16
THE S.I.G.I.T. TOUR PERSONNELS THE BAND: REKTIVIANTO YOEWONO FARRI ICKSAN WIBISANA ADITYA BAGJA MULYANA DONAR ARMANDO EKANA MANAGER: GINO HERRYANSYAH Ph. 081563591999 E-mail: [email protected] ROAD MANAGER SOUND ENGINEER (FOH): BUDIANTO SETYADI Ph. 08156222321 E-mail: [email protected] SOUND ENGINEER (MONITOR): DITTO SUWARDITA Ph. 0817206064 TECHNICIANS: GUITAR TECH for REKTI ANDRE HARTIWAN Ph. 081322258468 GUTAR TECH for FARRI CEPPI HADIANA Ph. 0817203840 BASS TECH for ADIT HERRY HERDIANA Ph. 081563864666 DRUM TECH for ACIL CHORNOLIS Ph. 085624428591 BAND PHOTOGRAPHER

The Sigit Riders 2010

Embed Size (px)

Citation preview

Page 1: The Sigit Riders 2010

THE S.I.G.I.T.TOUR PERSONNELS

THE BAND:REKTIVIANTO YOEWONOFARRI ICKSAN WIBISANAADITYA BAGJA MULYANADONAR ARMANDO EKANA

MANAGER:GINO HERRYANSYAH

Ph. 081563591999E-mail: [email protected]

ROAD MANAGERSOUND ENGINEER (FOH):

BUDIANTO SETYADIPh. 08156222321

E-mail: [email protected]

SOUND ENGINEER (MONITOR):DITTO SUWARDITA

Ph. 0817206064

TECHNICIANS:

GUITAR TECH for REKTI ANDRE HARTIWAN

Ph. 081322258468

GUTAR TECH for FARRICEPPI HADIANA

Ph. 0817203840

BASS TECH for ADITHERRY HERDIANA

Ph. 081563864666

DRUM TECH for ACILCHORNOLIS

Ph. 085624428591

BAND PHOTOGRAPHERFIRMAN NI

MERCHANDISEARI HERIANTOPh. 085659157854

Page 2: The Sigit Riders 2010

SOUND SYSTEM SPECIFICATION

PA (Main System)

Response frequencyPower Capacity

Other

1. Main system 80-20khz Indoor : minimum 10.000watt Outdoor: minimum 20.000 watt

3 ways or 2 waysactive or passive crossover

2. Sub bass system 30Hz - 300Hz

Total power capacity for indoor main system: 40.000 Watt RMS(minimum)Total power capacity for indoor main system: 60.000 Watt RMS(minimum)

Stage Monitors

Response frequencyPower Capacity

Other

3. Floor monitor system

50-20khz minimum 5.000watts

- 3 ways or 2 ways- active or passive crossover- minimum 6 units

4. Drum fill system 30-20khz minimum 1000 watts

- 3 ways or 2 ways- active or passive crossover- min. 2 units (left & right)

Total power capacity for stage monitor system : 10.000 Watt(minimum)

Mixing Console

Outboard equipment

Sound Effect System Dynamic Processor

5. Main Mixer(FOH)

- 1 Unit - 48 channel input- Profesional series

3 units of Reverbration :

- Yamaha SPX 900 - Yamaha SPC 2000- Lexicon PCM 80 or higher

Noise Gate :- 4 units of dual stereo (8 channels}- Drawner DS 201 or equivalence

Compressor / Limiter :- dbx, 4 channels or equivalence

6. Stage monitor mixer

- 1 Unit - 48 channel input- Profesional series

Noise Gate :- 4 units of dual stereo (8 channels}- Drawner DS 201 or equivalence

Compressor / Limiter :- dbx, 4 channels or equivalence

Page 3: The Sigit Riders 2010

BACKLINESWe usually bring our own equipments. However it’s not always possible to bring all the equipments. In this case, please provide back up for subtitution. Once the equipments are loaded to your venue, you must be responsible for our equipments safety.

*Shaded Area Indicates Equipments that are must be provided**See figure 2 (below) for equipments and monitors placements

REKTIBand’s Equipments Back Up Note

Vocal Microphone -Sennheiser e865 or-Shure SM58

Guitar Gibson SG Standard Greco SG ’61

Guitar Amplification

Orange Rockverb Marshall JCM 800

Orange 4x12 Cabinets -Marshall 4x12 CabinetsGuitar Effects Boss TU-2

Fulltone Overdrive 2EHX BigMuffEHX POGEHX WigglerEHX Deluxe Memory ManIbanez TS 808

Guitar Amp Microphone

Shure SM57

Power Supply for Pedals

- 220 volt - Type C Plug (See Figure 1)

Please locate the power plug near the main microphone at the rear right of stage.

