TPSC Presentation 2010

Embed Size (px)

DESCRIPTION

Thermal power

Citation preview

  • 1TOSHIBA

    Steam Turbine

    November, 2007

    TOSHIBA PLANT SYSTEMS & SERVICES CORPORATION

  • 2INTRODUCTION

  • 3Power Business(approx. 150MW /unit)

    Independent Business by TPSC

    Work with TOSHIBAas a member of TOSHIBA

    Group

    Nuclear

    Conventional Combined

    Fuel Cell Geothermal

    Hydro

    Co-Gen

    CombinedConventional

    Green Energy

    PARTNERSHIP WITH TOSHIBA

  • 4 EPC Project : TPSC can be most competitive to be an EPC Contractor.

    BOP Supply : TPSC can change the scope of supply according to Customer's Business Structure, i.e. TPSC can supply a part of power plant equipment upon Customer's requirement.

    STG Supply :TPSC supplies Turbine Generator set.

    THERMAL POWER SYSTEMS & SERVICE DIVISIONUnder "ONE THROUGH CAPABILITY," Thermal Power Division targets following three (3) businesses.

  • 5FULL RANGE CLIENTSERVICE

    FeasibilityStudy

    Planning /Design Procurement

    Erection /Installation

    Test /Commissioning

    MaintenanceService

    ManufacturingTOSHIBA)

  • 6Overseas sales & marketing network

    Toshiba de Venezuela

    Toshiba International Corp.(TX, SF - USA)

    Shanghai Rep. Office

    Toshiba China Co.,Ltd.(Beijing(HQ), Shanghai)

    TAPL (Philippines)

    Toshiba International Corp.(Australia)

    TAPL (Indonesia)

    TAPL (Singapore(HQ))TAPL (Malaysia)

    TAPL(Thailand)Toshiba Gulf FZE

    (Dubai)

    Toshiba International (Europe) Ltd.(UK)

    Toshiba India Private Ltd.

    Moscow Rep.Office

    Johannesburg Rep.Office

    Toshiba Info., Industrial & Power Sys. Taiwan Corp.

    Toshiba do Brasil(Rio & Sao Paulo)

    TAPL: Toshiba Asia Pacific PTE.,Ltd

    20 offices in 16 countries

  • 7TOSHIBA STEAM TURBINE EXPERIENCE

  • 8Toshiba Turbine Cumulated Experience

    0

    500

    1,000

    1,500

    2,000

    1950 1960 1970 1980 1990 2000

    Cum

    ula

    tive N

    um

    ber

    0

    40

    80

    120

    160

    Cum

    ula

    tive O

    utp

    ut(

    GW

    )

    For Geothermal

    Supercritical

    For NuclearFor Combined Cycle

    50 GW

    1,000

    1,500

    For Simple Cycle

    First Steam Turbine delivered in 1927

    Output : 139.1 GWNumber : 1,807

    As of Jan. 2005

  • 9THERMAL POWER PLANTS SUPPLIED BY TOSHIBAIN THE GLOBAL MARKET

    Total: 1,834 Units, 145,013MW (As of Mar. 2006)

    PRD-KGG-AAH00702

    Canada

    1,427MW

    U.S.A19,373MW

    Mexico2,512MW

    Costa Rica

    55MW

    Antigua

    18MW

    Brazil155MW

    Venezuela1,418MW

    Argentina14MW

    Korea2,138MW

    2475MWPhilippines1,114MW

    Thailand348MW

    Australia11,852MW

    Indonesia2,950MW

    Malaysia2,605MW

    Sri Lanka6MW

    India1,002MW

    South Africa118MW

    Botswana33MW

    Nigeria56MW

    Egypt1,764MW

    Cyprus120MW

    Lebanon130MW

    Bahrain65MWKuwait

    4,254MW

    Iran255MW Bangladesh

    41MW China9,248MW

    Puerto Rico214MW

    Pakistan137MW

    Papua New Guinea135MW

    Nauru0.1MW

    Myanmar0.9MW

    Japan79,346MW

    UAE942MW

    Bulgaria177MW

    Italy990MW

  • 10

    MEDIUM / SMALL CLASS STEAM TURBINE

  • 11

    G

    Exhaust

    LPIP

    Extraction

    HP G

    Extraction

    LPIPHP GRH

    BACK PRESSURE TURBINE

    EXTRACTION CONDENSING TURBINE

    REHEAT CONDENSING TURBINE

    For small electrical output and large thermal output

    Exhaust is applicable for process steam, district heating etc.

