15
The Hornet Recurring International Logistics Review 3 – 7 April 2017 DRAFT AGENDA

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEW MONDAY ...gohornetteam.com/.../THRILR-DRAFT-AGENDA-2017.pdf · the hornet recurring international logistics review monday 3 april

  • Upload
    phamque

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

The Hornet Recurring International Logistics Review3 – 7 April 2017

DRAFT AGENDA

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWMONDAY 3 APRIL 2017

DRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS

0830-1600 EARLY REGISTRATION LOBBY ALL

1300-1600 LIFE CYCLE PLANNING/ CRITICAL SPARES DEFINITION MTG

USN DAN WAGNERBOEING BILL MULVEENA

NGC GREG GIESEGH

MAIN BALLROOM LCP ATTENDEES

1600 ADJOURN

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWTUESDAY 4 APRIL 2017

BRIEFING SESSIONSDRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS

0800 WELCOME/ADMIN REMARKS

DAN WAGNER WINDSOR ROOM ALL

0810 “INSIDE THE PMA” CAPT KINDLEY WINDSOR ROOM ALL

COUNTRY BRIEFS

0830 AUSTRALIA SQNLDR CLINTON HALLAM WINDSOR ROOM ALL

0850 CANADA MAJ DAVID CHOWN WINDSOR ROOM ALL

0910 FINLAND CAPT RAMI MYLLYNIEMI WINDSOR ROOM ALL

0930 KUWAIT COLONEL FAHAD ALKHARAING

WINDSOR ROOM ALL

0950 MALAYSIA FLORENCE MYLES WINDSOR ROOM ALL

1010 BREAK ALL

1030 SPAIN MAJ. MONTERO WINDSOR ROOM ALL

1050 SWITZERLAND CHRISTIAN HUMBERT WINDSOR ROOM ALL

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWTUESDAY 4 APRIL 2017

BRIEFING SESSIONSDRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS1110-1130 IB PM OVERVIEW JOHN SMITH WINDSOR ROOM ALL

1130-1200 PDAPML OVERVIEW/THRILR 2016 ACTION ITEM REVIEW

DAN WAGNER WINDSOR ROOM ALL

1200-1300 LUNCH ALL

1300-1320 DEPARTMENT OF STATE (DCS ROE)

JENNY HOANG WINDSOR ROOM ALL

1320-1340 PSM/APML OVERVIEW CDR BURGESS/JIM TIVNAN

WINDSOR ROOM ALL

1340-1400 AIR VEHICLE LOGISTICS BRIEF

DAN DOTSON WINDSOR ROOM ALL

1400-1420 BOEING COMPANY SUSTAINMENT BRIEF

GARY POCHUREK WINDSOR ROOM ALL

1420-1435 BREAK ALL

1435-1455 NORTHROP GRUMMAN SUSTAINMENT BRIEF

GREG GIESEGH WINDSOR ROOM ALL

1455-15115 GE SUSTAINMENTBRIEF

JOHN BARTLEY WINDSOR ROOM ALL

1515-1535 RAYTHEON SUSTAINMENT BRIEF

SCOTT SAMPLES WINDSOR ROOM ALL

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWTUESDAY 4 APRIL 2017

BRIEFING SESSIONSDRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS1535-1555 WORLDWIDE

WAREHOUSE REDISTIBUTION SERVICES

JOHN DORNON WINDSOR ROOM ALL

1555-1630 SHAREPOINT CONFIGURATIONMANAGEMENT MODULE DEMO

DAN BERGER WINDSOR ROOM ALL

1630 CLOSING REMARKS/ADJOURN

DAN WAGNER WINDSOR ROOM ALL

1745 *BUS DEPARTURE FROM HOTEL FOR SOCIAL EVENT**SUBJECT TO CHANGE – WILL MAKE ANNOUNCEMENTS ON TUESDAY

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWWEDNESDAY 5 APRIL 2017

WORKING GROUP BREAKOUT SESSIONSDRAFT AGENDA

TIME WORKING GROUP FACILITATOR ROOM

0800-1000 GENERATOR CONVERTER UNIT (GCU)

