Massachusetts Water Resources Authority Thunderstorm Impacts on Wastewater System Operations July 17, 2019

Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Massachusetts Water Resources Authority

Thunderstorm Impacts on Wastewater System Operations

July 17, 2019

Page 2: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

3

Thunderstorms

• Thunderstorms frequently occur in the afternoon and early evening during the late Spring and Summer months and their intensity and track are hard to predict

Page 3: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

4

Thunderstorm Staffing Preparations

Precautionary staffing necessary due to the unpredictable nature of thunderstorms

• Operations staff required at:

⁻ 3 CSO Treatment Facilities (Prison Point, Cottage Farm and Somerville Marginal)

⁻ 3 Northern Headworks (Chelsea Creek, Ward Street and Columbus Park)

⁻ 2 roving crews to respond to operational issues

• Maintenance staff stationed to address equipment issues in a timely manner at:

⁻ Chelsea Maintenance Facility, Chelsea Creek, Ward Street and Prison Point

Page 4: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

5

Severe Weather Outlook for June 29, 2019

National Weather Service Forecast:• Thunderstorms and showers• Chance of rain 60%

Page 5: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

6

Severe Thunderstorm Warning for Boston for Saturday June 29, 2019

Page 6: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

7

Rainfall Totals for June 29, 20190.38”

0.79”

0.74”

0.66”

1.82”

JUNE 29th THUNDERSTORM

Measured Area Rainfall:

Hayes PS: 0.38 inchesColumbus Pk HW: 0.66 inchesWard Street HW: 0.74 inches Hanscom: 0.79 inchesChelsea Creek HW: 1.82 inches

v Chelsea Admin Building Rain Gauge registered an instantaneous rainfall rateof 12.26 in/hr at 4:30 pm

Page 7: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

8

Severe Weather Outlook for Sunday, June 30, 2019

National Weather Service Forecast:• Thunderstorms and showers• Chance of rain 80%

Page 8: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

9

Severe Thunderstorm Warning for Sunday, June 30, 2019

Page 9: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

10

Rainfall Totals for Sunday, June 30, 2019

0.42”

0.16”

0.08”0.38”

0.19”

JUNE 30th THUNDERSTORM

Measured Area Rainfall:

Hayes PS: 0.42 inchesColumbus Pk HW: 0.38 inchesWard Street HW: 0.08 inches Hanscom: 0.16 inchesChelsea Creek HW: 0.19 inches

Page 10: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

11

Rainfall Totals From June 29th to July 1st

Page 11: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

12

Chelsea Creek Headworks Flow

0

0.2

0.4

0.6

0.8

1

1.2

1.4

0

50

100

150

200

250

3001

2:15

:00

AM

1:3

0:00

AM

2:4

5:00

AM

4:0

0:00

AM

5:1

5:00

AM

6:3

0:00

AM

7:4

5:00

AM

9:0

0:00

AM

10:

15:0

0 A

M

11:

30:0

0 A

M

12:

45:0

0 P

M

2:0

0:00

PM

3:1

5:00

PM

4:3

0:00

PM

5:4

5:00

PM

7:0

0:00

PM

8:1

5:00

PM

9:3

0:00

PM

10:

45:0

0 P

M

12:

00:0

0 A

M

1:1

5:00

AM

2:3

0:00

AM

3:4

5:00

AM

5:0

0:00

AM

6:1

5:00

AM

7:3

0:00

AM

8:4

5:00

AM

10:

00:0

0 A

M

11:

15:0

0 A

M

12:

30:0

0 P

M

1:4

5:00

PM

3:0

0:00

PM

4:1

5:00

PM

5:3

0:00

PM

6:4

5:00

PM

8:0

0:00

PM

9:1

5:00

PM

10:

30:0

0 P

M

11:

45:0

0 P

M

RAIN

FALL

(IN

CHES

/15

MIN

)

FLO

W (M

GD

)CHELSEA CREEK HEADWORKS FLOWS

JUNE 29-30 2019

Chelsea Creek HW Rainfall Chelsea Creek HW Total Flow

1.6

0.19 0.14 in.

Page 12: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

13

Ward Street Headworks Flow

0

50

100

150

200

250

300

12:1

5:00

AM

1:30

:00

AM

2:45

:00

AM

4:00

:00

AM

5:15

:00

AM

6:30

:00

AM

7:45

:00

AM

9:00

:00

AM

10:1

5:00

AM

11:3

0:00

AM

12:4

5:00

PM

2:00

:00

PM

3:15

:00

PM

4:30

:00

PM

5:45

:00

PM

7:00

:00

PM

8:15

:00

PM

9:30

:00

PM

10:4

5:00

PM

12:0

0:00

AM

1:15

:00

AM

2:30

:00

AM

3:45

:00

AM

5:00

:00

AM

6:15

:00

AM

7:30

:00

AM

8:45

:00

AM

10:0

0:00

AM

11:1

5:00

AM

12:3

0:00

PM

1:45

:00

PM

3:00

:00

PM

4:15

:00

PM

5:30

:00

PM

6:45

:00

PM

8:00

:00

PM

9:15

:00

PM

10:3

0:00

PM

11:4

5:00

PM

0

0.2

0.4

0.6

0.8

1

1.2

1.4

FLO

W (M

GD

)