Please provide plug converter, in case of plug differences.

Figure 1. Type C Plug

Page 4: The Sigit Riders 2010

FARRIBand’s Equipments Back Up Note

Vocal Microphone Shure SM58Guitar Gibson Les Paul Standard

Radix RoyalGuitar Amplification

Orange Thunderverb 200 Marshall JCM 800

Orange 4x12 Cabinets Marshall 4x12 CabinetsPower Conditioner Phonic P900EGuitar Effects Boss TU-2

Visual Sound Jeckyll & HydeFulltone Fuzz ‘70Digitech WhammyMXR Micro AmpEHX Deluxe Memory ManIbanez TS 808Vox V-847A Wah

Guitar Amp Microphone

Shure SM57

Power Supply for Pedals

- 220 volt - Type C Plug (See Figure 1)

Please locate the power plug near the main microphone at the rear left of stage.

Please provide plug converter, in case of plug differences.

Figure 1. Type C Plug

Page 5: The Sigit Riders 2010

ADITBand’s Equipments Back Up Note

Vocal Microphone Shure SM58Bass Guitar Fender Jazz Bass

YamahaBass Amplification Ampeg SVT CL Ampeg SVT

Ampeg 810 CE CabinetsBass Effects Boss TU-2

Maleko B:Ass MasterDBX Compressor

Bass Amp Microphone

Shure SM57

ACILBand’s Equipments Back Up Note

Drum Sets Tama Superstar Hyperdrive Kit Pearl Export Series / Tama Starclassic Series Kit – Finely Tuned & Mint Condition

-22” Kick drum-16” Floor Tom-14” Tom-12” TomPearl Eric Singer Signature Series Snare

Cymbals Zildjian “K” Dark Crash 16 “Zildjian “K” Heavy Ride 18”Zildjian “Avedis” Crash 18”Zildjian “K” Hi Hat

Hardware Tama Standard Cymbal Stand Yamaha Standard Cymbal Stand

Pearl Roadster Throne

Drum MicrophoneAdditional Requirements

Standing Ventilation Fan

Page 6: The Sigit Riders 2010

General EquipmentsBand’s Equipments Back Up Note

Page 7: The Sigit Riders 2010

STAGE PLOT

Figure 2. Stage Plot

*20 SEPARATE CHANNELS are must be provided to be used only by THE S.I.G.I.T.

INSERT LISTDRUM BASS GUITAR VOCAL1. Kick– Insert Compressor + Gate 1. Bass D.I. – Insert Compressor 1. Farri Guitar Amp D.I. 1. Vocal Rekti – Insert Compressor 2. Snare Top – Insert Compressor + Gate 2. Bass Mic – Insert Compressor 2. Farri Guitar Amp Mic 2. Vocal Adit3. Snare Bottom 3. Rekti Guitar Amp D.I. 3. Vocal Farri4. Hi Hat 4. Rekti Guitar Amp Mic5. Tom – Insert Compressor + Gate6. Floor 1 – Insert Compressor + Gate7. Floor 2 – Insert Compressor + Gate8. OH L9. Oh R

Page 8: The Sigit Riders 2010

STAGE PERFORMANCES

1. The band name must be stated as THE SUPER INSURGENT GROUP of INTEMPERANCE

TALENT on all promotion media. Stating (The S.I.G.I.T.) after the band name is optional.

2. Organizer must provide 17 backstage pass and at least 10 free tickets.

3. There are no unofficial photographer allowed on stage during performance.

4. There are no unauthorized person allowed on stage during performance.

5. Organizer must assure that there are no racial offend contents on stage and venue.

6. Organizer must assure that during break between songs, stage lights must be turned down.

7. Organizer must assure that all schedules in venue are on time. Please be certain about time schedule

and duration of performance.

8. The S.I.G.I.T. doesn’t responsible for any damage and schedule delay happened during show which

caused by audience or other people outside of The S.I.G.I.T. team.

SOUND CHECK

1. Organizer must provide 2 HOURS for sound check 3 hours before show at most.

2. Organizer must assure The S.I.G.I.T. and equipments safety and securities during sound check, before-

during-after stage performance.

3. Organizer must assure that all schedules in venue are on time.

4. There’s no unauthorized persons allowed on stage during sound check.

5. The S.I.G.I.T. doesn’t responsible for any delay happened which not caused by The S.I.G.I.T. team.

BACKSTAGE ROOM

Organizer must provide an air conditioned and clean backstage room for the band at least 4 x 4 m, the

room must have at least 1 meter tall mirror. Please make sure that the room has been cleaned up and

cleared 30 minutes before band arrival. And the band has the right to stay 1 hour after the show. No

unauthorized person allowed in backstage.

