    THE CHANGE WE CAN MAKE

    THE CHUNK WE CAN HAVE

    CENTRAL MATERIAL REQUIREMENT

    PLANNING AND INVENTORYCONTROL DEPARTMENT

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    2/13

    Concept of PPIC:Currently, at Square we have adopted the concept of PPIC to bridge the gap among

    PMD/IMD, Production, QA and SCM to ensure smooth operation of production,

    procurement. For a business organization with small volume of operation such a

    department is a burden but for an organization involving a large volume of operations

    the essentiality of such a department goes without saying.

    But a simple modification of the concept can save a chunk of the investment of the

    corporation, which is being presented on forwards.

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    3/13

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    4/13

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    5/13

    Achievable Opportunities from Central Material

    Requirement Planning & Inventory Control

    Department:

    1. Optimization of Inventory

    2. Maximization of Support

    3. Minimization of Order Processing Cost

    4. Minimization of Loss of Low Consumed RMs

    5. Maximum Output with Minimum Manpower

    6. Optimization of Technical Resource Utilization

    7. Save Communication Time, Save Money8. Central Monitoring, Tracking and Control of Finished Products

    9. Total Solution from a Total Picture

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    6/13

    Optimization of Inventory

    As we see in the below table, a good number of materials are commonly used among

    the different plants and every material retains its own safety stock, only global

    planning can dramatically change the total inventory picture. Total Inventory Level

    can be minimized and thereby material holding cost can be decreased by maintaining

    a common safety stock. Earlier it was difficult to arrange a Global Plan, as different

    plants maintain different databases which were not integrated and the planning

    patterns of every plant were not functioning in parallel.

    Plant/Unit Total RM Common RM

    Pabna 666 267

    GPB 357 84

    SCL 116 21

    SVPO & Biotech 58 30

    PMU 55 24

    Agrovet 185 84

    SHNL 61 22

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    7/13

    Maximization of Support

    By viewing the total inventory picture of all plants from a single point with the help of

    ERP, we can easily ensure the best support in Crisis Moments of any plant and

    thereby efficiently managing Potential Sales. Earlier, it was difficult to give a total

    solution due to lack of external plants information and absence of database

    integration.

    Minimization of Order Processing Cost

    As almost all commonly used materials will be procured under a single LC, the Order

    Processing Cost (LC Cost, Regulatory Cost, Landing Cost) will be at minimum level.

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    8/13

    Minimization of Loss of Low Consumed RMs

    Every plant has some materials ( especially excipients) which are consumed in very

    low quantity. Very often, even the MOQ of these materials can not be consumed

    within the shelf-life of these materials. As a result a big portion of these materials

    are rejected. These types of capital loss can be brought down to the minimum levelby increasing their use at different plants. Only a total picture at a single point can

    lead to such a total solution.

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    9/13

    Maximum Output with Minimum Manpower

    Manpower requirement will be dwindled to less than 50% than that of current one,

    as the planning job will be rearranged vertically and obviously the work efficiency will

    also be at the highest level then ever before.

    Comparative Key Manpower Status in different PPIC Depts.

    Parameter Pabna Unit Dhaka Unit Agrovet Herbal PMU & CD Pesticide CPD

    Sr. Manager 1 0 0 0 0 0 1

    Sr. Exe 1 2 0 0 1 0 1 or 0

    Executive 2 2 1 0 0 0 2 or 3

    Officer 2 2 0 1 2 1 2

    Sub Total 6 6 1 1 3 1 6

    Grand Total 18 6

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    10/13

    Reduction of Technical Resource Utilization

    Technical (Hardware and Software) resource utilization will be at the minimum level

    to ensure the highest output as the job function will be arranged vertically nothorizontally. It is mentionable here that each Client PC will be charged individually

    after implementation of SAP. So, the minimum number of Client PC used, the

    minimum will be the charge to pay.

    Comparative Technical Equipment Requirement Status

    Parameter P-PPIC D-PPIC Agv.-PPIC SHNL-PPIC PMU & CD-PPIC CPD

    PC 15 9 1 1 2 6

    Total Client PC 28 6

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    11/13

    Save Communication Time, Save Money, Efficient Utilization of

    Resources

    a. Inter-Plant Communication for Material Transfer:Currently, it is a common practice to maintain daily communication with other plants for

    inter-plant material transfer in case of crisis. These type of communication will be totally

    absent as the solution will come from the central point.

    b. IMD/PMD - Plant Communication for Special Order Execution:This, also, is a common practice, at present, which consumes a lot of valuable time of both

    end. A chunk of this time can also be saved with central planning idea.

    c. Plant - Marketing - Plant Communication for Product Transfer:

    A lot of efforts are made from time to time for inter-plant product transfer, which can be

    simple then ever before with the help of central planning idea.

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    12/13

    Central Monitoring, Tracking and Control of Finished Products

    With the help of ERP and Central Planning Dept., the finished products at

    different depots can be monitored, tracked and controlled best then ever

    before. This central monitoring will ensure smooth purvey of market

    demand and at the same time ensure harmony of operation of cross-

    functional departments.

    Total Solution from a Total Picture

    For making any decision we depend on data and information. With the total

    data and total information from a single point, we can have a total solution.

  • 7/29/2019 THE CHANGE WE CAN MAKE AND THE CHUNK.ppt

    13/13

    THANKS A LOT