PJM©2010 www.pjm.com The View from PJM: Operating Competitive Markets over a Multi-State Footprint Presentation to International Energy Agency October 1, 2013 Craig Glazer Vice President-Federal Government Policy PJM Interconnection, L.L.C.

The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 www.pjm.com

The View from PJM: Operating

Competitive Markets over a Multi-State

Footprint

Presentation to International Energy Agency

October 1, 2013

Craig Glazer

Vice President-Federal

Government Policy

PJM Interconnection,

L.L.C.

Page 2: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2013 2

PJM as Part of the Eastern Interconnection

KEY STATISTICS

PJM member companies 850+

millions of people served 61

peak load in megawatts 165,492

MWs of generating capacity 183,604

miles of transmission lines 62,556

2012 GWh of annual energy 793,679

generation sources 1,376

square miles of territory 243,417

area served 13 states + DC

externally facing tie lines 191

• 27% of generation in

Eastern Interconnection

• 28% of load in Eastern Interconnection

• 20% of transmission assets in

Eastern Interconnection

21% of U.S. GDP

produced in PJM

www.pjm.com

As of 7/1/2013

Page 3: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 3

PJM Functions

• Operate the bulk electric power grid for reliability

• Facilitate various electric markets

• Plan for transmission expansion

• Monitor the markets to ensure competitiveness

• Provide exceptional customer/member service

• Share best practices with neighboring and international system operators

Page 4: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 4

PJM Backbone Transmission

Page 5: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 5

Overview of PJM

Electricity Markets

Page 6: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 6

PJM Maintains Reliability through Markets

Page 7: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 7

Options for Energy Supply

Commercial

Bilateral

Transactions

PJM

Spot Market

Load Serving Entities

obtain energy

to serve customers.

Self-schedule own resources

Residential Industrial

Page 8: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 8

PJM’s Operational Markets and Services

• Two Energy Markets

– Day-Ahead

– Real-Time

• Reliability Pricing Model (RPM) Auction

• Financial Transmission Rights (FTRs) Auction

• Ancillary Services

– Regulation Market

– Synchronized Reserve Market

– Blackstart Service

– Reactive Services

Page 9: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 9

PJM Cross-Border Coordination

• Inter-regional

• International

www.pjm.com

Page 10: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 10

Nine Major North American RTOs / ISOs

www.pjm.com

Page 11: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 11

Cross Border Trading: Key Ingredients

Page 12: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 12

KEY INGREDIENTS FOR CROSS-BORDER TRADING

• Adequate Infrastructure

• Grid Code

• Transmission Pricing and Cost Allocation

• Establishment of Balancing Markets

• Handling schedules and deviations

• Emergency Procedures

• Billing and Settlements

• Dispute Resolution

www.pjm.com

Page 13: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 14

Cross-Border Trading:

Regulatory Challenges and Opportunities

www.pjm.com

Page 14: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 15

REGULATORY CHALLENGES re: CROSS-BORDER TRADING

Capacity Portability

– Unit Specific Commitments vs. “Slice of System”

Capacity Obligation

– Pricing of Capacity Obligations: Administrative Cost-

Based, Bid-Based?

– Binding call rights on transmission and fixed rules on

curtailment priorities

– Capacity Planning: Load Serving Entity Obligation or

System Operator Obligation

www.pjm.com

Page 15: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 16

REGULATORY CHALLENGES

: CROSS-BORDER OBLIGATIONS

Energy Markets:

• Common rules and pricing

• Obligations to Redispatch across the border

• Grandfathering of existing transmission rights

www.pjm.com

Page 16: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 17

SEAMS COORDINATION

Joint Operating Agreement: PJM and Midwest ISO

• Congestion Management: Coordination of

Flowgates

• Exchange of Operating Data: Real time

generator data, planning data, facilities data

• Flow data, reliability data, interchange schedules

• Consistency of modeling for ATC, congestion

management, outage scheduling

www.pjm.com

Page 17: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 18

REGULATORY CHALLENGES

re: CROSS BORDER OBLIGATIONS

Planning:

• Defining “benefits” across the border---Must

project benefit each region?

• Allocation of costs---Solutions-based flow model

vs. socialization of costs across a footprint

• Harmonizing each country’s public policy

• Dispute resolution

www.pjm.com

Page 18: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 19

SEAMS COORDINATION

Basic Cross-Border Tools:

• Redispatch of generation when cost effective to

solve constraint across the border;

• Respecting and modeling each entity’s AFC

determinations;

• Outage schedule: Joint Approvals

• Emergency coordination, drills and authority

• Planning and cost allocation of cross-border

facilities: 1.25 benefit to cost ratio

www.pjm.com

Page 19: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 20

SEAMS COORDINATION

• Planning: Requirement of Cross-Border Benefits

– Benefit/Cost Ratio of 1.25

• Coordination of Reliability Planning

• Economic Planning: identifying Market Efficiency

Projects

• Joint Operating Agreement Link:

– http://www.pjm.com/~/media/documents/agreeme

nts/joa-complete.ashx

www.pjm.com

Page 20: The View from PJM: Operating Competitive Markets over a … · 5 PJM©2010 Overview of PJM Electricity Markets . 6 PJM©2010 PJM Maintains Reliability through Markets . 7 PJM©2010

PJM©2010 21

LET’S TALK…

Craig Glazer Vice President-Federal Government Policy PJM Interconnection Washington, D.C. , USA 1-202-393-7756 [email protected]