CHUCK SINGER TBD

OBJECTIVES

• BACKGROUND OF SYSTEM/ COMPONENTS

• IDENTIFY FLEET ISSUES/READINESS DEGRADER RANKING

• SOLUTIONS • RESULTS/GET WELL DATE

0800-1000 FUEL CELLS LYNETTE McMAHON TBD

OBJECTIVES

• BACKGROUND OF SYSTEM/ COMPONENTS

• IDENTIFY FLEET ISSUES/READINESS DEGRADER RANKING

• SOLUTIONS • RESULTS/GET WELL DATE

0800-1200 BOEING FLEET MANAGEMENT

SYSTEM/DATA ANALYTICS DISCUSSION

CURT ALTHAGE MATSON ROOM

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWWEDNESDAY 5 APRIL 2017

WORKING GROUP BREAKOUT SESSIONSDRAFT AGENDA

TIME WORKING GROUP FACILITATOR ROOM

1015-1200 APG-65/73 RADAR(TRANSMITTER; POWER SUPPLY;

RECEIVER; ANTENNA)

TIM THOMPSON WINDSOR ROOM

OBJECTIVES

• BACKGROUND OF SYSTEM/ COMPONENTS

• IDENTIFY FLEET ISSUES/READINESS DEGRADER RANKING

• SOLUTIONS • RESULTS/GET WELL DATE

1015-1200 AIRFRAME(AV TEMP/FLOW; ECS; RUDDER

SERVOs)

DAN DOTSON AUGUSTA ROOM

OBJECTIVES

• BACKGROUND OF SYSTEM/ COMPONENTS

• IDENTIFY FLEET ISSUES/READINESS DEGRADER RANKING

• SOLUTIONS • RESULTS/GET WELL DATE

1200-1300 LUNCH

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWWEDNESDAY 5 APRIL 2017

WORKING GROUP BREAKOUT SESSIONSDRAFT AGENDA

TIME WORKING GROUP FACILITATOR ROOM

1300-1500 CONFIGURATION MGT CATHY DAVIS MATSON ROOM

OBJECTIVES

• DISCUSS ECP PROCESSES• DISCUSS TECH DIR

SANITIZATION PROCESS• DISCUSS CLASS II ECPs• DISCUSS CPM NOTIFICATIONS

1300-1500 ENGINES(ENGINE MODULES; TURBINENOZZLES;

AB FLAME HOLDER, AMAD’s)

GENE CASTERLIN AUGUSTA ROOM

OBJECTIVES

• BACKGROUND OF SYSTEM/ COMPONENTS

• IDENTIFY FLEET ISSUES/READINESS DEGRADER RANKING

• SOLUTIONS • RESULTS/GET WELL DATE

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWWEDNESDAY 5 APRIL 2017

WORKING GROUP BREAKOUT SESSIONSDRAFT AGENDA

TIME WORKING GROUP FACILITATOR ROOM1515-1700 NAVSUP/DLA GREG SHALOKA (NAVSUP)

CHUCK BLOOM (DLA)WINDSOR ROOM

OBJECTIVES

TOPICS

• INCREASE UNDERSTANDING/AWARENESS OF THE SUPPLY SUPPORT LOGISTICS ELEMENT

• CONTRACTING/LEADTIME/PROCESSING/AVAILABILITY• HAZMAT• NON CONFORMING PARTS• LETTERS OF TRANSMITTAL• NAVSUP SUPPORT CASES• SPARES CALLS