Page 9: The Sigit Riders 2010

FOODS AND BEVERAGES

Organizer must provide the healthy meal 3 times per day for 12 persons since arrival until departure.

The catering meal should be equal at least Rp. 70.000,- per meal per person.

Foods and beverages must be provided at VENUE:

1. Healthy Meal for 12 Persons equal to Rp.

70.000,-/pax

2. 20 small bottles of Soft drinks or fruit

juice

3. 4 cans of Jiguja (usually available at

Circle K stores)

4. 4 packs of Ultra Milk Low Fat Chocolate

Flavour

5. 2 LARGE pans of Pizza Hut Meat Lovers

6. 14 cans of Pocari Sweat

7. 28 small bottles of mineral water

8. 12 small towels

TRANSPORTATIONS

1. Organizer must provide The S.I.G.I.T. with appropriate vehicles such as 2 MPV for arrivals to venue

and departures. Vehicle must be time efficient, convenience and big enough to accommodate at least 12

persons, band equipments and properties.

2. If not conditional for using vehicle, Organizer must provide airplane tickets, for arrivals to venue and

departures, for 12 persons and extra baggage to accommodate our equipment and properties, band

equipments total weight around 350 kg. 12 return tickets must be received by the management at

least 1 week before show date. Organizer is responsible to pay for airport taxes and transport from

Bandung – Jakarta – Bandung (if the flight departs from Jakarta).

3. Upon arrival, Organizer must provide The S.I.G.I.T. 2 MPV to accommodate team, and 1 Box Car for

the band equipment and properties. Vehicle must be available 24 hours, along with a driver, since

arrival until departure.

4. Organizer must make sure that The S.I.G.I.T. team arrived in venue at least 30 minutes before show.

5. Organizer must send LO (Liaison Officer) to inform us everything about the event and schedules.

6. EO must guarantee the safety and security of The S.I.G.I.T. team, equipment and properties at

arrivals, hotel, venue and departures.

7. If any of following accident happen since our arrivals till our departures:

a. One or more of The S.I.G.I.T.’s team injured

b. Defect and lost of The S.I.G.I.T.’s equipments and properties

Then EO must be responsible and taking action by giving us medicines and replace equipment and

properties with exact specification.

8. The S.I.G.I.T. doesn’t responsible for any damage on vehicles, plane facilities which caused by people

outside of The S.I.G.I.T. team.

9. The S.I.G.I.T. doesn’t responsible for any delay on flight schedules, transportation schedules, venue

schedules and show schedules which not caused by The S.I.G.I.T. team.

Page 10: The Sigit Riders 2010

ACCOMMODATION

1. EO (Event Organizer) must provide The S.I.G.I.T. with clean, healthy and comfy at least 3 (three)

stars 6 hotel rooms or 2 apartments with 3 bedrooms with clean and appropriate bathroom for at

least 12 persons and extra space for our equipment and properties, since arrival till departure.

2. The S.I.G.I.T. doesn’t responsible for any damage on hotel facilities which caused by people outside of

The S.I.G.I.T. team.

3. The S.I.G.I.T. doesn’t responsible for any delay hotel booking schedules, which not caused by The

S.I.G.I.T. team.

FEE PAYMENT

1. EO must pay 50% of the total fee that had been dealt in contract made by The S.I.G.I.T.’s official

manager and EO, 3 weeks before show date, transferred to bank account noticed further.

2. Other 50% must be paid cash by EO to The S.I.G.I.T.’s official manager 1 week before the show date.

3. No money return for cancellation by EO after first term payment.

4. EO must pay extra charge, 10% of total fee per hour, if any delay for the schedules happened in venue

which caused by EO.

5. After this rules and riders are agreed and signed by EO, The S.I.G.I.T. can cancel performances or

reject to perform if EO doesn’t fulfilled one or more point that mentioned before.

This rules and riders are negotiable. If any inconveniences occurred caused by any point mentioned in

this riders, please contact The S.I.G.I.T. management.

For sound specification negotiation please do contact BUDIANTO SETYADI at 08156222321.

Page 11: The Sigit Riders 2010

This riders must be replied and signed by both parties. The S.I.G.I.T. has the right to cancel or

reject to perform if EO doesn’t fulfill one or more points that mentioned before after this riders

agreed and signed by both parties.

These deals and agreement above were made with fair and without any force between The S.I.G.I.T.

and Event Organizer.

………….., ………………….

Event Organizer The Super Insurgent Group ofIntemperance Talent

( ) ( Gino Herryansyah)