RAIN

FALL

(IN

CHES

/15

MIN

)

WARD STREET HEADWORKS FLOWJUNE 29-30 2019

Ward Street HW Rainfall Ward Street HW Total Flow

Page 13: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

14

Prison Point CSO Inlet Elevation

0

0.2

0.4

0.6

0.8

1

1.2

1.4

80

85

90

95

100

105

110

12:

15:0

0 A

M

1:1

5:00

AM

2:1

5:00

AM

3:1

5:00

AM

4:1

5:00

AM

5:1

5:00

AM

6:1

5:00

AM

7:1

5:00

AM

8:1

5:00

AM

9:1

5:00

AM

10:

15:0

0 A

M

11:

15:0

0 A

M

12:

15:0

0 P

M

1:1

5:00

PM

2:1

5:00

PM

3:1

5:00

PM

4:1

5:00

PM

5:1

5:00

PM

6:1

5:00

PM

7:1

5:00

PM

8:1

5:00

PM

9:1

5:00

PM

10:

15:0

0 P

M

11:

15:0

0 P

M

12:

15:0

0 A

M

1:1

5:00

AM

2:1

5:00

AM

3:1

5:00

AM

4:1

5:00

AM

5:1

5:00

AM

6:1

5:00

AM

7:1

5:00

AM

8:1

5:00

AM

9:1

5:00

AM

10:

15:0

0 A

M

11:

15:0

0 A

M

12:

15:0

0 P

M

1:1

5:00

PM

2:1

5:00

PM

3:1

5:00

PM

4:1

5:00

PM

5:1

5:00

PM

6:1

5:00

PM

7:1

5:00

PM

8:1

5:00

PM

9:1

5:00

PM

10:

15:0

0 P

M

11:

15:0

0 P

M

RA

INFA

LL (

INC

HE

S/1

5 M

IN)

LEV

EL

(FE

ET

MD

C)

PRISON POINT CSO INLET LEVEL

JUNE 29-30 2019

Chelsea Creek HW Rainfall Prison Point Inlet Structure Level

0.14

in.

1.67

in.

0.19

in.

Page 14: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

15

Somerville Marginal CSO Inlet Elevation

0

0.2

0.4

0.6

0.8

1

1.2

1.4

101

102

103

104

105

106

107

108

109

110

111

12:

15:0

0 A

M

1:1

5:00

AM

2:1

5:00

AM

3:1

5:00

AM

4:1

5:00

AM

5:1

5:00

AM

6:1

5:00

AM

7:1

5:00

AM

8:1

5:00

AM

9:1

5:00

AM

10:

15:0

0 A

M

11:

15:0

0 A

M

12:

15:0

0 P

M

1:1

5:00

PM

2:1

5:00

PM

3:1

5:00

PM

4:1

5:00

PM

5:1

5:00

PM

6:1

5:00

PM

7:1

5:00

PM

8:1

5:00

PM

9:1

5:00

PM

10:

15:0

0 P

M

11:

15:0

0 P

M

12:

15:0

0 A

M

1:1

5:00

AM

2:1

5:00

AM

3:1

5:00

AM

4:1

5:00

AM

5:1

5:00

AM

6:1

5:00

AM

7:1

5:00

AM

8:1

5:00

AM

9:1

5:00

AM

10:

15:0

0 A

M

11:

15:0

0 A

M

12:

15:0

0 P

M

1:1

5:00

PM

2:1

5:00

PM

3:1

5:00

PM

4:1

5:00

PM

5:1

5:00

PM

6:1

5:00

PM

7:1

5:00

PM

8:1

5:00

PM

9:1

5:00

PM

10:

15:0

0 P

M

11:

15:0

0 P

M

RA

INFA

LL (

INC

HE

S/1

5 M

IN)

LEV

EL

(FE

ET

MD

C)

SOMERVILLE MARGINAL CSO INLET LEVEL

JUNE 29-30 2019

Somerville Remote Rain Gauge Somerville Marginal Inlet Level

0.97

0.39 0.16

in.