1515-1700 SUPPORT EQUIPMENT ERWIN STA-INES AUGUSTA ROOM

OBJECTIVES

TOPICS

• INCREASE UNDERSTANDING/AWARENESS OF THE SUPPORT EQUIPMENT LOGISTICS ELEMENT

• CONTRACTING/LEADTIME/PROCESSING/AVAILABILITY• CASS PBL• CRALTS SUPPORT• SE CALLS• SE OBSOLESCENCE

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWWEDNESDAY 5 APRIL 2017

WORKING GROUP BREAKOUT SESSIONSDRAFT AGENDA

TIME WORKING GROUP FACILITATOR ROOM1515-1700 TECH DATA MONICA PARO MATSON ROOM

OBJECTIVES

TOPICS

• INCREASE UNDERSTANDING/AWARENESS OF THE TECHNICAL DATA LOGISTICS ELEMENT

• PROCESS FOR IETM UPDATES• AV TEMP FLOW SENSOR TEST PROCEDURES• DEVELOP NATEC PROCESS & DIGITAL SYS SIMILAR TO USAF• TPDR/IRAC FOR NON-IETM CUSTOMERS• DIMINISHING INFORMATION FLOW• D-LEVEL PUBS OUT OF DATE• ITAR/TPT COMPLEXITY• LES PROCESSING• PEMA PROCURMENT/LICENSING

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWTHURSDAY 6 APRIL 2017

LOGISTICS PANEL DISCUSSIONSDRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS0800-0830 PMA 265 FMS

PROGRAMMATICS:JOHN SMITH/DAN WAGNER

WINDSOR ROOM ALL

TOPICS• FISIF FUTURE• QTRLY ACTION ITEM UPDATES• TPT PROCESS• RELEASE OF USN CLASS A MISHAP REPORTS

0830-0900 COMMODITY PMAs PMA 201PMA 202PMA 209PMA 260PMA 272

WINDSOR ROOM ALL

TOPICS• LACK OF INFORMATION EXCHANGE OPPORTUNITIES • STREAMLINING PMA PROCESSES• CADS/PADS• PEMA PROCUREMENT/LICENSING

0900-0930 OBSOLESCENCE DAN WAGNER WINDSOR ROOM ALL

TOPICS • STATUS OF APG-65/73 OBSOLESCENCE HEALTH SUPPORTABILITY ANALYSIS• BOMs

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWTHURSDAY 6 APRIL 2017

LOGISTICS PANEL DISCUSSIONSDRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS

0930-1000 GCU WORKING GROUP OUT-BRIEF

CHUCK SINGER WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

1000-1020 BREAK

1020-1050 FUEL CELLS WORKING GROUP OUT-BRIEF

LYNETTE McMAHON WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

1050-1120 APG-65/73 RADAR WORKING GROUP

OUT-BRIEF

TIM THOMPSON WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

1120-1150 AIRFRAME WORKING GROUP OUT-BRIEF

DAN DOTSON WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWTHURSDAY 6 APRIL 2017

LOGISTICS PANEL DISCUSSIONSDRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS

1150-1300 LUNCH

1300-1330 LANDING GEAR WORKING GROUP

OUT-BRIEF

RICK LEE/MATT TUNDERMAN

WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

1330-1400 ENGINES WORKING GROUP OUT-BRIEF

GENE CASTERLIN WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

1400-1430 NAVSUP/DLA WORKING GROUP

OUT-BRIEF

GREG SHALOKA (NAVSUP)

CHUCK BLOOM (DLA)

WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEWTHURSDAY 6 APRIL 2017

LOGISTICS PANEL DISCUSSIONSDRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS

1430-1450 BREAK

1450-1520 SUPPORT EQUIPMENT WORKING GROUP

OUT-BRIEF

ERWIN STA-INES WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

1450-1520 TECH DATA WORKING GROUP OUT-BRIEF

MONICA PARO WINDSOR ROOM ALL

STATUS • ISSUES DISCUSSED• NEW ACTION ITEMS

1520 • CLOSING REMARKS/ADJOURN

DAN WAGNER WINDSOR ROOM ALL

THE HORNET RECURRING INTERNATIONAL LOGISTICS REVIEW FRIDAY 7 APRIL 2017

DRAFT AGENDA

TIME EVENT PRESENTER ROOM PARTICIPANTS0800-1400 LIFE CYCLE PLANNING

MANAGEMENT TEAM MEETING

JOHN SMITH WINDSOR ROOM LCP ATTENDEES