13
1 By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building project for the sustainable development of biomass production and marketing in the UNECE region

The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

1

By: Hans JansenUNECE

Economic Cooperation and Integration Division

Geneva, 5 December 2007

The UNECE/ECID capacity building project for the sustainable development of biomass production and marketing in the UNECE

region

Page 2: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

2

Biomass

Page 3: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

3

Biomass in UNECE project includes:

-Woody biomass

-Crop residues

Page 4: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

4

UNECE W orking Areas

Econom ic Cooperation and In tegration

Statistics

Energ yEnvironm ent, Housing and Land M anagem ent

Transport

Trade

Tim ber

Page 5: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

5

Integrated Approach• Enterprise Development• Sustainable development of the agro/forest

sector• Certification• Training and education• Biomass trade logistics• Port logistics• Trade facilitation procedures

Page 6: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

6

Biomass Demand in Europe

Page 7: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

7

Page 8: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

8

Timber Resources of Russia

Ekaterinburg

St.-Petersburg

Moscow

Novosibirsk

Nizhni Novgorod

Rostov–on-Don

North-West Federal DistrictResources - 8063.0 million m3

Far-East Federal DistrictResources – 21023.0 million m3

Siberian Federal DistrictResources – 30718.0 million m3

Ural Federal DistrictResources - 6885.0 million m3

Central Federal DistrictResources – 2317.0 million m3

Privolzhsky Federal DistrictResources – 4053.0 million m3

North-Caucasian Federal DistrictResources – 539.2 million m3

Page 9: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

9

Biomass Producers

Page 10: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

10

Bulk Terminal Rotterdam

Page 11: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

11

Creating Sustainable Biomass Sector

• Inter-sectoral cooperationEnterprise Development and “high-growth” SMEsEnvironment, Sustainable Energy and Combating Climate ChangeTrade, Transport

• Cooperation with the private sector along entire logistics chainForest- and agro residue producers Transport operators (rail, road, port)International bulk tradersEnergy producers (electricity; district heating)

• Concrete ResultsIntegrated solutions for the entire logistics chainCoordinated approach involving all stakeholders: private sector,governments, academia, local communities, NGOs

Page 12: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

12

The logistics chain

Page 13: The UNECE/ECID capacity building project for the ... · By: Hans Jansen UNECE Economic Cooperation and Integration Division Geneva, 5 December 2007 The UNECE/ECID capacity building

13

For Further Information:

Hans JansenProject Manager

UNECE Economic Cooperation and Integration Division

Tel: 41 22 917 37 [email protected]