Page 15: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the
Page 16: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

17

Page 17: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the
Page 18: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Massachusetts Water Resources Authority

Deer Island Treatment PlantMaintenance Coating Contract

July 17, 2019

Page 19: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

• Painting/coating/concrete and steel repairs in several areas of the Deer Island Treatment Plant:

– Primary Scum Building Scum Wells (8 Total)– Odor Control Facilities Carbon Adsorbers (6 Total)– Module 3 Digester Overflow Boxes (4 Total)

20

Contract S583 Scope of Services Summary

Page 20: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

21

Contract S583 Scum Well Scope

Mixer

Mixer

Scum Well Below

• 4 Primary Batteries each with 2 Scum Wells for a total of 8 Scum Wells

Page 21: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

22

S583 Odor Control Facility Carbon Adsorber Scope

• East and West Odor Control Facility - 5 Carbon Adsorbers• Residuals Odor Control Facility - 1 Carbon Adsorber

6 Total

Page 22: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

S583 Module 3 Digester Overflow Box Scope

Four (4) Overflow Boxes Total

Page 23: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Advertised and bid in accordance with Chapter 149 of the Massachusetts General laws. Bids were opened June 11, 2019:

Atlas Painting And Sheeting Co. $2,020,000*Engineer’s Estimate $2,275,000Soep Painting Corporation $2,495,000John W. Egan Co. Inc. $3,508,990* Atlas bid was deemed non-responsive as it did not include the DCAMM Update Statement

Based on the bid evaluation, Soep Painting Corporation was found to be the lowest responsible and eligible bidder

24

Contract S583 Procurement Summary

Page 24: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the
Page 25: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Massachusetts Water Resources Authority

Piping Relocation at the Pelletizing Plant

July 17, 2019

Page 26: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

MWRA Pellet Plant

27

• Process liquid digested sludge from Deer Island – 105 dry tons sludge daily

• Markets and distributes 31,000 tons pellets annually

• On-site storage for 5,000 tons of dried pellets

• Five adjacent silos

• Four remote silos connected by pipe conveyance system

Page 27: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

MWRA Pellet Plant Layout

28

Remote Silos

Adjacent Silos

Building 11

Sludge Receiving Tanks

Page 28: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Building 11 Pellet Piping Transfer Lines

29

Adjacent Silos

Building 11

Transfer Lines

Remote Silos

Transfer Lines

Partial roof collapse

Page 29: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Building 11 Demolition – September 2018

30

Page 30: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Post Demolition – Building 11

31

New Transfer Line Route

• Loss of access to remote silos reduces on-site storage by 45%

• Board approved Amendment 2 to NEFCO Contract for increased expenses-January 2019

• This Contract will install a new pellet conveyance piping system on dedicated supports

Page 31: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Contract 7173

32

• Bids Received:

1. Walsh Construction Co. II, LLC $4,250,445.002. William M. Collins Co., Inc. $5,658,061.003. IPC Lydon, LLC $6,187,762.004. Engineer’s Estimate $3,200,000.00

• Contractor: Walsh Construction Co. II, LLC (lowest responsive bidder)

• Contract Duration: 450 days

Page 32: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the
Page 33: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

Massachusetts Water Resources Authority

Bellevue 2 and Turkey Hill Steel Tank Painting

July 17, 2019

Page 34: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

35

Bellevue 2 and Turkey Hill Water Tank Painting

Turkey HillArlington

Bellvue 2, West Roxbury

Chelsea

Page 35: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

36

Turkey Hill Foundation Repair Contract Repair Limits

water tank

foundation

3” depth of concrete removal

20”

36”

Page 36: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

37

Demolition of Deteriorated Concrete on Foundation

20”

36”

Water tank

Steel rebar

Page 37: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

38

“Test” section to determine extent of demo required

20”

36”

Original concrete

Repair mortar

Steel rebar

Wire mesh reinf.

Water tank

Page 38: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

39

Foundation Core Samples

Originalconcrete

Repair mortar coating

Six concrete core samples taken2 ¾” diameter, up to 8” depth

Page 39: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

40

Final Foundation Repair Detail

Water tank

6” depth

4” depth

Page 40: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

41

Bellevue 2 “Robot” Paint Removal

November 2018

Vacuum hose

Original coating

Robot paint remover

Page 41: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

42

Bellevue 2 Interior surface

October 2018March 2019

Failure of previous coating

Operating water level

Page 42: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

43

Bellevue 2 Ceiling Final Coating Complete

March 2019

Page 43: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

44

Bellevue 2 Before and After

September 2018

April 2019

Page 44: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

45

Bellevue 2 MWRA Drone View

Page 45: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

46

Bellevue 1 and 2

Page 46: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

47

Turkey Hill Tank Antennas, February 2019

Arlington FDArlington PDArmstrong AmbulanceLifeline AmbulanceMassDOTMass State PoliceVerizonT-MobileSprintCingularAT&TFederal AgencyMWRA

Page 47: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

48

Turkey Hill Water Tank “Robot” Paint Removal

Robot paint remover

Primer coating

Bare Steel

Original Coating

Page 48: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

49

Turkey Hill Exterior Finish Coating Complete

June 2019

Page 49: Thunderstorm Impacts on Wastewater System Operations · Thunderstorm Impacts on Wastewater System Operations July 17, 2019. 3 Thunderstorms • Thunderstorms frequently occur in the

50

Turkey Hill Water Tank Interior Ceiling and Wall at Finish Coating