1X2X3
Y1Y2Y3
H1 H0
CH1 CHX CH2
CHY
HV Lead LV Lead
Doble Testing Potential Transformers 12
Test Procedure - Single Phase - P T
Test #3: GST-Guard (Cross-Check Test #2)
•Measure: CH2+ 1/2CHX + 1/2CHY
X1X2X3
Y1Y2Y3
H1 H0
CH1 CHX CH2
CHY
HV LeadLV Lead
Doble Testing Potential Transformers 13
Test Procedure - Single Phase - P T
X1X2X3
Y1Y2Y3
H1 H0
CH1 CHX CH2
CHY
HV Lead LV Lead
Test #4: Ungrounded Specimen Test (UST)
Measure: Excitation Current
Doble Testing Potential Transformers 14
Test Procedure - Single Phase - P T
X1X2X3
Y1Y2Y3
H1 H0
CH1 CHX CH2
CHY
HV LeadLV Lead
Test #5: Ungrounded Specimen Test (UST)
Measure: Excitation Current
Doble Testing Potential Transformers 15
Supplementary Tests - Single-Phase P T
Test No.
Test Mode
Energize
Ground
Guard
UST
Test Description
6 UST H1, H2 Yn - Xn CHX
7 UST H1, H2 Xn - Yn CHY
8 GST H1 - H2, Xn, Yn
- Bushing H1
9 GST H2 - H1, Xn, Yn
- Bushing H2
Note: n designates any winding connection, 1, 2 or 3
Doble Testing Potential Transformers 16
X1X2X3
Y1Y2Y3
CH1 CH2
CHY
CHX
Test #6 : UST
Measure: CHXH1 H0
HV Lead
LV Lead
Supplementary Tests - Single-Phase P T
Doble Testing Potential Transformers 17
X1X2X3
Y1Y2
Y3
CH1 CH2
CHY
CHX
Test #7 : UST
Measure: CHYH1 H0
HV Lead
LV Lead
Supplementary Tests - Single-Phase P T
Doble Testing Potential Transformers 18
Test Procedure - Single Phase - P T
X1X2X3
Y1Y2Y3
H1 H0
CH1 CHX CH2
CHY
HV Lead
LV Lead
Test #8: GST-Guard Red & Blue
Measure: CH1
LV Lead
Doble Testing Potential Transformers 19
Test Procedure - Single Phase - P T
X1X2X3
Y1Y2Y3
H1 H0
CH1 CHX CH2
CHY
HV Lead
LV Lead
Test #9: GST-Guard Red & Blue
Measure: CH2
LV Lead
Doble Testing Potential Transformers 20
Single Phase Internally Grounded PT
H1
CH
CHX
CHY
Neutral Shown Internally Grounded H0
X1
X2X3
Y1Y2Y3
Doble Testing Potential Transformers 21
Test No. Mode Energize Ground Guard UST
1 UST H1 HO ---- X1,Y1
2 GST H1 HO X1,Y1 ----
Test No. 1: Measures Line-End Interwinding Insulation
Test No. 2: Measure Excitation Current
Single Phase Internally Grounded PT
Test Procedure
Doble Testing Potential Transformers 22
Cascade Potential Transformers
H0
H1
Ground Lead
Doble Testing Potential Transformers 23
Cascade Potential Transformers
•Test Preparation - Single Phase Line-to-Ground PT
•One Side Of Each Secondary Winding Grounded
•Remove Ground Link From Neutral
•Short Circuit H1(Line) to H0 (Neutral)
•Test No. 1 Only
NOTE: Test Voltage for Tests 1, 3, 4, 5 Limited by
Rating of Neutral Bushing (5 kV)
Doble Testing Potential Transformers 24
Cascade Potential Transformers
Test #1: GST-Ground
H0
H1
Ground Lead
HV Cable
Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV)
Secondary Windings
Not Shown
Doble Testing Potential Transformers 25
H1
Cascade Potential Transformers
H0
HV Cable
Ground Lead
Test #2: GST-Guard
Measure: Cross-Check #1
LV Lead
Secondary Windings
Not Shown
Doble Testing Potential Transformers 26
Cascade Potential Transformers
Test #3: GST-Guard
Measure: Cross-Check #2
H0
HV CableGround Lead
H1
LV Lead
Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV)
Secondary Windings
Not Shown
Doble Testing Potential Transformers 27
Cascade Potential Transformers
H0
HV Cable
Ground Lead
Test #4: UST
Measure: Excitation Current
Secondary Windings
Not Shown
Doble Testing Potential Transformers 28
Cascade Potential Transformers
H0
HV CableGround Lead
H1
LV Lead
Test #5: UST
Measure: Excitation Current
Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV)
Secondary Windings
Not Shown
Doble Testing Potential Transformers 29
Cascade Potential Transformers
Test No. Test Mode Energize Ground Floating Test
Description
1A GST H0 X1, X2, X3 H1 Overall
Y1, Y2, Y3
Tests 2 Through 5 - Same as
Conventional PT
Alternative Method for Performing the Overall Test*
*Note: No Short Circuit Used Between H1 & H0
Doble Testing Potential Transformers 30
Cascade Potential Transformers
H0
HV CableGround Lead
H1
Test #1A: GST-Ground
Test Voltage for Tests 1, 3, 4, 5 Limited by Rating of Neutral Bushing (5 kV)
No Short Circuit on Primary Winding
Secondary Windings
Not Shown
Doble Testing Potential Transformers 31
Use of Guard Collar on Cascade PT
H1
H0
Connect to Guard
Isurface
Secondary Windings
Not Shown
Doble Testing Potential Transformers 32
Test Procedure-Single-Phase PT - DTA
Doble Testing Potential Transformers 33
Analysis of Results: PTs
•Compare Overall Power Factor Test Values to
Previous Test Results
•Compare Overall Power Factor Values to Similar Units
(Doble Test-Data-Reference-Book)
•Compare Cross-Check Power Factors
•Most PTs Test Results are Similar
Doble Testing Potential Transformers 34
Analysis of Results: PTs
PT #1
Test No. mA Watts %PF
1 (Overall) 2.540 0.104 0.41
2 (H1 Cross-check) 1.256 0.056 0.45
3 (H2 Cross-check) 1.248 0.046 0.37
Examples:
PT #2
Test No. mA Watts %PF
1 (Overall) 2.650 0.354 1.32
2 (H1 Cross-check) 1.356 0.313 2.31
3 (H2 Cross-check) 1.248 0.055 0.44
Doble Testing Potential Transformers 35
What is Wrong With PT #2?
Analysis of Results: PTs
•Consider Performing Supplemental Tests to Locate
Cause of Problem
•Refer to Doble Test Equipment Instruction Manual
Doble Testing Potential Transformers 36
Test No. mA Watts % Power Factor
1 (Overall) 3.040 0.152 0.50
2 (H1 Cross-Check) 0.278 0.0312 1.12
3 (H0 Cross-Check) 2.810 0.128 0.46
Typical Good Unit
Analysis of Results: PTs
Doble Testing Potential Transformers 37
Analysis of Results: PTs
Test No. mA Watts % Power Factor
1 (Overall) 3.080 0.181 0.58
2 (H1 Cross-Check) 0.311 0.0682 2.19
3 (H0 Cross-Check) 2.810 0.128 0.46
Questionable Unit