    Low initial cost without condenser

    Wide variety of electrical / thermal output combination to meet the demand of clients.

    One or plural internal pressure controlled extraction is applicable for process steam, district heating etc.

    External control and non-controlled extraction is also applicable for process and feedwater heaters.

    For larger electrical output

    Tandem compound or Single cylinder

    Internal / external control extraction and non-controlled extraction applicable for process and feedwater heaters.

  • 12

    HIGH-RELIABILITY, HIGH-EFFICIENCY STEAM TURBINE

    Impulse design and inherently rugged compartment-type construction

    Compact shell-mounted control valve construction in high-pressure section

    High-pressure steam inlet construction True center support construction of the

    casing and nozzle diaphragms Spring-backed shaft packing Double-sheet spool-type extraction

    control valves

    Solid rotor, flexible shaft construction Tilting pad journal bearing Tapered-land type thrust bearing Horizontal split, casing, nozzle, and

    packing construction LP and HP EHC control system with

    high control accuracy Standard block design

  • 13

    Reheat Condensing 24units not larger than 300MW

    Electrical Output (MW)

    EXPERIENCE of TURBINE TYPE / ELECTRICAL OUTPUT

    Extraction Condensing 93units

    Straight Condensing 124units

    Reheat Extraction Condensing 25units

    Back Pressurewith/without

    Extraction 81units

    1000300200100

  • 14

    BACK-PRESSURE TURBINERated Output : 25,000kWMain Steam Pressure : 11.3MPagMain Steam Temperature : 538Back Pressure : 1.27MPag

    AUTOMATIC-DOUBLE-EXTRACTION BACK-PRESSURE TURBINERated Output : 35,000kWMain Steam Pressure : 5.9MPagMain Steam Temperature : 440Extraction Pressure : 1.23 / 0.69MPagBack Pressure : 0.27MPag

  • 15

    CONDENSING TURBINERated Output : 38,000kWMain Steam Pressure : 2.9MPagMain Steam Temperature : 390Exhaust Pressure : 5.07kPa abs.

    CONDENSING TURBINE(2 casing type)For large capacity condensing turbineRated Output : 100,000kWMain Steam Pressure : 8.6MPagMain Steam Temperature : 510Exhaust Pressure : 8.00kPa abs.

  • 16

    REHEAT TURBINE (axial flow)Suitable for combined cycle and low floor installation plantsRated Output : 200,000kWMain Steam Pressure : 12.7MPagMain Steam Temperature : 538Reheat Steam Temperature : 538Exhaust Pressure : 8.63kPa abs.

    REHEAT TURBINE(2 casing type)For large capacity reheat turbineRated Output : 500,000kWMain Steam Pressure : 16.6MPagMain Steam Temperature : 538Reheat Steam Temperature : 538Exhaust Pressure : 10.2kPa abs.

  • 17

    AUTOMATIC-DOUBLE-EXTRACTION CONDENSING TURBINERated Output : 30,000kWMain Steam Pressure : 10.0MPagMain Steam Temperature : 538Extraction Pressure : 1.18 / 0.59MPagExhaust Pressure : 8.63kPa abs.

    AUTOMATIC-DOUBLE-EXTRACTION REHEAT TURBINE(2 casing single exhaust flow type)Rated Output : 149,000kWMain Steam Pressure : 16.6MPagMain Steam Temperature : 566Reheat Steam Temperature : 538Extraction Pressure : 3.5 / 0.69MPagExhaust Pressure : 5.07kPa abs.

  • 18

    AUTOMATIC-EXTRACTION REHEAT TURBINE(2 casing double exhaust flow type)Rated Output : 300,000kWMain Steam Pressure : 13.9MPagMain Steam Temperature : 535Reheat Steam Temperature : 535Extraction Pressure : 0.25MPagExhaust Pressure : 6.27kPa abs.

    Extraction Control Valve (Butterfly Valve)

    TOSHIBA Steam Turbine Slide Number 2Slide Number 3Slide Number 4Slide Number 5Overseas sales & marketing networkSlide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18