The INDOT CORS 2007 Indiana GIS Conference March 13, 2007. By William A. Schmidt, PE, LS Manager of Aerial Engineering, INDOT Thomas A. Mahon, PE, LS Survey Group Manager, Woolpert Inc. Continuously Operating Reference Station Operated by Others Operates continuously - PowerPoint PPT Presentation

Citation preview

  • The INDOT CORS 2007 Indiana GIS ConferenceMarch 13, 2007By William A. Schmidt, PE, LSManager of Aerial Engineering, INDOTThomas A. Mahon, PE, LSSurvey Group Manager, Woolpert Inc

  • What is a CORS?Continuously Operating Reference StationOperated by Others Operates continuouslyData available for Post-ProcessingData may be available in real-time

  • Advantages of a CORSSingle coordinate systemUniform precisionNo need to setup base stationsAvoids base station radio issuesFrees up base stations as roversIncreases productivityEase of use

  • Existing CORSNGS

  • Existing CORS (contd)Seiler Instruments

  • INDOTs Primary Network17 New Stations plus Bloomington (IUCO)

  • Typical Installation

  • Initial Installations

  • Primary Monumentation

  • Primary Monumentation (Contd)

  • Primary Monumentation (Contd)

  • Secondary Monumentation

  • Station SponsorsPrimary StationsIndiana Department of TransportationSecondary StationsOther State AgenciesMunicipalities/Counties (Possibly)Higher Education (Possibly)Private Contractors (Not at this time)

  • Network AdministrationINDOT to Fund Primary NetworkIndiana Office of Technology (IOT) to Maintain ServersServers dedicated to INDOT CORS

  • BudgetsInitial Capital CostsPrimary Network: $400,000Secondary Network: $800,000

    Annual Operating Budget: to be determinedHardware and Software UpgradesAdditional User LicensesNetwork Administration

  • ScheduleProcurement Bids March 2007Bids Received April 2007Bid Awarded April 2007Begin Primary Installations May 2007Complete Primary Installation, including operational network December 2007Begin Secondary Installation August 2007Complete Secondary Installation - TBD

  • CORS AccessPost-ProcessingFree & Available thru www, location to be determinedReal-Time KinematicControlled by user name and passwordUp to 250 concurrent users w/o paying for additional access licensesMay develop a fee-based system of access to support maintenance and upgrades

  • CORS Access (Contd)Real-Time DifferentialCoast Guard Beacons (10 m h 68%)WAAS FAA (7 m h&v 95%)Third Party Vendors Omnistar (submeter 95%)INDOT CORS (subdecimeter 95%)Potential fee schedule similar to RTK

  • CORS Access (Contd)

  • CORS Access (Contd)

  • INDOT CORSQuestions?