11
Track Record Page 6 of 36 TRACK RECORD Fujairah Refinery Co. Ltd. Owner : Fujairah Refinery Co. Ltd Construction Period : 2007 - 2009 Scope of Work : Engineering, Procurement and Construction Location : Emirates of Fujairah Project Description : Fujairah Refinery Co. Ltd. (FRCL) operates a refinery in Fujairah, U.A.E., and is currently expanding an additional storage capacity with their existing facilities. These are to house the following products: Gasoline, Distillate and Fuel Oil.

Track Record Audex

Embed Size (px)

Citation preview

Page 1: Track Record Audex

Track Record

Page 6 of 36

TRACK RECORD

Fujairah Refinery Co. Ltd.

Owner : Fujairah Refinery Co. Ltd

Construction Period : 2007 - 2009

Scope of Work : Engineering, Procurement and Construction

Location : Emirates of Fujairah

Project Description : Fujairah Refinery Co. Ltd. (FRCL) operates a refinery inFujairah, U.A.E., and is currently expanding an additionalstorage capacity with their existing facilities. These are tohouse the following products: Gasoline, Distillate and FuelOil.

Page 2: Track Record Audex

Track Record

Page 7 of 36

TRACK RECORD

Vopak Oil Distribution Terminal, Jakarta

Owner : PT Jakarta Tank Terminal (Vopak - PT AKR Joint Venture)

Construction Period : 2007- 2009

Scope of Work : Engineering, Procurement and Construction

Location : Jakarta, Indonesia

Project Description : Tanjung Priok Terminal is designed to handle a wide rangeof liquid Gasoil and Mogas products. The project includes asub-sea pipelines which link to the jetties at oppositeriverbank.

Page 3: Track Record Audex

Track Record

Page 8 of 36

TRACK RECORD

Petrolimex Oil Terminal, Vietnam

Owner : VanPhong Bonded Petroleum Terminal J.V. Company Ltd.

Construction Period : 2006 - 2009

Scope of Work : FEED, Detailed Engineering, Project Management

Location : Mygiang Island, Vietnam

Project Description : Petrolimex Oil Terminal is a grass root terminal withassociated facilities that able to house mogas (motorgasoline), diesel oil and fuel oils. On top of that, jetties withall essential topside facilities are also part of this project.

Page 4: Track Record Audex

Track Record

Page 9 of 36

TRACK RECORD

Helios Terminals Corporation

Owner : Helios Terminals Corporation

Construction Period : 2006 - 2007

Scope of Work : Project Management

Location : Jurong Island, Singapore

Project Description : Helios Oil Terminal is designed for bulk liquid storage andassociated with blending facilities for heavy fuel oil. Theproject also includes a finger jetty, pipelines connectionand loading arms to existing VLCC jetty.

Page 5: Track Record Audex

Track Record

Page 10 of 36

TRACK RECORD

Vopak Chemical Terminal, ZhangJiaGang

Owner : Vopak Terminal Zhangjiagang Ltd

Construction Period : 2006- 2007

Scope of Work : FEED and Project Management

Location : Zhangjiagang, China

Project Description : Vopak Chemical Terminal is designated for liquid chemicalstorage and transportation.

Page 6: Track Record Audex

Track Record

Page 11 of 36

TRACK RECORD

Vopak Chemical Terminal, Shanghai

Owner : Vopak Terminal Shanghai Ltd

Construction Period : 2003- 2008

Scope of Work : FEED and Project Management

Location : Caojin, China

Project Description : Vopak Chemical Terminal consist a jetty and tank farm forbulk chemicals. The terminal will provide a long term andstable supply of raw chemical materials and products toShanghai City and the surrounding provinces.

Page 7: Track Record Audex

Track Record

Page 12 of 36

TRACK RECORD

Vopak, Oil and Chemical Terminal at Banyan, Jurong Island

Owner : Vopak Terminals Singapore Pte Ltd

Construction Period : 2004- 2009

Scope of Work : Tankage and Piping Construction

Location : Jurong Island, Singapore

Project Description : Vopak, Oil and Chemical Terminal is equipped with thenecessary facilities to handle the related products. Theterminal is developed in four phases.

Page 8: Track Record Audex

Track Record

Page 13 of 36

TRACK RECORD

Horizon Singapore Terminal Pte Ltd

Owner : Horizon Singapore Terminal Pte Ltd

Construction Period : 2005 - 2009

Scope of Work : E & I Works and Construction Management

Location : Jurong Island, Singapore

Project Description : Horizon Singapore Terminal is designed to store bothcrude and refined petroleum products, which consisting ofNaphtha, Gasoline, Jet A1, Kerosene, Diesel Gas oil, FuelOil, MTBE, Blend Stock, Cutter Stock, and Bunkers.

Page 9: Track Record Audex
Page 10: Track Record Audex

Current Projects in Execution

Page 35 of 36

CURRENT PROJECTS IN EXECUTION

ETT3, Rotterdam, Netherlands

Owner : EuroTank Terminal B.V.

Construction Period : 2010 - 2012

Scope of Work : EPC Terminal Expansion K1 Storage Facilities

Location : Europoort-Rotterdam

Project Description : At present, ETT comprises of 16 tanks with a total capacityof 622,000 m³ for a variety of K3 hydrocarbon products.ETT3 increases this storage capacity by 465,000 m³ (gross)to include the handling of new K1 hydrocarbons as well asoxygenate products. ETT3 consists of 10 storage tanks forvarious products, corresponding product lines and productspumps, as well as loading and unloading facilities (loadingarms). The current infrastructure, of the site has to bemodified, to accommodate this expansion as well as toaccommodate the new DPO pipeline system.

Page 11: Track Record Audex

Current Projects in Execution

Page 36 of 36

CURRENT PROJECTS IN EXECUTION

ATT Tanjung Bin, Johore, Malaysia

Owner : ATT Tanjung Bin Sdn Bhd

Construction Period : December 2008 – September 2009 (Concept Design &FEED)

December 2009 – April 2012 (Engineering, Procurement &Construction

Scope of Work : Concept Design, FEED, Engineering, Procurement &Construction

Location : Port of Tanjong Pelepas

Project Description : Vitol Tank Terminal International BV, through its subsidiary,ATT Tanjung Bin Sdn Bhd, has committed to construct ahydrocarbon storage and distribution facility, complete withimport and export jetty facilities within the Petrochemicaland Maritime Industrial Park at Tanjung Bin, Johore,Malaysia.

This terminal will have tanker and coaster berthing andloading facilities and will serve the local and export market.Products may be transported in and out either by ship,coaster, barge or truck. The terminal and its relatedfacilities will be built in phases and is expected tocommence operations in Mar 2012.